CCSJ: 0016-02-103

District: Austin Let Date: DEC 2004
Highway: IH 35 Let Status: Actual
Project ID: IM 35-3(239) CSJ: 0016-02-103
Description: REPLACE BRIDGE AND APPROACHES AND RECONSTRUCT FRONTAGE ROADS Handling
Code:
 
Limits From: N OF BUNTON OVERPASS Fund Cat: 1
Limits To: S OF BUNTON OVERPASS Estimate: $4,500,091
Length: 0.3 Miles Actual: $4,628,272
 
District: Austin Let Date: DEC 2004
Highway: FM 1626 Let Status: Actual
Project ID: SB 2005(62) CSJ: 1539-01-011
Description: CONSTRUCT 4 - LN DIVIDED ROADWAY Handling
Code:
 
Limits From: FM 2770 Fund Cat: 10
Limits To: IH 35 Estimate: $10,851,251
Length: 2.9 Miles Actual: $10,989,853
 
District: Austin Let Date: DEC 2004
Highway: FM 1626 Let Status: Actual
Project ID: MG 2005(155) CSJ: 1539-01-012
Description: CONSTRUCT OVERPASS Handling
Code:
 
Limits From: AT UPRR Fund Cat: 11
Limits To: . Estimate: $962,531
Length: 0.1 Miles Actual: $911,463
 
Back...

Totals for 0016-02-103
Length: 3.3 Miles
Estimate: $16,313,873
Actual: $16,529,588

CCSJ: 0113-07-052

District: Austin Let Date: JUL 2005
Highway: US 290 Let Status: Actual
Project ID: STP 2005(659)SFT CSJ: 0113-07-052
Description: CONST PAVED SHOULDERS & INSTALL CONTINUOUS TURN LANE Handling
Code:
 
Limits From: AT MCGREGOR LANE Fund Cat: 11
Limits To: . Estimate: $588,872
Length: 0.5 Miles Actual: $670,449
 
Award Status
Bid Tabulations
Back...

Totals for 0113-07-052
Length: 0.5 Miles
Estimate: $588,872
Actual: $670,449

CCSJ: 0914-33-029

District: Austin Let Date: AUG 2005
Highway: VA Let Status: Approved
Project ID: STP 2002(108)TE CSJ: 0914-33-029
Description: CONSTRUCT PEDESTRIAN FACILITY Handling
Code:
LN
Limits From: OLDE TOWNE BUDA PEDESTRIAN FACILITY Fund Cat: 9
Limits To: IN CITY OF BUDA Estimate: $977,963
Length: 0.0 Miles Actual:  
 
Back...

Totals for 0914-33-029
Length: 0.0 Miles
Estimate: $977,963
Actual:  

CCSJ: 0914-33-034

District: Austin Let Date: MAY 2005
Highway: VA Let Status: Actual
Project ID: STP 2005(244)MM CSJ: 0914-33-034
Description: PURCHASE HYBRID=ELECTRIC DIESEL COMMUTER BUS Handling
Code:
XX
Limits From: VARIOUS LOCATIONS IN SAN MARCOS Fund Cat: 7
Limits To: . Estimate: $600,000
Length: 0.1 Miles Actual: $600,000
 
Back...

Totals for 0914-33-034
Length: 0.1 Miles
Estimate: $600,000
Actual: $600,000

CCSJ: 0914-33-036

District: Austin Let Date: JUL 2005
Highway: VA Let Status: Actual
Project ID: C 914-33-36 CSJ: 0914-33-036
Description: UPGRADE TRAFFIC SIGNALS Handling
Code:
 
Limits From: VARIOUS ON-SYSTEM TS IN SAN MARCOS Fund Cat: 1
Limits To: . Estimate: $926,037
Length: 0.1 Miles Actual: $870,355
 
District: Austin Let Date: JUL 2005
Highway: CS Let Status: Actual
Project ID: CC 914-33-37 CSJ: 0914-33-037
Description: UPGRADE TRAFFIC SIGNALS Handling
Code:
 
Limits From: VARIOUS OFF-SYSTEM TS IN SAN MARCOS Fund Cat: 10
Limits To: . Estimate: $260,182
Length: 0.1 Miles Actual: $419,499
 
Bid Tabulations
Back...

Totals for 0914-33-036
Length: 0.2 Miles
Estimate: $1,186,219
Actual: $1,289,854

CCSJ: 3379-01-008

District: Austin Let Date: NOV 2004
Highway: FM 3407 Let Status: Actual
Project ID: MG 2002(671) CSJ: 3379-01-008
Description: CONSTRUCT RAILROAD GRADE SEPARATION STRUCTURE Handling
Code:
 
Limits From: AT UPRR IN SAN MARCOS Fund Cat: 12
Limits To: DOT NOS. 415513X & 447686B Estimate: $5,233,454
Length: 0.6 Miles Actual: $5,416,544
 
District: Austin Let Date: NOV 2004
Highway: FM 3407 Let Status: Actual
Project ID: CC 3379-1-11 CSJ: 3379-01-011
Description: UTILITY IDENTIFICATION Handling
Code:
 
Limits From: FM 3407: AT UPRR IN SAN MARCOS Fund Cat: ROW
Limits To: DOT NOS. 415513X AND 447686B Estimate: $28,042
Length: 0.0 Miles Actual: $70,456
 
District: Austin Let Date: NOV 2004
Highway: FM 3407 Let Status: Actual
Project ID: CC 3379-1-12 CSJ: 3379-01-012
Description: UTILITY IDENTIFICATION Handling
Code:
NC
Limits From: FM 3407: AT UPRR IN SAN MARCOS Fund Cat: ROW
Limits To: DOT NOS. 415513X AND 447686B Estimate: $81,924
Length: 0.0 Miles Actual: $151,303
 
Back...

Totals for 3379-01-008
Length: 0.6 Miles
Estimate: $5,343,420
Actual: $5,638,303


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract