COUNTY: HARRIS HIGHWAY: SH 6 LENGTH: 2.9180MI CONTROL NUMBER: 1685-05-108 DBE GOAL: 3.5 % PROJECT NUMBER: STP 2017(639)HES TYPE: SAFETY LIGHTING TIME FOR COMPLETION: 525 WORKING DAYSGUARANTY: 36,000.00 BIDS RECEIVED UNTIL: 1:00 PM JANUARY 04, 2018*EST.COST: 1,840,957.92 BIDS WILL BE OPENED: 1:00 PM JANUARY 04, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONDOCK GEE ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 P.O.BOX 1386 200 E RIVERSIDEHOUSTON, TX 77251 AUSTIN TX 78704-1204713/802-5405 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: PINE FOREST LANE LIMITS TO: 0.5 MILES NORTH OF IH 10 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 16.0001 104 6001REMOVING CONC (PAV)SY 693.0002 104 6009REMOVING CONC (RIPRAP)SY 133.0003 104 6037REMOVE CONC (RAIL)LF 1,040.0004 105 6017REMOVING STAB BASE AND ASPH PAV (7")STA 693.0005 316 6405ASPH (AC-20-5TR OR AC-20XP)GAL 277.0006 316 6434AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)CY 7.0007 340 6135D-GR HMA(SQ) TY-D SAC-A PG76-22TON 29.0008 344 6122SUPERPAVE MIXTURES SP-D PG70-22TON 26.0009 360 6006CONC PVMT (CONT REINF - CRCP) (12")SY 693.00010 416 6029DRILL SHAFT (RDWY ILL POLE) (30 IN)LF 972.00011 420 6064CL C CONC (COPING)CY 229.00012 420 6066CL C CONC (RAIL FOUNDATION)CY 27.00013 432 6001RIPRAP (CONC)(4 IN)CY 15.00014 432 6009RIPRAP (CONC) (CL B) (4")CY 11.00015 450 6096RAIL (TY T502)LF 1,040.00016 500 6001MOBILIZATIONLS 1.00017 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 35.00018 512 6001PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)LF 30.00019 512 6013PORT CTB (DES SOURCE)(SGL SLP)(TY 1)LF 3,420.00020 512 6025PORT CTB (MOVE)(SGL SLP)(TY 1)LF 34,200.00021 512 6037PORT CTB (STKPL)(SGL SLP)(TY 1)LF 3,420.00022 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 10.00023 545 6005CRASH CUSH ATTEN (REMOVE)EA 1.00024 545 6007CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)EA 1.00025 610 6208IN RD IL (TY SA) 40S-10 (250W EQ) LEDEA 64.00026 610 6216IN RD IL (TY SA) 40T-10 (250W EQ) LEDEA 30.00027 618 6046CONDT (PVC) (SCH 80) (2")LF 20,588.00028 618 6047CONDT (PVC) (SCH 80) (2") (BORE)LF 597.00029 620 6007ELEC CONDR (NO.8) BARELF 5,832.00030 620 6008ELEC CONDR (NO.8) INSULATEDLF 11,664.00031 620 6009ELEC CONDR (NO.6) BARELF 15,802.00032 620 6010ELEC CONDR (NO.6) INSULATEDLF 31,604.00033 624 6010GROUND BOX TY D (162922)W/APRONEA 4.00034 628 6052ELC SRV TY A 240/480 060(SS)SS(E)GC(U)EA 3.00035 662 6057WK ZN PAV MRK REMOV (TRAF BTN) TY WLF 3,420.00036 677 6001ELIM EXT PAV MRK & MRKS (4")LF 3,420.00037 678 6001PAV SURF PREP FOR MRK (4")LF 3,420.00038 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00 CONTRACTOR FORCE ACCOUNT WORK (PART) $12,000.00