COUNTY: TARRANT HIGHWAY: IH 30 LENGTH: 0.1520MI CONTROL NUMBER: 1068-01-228 DBE GOAL: 0.0 % PROJECT NUMBER: STP 2B20(008)HES TYPE: SAFETY IMPROVEMENT PROJECTS TIME FOR COMPLETION: 48 WORKING DAYSGUARANTY: 10,000.00 BIDS RECEIVED UNTIL: 1:00 PM JULY 09, 2020*EST.COST: 536,860.00 BIDS WILL BE OPENED: 1:00 PM JULY 09, 2020 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONRANDY BOWERS ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2501 SOUTHWEST LOOP 820 200 E RIVERSIDEFORT WORTH, TX 76133 AUSTIN TX 78704-1204817/370-6638 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: IH 30 WB LIMITS TO: IH 820 NB CONNECTOR ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 11.0001 132 6004EMBANKMENT (FINAL)(DENS CONT)(TY B)CY 125.0002 432 6007RIPRAP (CONC)(CL C)CY 155.0003 500 6001MOBILIZATIONLS 1.0004 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 3.0005 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 120.0006 506 6024CONSTRUCTION EXITS (REMOVE)SY 120.0007 506 6037SANDBAGS FOR EROSION CONTROL (12")LF 100.0008 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 200.0009 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 200.00010 512 6013PORT CTB (DES SOURCE)(SGL SLP)(TY 1)LF 1,320.00011 512 6037PORT CTB (STKPL)(SGL SLP)(TY 1)LF 1,320.00012 514 6001PERM CTB (SGL SLOPE) (TY 1) (42 )LF 950.00013 514 6047PERM CTB (SGL SLOPE)(TY 1)(TRANSITION)LF 10.00014 540 6001MTL W-BEAM GD FEN (TIM POST)LF 550.00015 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 1.00016 542 6001REMOVE METAL BEAM GUARD FENCELF 525.00017 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 1.00018 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 1.00019 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 1.00020 545 6005CRASH CUSH ATTEN (REMOVE)EA 1.00021 545 6007CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)EA 1.00022 545 6019CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)EA 1.00023 644 6030IN SM RD SN SUP&AM TYS80(1)SA(T)EA 6.00024 658 6013INSTL DEL ASSM (D-SW)SZ (BRF)CTBEA 21.00025 658 6064INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2EA 12.00026 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 180.00027 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 164.00028 61856002TMA (STATIONARY)DAY 18.00029 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $34,000.00