Detail Letting Schedule for Bowie County (FY 2005)
Detail Letting Schedule for Bowie County (FY 2005) | ||||
Last Update: Monday, August 15, 2005 |
Bowie County (FY 2005) |
CCSJ: 0010-11-067 | |||
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | CPM 10-11-67 | CSJ: | 0010-11-067 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | ANDERSON CREEK | Fund Cat: | 1 |
Limits To: | CASS C/L | Estimate: | $1,350,572 |
Length: | 15.8 Miles | Actual: | $1,324,831 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | CPM 10-12-62 | CSJ: | 0010-12-062 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 0.3 MI S OF FM 3098 | Fund Cat: | 1 |
Limits To: | ANDERSON CREEK | Estimate: | $263,583 |
Length: | 9.8 Miles | Actual: | $282,614 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 82 | Let Status: | Actual |
Project ID: | CPM 46-5-41 | CSJ: | 0046-05-041 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SP 86 | Fund Cat: | 1 |
Limits To: | FM 1398 W | Estimate: | $117,055 |
Length: | 4.4 Miles | Actual: | $123,793 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 82 | Let Status: | Actual |
Project ID: | CPM 46-6-61 | CSJ: | 0046-06-061 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1398 W | Fund Cat: | 1 |
Limits To: | FM 989 | Estimate: | $151,886 |
Length: | 7.6 Miles | Actual: | $161,263 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 8 | Let Status: | Actual |
Project ID: | CPM 62-2-21 | CSJ: | 0062-02-021 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | BOWIE C/L | Fund Cat: | 1 |
Limits To: | SH 77 | Estimate: | $134,135 |
Length: | 4.7 Miles | Actual: | $143,574 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 8 | Let Status: | Actual |
Project ID: | CPM 62-3-37 | CSJ: | 0062-03-037 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 2.3 MI S OF SH 77 | Fund Cat: | 1 |
Limits To: | SH 11 | Estimate: | $286,278 |
Length: | 10.5 Miles | Actual: | $305,797 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | CPM 62-5-59 | CSJ: | 0062-05-059 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | CASS C/L | Fund Cat: | 1 |
Limits To: | 0.9 MI N OF SH 49 | Estimate: | $298,444 |
Length: | 7.6 Miles | Actual: | $319,679 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | CPM 62-6-48 | CSJ: | 0062-06-048 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 49 | Fund Cat: | 1 |
Limits To: | HARRISON C/L | Estimate: | $160,918 |
Length: | 3.4 Miles | Actual: | $172,339 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | CPM 63-1-74 | CSJ: | 0063-01-074 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 43 | Fund Cat: | 1 |
Limits To: | IH 20 | Estimate: | $98,078 |
Length: | 2.2 Miles | Actual: | $104,776 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | CPM 85-1-39 | CSJ: | 0085-01-039 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | IH 30 | Fund Cat: | 1 |
Limits To: | US 67 | Estimate: | $258,790 |
Length: | 7.4 Miles | Actual: | $273,521 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | C 85-4-31 | CSJ: | 0085-04-031 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | OKLAHOMA SL | Fund Cat: | 1 |
Limits To: | 0.3 MI S OF FM 44 | Estimate: | $353,236 |
Length: | 15.2 Miles | Actual: | $372,818 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | C 96-9-70 | CSJ: | 0096-09-070 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | LP 390 EAST OF MARSHALL | Fund Cat: | 1 |
Limits To: | IH 20 | Estimate: | $195,225 |
Length: | 7.8 Miles | Actual: | $208,596 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | CPM 208-1-21 | CSJ: | 0208-01-021 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | LP 390 | Fund Cat: | 1 |
Limits To: | US 59 | Estimate: | $106,655 |
Length: | 2.6 Miles | Actual: | $113,416 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | C 208-2-35 | CSJ: | 0208-02-035 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SP 449 | Fund Cat: | 1 |
Limits To: | 0.5 MI S OF SP 449 | Estimate: | $17,980 |
Length: | 0.5 Miles | Actual: | $18,989 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | CPM 218-3-78 | CSJ: | 0218-03-078 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 2791 | Fund Cat: | 1 |
Limits To: | 0.5 MI S OF FM 2791 | Estimate: | $24,374 |
Length: | 0.4 Miles | Actual: | $27,661 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | CPM 218-4-108 | CSJ: | 0218-04-108 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 0.5 MI S OF FM 2791 | Fund Cat: | 1 |
Limits To: | FM 249 | Estimate: | $109,461 |
Length: | 2.2 Miles | Actual: | $120,144 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | CPM 221-5-77 | CSJ: | 0221-05-077 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1896 | Fund Cat: | 1 |
Limits To: | 1.1 MI N OF BU 271 E | Estimate: | $139,836 |
Length: | 6.7 Miles | Actual: | $148,980 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | BU 271E | Let Status: | Actual |
Project ID: | CPM 221-9-26 | CSJ: | 0221-09-026 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 67 | Fund Cat: | 1 |
Limits To: | US 271/SH 49 | Estimate: | $68,160 |
Length: | 1.3 Miles | Actual: | $73,085 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 49 | Let Status: | Actual |
Project ID: | C 222-1-48 | CSJ: | 0222-01-048 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 271 | Fund Cat: | 1 |
Limits To: | FM 1735 | Estimate: | $154,277 |
Length: | 3.6 Miles | Actual: | $164,818 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 11 | Let Status: | Actual |
Project ID: | CPM 222-3-54 | CSJ: | 0222-03-054 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 0.6 MI E OF US 259 | Fund Cat: | 1 |
Limits To: | RR OVERPASS | Estimate: | $96,861 |
Length: | 2.3 Miles | Actual: | $103,422 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 49 | Let Status: | Actual |
Project ID: | C 222-4-50 | CSJ: | 0222-04-050 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 155 | Fund Cat: | 1 |
Limits To: | MARION C/L | Estimate: | $29,502 |
Length: | 1.4 Miles | Actual: | $31,394 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 49 | Let Status: | Actual |
Project ID: | CPM 222-5-40 | CSJ: | 0222-05-040 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | CASS C/L | Fund Cat: | 1 |
Limits To: | US 59 | Estimate: | $380,313 |
Length: | 13.9 Miles | Actual: | $405,006 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 79 | Let Status: | Actual |
Project ID: | CPM 246-2-40 | CSJ: | 0246-02-040 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 4.4 MI E OF RUSK C/L | Fund Cat: | 1 |
Limits To: | RUSK C/L | Estimate: | $134,219 |
Length: | 4.4 Miles | Actual: | $143,936 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 79 | Let Status: | Actual |
Project ID: | CPM 247-2-40 | CSJ: | 0247-02-040 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 31 | Fund Cat: | 1 |
Limits To: | SABINE RIVER | Estimate: | $237,486 |
Length: | 6.6 Miles | Actual: | $253,658 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | CPM 248-1-65 | CSJ: | 0248-01-065 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 1.2 MI S OF SH 49 | Fund Cat: | 1 |
Limits To: | CAMP C/L | Estimate: | $206,316 |
Length: | 4.1 Miles | Actual: | $221,342 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | CPM 248-3-20 | CSJ: | 0248-03-020 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 0.1 MI S OF LP 238 | Fund Cat: | 1 |
Limits To: | UPSHUR C/L | Estimate: | $239,868 |
Length: | 5.7 Miles | Actual: | $256,930 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | CPM 248-4-60 | CSJ: | 0248-04-060 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | CAMP C/L | Fund Cat: | 1 |
Limits To: | FM 2088 | Estimate: | $228,784 |
Length: | 6.4 Miles | Actual: | $244,678 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 77 | Let Status: | Actual |
Project ID: | CPM 277-1-25 | CSJ: | 0277-01-025 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 259 | Fund Cat: | 1 |
Limits To: | CAS C/L | Estimate: | $181,144 |
Length: | 5.9 Miles | Actual: | $189,614 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 77 | Let Status: | Actual |
Project ID: | CPM 277-2-39 | CSJ: | 0277-02-039 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 250 | Fund Cat: | 1 |
Limits To: | 3.2 MI W OF SH 8 | Estimate: | $336,078 |
Length: | 7.7 Miles | Actual: | $355,350 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 77 | Let Status: | Actual |
Project ID: | CPM 277-2-40 | CSJ: | 0277-02-040 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | MORRIS C/L | Fund Cat: | 1 |
Limits To: | 0.2 MI W OF SH 8 | Estimate: | $32,651 |
Length: | 0.8 Miles | Actual: | $34,436 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 77 | Let Status: | Actual |
Project ID: | CPM 278-1-50 | CSJ: | 0278-01-050 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 59 | Fund Cat: | 1 |
Limits To: | FM 1841 | Estimate: | $79,189 |
Length: | 1.8 Miles | Actual: | $83,510 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 149 | Let Status: | Actual |
Project ID: | CPM 393-3-30 | CSJ: | 0393-03-030 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | HOGAN CREEK | Fund Cat: | 1 |
Limits To: | 0.5 MI N OF SP 152 | Estimate: | $46,192 |
Length: | 2.4 Miles | Actual: | $49,119 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 154 | Let Status: | Actual |
Project ID: | CPM 402-2-23 | CSJ: | 0402-02-023 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 259 | Fund Cat: | 1 |
Limits To: | HARRISON C/L | Estimate: | $57,786 |
Length: | 3.3 Miles | Actual: | $60,860 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 154 | Let Status: | Actual |
Project ID: | C 402-3-36 | CSJ: | 0402-03-036 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | UPSHUR C/L | Fund Cat: | 1 |
Limits To: | FM 2208 | Estimate: | $167,053 |
Length: | 9.4 Miles | Actual: | $176,588 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | CPM 495-10-74 | CSJ: | 0495-10-074 |
Description: | SEAL CAOT | Handling Code: |
|
Limits From: | IH 20/US 80 | Fund Cat: | 1 |
Limits To: | SP 156 | Estimate: | $124,081 |
Length: | 6.4 Miles | Actual: | $130,010 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 155 | Let Status: | Actual |
Project ID: | CPM 520-2-43 | CSJ: | 0520-02-043 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 271 | Fund Cat: | 1 |
Limits To: | FM 1404 | Estimate: | $136,122 |
Length: | 5.3 Miles | Actual: | $145,568 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 155 | Let Status: | Actual |
Project ID: | CPM 520-3-29 | CSJ: | 0520-03-029 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 8 | Fund Cat: | 1 |
Limits To: | SH 49 | Estimate: | $382,090 |
Length: | 13.2 Miles | Actual: | $408,414 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 155 | Let Status: | Actual |
Project ID: | CPM 520-3-30 | CSJ: | 0520-03-030 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 49 | Fund Cat: | 1 |
Limits To: | MARION C/L | Estimate: | $120,805 |
Length: | 4.0 Miles | Actual: | $129,232 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 155 | Let Status: | Actual |
Project ID: | CPM 520-4-28 | CSJ: | 0520-04-028 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | CASS C/L | Fund Cat: | 1 |
Limits To: | UPSHUR C/L | Estimate: | $154,409 |
Length: | 5.3 Miles | Actual: | $165,173 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 155 | Let Status: | Actual |
Project ID: | CPM 520-5-38 | CSJ: | 0520-05-038 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | MARION C/L | Fund Cat: | 1 |
Limits To: | US 259 | Estimate: | $42,272 |
Length: | 1.6 Miles | Actual: | $45,150 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | C 569-3-18 | CSJ: | 0569-03-018 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 805 | Fund Cat: | 1 |
Limits To: | HARRISON C/L | Estimate: | $101,252 |
Length: | 2.9 Miles | Actual: | $107,228 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | C 569-4-17 | CSJ: | 0569-04-017 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | MARION C/L | Fund Cat: | 1 |
Limits To: | SP 449 | Estimate: | $161,732 |
Length: | 3.0 Miles | Actual: | $170,051 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 134 | Let Status: | Actual |
Project ID: | C 632-3-38 | CSJ: | 0632-03-038 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1999 | Fund Cat: | 1 |
Limits To: | US 80 | Estimate: | $196,265 |
Length: | 10.5 Miles | Actual: | $205,515 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 21 | Let Status: | Actual |
Project ID: | CPM 633-2-10 | CSJ: | 0633-02-010 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FRANKLIN C/L | Fund Cat: | 1 |
Limits To: | CAMP C/L | Estimate: | $75,918 |
Length: | 3.8 Miles | Actual: | $79,428 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 31 | Let Status: | Actual |
Project ID: | C 640-1-39 | CSJ: | 0640-01-039 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 0.1 MI N OF IH 20 | Fund Cat: | 1 |
Limits To: | FM 2625 | Estimate: | $108,807 |
Length: | 4.8 Miles | Actual: | $115,843 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 852 | Let Status: | Actual |
Project ID: | CPM 640-3-23 | CSJ: | 0640-03-023 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 556 | Fund Cat: | 1 |
Limits To: | SH 154 | Estimate: | $101,019 |
Length: | 5.1 Miles | Actual: | $105,623 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 449 | Let Status: | Actual |
Project ID: | CPM 640-6-36 | CSJ: | 0640-06-036 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 450 | Fund Cat: | 1 |
Limits To: | SH 154 | Estimate: | $232,866 |
Length: | 12.0 Miles | Actual: | $243,777 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 31 | Let Status: | Actual |
Project ID: | CPM 731-1-43 | CSJ: | 0731-01-043 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 123 | Fund Cat: | 1 |
Limits To: | 5.1 MI S OF FM 2517 | Estimate: | $248,285 |
Length: | 12.6 Miles | Actual: | $260,251 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 127 | Let Status: | Actual |
Project ID: | CPM 734-1-34 | CSJ: | 0734-01-034 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 21 | Fund Cat: | 1 |
Limits To: | US 271 | Estimate: | $167,756 |
Length: | 10.3 Miles | Actual: | $177,026 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 251 | Let Status: | Actual |
Project ID: | C 812-1-30 | CSJ: | 0812-01-030 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 77 | Fund Cat: | 1 |
Limits To: | FM 125 | Estimate: | $193,148 |
Length: | 12.8 Miles | Actual: | $203,815 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 450 | Let Status: | Actual |
Project ID: | CPM 743-2-18 | CSJ: | 0843-02-018 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 154 | Fund Cat: | 1 |
Limits To: | FM 449 | Estimate: | $111,163 |
Length: | 5.6 Miles | Actual: | $116,216 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 593 | Let Status: | Actual |
Project ID: | CPM 946-3-20 | CSJ: | 0946-03-020 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 271 | Fund Cat: | 1 |
Limits To: | FM 2796 | Estimate: | $126,584 |
Length: | 7.0 Miles | Actual: | $132,235 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 556 | Let Status: | Actual |
Project ID: | CPM 1019-1-25 | CSJ: | 1019-01-025 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | LP 238 | Fund Cat: | 1 |
Limits To: | UPSHUR C/L | Estimate: | $153,974 |
Length: | 7.8 Miles | Actual: | $161,164 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 992 | Let Status: | Actual |
Project ID: | CPM 1214-1-16 | CSJ: | 1214-01-016 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 11.8 MI NO OF US 82 | Fund Cat: | 1 |
Limits To: | 6.9 MI NO OF US 82 | Estimate: | $92,773 |
Length: | 4.9 Miles | Actual: | $97,500 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 992 | Let Status: | Actual |
Project ID: | CPM 1215-1-19 | CSJ: | 1215-01-019 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 6.9 MI N OF US 82 | Fund Cat: | 1 |
Limits To: | US 82 | Estimate: | $134,902 |
Length: | 6.8 Miles | Actual: | $141,084 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 992 | Let Status: | Actual |
Project ID: | CPM 1215-1-20 | CSJ: | 1215-01-020 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 6.9 MI N OF US 82 | Fund Cat: | 1 |
Limits To: | 10.3 MI NO OF US 82 | Estimate: | $66,338 |
Length: | 3.4 Miles | Actual: | $69,420 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 1735 | Let Status: | Actual |
Project ID: | CPM 1226-2-18 | CSJ: | 1226-02-018 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 49 | Fund Cat: | 1 |
Limits To: | SH 11 | Estimate: | $90,181 |
Length: | 4.7 Miles | Actual: | $94,697 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 1997 | Let Status: | Actual |
Project ID: | CPM 1919-2-29 | CSJ: | 1919-02-029 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | LP 390 | Fund Cat: | 1 |
Limits To: | US 80 | Estimate: | $46,266 |
Length: | 1.7 Miles | Actual: | $59,891 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 1997 | Let Status: | Actual |
Project ID: | C 1919-2-30 | CSJ: | 1919-02-030 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 3001 | Fund Cat: | 1 |
Limits To: | LP 390 | Estimate: | $127,990 |
Length: | 6.6 Miles | Actual: | $134,047 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 2148 | Let Status: | Actual |
Project ID: | C 2050-1-18 | CSJ: | 2050-01-018 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 82 | Fund Cat: | 1 |
Limits To: | US 67 | Estimate: | $55,959 |
Length: | 2.9 Miles | Actual: | $59,566 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | LP 281 | Let Status: | Actual |
Project ID: | CPM 2642-2-20 | CSJ: | 2642-02-020 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 80 | Fund Cat: | 1 |
Limits To: | IH 20 | Estimate: | $117,338 |
Length: | 2.7 Miles | Actual: | $125,901 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 2878 | Let Status: | Actual |
Project ID: | C 2878-1-10 | CSJ: | 2878-01-010 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 559 | Fund Cat: | 1 |
Limits To: | IH 30 | Estimate: | $39,234 |
Length: | 2.4 Miles | Actual: | $41,520 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 1297 | Let Status: | Actual |
Project ID: | C 2879-1-6 | CSJ: | 2879-01-006 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 2878 | Fund Cat: | 1 |
Limits To: | FM 559 | Estimate: | $22,263 |
Length: | 1.2 Miles | Actual: | $23,537 |
District: | Atlanta | Let Date: | OCT 2004 |
Highway: | FM 2882 | Let Status: | Actual |
Project ID: | CPM 2881-1-5 | CSJ: | 2881-01-005 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 21 | Fund Cat: | 1 |
Limits To: | FM 127 | Estimate: | $26,827 |
Length: | 1.4 Miles | Actual: | $28,129 |
Back... |
Totals for 0010-11-067 | ||
---|---|---|---|
Length: | 362.5 Miles | ||
Estimate: | $10,501,004 | ||
Actual: | $11,047,548 | ||
CCSJ: 0010-12-061 | |||
District: | Atlanta | Let Date: | FEB 2005 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | STP 2005(165)HES | CSJ: | 0010-12-061 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: |
|
Limits From: | AT INTERSECTION OF FM 3098 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $40,473 |
Length: | 0.1 Miles | Actual: | $31,842 |
District: | Atlanta | Let Date: | FEB 2005 |
Highway: | SH 11 | Let Status: | Actual |
Project ID: | STP 2005(165)HES | CSJ: | 0083-07-034 |
Description: | SAFETY LIGHTING AT INTERSECTION | Handling Code: |
|
Limits From: | AT INTERSECTION OF FM 1519 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $14,655 |
Length: | 0.1 Miles | Actual: | $11,543 |
District: | Atlanta | Let Date: | FEB 2005 |
Highway: | FM 2208 | Let Status: | Actual |
Project ID: | STP 2005(165)HES | CSJ: | 0138-12-019 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: |
|
Limits From: | AT INTERSECTION OF FM 3001 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $20,557 |
Length: | 0.1 Miles | Actual: | $17,867 |
District: | Atlanta | Let Date: | FEB 2005 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | STP 2005(165)HES | CSJ: | 0222-03-053 |
Description: | INSTALL OVERHEIGHT WARNING SYSTEM | Handling Code: |
|
Limits From: | AT KCS RR | Fund Cat: | 8 |
Limits To: | . | Estimate: | $62,969 |
Length: | 0.1 Miles | Actual: | $85,474 |
District: | Atlanta | Let Date: | FEB 2005 |
Highway: | SH 49 | Let Status: | Actual |
Project ID: | STP 2005(165)HES | CSJ: | 0222-05-039 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: |
|
Limits From: | AT INTERSECTION OF FM 728 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $16,038 |
Length: | 0.1 Miles | Actual: | $15,460 |
District: | Atlanta | Let Date: | FEB 2005 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | STP 2005(165)HES | CSJ: | 0248-04-061 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: |
|
Limits From: | AT THE INTERSECTION OF FM 593 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $20,728 |
Length: | 0.1 Miles | Actual: | $17,933 |
District: | Atlanta | Let Date: | FEB 2005 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | STP 2005(165)HES | CSJ: | 0392-02-073 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: |
|
Limits From: | AT THE INTERSECTION OF FM 726 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $21,406 |
Length: | 0.1 Miles | Actual: | $18,721 |
Back... |
Totals for 0010-12-061 | ||
Length: | 0.7 Miles | ||
Estimate: | $196,826 | ||
Actual: | $198,840 | ||
CCSJ: 0046-03-031 | |||
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 82 | Let Status: | Actual |
Project ID: | C 46-3-31 | CSJ: | 0046-03-031 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | RED RIVER COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 992 IN DEKALB | Estimate: | $62,833 |
Length: | 8.0 Miles | Actual: | $34,400 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 82 | Let Status: | Actual |
Project ID: | C 46-4-49 | CSJ: | 0046-04-049 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | FM 992 IN DEKALB | Fund Cat: | 1 |
Limits To: | 0.5 MI W OF SH 8 | Estimate: | $15,013 |
Length: | 12.1 Miles | Actual: | $21,850 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 82 | Let Status: | Actual |
Project ID: | C 46-5-40 | CSJ: | 0046-05-040 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | 0.5 MI W OF SH 8 | Fund Cat: | 1 |
Limits To: | FM 1398 IN HOOKS | Estimate: | $7,833 |
Length: | 9.2 Miles | Actual: | $11,400 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 82 | Let Status: | Actual |
Project ID: | C 46-6-60 | CSJ: | 0046-06-060 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | FM 1398 | Fund Cat: | 1 |
Limits To: | US 67 | Estimate: | $18,276 |
Length: | 13.0 Miles | Actual: | $26,600 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | C 62-7-76 | CSJ: | 0062-07-076 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | MARION COUNTY LINE | Fund Cat: | 1 |
Limits To: | US 80 | Estimate: | $28,379 |
Length: | 11.6 Miles | Actual: | $30,395 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | C 63-3-54 | CSJ: | 0063-03-054 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | FM 2792 | Fund Cat: | 1 |
Limits To: | BU 79 | Estimate: | $58,243 |
Length: | 17.2 Miles | Actual: | $38,036 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | C 63-4-51 | CSJ: | 0063-04-051 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | BU 79 | Fund Cat: | 1 |
Limits To: | S END OF MURVAUL CREEK BRIDGE | Estimate: | $53,771 |
Length: | 7.2 Miles | Actual: | $50,894 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | C 84-1-18 | CSJ: | 0084-01-018 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | US 67 | Fund Cat: | 1 |
Limits To: | SH 49 | Estimate: | $16,698 |
Length: | 10.2 Miles | Actual: | $22,066 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | C 85-1-38 | CSJ: | 0085-01-038 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | BOWIE COUNTY LINE | Fund Cat: | 1 |
Limits To: | US 67 | Estimate: | $17,149 |
Length: | 9.0 Miles | Actual: | $24,085 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | C 85-2-42 | CSJ: | 0085-02-042 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | 0.3 MI S OF FM 44 | Fund Cat: | 1 |
Limits To: | MORIS COUNTY LINE | Estimate: | $3,781 |
Length: | 12.6 Miles | Actual: | $5,253 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | C 85-4-30 | CSJ: | 0085-04-030 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | OKLAHOMA STATE LINE | Fund Cat: | 1 |
Limits To: | 0.3 MI S OF FM 44 | Estimate: | $16,047 |
Length: | 15.6 Miles | Actual: | $22,856 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | C 96-3-65 | CSJ: | 0096-03-065 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | WOOD CO LINE | Fund Cat: | 1 |
Limits To: | GREGG CO LINE | Estimate: | $5,874 |
Length: | 11.8 Miles | Actual: | $8,550 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | C 96-7-36 | CSJ: | 0096-07-036 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | GREGG COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 450 | Estimate: | $3,766 |
Length: | 7.6 Miles | Actual: | $4,909 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | C 96-8-47 | CSJ: | 0096-08-047 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | FM 450 | Fund Cat: | 1 |
Limits To: | SH 154 | Estimate: | $7,180 |
Length: | 11.1 Miles | Actual: | $10,450 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | C 96-9-68 | CSJ: | 0096-09-068 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | SH 154 | Fund Cat: | 1 |
Limits To: | IH 20 | Estimate: | $25,709 |
Length: | 14.5 Miles | Actual: | $35,918 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | C 217-1-26 | CSJ: | 0217-01-026 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | ARKANSAS STATE LINE | Fund Cat: | 1 |
Limits To: | 1.5 MI N OF IH 30 | Estimate: | $1,440 |
Length: | 3.9 Miles | Actual: | $1,382 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | C 218-2-33 | CSJ: | 0218-02-033 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | 0.5 MI N OF IH 30 | Fund Cat: | 1 |
Limits To: | LP 151 | Estimate: | $81,345 |
Length: | 4.0 Miles | Actual: | $74,764 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | C 218-4-106 | CSJ: | 0218-04-106 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | SH 43 | Fund Cat: | 1 |
Limits To: | SH 155 | Estimate: | $40,275 |
Length: | 15.5 Miles | Actual: | $35,833 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | C 221-5-76 | CSJ: | 0221-05-076 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | FRANKLIN COUNTY LINE | Fund Cat: | 1 |
Limits To: | US 67 | Estimate: | $24,508 |
Length: | 17.3 Miles | Actual: | $33,919 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | SH 49 | Let Status: | Actual |
Project ID: | C 222-1-47 | CSJ: | 0222-01-047 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | BU 271-E | Fund Cat: | 1 |
Limits To: | MORRIS COUNTY LINE | Estimate: | $3,485 |
Length: | 10.0 Miles | Actual: | $3,958 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 79 | Let Status: | Actual |
Project ID: | C 246-2-41 | CSJ: | 0246-02-041 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | SH 149 | Fund Cat: | 1 |
Limits To: | RUSK CO LINE | Estimate: | $11,343 |
Length: | 12.6 Miles | Actual: | $15,758 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 79 | Let Status: | Actual |
Project ID: | C 247-1-46 | CSJ: | 0247-01-046 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | S END OF SABINE RIVER BRIDGE | Fund Cat: | 1 |
Limits To: | US 59 | Estimate: | $12,390 |
Length: | 7.3 Miles | Actual: | $15,244 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 79 | Let Status: | Actual |
Project ID: | C 247-2-41 | CSJ: | 0247-02-041 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | FM 31 | Fund Cat: | 1 |
Limits To: | S END OF SABINE RIVER BRIDGE | Estimate: | $3,781 |
Length: | 6.8 Miles | Actual: | $5,253 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 79 | Let Status: | Actual |
Project ID: | C 247-3-22 | CSJ: | 0247-03-022 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | LOUISIANA ST LINE | Fund Cat: | 1 |
Limits To: | FM 31 | Estimate: | $7,562 |
Length: | 8.9 Miles | Actual: | $10,506 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | C 248-1-63 | CSJ: | 0248-01-063 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | US 67 | Fund Cat: | 1 |
Limits To: | CAMP COUNTY LINE | Estimate: | $6,392 |
Length: | 7.5 Miles | Actual: | $9,053 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | C 248-2-57 | CSJ: | 0248-02-057 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | TITUS COUNTY LINE | Fund Cat: | 1 |
Limits To: | PITTSBURG CITY LIMITS | Estimate: | $21,229 |
Length: | 6.5 Miles | Actual: | $27,865 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | C 248-3-19 | CSJ: | 0248-03-019 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | 0.3 MI N OF FM 3384 | Fund Cat: | 1 |
Limits To: | UPSHUR COUNTY LINE | Estimate: | $3,916 |
Length: | 5.7 Miles | Actual: | $5,700 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | C 248-4-58 | CSJ: | 0248-04-058 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | CAMP COUNTY LINE | Fund Cat: | 1 |
Limits To: | SH 154 | Estimate: | $19,040 |
Length: | 12.1 Miles | Actual: | $26,711 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | C 248-5-48 | CSJ: | 0248-05-048 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | SH 154 | Fund Cat: | 1 |
Limits To: | GREGG COUNTY LINE | Estimate: | $10,690 |
Length: | 12.8 Miles | Actual: | $14,808 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | C 392-1-64 | CSJ: | 0392-01-064 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | SH 11 | Fund Cat: | 1 |
Limits To: | UPSHUR COUNTY LINE | Estimate: | $17,217 |
Length: | 9.2 Miles | Actual: | $24,308 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | SH 315 | Let Status: | Actual |
Project ID: | C 462-3-38 | CSJ: | 0462-03-038 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | RUSK COUNTY LINE | Fund Cat: | 1 |
Limits To: | BU 79 | Estimate: | $6,391 |
Length: | 17.3 Miles | Actual: | $6,599 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | SH 154 | Let Status: | Actual |
Project ID: | C 1575-4-10 | CSJ: | 1575-04-010 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | LP 390 | Fund Cat: | 1 |
Limits To: | US 80 | Estimate: | $6,621 |
Length: | 0.8 Miles | Actual: | $8,565 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | LP 390 | Let Status: | Actual |
Project ID: | C 1575-4-11 | CSJ: | 1575-04-011 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | SH 154 | Fund Cat: | 1 |
Limits To: | US 59 | Estimate: | $5,222 |
Length: | 3.4 Miles | Actual: | $7,600 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | LP 390 | Let Status: | Actual |
Project ID: | C 1575-5-11 | CSJ: | 1575-05-011 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | US 59 | Fund Cat: | 1 |
Limits To: | US 80 | Estimate: | $15,151 |
Length: | 5.1 Miles | Actual: | $15,838 |
District: | Atlanta | Let Date: | NOV 2004 |
Highway: | LP 281 | Let Status: | Actual |
Project ID: | C 2642-2-19 | CSJ: | 2642-02-019 |
Description: | UPGRADE EXISTING GUIDE SIGNS | Handling Code: |
|
Limits From: | GREGG COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 968 | Estimate: | $31,245 |
Length: | 5.6 Miles | Actual: | $30,470 |
Back... |
Totals for 0046-03-031 | ||
Length: | 343.0 Miles | ||
Estimate: | $669,795 | ||
Actual: | $721,796 | ||
CCSJ: 0330-03-023 | |||
District: | Atlanta | Let Date: | APR 2005 |
Highway: | FM 561 | Let Status: | Actual |
Project ID: | STP 2005(301)HES | CSJ: | 0330-03-023 |
Description: | SAFETY TREAT DRAINAGE STRUCTURES AND WIDEN LANES | Handling Code: |
|
Limits From: | SH 98 | Fund Cat: | 8 |
Limits To: | FM 44 | Estimate: | $502,088 |
Length: | 5.7 Miles | Actual: | $501,137 |
District: | Atlanta | Let Date: | APR 2005 |
Highway: | FM 561 | Let Status: | Actual |
Project ID: | STP 2005(301)HES | CSJ: | 0330-03-024 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | SH 98 | Fund Cat: | 8 |
Limits To: | FM 44 | Estimate: | $303,882 |
Length: | 5.7 Miles | Actual: | $282,785 |
Back... |
Totals for 0330-03-023 | ||
Length: | 11.4 Miles | ||
Estimate: | $805,970 | ||
Actual: | $783,922 | ||
CCSJ: 0945-01-030 | |||
District: | Atlanta | Let Date: | DEC 2004 |
Highway: | FM 1397 | Let Status: | Actual |
Project ID: | STP 2005(67)HES | CSJ: | 0945-01-030 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | 6.0 MI N OF FM 2240 | Fund Cat: | 8 |
Limits To: | IH 30 | Estimate: | $205,829 |
Length: | 6.5 Miles | Actual: | $225,530 |
District: | Atlanta | Let Date: | DEC 2004 |
Highway: | FM 558 | Let Status: | Actual |
Project ID: | STP 2005(67)HES | CSJ: | 0945-02-019 |
Description: | SAFETY TREAT DRAINAGE STRUCTURES AND WIDEN LANES | Handling Code: |
|
Limits From: | SH 93 | Fund Cat: | 8 |
Limits To: | COUNTY ROAD 452 | Estimate: | $418,989 |
Length: | 5.9 Miles | Actual: | $492,203 |
District: | Atlanta | Let Date: | DEC 2004 |
Highway: | FM 558 | Let Status: | Actual |
Project ID: | STP 2005(67)HES | CSJ: | 0945-02-021 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | SH 93 | Fund Cat: | 8 |
Limits To: | COUNTY ROAD 452 | Estimate: | $288,459 |
Length: | 5.9 Miles | Actual: | $299,909 |
Back... |
Totals for 0945-01-030 | ||
Length: | 18.3 Miles | ||
Estimate: | $913,277 | ||
Actual: | $1,017,642 | ||
CCSJ: 1021-01-010 | |||
District: | Atlanta | Let Date: | JUN 2005 |
Highway: | FM 560 | Let Status: | Actual |
Project ID: | BR 2005(451) | CSJ: | 1021-01-010 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | AT PANTHER CREEK | Fund Cat: | 6 |
Limits To: | . | Estimate: | $233,454 |
Length: | 0.0 Miles | Actual: | $303,027 |
Bid Tabulations Back... |
Totals for 1021-01-010 | ||
Length: | 0.0 Miles | ||
Estimate: | $233,454 | ||
Actual: | $303,027 | ||
CCSJ: 1021-01-017 | |||
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 560 | Let Status: | Actual |
Project ID: | STP 2005(158)SFT | CSJ: | 1021-01-017 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | US 82 | Fund Cat: | 8 |
Limits To: | 4.9 MI. N. OF US 82 | Estimate: | $177,779 |
Length: | 4.9 Miles | Actual: | $205,498 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 560 | Let Status: | Actual |
Project ID: | STP 2005(406)SFT | CSJ: | 1021-01-018 |
Description: | WIDEN LANES ON EXISTING ROADWAY | Handling Code: |
|
Limits From: | 0.8 MI N OF US 82 | Fund Cat: | 8 |
Limits To: | 4.9 MI N OF US 82 | Estimate: | $323,363 |
Length: | 4.2 Miles | Actual: | $401,154 |
Back... |
Totals for 1021-01-017 | ||
Length: | 9.1 Miles | ||
Estimate: | $501,142 | ||
Actual: | $606,652 |
|
|