COUNTY: NEWTON HIGHWAY: FM2991 LENGTH: 5MI CONTROL NUMBER: 6342-29-001 SBE GOAL: 0.0 % PROJECT NUMBER: RMC - 634229001 TYPE: OVERLAY TIME FOR COMPLETION: 22 WORKING DAYSGUARANTY: 22,000.00 BIDS RECEIVED UNTIL: 1:00 PM DECEMBER 04, 2019*EST.COST: 1,079,999.95 BIDS WILL BE OPENED: 1:00 PM DECEMBER 04, 2019 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONVADA BYFORD ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 3304 US 190 W 200 E RIVERSIDEJASPER, TX 759510000 AUSTIN TX 78704-1204409/384-2244 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SH 63 SOUTH LIMITS TO: FM 1414 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 132 6019EMBANKMENT (VEHICLE)(ORD COMP)(TY B)CY 140.0001 134 6001BACKFILL (TY A)STA 261.4002 341 6047D-GR HMA TY-D SAC-A PG76-22TON 6,780.0003 351 6002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY 190.0004 354 6051PLANE ASPH CONC PAV (0" TO 1 1/2")SY 2,651.0005 401 6001FLOWABLE BACKFILLCY 6.0006 432 6031RIPRAP (STONE PROTECTION)(12 IN)CY 44.0007 432 6045RIPRAP (MOW STRIP)(4 IN)CY 44.0008 438 6004CLEANING AND SEALING EXIST JOINTS(CL7)LF 196.0009 500 6001MOBILIZATIONLS 1.00010 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 2.00011 530 6016 DRIVEWAYS (BASE)SY 847.00012 533 6002RUMBLE STRIPS (CENTERLINE)LF 24,084.00013 540 6001MTL W-BEAM GD FEN (TIM POST)LF 650.00014 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 4.00015 542 6001REMOVE METAL BEAM GUARD FENCELF 700.00016 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 4.00017 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 4.00018 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 2.00019 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 6.00020 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 12.00021 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 2,927.00022 666 6224PAVEMENT SEALER 4"LF 960.00023 666 6283REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)LF 52,780.00024 666 6311RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)LF 3,180.00025 666 6314RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)LF 39,069.00026 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 38.00027 672 6009REFL PAV MRKR TY II-A-AEA 698.00028 61856002TMA (STATIONARY)DAY 22.00029 61856003TMA (MOBILE OPERATION)HR 16.00030 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK $30,000.00