COUNTY: HARRISON HIGHWAY: FM 9 LENGTH: 4.5430MI CONTROL NUMBER: 0632-04-034, ETCDBE GOAL: 4.0 % PROJECT NUMBER: STP 2019(262) TYPE: FOAMED ASPH TRT,ACP SURF & PAV MRKS TIME FOR COMPLETION: 87 WORKING DAYSGUARANTY: 61,000.00 BIDS RECEIVED UNTIL: 1:00 PM DECEMBER 06, 2018*EST.COST: 3,365,677.21 BIDS WILL BE OPENED: 1:00 PM DECEMBER 06, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONRAY BRADY ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 300 E LOOP 390 N 200 E RIVERSIDEMARSHALL, TX 75670 AUSTIN TX 78704-1204903/935-2809 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ HARRISON0632-04-034FM 2625 FM 9STP 2019(262)FM 451 LENGTH: 3.8730 MILES HARRISON1576-01-012FM 451 FM 9STP 2019(262)PANOLA C/L LENGTH: 0.3350 MILES HARRISON1576-01-012FM 451 FM 9STP 2019(262)PANOLA C/L LENGTH: 0.3350 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6017REMOVING CONC (DRIVEWAYS)SY 173.0001 104 6029REMOVING CONC (CURB OR CURB & GUTTER)LF 232.0002 132 6021EMBANKMENT (VEHICLE)(ORD COMP)(TY C)CY 142.0003 134 6003BACKFILL (TY C)STA 227.0004 150 6001BLADINGSTA 10.5005 164 6009BROADCAST SEED (TEMP) (WARM)SY 12,964.0006 164 6011BROADCAST SEED (TEMP) (COOL)SY 12,964.0007 164 6054BOND FBR MTRX SEED (PERM)(RURAL)(SAND)SY 51,855.0008 168 6001VEGETATIVE WATERINGMG 830.0009 169 6004SOIL RETENTION BLANKETS (CL 1) (TY D)SY 340.00010 216 6001PROOF ROLLINGHR 5.00011 247 6386FL BS(RD DEL)(TY E GR 4)(RAP)(IN VEH)CY 3,653.00012 315 6004FOG SEAL (CSS-1H)GAL 5,437.00013 316 6017ASPH (AC-20-5TR)GAL 24,160.00014 316 6224AGGR(TY-PB GR-4 SAC-B)CY 432.00015 344 6063SUPERPAVE MIXTURES SP-C SAC-A PG76-22TON 6,773.00016 400 6005CEM STABIL BKFLCY 4.00017 400 6006CUT & RESTORING PAVSY 2.00018 403 6001TEMPORARY SPL SHORINGSF 532.00019 416 6029DRILL SHAFT (RDWY ILL POLE) (30 IN)LF 60.00020 432 6006RIPRAP (CONC)(CL B)CY 2.00021 432 6031RIPRAP (STONE PROTECTION)(12 IN)CY 14.00022 432 6039BEDDING MATERIAL (6 IN)CY 7.00023 462 6012CONC BOX CULV (6 FT X 5 FT)LF 18.00024 464 6003RC PIPE (CL III)(18 IN)LF 146.00025 464 6007RC PIPE (CL III)(30 IN)LF 4.00026 466 6195WINGWALL (PW - 2) (HW=6 FT)EA 2.00027 467 6358SET (TY II) (18 IN) (RCP) (4: 1) (C)EA 2.00028 467 6448SET (TY II) (36 IN) (RCP) (3: 1) (C)EA 4.00029 467 6580SET (REMOV & REINSTALL)EA 6.00030 472 6004REMOV & RE - LAY PIPE (18 IN)LF 4.00031 500 6001MOBILIZATIONLS 1.00032 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 7.00033 506 6003ROCK FILTER DAMS (INSTALL) (TY 3)LF 54.00034 506 6011ROCK FILTER DAMS (REMOVE)LF 54.00035 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 390.00036 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 390.00037 529 6005CONC CURB (MONO) (TY II)LF 46.00038 529 6008CONC CURB & GUTTER (TY II)LF 529.00039 530 6004DRIVEWAYS (CONC)SY 177.00040 530 6005DRIVEWAYS (ACP)SY 1,733.00041 530 6008TURNOUTS (ACP)SY 1,778.00042 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 31.00043 560 6012MAILBOX INSTALL-D (TWW-POST) TY 4EA 10.00044 560 6013MAILBOX INSTALL-M (TWW-POST) TY 4EA 4.00045 610 6288IN RD IL (TY SA) 50T-10 (400W EQ) LEDEA 6.00046 618 6023CONDT (PVC) (SCH 40) (2")LF 805.00047 618 6024CONDT (PVC) (SCH 40) (2") (BORE)LF 184.00048 620 6009ELEC CONDR (NO.6) BARELF 989.00049 620 6010ELEC CONDR (NO.6) INSULATEDLF 1,978.00050 624 6002GROUND BOX TY A (122311)W/APRONEA 3.00051 628 6004ELC SRV TY A 120/240 060(NS)AL(E)SP(O)EA 2.00052 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 7.00053 644 6076REMOVE SM RD SN SUP&AMEA 2.00054 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 7.00055 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 93,560.00056 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 1,753.00057 662 6113WK ZN PAV MRK SHT TERM RMV (Y)(4")LF 10,340.00058 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 86.00059 668 6085PREFAB PAV MRK TY C (W) (WORD)EA 2.00060 672 6009REFL PAV MRKR TY II-A-AEA 515.00061 30636001ASPHALT BINDER (PG64-22)GAL 182,906.00062 30636002CEMENTTON 332.00063 30636004FOAMED ASPHALT TREATMENT (11") (DC)SY 60,400.00064 60566001PREFORMED IN-LANE(TRANS) RUMBLE STRIPLF 10,890.00065 60566002PREFORMED CENTERLINE RUMBLE STRIPLF 5,445.00066 61496001REFL PAV MRK AWT (W) 4" (SLD) (100MIL)LF 45,270.00067 61496007REFL PAV MRK AWT (Y) 4" (SLD) (100MIL)LF 27,838.00068 61496008REFL PAV MRK AWT (Y) 4" (BRK) (100MIL)LF 3,370.00069 61856001TMA (STATIONARY)EA 1.00070 61856002TMA (STATIONARY)DAY 12.00071 61856003TMA (MOBILE OPERATION)HR 160.00072 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $36,000.00