COUNTY: MONTGOMERY, ETCHIGHWAY: CR LENGTH: 0.2030MI CONTROL NUMBER: 0912-37-229, ETCDBE GOAL: 5.0 % PROJECT NUMBER: BR 2016(617), ETC TYPE: REPLACE BRIDGE AND APPROACHES TIME FOR COMPLETION: 203 WORKING DAYSGUARANTY: 30,000.00 BIDS RECEIVED UNTIL: 1:00 PM OCTOBER 03, 2017 EST.COST: 1,534,574.05 BIDS WILL BE OPENED: 1:00 PM OCTOBER 03, 2017 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONADAM GALLAND ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 901 NORTH FM 3038 E 200 E RIVERSIDECONROE, TX 77303 AUSTIN TX 78704-1204936/538-3300 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html ------------------------------------------------------------------------------ COUNTY CONTROL LIMITS FROM HIGHWAY PROJECT LIMITS TO ------------------------------------------------------------------------------ MONTGOMERY0912-37-229MOUNT MIRIAH AT LAKE CREEK DRAW CRBR 2016(617). LENGTH: 0.07 MILES WALLER0912-56-053RICE ROAD AT BRUSHY CREEK CRBR 2016(772). LENGTH: 0.0620 MILES WALLER0912-56-054CREEK BEND RD AT THREEMILE CREEK CRBR 2016(773). LENGTH: 0.0710 MILES ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 10.7501 110 6001EXCAVATION (ROADWAY)CY 880.0002 110 6002EXCAVATION (CHANNEL)CY 610.0003 132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY 1,217.0004 162 6002BLOCK SODDINGSY 4,344.0005 162 6003STRAW OR HAY MULCHSY 4,344.0006 164 6051DRILL SEED (TEMP)(WARM OR COOL)SY 4,344.0007 166 6001FERTILIZERAC 0.9108 168 6001VEGETATIVE WATERINGMG 109.2009 292 6002ASPHALT STAB BASE (GR 2)(PG 64)TON 914.00010 305 6009SALV, HAUL & STKPL RCL APH PV (4 TO 8")SY 1,474.00011 340 6034D-GR HMA(SQ) TY-C PG64-22TON 399.00012 340 6120D-GR HMA(SQ) TY-D SAC-B PG70-22TON 257.00013 400 6005CEM STABIL BKFLCY 255.00014 416 6001DRILL SHAFT (18 IN)LF 288.00015 416 6004DRILL SHAFT (36 IN)LF 764.00016 420 6013CL C CONC (ABUT)CY 126.00017 422 6001REINF CONC SLABSF 5,530.00018 422 6015APPROACH SLABCY 48.20019 425 6035PRESTR CONC GIRDER (TX28)LF 794.00020 432 6024RIPRAP (STONE COMMON)(DRY)(12 IN)CY 23.00021 432 6032RIPRAP (STONE PROTECTION)(15 IN)CY 656.00022 432 6036RIPRAP (STONE PROTECTION)(30 IN)CY 483.00023 432 6045RIPRAP (MOW STRIP)(4 IN)CY 33.00024 450 6006RAIL (TY T223)LF 568.00025 454 6004ARMOR JOINT (SEALED)LF 144.00026 496 6009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 2.00027 496 6016REMOV STR (PIPE)EA 3.00028 500 6001MOBILIZATIONLS 1.00029 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 13.00030 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 180.00031 506 6011ROCK FILTER DAMS (REMOVE)LF 180.00032 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 468.00033 506 6024CONSTRUCTION EXITS (REMOVE)SY 468.00034 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 2,716.00035 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 2,716.00036 530 6005DRIVEWAYS (ACP)SY 34.00037 540 6001MTL W-BEAM GD FEN (TIM POST)LF 175.00038 540 6007MTL BEAM GD FEN TRANS (TL2)EA 6.00039 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 6.00040 540 6018MTL BM GD FEN TRANS (NON - SYM)EA 6.00041 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 6.00042 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 6.00043 644 6076REMOVE SM RD SN SUP&AMEA 10.00044 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 14.00045 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 6.00046 658 6060REMOVE DELIN & OBJECT MARKER ASSMSEA 6.00047 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 16.00048 666 6224PAVEMENT SEALER 4"LF 960.00049 666 6302RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)LF 2,150.00050 666 6314RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)LF 2,150.00051 672 6009REFL PAV MRKR TY II-A-AEA 28.00052 678 6001PAV SURF PREP FOR MRK (4")LF 960.00053 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 822.00054