COUNTY: DALLAS HIGHWAY: CS LENGTH: 0MI CONTROL NUMBER: 0918-47-288 DBE GOAL: 5.5 % PROJECT NUMBER: BR 2021(911) TYPE: BRIDGE REPLACEMENT TIME FOR COMPLETION: 122 WORKING DAYSGUARANTY: 53,000.00 BIDS RECEIVED UNTIL: 1:00 PM SEPTEMBER 05, 2024*EST.COST: 2,658,707.80 BIDS WILL BE OPENED: 1:00 PM SEPTEMBER 05, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONNATHAN PETTER ATTN: CONSTRUCTION DIVISION - M1C3.02 4777 EAST HIGHWAY 80 6230 E. STASSNEY LANEMESQUITE, TX 75150 AUSTIN TX 78744-3147214/320-6243 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: BARNES BRIDGE ROAD AT DUCK CREEK LIMITS TO: . ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 7002PREPARING ROWSTA 7.5001 104 7001REMOV CONC (PAV)SY 1,457.0002 104 7049REMOV CONC (OTHER APPURTENANCES)SY 153.0003 105 7053RMV (2"-8") TRT/UNTRT BASE & ASPH PAVSY 1,457.0004 110 7001EXCAV (ROADWAY)CY 1,473.0005 132 7008EMBANK (FNL)(DC)(TY C1)CY 1,506.0006 161 7002COMPOST MANUF TOPSOIL (4")SY 2,212.0007 164 7012DRILL SEED (PERM_URBAN_CLAY)SY 2,212.0008 164 7015DRILL SEED (TEMP_WARM_COOL)SY 2,212.0009 168 7001VEGETATIVE WATERINGTGL 658.00010 247 7102FL BS (CMP IN PLC)(TY D GR 1-2) (10")SY 1,219.00011 260 7003LIME (QUICKLIME (SLURRY))TON 18.00012 260 7006LIME TRT (EXIST MATL)(6")SY 1,406.00013 310 7013PRIME COAT(MC-30 OR AE-P)GAL 223.00014 344 7011SP MIXES SP-C SAC-B PG64-22TON 123.00015 400 7010CEM STABIL BKFLCY 111.00016 416 7006DRILL SHAFT (36 IN)LF 866.00017 420 7005CL A CONC (CURB OUTLET)(TY II)EA 2.00018 420 7013CL C CONC (ABUT)(HPC)CY 39.20019 420 7023CL C CONC (CAP)(HPC)CY 79.50020 420 7039CL C CONC (COLUMN)(HPC)CY 38.40021 422 7002REINF CONC SLAB (HPC)SF 10,880.00022 422 7014APPROACH SLAB (HPC)CY 65.00023 425 7035PRESTR CONC X-BEAM (5XB20)LF 1,267.63024 432 7013RIPRAP (MOW STRIP)(4 IN)CY 14.00025 432 7041RIPRAP (STONE PROTECTION)(12 IN)CY 446.00026 450 7009RAIL (TY T223)(HPC)LF 682.00027 454 7006SEALED EXPANSION JOINT (4 IN) (SEJ - B)LF 102.00028 464 7005RC PIPE (CL III)(24 IN)LF 324.00029 464 7007RC PIPE (CL III)(30 IN)LF 68.00030 467 7325SET (TY II) (24 IN) (RCP) (3: 1) (C)EA 3.00031 467 7328SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 3.00032 467 7345SET (TY II) (30 IN) (RCP) (3: 1) (C)EA 1.00033 467 7348SET (TY II) (30 IN) (RCP) (6: 1) (P)EA 1.00034 496 7009REMOV STR (BRIDGE 0 - 99 FT LENGTH)EA 1.00035 500 7001MOBILIZATIONLS 1.00036 502 7001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 8.00037 506 7002ROCK FILTER DAMS (INSTALL) (TY 2)LF 160.00038 506 7011ROCK FILTER DAMS (REMOVE)LF 160.00039 506 7020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 172.00040 506 7024CONSTRUCTION EXITS (REMOVE)SY 172.00041 506 7039TEMP SEDMT CONT FENCE (INSTALL)LF 1,574.00042 506 7041TEMP SEDMT CONT FENCE (REMOVE)LF 1,574.00043 529 7009CONC CURB & GUTTER (TY II)LF 762.00044 540 7001MTL W-BEAM GD FEN (TIM POST)LF 50.00045 540 7006MTL BEAM GD FEN TRANS (TL2)EA 4.00046 540 7015DOWNSTREAM ANCHOR TERMINAL SECTIONEA 2.00047 544 7001GUARDRAIL END TREATMENT (INSTALL)EA 2.00048 644 7001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 4.00049 658 7013INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)EA 6.00050 658 7019INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 8.00051 666 7347PAVEMENT SLER 6"LF 1,475.00052 666 7411REFL PAV MRK TY I (W)6"(SLD)(100MIL)LF 1,500.00053 666 7423REFL PAV MRK TY I (Y)6"(SLD)(100MIL)LF 1,500.00054 672 7004REFL PAV MRKR TY II-A-AEA 19.00055 678 7002PAV SURF PREP FOR MRK (6")LF 1,475.00056 730 7019FULL - WIDTH MOWINGCYC 2.00057 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $40,000.00