COUNTY: DALLAS HIGHWAY: CS LENGTH: 0.4730MI CONTROL NUMBER: 0918-47-176 DBE GOAL: 0.0 % PROJECT NUMBER: STP 2018(887) TYPE: CHANNEL WORK,GRD TIME FOR COMPLETION: 275 WORKING DAYSGUARANTY: 64,000.00 BIDS RECEIVED UNTIL: 1:00 PM MAY 02, 2018*EST.COST: 3,519,866.48 BIDS WILL BE OPENED: 1:00 PM MAY 02, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONJASON MASHELL ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 4777 EAST HIGHWAY 80 200 E RIVERSIDEMESQUITE, TX 75150 AUSTIN TX 78704-1204214/320-6240 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: ON BELTLINE RD, FROM DRY BRANCH LIMITS TO: BEAR CREEK ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 30.5801 110 6002EXCAVATION (CHANNEL)CY 18,351.0002 132 6001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY 1,843.0003 132 6015EMBANKMENT (ORIGINAL)(ORD COMP)(TY D)CY 1,073.0004 192 6023PLANT MATERIAL (15 GAL) (TREE)EA 690.0005 403 6001TEMPORARY SPL SHORINGSF 12,744.0006 432 6002RIPRAP (CONC)(5 IN)CY 2,075.0007 432 6035RIPRAP (STONE PROTECTION)(24 IN)CY 45.0008 459 6009GABIONS (3' X 3')(GALV)CY 5,368.0009 464 6003RC PIPE (CL III)(18 IN)LF 30.00010 496 6007REMOV STR (PIPE)LF 183.00011 496 6100REMOVE STR (GABION)LF 990.00012 500 6001MOBILIZATIONLS 1.00013 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 13.00014 506 6003ROCK FILTER DAMS (INSTALL) (TY 3)LF 50.00015 506 6011ROCK FILTER DAMS (REMOVE)LF 50.00016 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 222.00017 506 6024CONSTRUCTION EXITS (REMOVE)SY 222.00018 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 5,494.00019 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 5,494.00020 506 6040BIODEG EROSN CONT LOGS (INSTL) (8")LF 105.00021 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 105.00022 662 6063WK ZN PAV MRK REMOV (W)4"(SLD)LF 1,240.00023 678 6001PAV SURF PREP FOR MRK (4")LF 1,240.00024 61856001TMA (STATIONARY)EA 1.00025 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $199,237.73