Detail Letting Schedule for Harrison County (FY 2005)
Detail Letting Schedule for Harrison County (FY 2005) | ||||
Last Update: Monday, August 15, 2005 |
Harrison County (FY 2005) |
CCSJ: 0063-01-073 | |||
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | STP 2005(38)SFT | CSJ: | 0063-01-073 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | US 80 | Fund Cat: | 8 |
Limits To: | FM 1186 | Estimate: | $263,304 |
Length: | 11.2 Miles | Actual: | $283,342 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | STP 2005(398)SFT | CSJ: | 0063-01-076 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | FM 31 | Fund Cat: | 8 |
Limits To: | FM 1186 | Estimate: | $341,665 |
Length: | 10.7 Miles | Actual: | $319,251 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | STP 2005(38)SFT | CSJ: | 0063-09-013 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | FM 1186 | Fund Cat: | 8 |
Limits To: | PANOLA COUNTY LINE | Estimate: | $98,887 |
Length: | 4.2 Miles | Actual: | $101,291 |
Back... |
Totals for 0063-01-073 | ||
---|---|---|---|
Length: | 26.1 Miles | ||
Estimate: | $703,856 | ||
Actual: | $703,884 | ||
CCSJ: 0208-02-034 | |||
District: | Atlanta | Let Date: | DEC 2004 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | STP 2005(40)HES | CSJ: | 0208-02-034 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | SP 449 | Fund Cat: | 8 |
Limits To: | 3.8 MI N OF US 59 | Estimate: | $531,998 |
Length: | 8.7 Miles | Actual: | $756,395 |
District: | Atlanta | Let Date: | DEC 2004 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | STP 2005(40)HES | CSJ: | 0569-01-042 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | FM 2328 | Fund Cat: | 8 |
Limits To: | MARION COUNTY LINE | Estimate: | $287,401 |
Length: | 13.1 Miles | Actual: | $356,987 |
District: | Atlanta | Let Date: | DEC 2004 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | STP 2005(40)HES | CSJ: | 0569-01-045 |
Description: | HES SAFETY WORK | Handling Code: |
|
Limits From: | FM 2328 | Fund Cat: | 8 |
Limits To: | MARION CO LINE | Estimate: | $323,070 |
Length: | 13.1 Miles | Actual: | $316,026 |
District: | Atlanta | Let Date: | DEC 2004 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | STP 2005(40)HES | CSJ: | 0569-02-013 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | CASS COUNTY LINE | Fund Cat: | 8 |
Limits To: | SH 49 | Estimate: | $108,481 |
Length: | 4.7 Miles | Actual: | $122,356 |
District: | Atlanta | Let Date: | DEC 2004 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | STP 2005(40)HES | CSJ: | 0569-02-014 |
Description: | HES SAFETY WORK | Handling Code: |
|
Limits From: | CASS COUNTY LINE | Fund Cat: | 8 |
Limits To: | SH 49 | Estimate: | $153,685 |
Length: | 4.7 Miles | Actual: | $167,018 |
District: | Atlanta | Let Date: | DEC 2004 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | STP 2005(40)HES | CSJ: | 0569-03-017 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | SH 49 | Fund Cat: | 8 |
Limits To: | HARRISON COUNTY LINE | Estimate: | $210,849 |
Length: | 8.1 Miles | Actual: | $308,971 |
District: | Atlanta | Let Date: | DEC 2004 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | STP 2005(40)HES | CSJ: | 0569-03-019 |
Description: | HES SAFETY WORK | Handling Code: |
|
Limits From: | SH 49 | Fund Cat: | 8 |
Limits To: | HARRISON CO LINE | Estimate: | $218,000 |
Length: | 8.1 Miles | Actual: | $179,120 |
District: | Atlanta | Let Date: | DEC 2004 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | STP 2005(40)HES | CSJ: | 0569-04-015 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | SOUTH END OF BIG CYPRESS CREEK BRID | Fund Cat: | 8 |
Limits To: | SP 449 | Estimate: | $63,120 |
Length: | 3.0 Miles | Actual: | $45,485 |
District: | Atlanta | Let Date: | DEC 2004 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | STP 2005(40)HES | CSJ: | 0569-04-018 |
Description: | HES SAFETY WORK | Handling Code: |
|
Limits From: | SOUTH END OF BIG CYPRESS CR BRIDGE | Fund Cat: | 8 |
Limits To: | SP 449 | Estimate: | $67,483 |
Length: | 3.0 Miles | Actual: | $70,239 |
District: | Atlanta | Let Date: | DEC 2004 |
Highway: | FM 729 | Let Status: | Actual |
Project ID: | STP 2005(40)HES | CSJ: | 1018-03-034 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | MORRIS COUNTY LINE | Fund Cat: | 8 |
Limits To: | SH 49 | Estimate: | $491,939 |
Length: | 18.9 Miles | Actual: | $635,861 |
District: | Atlanta | Let Date: | DEC 2004 |
Highway: | FM 729 | Let Status: | Actual |
Project ID: | STP 2005(40)HES | CSJ: | 1018-03-035 |
Description: | SAFETY TREAT FIXED OBJECTS, INSTALL PROTECTION & MODERNIZE | Handling Code: |
|
Limits From: | MORRIS COUNTY LINE | Fund Cat: | 8 |
Limits To: | SH 49 | Estimate: | $305,400 |
Length: | 18.9 Miles | Actual: | $320,877 |
District: | Atlanta | Let Date: | DEC 2004 |
Highway: | FM 729 | Let Status: | Actual |
Project ID: | STP 2005(40)HES | CSJ: | 1018-04-012 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | US 259 | Fund Cat: | 8 |
Limits To: | MARION COUNTY LINE | Estimate: | $39,266 |
Length: | 3.4 Miles | Actual: | $45,255 |
Back... |
Totals for 0208-02-034 | ||
Length: | 107.7 Miles | ||
Estimate: | $2,800,692 | ||
Actual: | $3,324,590 | ||
CCSJ: 0495-08-083 | |||
District: | Atlanta | Let Date: | JUL 2005 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | STP 2005(401)SFT | CSJ: | 0495-08-083 |
Description: | INSTALL A CABLE SAFETY SYSTEM MEDIAN BARRIER | Handling Code: |
|
Limits From: | GREGG COUNTY LINE | Fund Cat: | 8 |
Limits To: | 0.5 MI W OF SH 43 | Estimate: | $2,009,276 |
Length: | 16.9 Miles | Actual: | $1,248,911 |
District: | Atlanta | Let Date: | JUL 2005 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | STP 2005(401)SFT | CSJ: | 0495-09-046 |
Description: | INSTALL A CABLE SAFETY SYSTEM MEDIAN BARRIER | Handling Code: |
|
Limits From: | 0.5 MI W OF SH 43 | Fund Cat: | 8 |
Limits To: | 0.2 MI W OF FM 31 | Estimate: | $564,405 |
Length: | 6.9 Miles | Actual: | $377,146 |
District: | Atlanta | Let Date: | JUL 2005 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | STP 2005(401)SFT | CSJ: | 0495-10-076 |
Description: | INSTALL A CABLE SAFETY SYSTEM MEDIAN BARRIER | Handling Code: |
|
Limits From: | 0.2 MI W OF FM 31 | Fund Cat: | 8 |
Limits To: | LOUISIANA STATE LINE | Estimate: | $2,098,849 |
Length: | 15.5 Miles | Actual: | $1,360,783 |
Award Status Bid Tabulations Back... |
Totals for 0495-08-083 | ||
Length: | 39.3 Miles | ||
Estimate: | $4,672,530 | ||
Actual: | $2,986,840 | ||
CCSJ: 0640-06-035 | |||
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 449 | Let Status: | Actual |
Project ID: | STP 2005(386)SFT | CSJ: | 0640-06-035 |
Description: | SAFETY TREAT FIXED OBJECTS & WIDEN LANES | Handling Code: |
|
Limits From: | GREGG COUNTY LINE | Fund Cat: | 8 |
Limits To: | SH 154 | Estimate: | $1,326,769 |
Length: | 19.1 Miles | Actual: | $1,153,079 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 449 | Let Status: | Actual |
Project ID: | STP 2005(405)SFT | CSJ: | 0640-06-037 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | GREGG COUNTY LINE | Fund Cat: | 8 |
Limits To: | SH 154 | Estimate: | $686,829 |
Length: | 19.1 Miles | Actual: | $564,733 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 450 | Let Status: | Actual |
Project ID: | STP 2005(386)SFT | CSJ: | 0843-01-011 |
Description: | SAFETY TREAT FIXED OBJECTS & WIDEN LANES | Handling Code: |
|
Limits From: | SH 154 | Fund Cat: | 8 |
Limits To: | 0.7 MI S OF FM 726 | Estimate: | $390,494 |
Length: | 5.3 Miles | Actual: | $489,592 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 450 | Let Status: | Actual |
Project ID: | STP 2005(386)SFT | CSJ: | 0843-01-012 |
Description: | SAFETY TREAT FIXED OBJECTS, INSTALL PROTECTION & MODERNIZE | Handling Code: |
|
Limits From: | SH 154 | Fund Cat: | 8 |
Limits To: | 0.7 MI S OF FM 726 | Estimate: | $184,878 |
Length: | 5.3 Miles | Actual: | $124,829 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 450 | Let Status: | Actual |
Project ID: | STP 2005(386)SFT | CSJ: | 0843-02-017 |
Description: | SAFETY TREAT FIXED OBJECTS & WIDEN LANES | Handling Code: |
|
Limits From: | US 80 | Fund Cat: | 8 |
Limits To: | SH 154 | Estimate: | $976,414 |
Length: | 13.5 Miles | Actual: | $1,218,047 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 450 | Let Status: | Actual |
Project ID: | STP 2005(386)SFT | CSJ: | 0843-02-019 |
Description: | SAFETY TREAT FIXED OBJECTS, INSTALL PROTECTION & MODERNIZE | Handling Code: |
|
Limits From: | US 80 | Fund Cat: | 8 |
Limits To: | SH 154 | Estimate: | $538,350 |
Length: | 13.5 Miles | Actual: | $380,916 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 1968 | Let Status: | Actual |
Project ID: | STP 2005(386)SFT | CSJ: | 0843-04-013 |
Description: | SAFETY TREAT DRAINAGE STRUCTURES AND WIDEN LANES | Handling Code: |
|
Limits From: | HARRISON COUNTY LINE | Fund Cat: | 8 |
Limits To: | COUNTY ROAD 309 | Estimate: | $39,260 |
Length: | 1.0 Miles | Actual: | $49,733 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 1968 | Let Status: | Actual |
Project ID: | STP 2005(386)SFT | CSJ: | 0843-04-014 |
Description: | SAFETY TREAT FIXED OBJECTS, INSTALL PROTECTION & MODERNIZE | Handling Code: |
|
Limits From: | HARRISON COUNTY LINE | Fund Cat: | 8 |
Limits To: | COUNTY ROAD 309 | Estimate: | $35,376 |
Length: | 1.0 Miles | Actual: | $28,515 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 1968 | Let Status: | Actual |
Project ID: | STP 2005(386)SFT | CSJ: | 0843-05-011 |
Description: | SAFETY TREAT DRAINAGE STRUCTURES AND WIDEN LANES | Handling Code: |
|
Limits From: | FM 450 | Fund Cat: | 8 |
Limits To: | MARION COUNTY LINE | Estimate: | $313,546 |
Length: | 3.9 Miles | Actual: | $355,611 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 1968 | Let Status: | Actual |
Project ID: | STP 2005(386)SFT | CSJ: | 0843-05-012 |
Description: | SAFETY TREAT FIXED OBJECTS, INSTALL PROTECTION & MODERNIZE | Handling Code: |
|
Limits From: | FM 450 | Fund Cat: | 8 |
Limits To: | MARION COUNTY LINE | Estimate: | $83,507 |
Length: | 3.9 Miles | Actual: | $61,850 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 450 | Let Status: | Actual |
Project ID: | STP 2005(386)SFT | CSJ: | 1382-01-011 |
Description: | SAFETY TREAT FIXED OBJECTS & WIDEN LANES | Handling Code: |
|
Limits From: | MARION COUNTY LINE | Fund Cat: | 8 |
Limits To: | US 259 | Estimate: | $82,848 |
Length: | 1.3 Miles | Actual: | $97,040 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 450 | Let Status: | Actual |
Project ID: | STP 2005(386)SFT | CSJ: | 1382-01-012 |
Description: | SAFETY TREAT FIXED OBJECTS, INSTALL PROTECTION & MODERNIZE | Handling Code: |
|
Limits From: | MARION COUNTY LINE | Fund Cat: | 8 |
Limits To: | US 259 | Estimate: | $42,050 |
Length: | 1.3 Miles | Actual: | $27,789 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 450 | Let Status: | Actual |
Project ID: | STP 2005(386)SFT | CSJ: | 1382-02-012 |
Description: | SAFETY TREAT FIXED OBJECTS & WIDEN LANES | Handling Code: |
|
Limits From: | HARRISON COUNTY LINE | Fund Cat: | 8 |
Limits To: | UPSHUR COUNTY LINE | Estimate: | $155,821 |
Length: | 2.0 Miles | Actual: | $199,283 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 450 | Let Status: | Actual |
Project ID: | STP 2005(386)SFT | CSJ: | 1382-02-013 |
Description: | SAFETY TREAT FIXED OBJECTS, INSTALL PROTECTION & MODERNIZE | Handling Code: |
|
Limits From: | HARRISON COUNTY LINE | Fund Cat: | 8 |
Limits To: | UPSHUR COUNTY LINE | Estimate: | $88,424 |
Length: | 2.0 Miles | Actual: | $64,394 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 450 | Let Status: | Actual |
Project ID: | STP 2005(386)SFT | CSJ: | 1382-03-013 |
Description: | SAFETY TREAT FIXED OBJECTS & WIDEN LANES | Handling Code: |
|
Limits From: | 0.7 MI S OF FM 726 | Fund Cat: | 8 |
Limits To: | MARION COUNTY LINE | Estimate: | $354,569 |
Length: | 4.5 Miles | Actual: | $442,218 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 450 | Let Status: | Actual |
Project ID: | STP 2005(386)SFT | CSJ: | 1382-03-014 |
Description: | SAFETY TREAT FIXED OBJECTS, INSTALL PROTECTION & MODERNIZE | Handling Code: |
|
Limits From: | 0.7 MI SOUTH OF FM 726 | Fund Cat: | 8 |
Limits To: | MARION COUNTY LINE | Estimate: | $234,153 |
Length: | 4.5 Miles | Actual: | $203,234 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 2879 | Let Status: | Actual |
Project ID: | STP 2005(386)SFT | CSJ: | 2880-01-015 |
Description: | SAFETY TREAT DRAINAGE STRCTURES AND WIDEN LANES | Handling Code: |
|
Limits From: | SH 154 | Fund Cat: | 8 |
Limits To: | FM 449 | Estimate: | $363,602 |
Length: | 5.0 Miles | Actual: | $353,913 |
District: | Atlanta | Let Date: | MAY 2005 |
Highway: | FM 2879 | Let Status: | Actual |
Project ID: | STP 2005(386)SFT | CSJ: | 2880-01-017 |
Description: | SAFETY TREAT FIXED OBJECTS | Handling Code: |
|
Limits From: | FM 449 | Fund Cat: | 8 |
Limits To: | SH 154 | Estimate: | $253,534 |
Length: | 5.0 Miles | Actual: | $275,859 |
Back... |
Totals for 0640-06-035 | ||
Length: | 111.2 Miles | ||
Estimate: | $6,150,424 | ||
Actual: | $6,090,635 | ||
CCSJ: 0843-07-010 | |||
District: | Atlanta | Let Date: | AUG 2005 |
Highway: | FM 2625 | Let Status: | Actual |
Project ID: | CC 843-7-10 | CSJ: | 0843-07-010 |
Description: | CONSTRUCT OVERPASS OVER LIGNITE MINING HAUL ROAD | Handling Code: |
|
Limits From: | 0.9 MI. E OF SH 43 | Fund Cat: | 10 |
Limits To: | 1.7 MI. E OF SH 43 | Estimate: | $3,384,701 |
Length: | 0.8 Miles | Actual: | $2,888,405 |
List Showing Order Proposal Req Form Project Addenda Bidders List Bid Tabulations Back... |
Totals for 0843-07-010 | ||
Length: | 0.8 Miles | ||
Estimate: | $3,384,701 | ||
Actual: | $2,888,405 | ||
CCSJ: 1575-02-028 | |||
District: | Atlanta | Let Date: | JUN 2005 |
Highway: | FM 968 | Let Status: | Actual |
Project ID: | STP 2005(254)SFT | CSJ: | 1575-02-028 |
Description: | SAFETY TREAT DRAINAGE STRUCTURES, REHABILITATE AND WIDEN | Handling Code: |
|
Limits From: | FM 450 | Fund Cat: | 1 |
Limits To: | GREGG COUNTY LINE | Estimate: | $3,677,772 |
Length: | 8.4 Miles | Actual: | $4,183,632 |
Bid Tabulations Back... |
Totals for 1575-02-028 | ||
Length: | 8.4 Miles | ||
Estimate: | $3,677,772 | ||
Actual: | $4,183,632 |
|
|