COUNTY: HARRIS HIGHWAY: IH0010 LENGTH: 0.0010MI CONTROL NUMBER: 6363-67-001 SBE GOAL: 0.0 % PROJECT NUMBER: RMC - 636367001 TYPE: FENDER SYSTEM CONSTRUCTION TIME FOR COMPLETION: 512 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM AUGUST 06, 2020 EST.COST: 14,645,720.00 BIDS WILL BE OPENED: 1:00 PM AUGUST 06, 2020 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONMELODY GALLAND ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 702 FM 1959 200 E RIVERSIDEHOUSTON, TX 770340000 AUSTIN TX 78704-1204713/636-7400 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: IH 10 SAN JACINTO RIVER BRIDGE LIMITS TO: IH 10 SAN JACINTO RIVER BRIDGE ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 407 6036SHEET PILING (NZ 26)SF 8,355.0001 432 6035RIPRAP (STONE PROTECTION)(24 IN)CY 1,197.0002 432 6038BEDDING MATERIAL (3 IN)CY 458.0003 496 6037REMOV STR (DOLPHIN AND FENDER SYS)EA 4.0004 496 6079REMOVE STR (PILING)EA 5.0005 496 6080REMOVE STRUCTURES (FENDER)EA 2.0006 500 6001MOBILIZATIONLS 1.0007 618 6046CONDT (PVC) (SCH 80) (2")LF 62.0008 620 6007ELEC CONDR (NO.8) BARELF 492.0009 620 6008ELEC CONDR (NO.8) INSULATEDLF 983.00010 60596001SOLAR-PWR MARINE NAV LIGHT SYSTEMLS 4.00011 70076001NAVIGATIONAL LIGHTING SYSTEMEA 2.00012 72376001DOLPHIN SYSTEMEA 4.00013 72376002EAST FENDER SYSTEMLS 1.00014 72376003WEST FENDER SYSTEMLS 1.00015