COUNTY: NUECES HIGHWAY: PW LENGTH: 0.0010MI CONTROL NUMBER: 0916-35-164 SBE GOAL: 0.0 % PROJECT NUMBER: C 916-35-164 TYPE: RESURFACING OF ROADWAY & PARKING TIME FOR COMPLETION: 55 WORKING DAYSGUARANTY: 30,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 07, 2017*EST.COST: 1,528,911.90 BIDS WILL BE OPENED: 1:00 PM JUNE 07, 2017 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONMARTIN HORST ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 1701 SPID 200 E RIVERSIDECORPUS CHRISTI, TX 78416 AUSTIN TX 78704-1204361/808-2261 TO REQUEST A PROPOSAL CALL 512/416-2498 FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: AT THE CCA-CPL MARINE DEVEL. CENTER LIMITS TO: . ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6001PREPARING ROWAC 7.3801 105 6043REMOVING STAB BASE & ASPH PAV (0-6")SY 28,868.0002 134 6001BACKFILL (TY A)STA 99.2003 216 6001PROOF ROLLINGHR 18.5004 247 6041FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)CY 2,136.0005 310 6009PRIME COAT (MC-30)GAL 2,852.0006 316 6001ASPH (MULTI OPTION)GAL 15,060.0007 316 6025ASPH (HFRS-2)GAL 4,059.0008 316 6222AGGR(TY-PB GR-3 SAC-B)CY 251.0009 316 6224AGGR(TY-PB GR-4 SAC-B)CY 194.00010 316 6226AGGR(TY-PB GR-5 SAC-B)CY 115.00011 340 6014D-GR HMA(SQ) TY-B PG70-22TON 3,434.00012 351 6002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY 334.00013 400 6005CEM STABIL BKFLCY 5.00014 400 6006CUT & RESTORING PAVSY 7.00015 432 6001RIPRAP (CONC)(4 IN)CY 1.40016 464 6001RC PIPE (CL III)(12 IN)LF 40.00017 467 6325SET (TY II) (12 IN) (RCP) (6: 1) (C)EA 2.00018 480 6001CLEAN EXIST CULVERTSEA 1.00019 496 6007REMOV STR (PIPE)LF 40.00020 500 6001MOBILIZATIONLS 1.00021 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 10.00022 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 111.00023 506 6024CONSTRUCTION EXITS (REMOVE)SY 111.00024 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 27,936.00025 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 27,936.00026 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 4,447.00027 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 4,447.00028 529 6025CONC CURB (TY III)LF 18,214.00029 644 6027IN SM RD SN SUP&AM TYS80(1)SA(P)EA 3.00030 644 6076REMOVE SM RD SN SUP&AMEA 3.00031 666 6166RE PM TY I (ACC PRK)(WHT)(SYMBOL ONLY)EA 2.00032 666 6207REFL PAV MRK TY II (Y) 4" (SLD)LF 832.00033 760 6001DITCH CLEANING AND RESHAPING (FOOT)LF 180.00034 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00