COUNTY: SHELBY HIGHWAY: CR LENGTH: 0.1190MI CONTROL NUMBER: 0911-39-038, ETCDBE GOAL: 3.0 % PROJECT NUMBER: BR 1602(393), ETC TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: 144 WORKING DAYSGUARANTY: 15,000.00 BIDS RECEIVED UNTIL: 1:00 PM JULY 12, 2017 EST.COST: 756,719.00 BIDS WILL BE OPENED: 1:00 PM JULY 12, 2017 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONSHANNON RAMOS ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 918 INDUSTRIAL BLVD 200 E RIVERSIDENACOGDOCHES, TX 75961 AUSTIN TX 78704-1204936/585-7043 TO REQUEST A PROPOSAL CALL 512/416-2498 FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ SHELBY0911-39-038CR 4059 AT POOR JOE CREEK CRBR 1602(393). LENGTH: 0.0460 MILES SHELBY0911-39-047CR 1440 AT TRIB OF IRISH CREEK CRBR 1602(399). LENGTH: 0.0320 MILES SHELBY0911-39-061CR 4293 AT TRIB CHICKEN BAYOU CRBR 1602(397). LENGTH: 0.0410 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 6.4001 110 6001EXCAVATION (ROADWAY)CY 757.0002 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 190.0003 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 1,063.0004 164 6021CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)SY 856.0005 164 6023CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)SY 558.0006 164 6029CELL FBR MLCH SEED(TEMP)(WARM)SY 707.0007 164 6031CELL FBR MLCH SEED(TEMP)(COOL)SY 707.0008 168 6001VEGETATIVE WATERINGMG 47.6009 247 6061FL BS (CMP IN PLC)(TYA GR1-2) (6")SY 1,313.00010 400 6005CEM STABIL BKFLCY 109.00011 403 6001TEMPORARY SPL SHORINGSF 1,837.00012 416 6002DRILL SHAFT (24 IN)LF 117.00013 420 6013CL C CONC (ABUT)CY 20.40014 420 6076CL E CONC (SEAL SLAB)CY 17.90015 422 6007REINF CONC SLAB (SLAB BEAM)SF 1,300.00016 425 6012PRESTR CONC SLAB BEAM (5SB15)LF 247.50017 432 6032RIPRAP (STONE PROTECTION)(15 IN)CY 317.00018 450 6019RAIL (TY T631LS)LF 257.40019 462 6018CONC BOX CULV (7 FT X 7 FT)LF 51.00020 462 6021CONC BOX CULV (8 FT X 6 FT)LF 52.00021 464 6003RC PIPE (CL III)(18 IN)LF 28.00022 466 6172WINGWALL (PW - 1) (HW=11 FT)EA 2.00023 466 6182WINGWALL (PW - 1) (HW=7 FT)EA 2.00024 467 6356SET (TY II) (18 IN) (RCP) (3: 1) (C)EA 1.00025 467 6358SET (TY II) (18 IN) (RCP) (4: 1) (C)EA 1.00026 496 6009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 3.00027 496 6016REMOV STR (PIPE)EA 1.00028 500 6001MOBILIZATIONLS 1.00029 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 12.00030 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 125.00031 506 6011ROCK FILTER DAMS (REMOVE)LF 125.00032 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 1,224.00033 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 1,224.00034 540 6001MTL W-BEAM GD FEN (TIM POST)LF 37.50035 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 5.00036 540 6017MTL BM GD FEN (LONG SPAN SYSTEM)LF 70.00037 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 7.00038 552 6001WIRE FENCE (TY A)LF 1,138.00039 658 6016INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)EA 13.00040 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 8.00041 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 5.00042