COUNTY: WHARTON HIGHWAY: CR LENGTH: 0.0680MI CONTROL NUMBER: 0913-09-069 DBE GOAL: 0.0 % PROJECT NUMBER: BR 2014(679) TYPE: REPLACE BRIDGE AND APPROACHES TIME FOR COMPLETION: 75 WORKING DAYSGUARANTY: 9,000.00 BIDS RECEIVED UNTIL: 1:00 PM SEPTEMBER 07, 2017*EST.COST: 436,585.00 BIDS WILL BE OPENED: 1:00 PM SEPTEMBER 07, 2017 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONRYAN SIMPER ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 1512 FM 102 200 E RIVERSIDEWHARTON, TX 77488 AUSTIN TX 78704-1204979/532-3141 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: AT BEE TREE BAYOU CR 103 LIMITS TO: (CR 103) STR # AA01-95-002 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 3.6001 110 6001EXCAVATION (ROADWAY)CY 165.0002 132 6005EMBANKMENT (FINAL)(ORD COMP)(TY C)CY 210.0003 150 6002BLADINGHR 10.0004 164 6023CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)SY 1,040.0005 164 6029CELL FBR MLCH SEED(TEMP)(WARM)SY 260.0006 164 6031CELL FBR MLCH SEED(TEMP)(COOL)SY 260.0007 168 6001VEGETATIVE WATERINGMG 3.6008 247 6366FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)CY 220.0009 310 6009PRIME COAT (MC-30)GAL 200.00010 316 6001ASPH (MULTI OPTION)GAL 980.00011 316 6222AGGR(TY-PB GR-3 SAC-B)CY 12.00012 400 6005CEM STABIL BKFLCY 29.00013 409 6002PRESTR CONC PIL (18 IN SQ)LF 735.00014 420 6013CL C CONC (ABUT)CY 24.00015 420 6029CL C CONC (CAP)CY 8.00016 422 6001REINF CONC SLABSF 2,249.00017 425 6009PRESTR CONC SLAB BEAM (4SB12)LF 552.00018 432 6033RIPRAP (STONE PROTECTION)(18 IN)CY 235.00019 450 6006RAIL (TY T223)LF 164.00020 454 6003ARMOR JOINTLF 56.00021 464 6005RC PIPE (CL III)(24 IN)LF 22.00022 464 6010RC PIPE (CL III)(48 IN)LF 26.00023 467 6389SET (TY II) (24 IN) (RCP) (3: 1) (P)EA 1.00024 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 2.00025 467 6475SET (TY II) (48 IN) (RCP) (3: 1) (P)EA 1.00026 467 6480SET (TY II) (48 IN) (RCP) (6: 1) (P)EA 1.00027 496 6005REMOV STR (WINGWALL)EA 1.00028 496 6009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 1.00029 496 6050REMOV STR (DRIVEWAY CULVERT)EA 2.00030 500 6001MOBILIZATIONLS 1.00031 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 5.00032 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 765.00033 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 765.00034 530 6016 DRIVEWAYS (BASE)SY 155.00035 540 6007MTL BEAM GD FEN TRANS (TL2)EA 4.00036 540 6014SHORT RADIUSLF 100.00037 540 6015DRIVEWAY TERMINAL ANCHOR SECTIONEA 3.00038 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 1.00039 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 6.00040 658 6016INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)EA 9.00041 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 3.00042 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,500.00