COUNTY: HARRIS HIGHWAY: SH 99 LENGTH: 13.63MI CONTROL NUMBER: 3510-06-025 SBE GOAL: 0.0 % PROJECT NUMBER: C 3510-6-25 TYPE: LANDSCAPE & SCENIC ENHANCEMENT TIME FOR COMPLETION: 210 WORKING DAYSGUARANTY: 87,000.00 BIDS RECEIVED UNTIL: 1:00 PM JULY 09, 2020*EST.COST: 4,389,513.90 BIDS WILL BE OPENED: 1:00 PM JULY 09, 2020 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONFRANK LEONG, P.E. ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 14838 NORTHWEST FREEWAY 200 E RIVERSIDEHOUSTON, TX 77040 AUSTIN TX 78704-1204713/934-5901 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: EAST OF US 290 LIMITS TO: EAST OF SH 249 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6013PREP ROW (TREE) (2" TO 12" DIA)EA 1.0001 161 6009EROSION CONTROL COMPOSTCY 33,993.0002 161 6012GENERAL USE COMPOSTCY 20,709.0003 166 6001FERTILIZERAC 11.4104 168 6001VEGETATIVE WATERINGMG 1,465.0005 180 6001WILDFLOWER SEEDINGAC 13.0006 180 6002WILDFLOWER SEEDING (MIX 1)AC 11.4107 180 6003WILDFLOWER SEEDING (MIX 2)AC 63.0008 192 6003PLANT MATERIAL (3-GAL)EA 3,675.0009 192 6021PLANT MATERIAL (5 GAL) (TREE)EA 38,578.00010 192 6023PLANT MATERIAL (15 GAL) (TREE)EA 2,642.00011 192 6030PLANT MATERIAL (3 GAL) (SHRUB)EA 859.00012 192 6064PLANT BED PREP (TYPE II)SY 372,010.00013 193 6001PLANT MAINTENANCEMO 18.00014 500 6001MOBILIZATIONLS 1.00015 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 14.00016 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 10,000.00017 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 10,000.00018 10066001LANDSCAPE SOIL AMENDMENT (TYPE I)SY 372,010.00019 10066002LANDSCAPE SOIL AMENDMENT (TYPE II)SY 372,010.00020 10226001LANDSCAPE TREATMENT(TY 1)EA 44,895.00021 10226002LANDSCAPE TREATMENT(TY 2)EA 224,475.00022 10226005LANDSCAPE TREATMENT (TY 5)EA 45,754.00023 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00