COUNTY: POTTER HIGHWAY: VA LENGTH: 0MI CONTROL NUMBER: 0904-00-220 DBE GOAL: 0.0 % PROJECT NUMBER: F 2B24(460) TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 182 WORKING DAYSGUARANTY: 65,000.00 BIDS RECEIVED UNTIL: 1:00 PM SEPTEMBER 06, 2024*EST.COST: 3,248,892.00 BIDS WILL BE OPENED: 1:00 PM SEPTEMBER 06, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONBERNARDO FERREL ATTN: CONSTRUCTION DIVISION - M1C3.02 1249 MADDOX AVE 6230 E. STASSNEY LANEDUMAS, TX 79029 AUSTIN TX 78744-3147806/934-1122 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: NEW MEXICO STATE LINE LIMITS TO: WHEELER COUNTY ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 416 6005DRILL SHAFT (42 IN)LF 304.0001 416 6023DRILL SHAFT (SIGN MTS) (54 IN)LF 105.0002 432 6001RIPRAP (CONC)(4 IN)CY 42.0003 432 6045RIPRAP (MOW STRIP)(4 IN)CY 91.0004 500 6001MOBILIZATIONLS 1.0005 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 11.0006 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 1,975.0007 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 1.0008 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 7.0009 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 12.00010 618 6046CONDT (PVC) (SCH 80) (2")LF 9,335.00011 618 6047CONDT (PVC) (SCH 80) (2") (BORE)LF 1,025.00012 618 6053CONDT (PVC) (SCH 80) (3")LF 1,880.00013 618 6054CONDT (PVC) (SCH 80) (3") (BORE)LF 30.00014 620 6007ELEC CONDR (NO.8) BARELF 1,805.00015 620 6008ELEC CONDR (NO.8) INSULATEDLF 3,610.00016 620 6009ELEC CONDR (NO.6) BARELF 1,815.00017 620 6010ELEC CONDR (NO.6) INSULATEDLF 3,630.00018 620 6011ELEC CONDR (NO.4) BARELF 1,525.00019 620 6012ELEC CONDR (NO.4) INSULATEDLF 3,900.00020 620 6015ELEC CONDR (NO.2) BARELF 4,115.00021 620 6016ELEC CONDR (NO.2) INSULATEDLF 9,665.00022 620 6019ELEC CONDR (NO.1/0) BARELF 1,100.00023 620 6020ELEC CONDR (NO.1/0) INSULATEDLF 3,300.00024 620 6025ELEC CONDR (NO.4/0) BARELF 1,910.00025 620 6026ELEC CONDR (NO.4/0) INSULATEDLF 5,730.00026 624 6002GROUND BOX TY A (122311)W/APRONEA 32.00027 624 6008GROUND BOX TY C (162911)W/APRONEA 9.00028 628 6220ELC SRV TY D 120/240 100(NS)AL(N)SP(O)EA 16.00029 650 6028INS OH SN SUP(30 FT BAL TEE)EA 5.00030 658 6061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA 21.00031 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 11.00032 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00033 60106002CCTV FIELD EQUIPMENT (DIGITAL)EA 16.00034 60106004CCTV MOUNT (POLE)EA 16.00035 60286001INSTALL DMS (POLE MTD CABINET)EA 5.00036 60646037ITS POLE (50 FT)(90 MPH)EA 16.00037 60646080ITS POLE MNT CAB (TY 2)(CONF 1)EA 16.00038 61856002TMA (STATIONARY)DAY 182.00039 62476005INSTALL OF CELLULAR MODEMEA 21.00040 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $40,000.00 CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $55,000.00