COUNTY: HARRIS HIGHWAY: SH 249 LENGTH: 8.8510MI CONTROL NUMBER: 0720-03-152 DBE GOAL: 6.0 % PROJECT NUMBER: F 2B24(464) TYPE: TRAFFIC CONTROL DEVICES TIME FOR COMPLETION: 195 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM SEPTEMBER 05, 2024*EST.COST: 9,898,221.06 BIDS WILL BE OPENED: 1:00 PM SEPTEMBER 05, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONPHILLIP GARLIN ATTN: CONSTRUCTION DIVISION - M1C3.02 16803 EASTEX FREEWAY 6230 E. STASSNEY LANEHUMBLE, TX 77347 AUSTIN TX 78744-3147281/319-6451 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: 0.2 MILES NORTH OF HOLLISTER ROAD LIMITS TO: 0.46 MILES NORTH OF GREGSON ROAD ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 7003REMOV CONC (MOWSTRIP)SY 3,590.0001 416 7031DRILL SHAFT (SIGN MTS) (42 IN)LF 258.0002 427 7002CONCRETE PAINT FINISHSF 359,652.0003 432 7013RIPRAP (MOW STRIP)(4 IN)CY 408.0004 451 7024RETROFIT RAIL (TY SSTR)LF 7,848.0005 500 7001MOBILIZATIONLS 1.0006 502 7001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 10.0007 503 7001PORTABLE CHANGEABLE MESSAGE SIGNDAY 404.0008 505 7001TMA (STATIONARY)DAY 390.0009 505 7002TMA (MOBILE OPERATION)HR 96.00010 512 7013PORT CTB (DES SOURCE)(SGL SLP)(TY 1)LF 10,560.00011 512 7025PORT CTB (MOVE)(SGL SLP)(TY 1)LF 63,360.00012 512 7037PORT CTB (STKPL)(SGL SLP)(TY 1)LF 10,560.00013 512 7041PORT CTB (STKPL)(F-SHAPE)(TY 1)LF 45,226.00014 514 7001PERM CTB (SGL SLOPE) (TY 1) (42 )LF 36,732.00015 514 7002PERM CTB (SGL SLOPE) (TY 3) (42 )LF 231.00016 514 7003PERM CTB (SGL SLOPE) (TY 4) (42 )LF 1,700.00017 540 7001MTL W-BEAM GD FEN (TIM POST)LF 7,575.00018 540 7005MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 15.00019 540 7015DOWNSTREAM ANCHOR TERMINAL SECTIONEA 19.00020 540 7029MTL BM GD FEN TRANS (ANCHOR PLATE)EA 15.00021 542 7001REMOVE METAL BEAM GUARD FENCELF 7,270.00022 542 7002REMOVE TERMINAL ANCHOR SECTIONEA 6.00023 542 7003REMOVE DOWNSTREAM ANCHOR TERMINALEA 14.00024 542 7004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA 15.00025 544 7001GUARDRAIL END TREATMENT (INSTALL)EA 28.00026 544 7003GUARDRAIL END TREATMENT (REMOVE)EA 28.00027 545 7002CRASH CUSH ATTEN (MOVE & RESET)EA 18.00028 545 7004CRASH CUSH ATTEN (REMOVE)EA 4.00029 545 7006CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)EA 1.00030 545 7018CCA (INSTL)(N)(TL3)(WORK ZONE)EA 3.00031 610 7008REMOVE RD IL ASM (CTB MOUNT)EA 8.00032 610 7173IN RD IL (TY SP) 48S-8-8 (400W EQ) LEDEA 8.00033 618 7054CONDT (PVC) (SCH 80) (2")LF 1,759.00034 618 7055CONDT (PVC) (SCH 80) (2") (BORE)LF 270.00035 620 7007ELEC CONDR (NO.8) BARELF 2,032.00036 620 7008ELEC CONDR (NO.8) INSULATEDLF 4,064.00037 624 7008GROUND BOX TY D (162922)W/APRONEA 2.00038 636 7003ALUMINUM SIGNS (TY O)SF 1,211.25039 650 7089INS OH SN SUP(80 FT BRDG)EA 1.00040 650 7094INS OH SN SUP(85 FT BRDG)EA 1.00041 650 7104INS OH SN SUP(95 FT BRDG)EA 1.00042 650 7193REMOVE OVERHD SIGN SUPEA 3.00043 658 7012INSTL DEL ASSM (D-SW)SZ 1(BRF)CTBEA 121.00044 658 7013INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)EA 448.00045 658 7048INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2EA 137.00046 666 7236RE PM TY III (W)(6")(SLD)LF 87,240.00047 666 7237RE PM TY III (W)(6")(BRK)LF 63,990.00048 666 7238RE PM TY III (W)(6")(DOT)LF 1,098.00049 666 7239RE PM TY III (W)(8")(SLD)LF 25,612.00050 666 7242RE PM TY III (W)(12")(SLD)LF 15,881.00051 666 7243RE PM TY III (W)(12")(DOT)LF 2,776.00052 666 7248RE PM TY III (Y)(6")(SLD)LF 86,565.00053 666 7262RE PM TY III (BLK)(6")(SHADOW)LF 63,990.00054 666 7347PAVEMENT SLER 6"LF 302,883.00055 666 7348PAVEMENT SLER 8"LF 25,612.00056 666 7350PAVEMENT SLER 12"LF 18,657.00057 666 7353PAVEMENT SLER (ARROW)EA 23.00058 666 7354PAVEMENT SLER (WORD)EA 2.00059 666 7356PAVEMENT SLER (DBL ARROW)EA 21.00060 668 7091PREFAB PM TY C (W)(ARROW)EA 23.00061 668 7093PREFAB PM TY C (W)(DBL ARROW)EA 2.00062 668 7103PREFAB PM TY C (W)(WORD)EA 21.00063 672 7006REFL PAV MRKR TY II-C-REA 4,781.00064 677 7002ELIM EXT PM & MRKS (6")LF 302,883.00065 677 7004ELIM EXT PM & MRKS (8")LF 25,612.00066 677 7006ELIM EXT PM & MRKS (12")LF 18,657.00067 677 7009ELIM EXT PM & MRKS (ARROW)EA 23.00068 677 7010ELIM EXT PM & MRKS (DBL ARROW)EA 2.00069 677 7015ELIM EXT PM & MRKS (WORD)EA 21.00070 678 7002PAV SURF PREP FOR MRK (6")LF 302,883.00071 678 7004PAV SURF PREP FOR MRK (8")LF 25,612.00072 678 7006PAV SURF PREP FOR MRK (12")LF 18,657.00073 678 7009PAV SURF PREP FOR MRK (ARROW)EA 23.00074 678 7010PAV SURF PREP FOR MRK (DBL ARROW)EA 2.00075 678 7016PAV SURF PREP FOR MRK (WORD)EA 21.00076 678 7033PAV SURF PREP FOR MRK (RPM)EA 4,781.00077 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $120,000.00