COUNTY: TYLER HIGHWAY: FM 256 LENGTH: 0.1250MI CONTROL NUMBER: 0877-03-025 DBE GOAL: 0.0 % PROJECT NUMBER: BR 2018(849) TYPE: STR, GR, BS, PVMT TIME FOR COMPLETION: 75 WORKING DAYSGUARANTY: 12,000.00 BIDS RECEIVED UNTIL: 1:00 PM MAY 01, 2018*EST.COST: 598,911.40 BIDS WILL BE OPENED: 1:00 PM MAY 01, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONBUTCH WILSON, PE. ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 3304 US HWY 190 W 200 E RIVERSIDEJASPER, TX 75951 AUSTIN TX 78704-1204409/384-5493 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: AT BELT CREEK LIMITS TO: (STR 087703003) ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6006PREP ROW (TREE)(LESS THAN 24" DIA)EA 3.0001 100 6007PREP ROW (TREE)(GREATER THAN 24" DIA)EA 1.0002 104 6054REMOVING CONCRETE(MOW STRIP)LF 690.0003 110 6002EXCAVATION (CHANNEL)CY 50.0004 112 6001SUBGRADE WIDENING (ORD COMP)STA 6.0005 132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY 50.0006 134 6004BACKFILL (TY A OR B)STA 6.0007 164 6009BROADCAST SEED (TEMP) (WARM)SY 503.0008 164 6011BROADCAST SEED (TEMP) (COOL)SY 503.0009 164 6021CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)SY 1,106.00010 168 6001VEGETATIVE WATERINGMG 9.30011 247 6483FL BS(RDWY DEL)(TY D GR 1-2)(FNAL POS)CY 299.00012 251 6034REWORK BS MTL (TY C) (8") (ORD COMP)SY 1,335.00013 275 6001CEMENTTON 30.00014 275 6014CEMENT TREAT (MX EXST MTL & NW BS)(8")SY 1,823.00015 310 6012PRIME COAT (RC-250)GAL 365.00016 316 6015ASPH (AC-15P)GAL 657.00017 316 6398AGGR (TY-PD GR-4 OR TY-PL GR-4)(SAC-B)CY 18.00018 316 6485AGGR (TY-D GR-5 OR TY-L GR-5)CY 16.00019 400 6005CEM STABIL BKFLCY 27.00020 409 6003PRESTR CONC PIL (20 IN SQ)LF 735.00021 420 6013CL C CONC (ABUT)CY 20.80022 420 6025CL C CONC (BENT)CY 8.00023 422 6007REINF CONC SLAB (SLAB BEAM)SF 1,928.00024 422 6015APPROACH SLABCY 46.00025 425 6009PRESTR CONC SLAB BEAM (4SB12)LF 472.00026 432 6033RIPRAP (STONE PROTECTION)(18 IN)CY 289.00027 432 6045RIPRAP (MOW STRIP)(4 IN)CY 34.00028 450 6006RAIL (TY T223)LF 144.00029 454 6004ARMOR JOINT (SEALED)LF 56.00030 496 6009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 1.00031 500 6001MOBILIZATIONLS 1.00032 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 5.00033 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 115.00034 506 6011ROCK FILTER DAMS (REMOVE)LF 115.00035 506 6030BACKHOE WORK (EROSION & SEDMT CONT)HR 20.00036 506 6034CONSTRUCTION PERIMETER FENCELF 1,360.00037 506 6042BIODEG EROSN CONT LOGS (INSTL) (18")LF 260.00038 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 1,620.00039 506 6045BIODEG EROSN CONT LOGS (INSTL) (6")LF 1,360.00040 540 6001MTL W-BEAM GD FEN (TIM POST)LF 400.00041 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 4.00042 542 6001REMOVE METAL BEAM GUARD FENCELF 350.00043 542 6005RM MTL BM GD FEN TRANS (T101)EA 4.00044 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 4.00045 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 4.00046 644 6068RELOCATE SM RD SN SUP&AM TY 10BWGEA 3.00047 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 2.00048 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 8.00049 666 6224PAVEMENT SEALER 4"LF 200.00050 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 1,320.00051 666 6312RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF 180.00052 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 593.00053 672 6009REFL PAV MRKR TY II-A-AEA 18.00054 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00055 61856003TMA (MOBILE OPERATION)HR 8.00056 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $20,000.00