PLANS ARE REQUIRED COUNTY: DENTON HIGHWAY: US0380 LENGTH: 0.0230MI CONTROL NUMBER: 6325-50-001 SBE GOAL: 0.0 % PROJECT NUMBER: RMC - 632550001 TYPE: CULVERT EXTENSION/REPLACING TIME FOR COMPLETION: 365 CALENDAR DAYSGUARANTY: 1,000.00 BIDS RECEIVED UNTIL: 10:30 AM MAY 08, 2018*EST.COST: 49,681.40 BIDS WILL BE OPENED: 10:30 AM MAY 08, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONTINA MASSEY DALLAS DISTRICT2624 W.PRAIRIE ATTN: MAINTENANCE CONTRACT OFFICEDENTON, TX 762010000 4777 E HWY 80940/323-1809 MESQUITE, TX 751506-643 214/320-6640 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: EAST OF NAIL ROAD LIMITS TO: IN DENTON COUNTY ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 132 6001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY 46.0001 161 6017COMPOST MANUF TOPSOIL (4")SY 127.0002 162 6002BLOCK SODDINGSY 127.0003 402 6001TRENCH EXCAVATION PROTECTIONLF 18.0004 464 6005RC PIPE (CL III)(24 IN)LF 236.0005 464 6008RC PIPE (CL III)(36 IN)LF 12.0006 465 6011JCTBOX(COMPL)(PJB)(6FTX6FT)EA 1.0007 465 6165INLET (COMPL)(TY C)(3 GRATE)EA 1.0008 465 6273INLET (COMPL) (TY C) (2 GRATE)EA 1.0009 496 6004REMOV STR (SET)EA 1.00010 496 6008REMOV STR (BOX CULVERT)LF 8.00011 500 6001MOBILIZATIONLS 1.00012 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 132.00013 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 132.00014 531 6003CONC SIDEWALKS (6")SY 24.00015 760 6001DITCH CLEANING AND RESHAPING (FOOT)LF 50.00016 61856001TMA (STATIONARY)EA 1.00017 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK $1.00