COUNTY: ARANSAS HIGHWAY: CS LENGTH: 0MI CONTROL NUMBER: 0916-38-013 DBE GOAL: 5.0 % PROJECT NUMBER: STP 2020(069)TAPS TYPE: PEDESTRIAN, SIDEWALKS & CURB RAMPS TIME FOR COMPLETION: 115 WORKING DAYSGUARANTY: 17,000.00 BIDS RECEIVED UNTIL: 1:00 PM DECEMBER 03, 2020*EST.COST: 838,190.26 BIDS WILL BE OPENED: 1:00 PM DECEMBER 03, 2020 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONROBERT ISASSI ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 US 181 2 MILES S OF SINTO 200 E RIVERSIDESINTON, TX 78387 AUSTIN TX 78704-1204361/364-6402 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: VARIOUS LOCATIONS IN ROCKPORT LIMITS TO: ON LIVE OAK,1ST,AUSTIN AND BAY STS. ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 93.0001 104 6017REMOVING CONC (DRIVEWAYS)SY 143.0002 104 6022REMOVING CONC (CURB AND GUTTER)LF 33.0003 104 6036REMOVING CONC (SIDEWALK OR RAMP)SY 41.0004 105 6052REMOVE STAB BASE & ASPH PAV (4"-5")SY 174.0005 110 6001EXCAVATION (ROADWAY)CY 910.0006 132 6006EMBANKMENT (FINAL)(DENS CONT)(TY C)CY 170.0007 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 8,405.0008 162 6002BLOCK SODDINGSY 5,043.0009 164 6025CELL FBR MLCH SEED(PERM)(URBAN)(SANDY)SY 3,362.00010 166 6001FERTILIZERAC 1.74011 168 6001VEGETATIVE WATERINGMG 153.24012 464 6001RC PIPE (CL III)(12 IN)LF 36.00013 464 6002RC PIPE (CL III)(15 IN)LF 61.00014 464 6003RC PIPE (CL III)(18 IN)LF 12.00015 465 6054INLET (COMPL)(PSL)(SL)(3FTX3FT)EA 1.00016 467 6323SET (TY II) (12 IN) (RCP) (4: 1) (C)EA 3.00017 467 6339SET (TY II) (15 IN) (RCP) (4: 1) (P)EA 5.00018 467 6345SET (TY II) (18 IN) (CMP) (4: 1) (C)EA 1.00019 479 6001ADJUSTING MANHOLESEA 4.00020 479 6005ADJUSTING MANHOLES (WATER VALVE BOX)EA 6.00021 500 6001MOBILIZATIONLS 1.00022 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 7.00023 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 6,018.00024 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 6,018.00025 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 175.00026 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 175.00027 530 6004DRIVEWAYS (CONC)SY 904.00028 530 6005DRIVEWAYS (ACP)SY 163.00029 531 6003CONC SIDEWALKS (6")SY 4,845.00030 531 6010CURB RAMPS (TY 7)EA 48.00031 531 6059SIDEWALK CURB DRAIN TY IEA 3.00032 560 6004MAILBOX INSTALL-S (TWG-POST) TY 2EA 14.00033 636 6001ALUMINUM SIGNS (TY A)SF 206.25034 644 6027IN SM RD SN SUP&AM TYS80(1)SA(P)EA 25.00035 644 6068RELOCATE SM RD SN SUP&AM TY 10BWGEA 9.00036 666 6042REFL PAV MRK TY I (W)12"(SLD)(100MIL)LF 1,921.00037 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 155.00038 61856002TMA (STATIONARY)DAY 10.00039 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $10,000.00