COUNTY: ANGELINA HIGHWAY: CR LENGTH: 0.0530MI CONTROL NUMBER: 0911-38-069 DBE GOAL: 0.0 % PROJECT NUMBER: BR 1702(558) TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: 43 WORKING DAYSGUARANTY: 7,000.00 BIDS RECEIVED UNTIL: 1:00 PM MAY 01, 2018*EST.COST: 359,674.50 BIDS WILL BE OPENED: 1:00 PM MAY 01, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJESSE SISCO ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 1805 N TIMBERLAND DR 200 E RIVERSIDELUFKIN, TX 75901 AUSTIN TX 78704-1204936/633-4331 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: ROBINSON LN AT GILLILAND CREEK LIMITS TO: . ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 2.8501 110 6001EXCAVATION (ROADWAY)CY 59.0002 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 259.0003 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 820.0004 164 6003BROADCAST SEED (PERM) (RURAL) (CLAY)SY 820.0005 164 6009BROADCAST SEED (TEMP) (WARM)SY 820.0006 164 6011BROADCAST SEED (TEMP) (COOL)SY 820.0007 168 6001VEGETATIVE WATERINGMG 8.2008 169 6002SOIL RETENTION BLANKETS (CL 1) (TY B)SY 820.0009 247 6061FL BS (CMP IN PLC)(TYA GR1-2) (6")SY 544.00010 310 6009PRIME COAT (MC-30)GAL 109.00011 340 6106D-GR HMA(SQ) TY-D PG64-22TON 45.00012 400 6005CEM STABIL BKFLCY 40.00013 416 6003DRILL SHAFT (30 IN)LF 369.00014 420 6013CL C CONC (ABUT)CY 26.60015 422 6005REINF CONC SLAB (BOX BEAM)SF 1,560.00016 422 6023SHEAR KEYCY 8.00017 425 6001PRESTR CONC BOX BEAM (4B20)LF 238.00018 425 6002PRESTR CONC BOX BEAM (5B20)LF 119.00019 432 6035RIPRAP (STONE PROTECTION)(24 IN)CY 162.00020 450 6019RAIL (TY T631LS)LF 152.00021 464 6007RC PIPE (CL III)(30 IN)LF 164.00022 467 6423SET (TY II) (30 IN) (RCP) (6: 1) (P)EA 2.00023 496 6009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 1.00024 500 6001MOBILIZATIONLS 1.00025 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 4.00026 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 85.00027 506 6011ROCK FILTER DAMS (REMOVE)LF 85.00028 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 156.00029 506 6024CONSTRUCTION EXITS (REMOVE)SY 156.00030 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 646.00031 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 646.00032 540 6001MTL W-BEAM GD FEN (TIM POST)LF 23.00033 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 2.00034 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 2.00035 552 6001WIRE FENCE (TY A)LF 426.00036 552 6008WIRE FENCE (WATER GAP)LF 120.00037 644 6076REMOVE SM RD SN SUP&AMEA 1.00038 658 6016INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)EA 3.00039 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 3.00040 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00