Letting Schedule for Dallas District (FY 2005)

 
 
Last Update: Monday, August 15, 2005
Dallas District (FY 2005)
Collin | Dallas | Denton | Ellis | Kaufman | Navarro | Rockwall

Collin County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0047-06-126 US 75 Actual JUN 2005 $391,390 10 LANDSCAPE DEVELOPMENT
0091-05-045 SH 289 Actual AUG 2005 $713,247 5 1 ON - SYSTEM INTERSECTION IMPROVEMENT
0549-03-017 SH 121 Actual JAN 2005 $869,531 1 MICROSURFACING PAVEMENT MARKINGS
0918-24-107 VA Actual MAY 2005 $238,471 5 UPGRADE AND OPTIMIZE TRAFFIC SIGNAL SYSTEM
0918-24-109 CS Actual SEP 2004 $2,909,651 7 NEW ROADWAY
0918-24-120 VA Actual FEB 2005 $295,983 1 INSTALLING SMALL SIGN MOUNTS
1012-02-020 FM 545 Actual OCT 2004 $980,228 10 ADD SHOULDERS AND RECONSTRUCT EXISTING ROADWAY ON NEW
1012-02-026 FM 545 Actual SEP 2004 $1,574,313 1 SPOT BASE REPAIR, LEVEL - UP, OVERLAY & PAVEMENT MARKINGS
3476-02-004 FM 3286 Actual SEP 2004 $20,767,940 6 REPLACE BRIDGE AND APPROACHES

Dallas County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0008-08-067 SH 180 Actual MAY 2005 $490,668 1 REHABILITATION OF EXISTING ROADWAY
0009-11-188 IH 30 Actual JUL 2005 $3,798,061 1 CONTINUOUS ILLUMINATION
0009-11-203 IH 30 Actual JAN 2005 $177,710 1 REHABILITATE DYNAMIC MESSAGE SIGN
0047-07-179 US 75 Actual JUN 2005 $626,188 5 1 ON - SYSTEM INTERSECTION IMPROVEMENTS
0047-07-189 US 75 Actual SEP 2004 $7,063,037 7 CONSTRUCTION AND WIDENING OF CHURCHILL WAY
0047-07-209 US 75 Actual FEB 2005 $862,400 10 LANDSCAPE ESTABLISHMENT
0091-06-038 SH 289 Actual AUG 2005 $562,333 5 INTERSECTION IMPROVEMENT
0091-06-040 SH 289 Actual AUG 2005 $1,573,953 5 1 ON SYSTEM INTERSECTION IMPROVEMENT
0091-06-041 SH 289 Actual AUG 2005 $1,099,906 5 1 ON SYSTEM INTERSECTION IMPROVEMENT
0091-06-042 SH 289 Actual AUG 2005 $3,391,929 5 1 ON - SYSTEM INTERSECTION IMPROVEMENT
0092-02-110 IH 45 Actual FEB 2005 $2,151,638 1 CONC. PAVEMENT, ACP OVERLAY, CLEAN & REPAIR DRAINAGE
0092-02-111 IH 45 Actual JUN 2005 $71,522 10 LANDSCAPE DEVELOPMENT
0092-07-044 SH 356 Actual AUG 2005 $747,602 5 INTERSECTION IMPROVEMENTS
0092-14-064 IH 345 Actual MAY 2005 $488,463 7 WIDEN NB TO WB RAMP TO TWO LANES
0092-14-068 IH 345 Actual OCT 2004 $847,625 7 INSTALLATION OF INCIDENT DETECTION AND RESPONSE SYSTEM
0092-14-074 IH 45 Actual NOV 2004 $392,960 1 INSTALL WIRE FENCE IN MEDIAN
0094-03-095 SH 183 Actual AUG 2005 $195,752 5 EXTEND LEFT TURN LANE
0094-07-034 SH 183 Actual JUL 2005 $2,151,212 11 RAMP RELOCATION & WIDENING OF MAINLANES
0094-07-038 SH 183 Actual OCT 2004 $470,165 10 LANDSCAPE DEVELOPMENT
0095-02-095 US 80 Actual DEC 2004 $1,656,247 1 INSTALL MEDIAN BARRIER & SAFETY LIGHTING
0196-03-106 IH 35E Actual JUN 2005 $1,027,520 11 ADD AUXILIARY LANES IN EACH DIRECTION BETWEEN ENTRANCE AND
0196-03-191 IH 35E Actual AUG 2005 $908,495 5 INTERSECTION IMPROVEMENTS
0196-03-192 IH 35E Actual AUG 2005 $2,664,935 5 1 ON SYSTEM INTERSECTION IMPROVEMENT
0196-03-217 IH 35E Actual JUL 2005 $1,005,348 5 MODIFY TURNING RADIUS FOR TRACKS
0196-06-022 LP 354 Actual AUG 2005 $573,437 5 1 ON SYSTEM INTESECTION IMPROVEMENT
0197-02-091 US 175 Actual JAN 2005 $566,599 1 WIDEN RAMP TO TWO LANES
0197-02-097 US 175 Actual JUL 2005 $3,351,487 1 MILL & OVERLAY, FULL DEPTH REPAIR, & SHLDR TEXTURING
0430-01-050 SH 352 Actual AUG 2005 $983,389 1 FULL DEPTH CONCRETE PAVEMENT REPAIR AND NOVACHIP
0442-02-138 IH 35E Actual JUN 2005 $231,820 1 FULL DEPTH CONCRETE PAVEMENT REPAIR
0581-01-100 LP 12 Actual JUL 2005 $1,337,354 5 INTERSECTION IMPROVEMENTS
0581-01-125 LP 12 Actual AUG 2005 $418,432 5 1 INTERSECTION IMPROVEMENT
0581-02-112 LP 12 Actual OCT 2004 $7,271,133 1 WIDEN EXISTING 6 LANES TO 8 LANES
0918-00-071 VA Actual NOV 2004 $4,053,010 1 SEALCOAT
0918-00-094 VA Actual MAY 2005 $4,175,000 5 DECREASE EMISSIONS VIA ALTERNATIVE FUELS
0918-00-096 VA Actual DEC 2004 $1,186,056 1 COBRA HEAD REPLACEMENT
0918-00-098 VA Actual JAN 2005 $248,993 1 GROUND BOX REPLACEMENT
0918-00-100 VA Actual DEC 2004 $413,000 1 LED SIGNAL HEAD UPGRADE
0918-00-101 VA Actual FEB 2005 $630,851 1 SIGN AND SIGN STRUCTURE REPLACEMENTS
0918-00-102 VA Actual NOV 2004 $4,422,784 1 SEALCOAT
0918-00-104 VA Actual JAN 2005 $4,300,000 1 SEAL COAT
0918-00-105 VA Actual JUL 2005 $258,444 1 REPAIR CANTILEVER AND OVERHEAD SIGN BRIDGES
0918-00-107 VA Actual NOV 2004 $200,000 7 LIGHT - EMITTING DIODE TRAFFIC SIGNAL REPLACEMENT PROGRAM
0918-00-108 VA Actual APR 2005 $261,198 1 REPAIR CTB - NWAO
0918-00-110 VA Actual APR 2005 $500,000 7 DIESEL FREIGHT VEHICLE IDLING REDUCTION PROGRAM
0918-00-111 VA Actual APR 2005 $1,000,000 7 EMPLOYEE TRIP REDUCTION PROGRAM
0918-00-112 VA Actual APR 2005 $312,500 7 CLEAN FLEET VEHICLE PROCUREMENT POLICY
0918-00-113 VA Actual APR 2005 $5,610,000 1 FUNDS TRANSFER FOR CONTRACTED ROUTINE MAINTENANCE
0918-00-116 VA Actual JUN 2005 $4,016,849 1 FUNDS TRANSFER FOR BASE REPAIRS, LEVEL UP PAVEMENT AND FULL
0918-45-166 CR Actual JUL 2005 $528,285 6 REPLACE BRIDGE AND APPROACHES
0918-45-295 CS Actual FEB 2005 $461,191 5 2 INTERSECTION IMPROVEMENTS
0918-45-319 CS Actual AUG 2005 $909,634 5 3 INTERSECTION IMPROVEMENTS
0918-45-320 CS Actual AUG 2005 $1,164,366 5 5 INTERSECTION IMPROVEMENTS
0918-45-323 CS Actual AUG 2005 $1,110,797 5 4 OFF SYSTEM INTERSECTION IMPROVEMENTS
0918-45-324 CS Actual NOV 2004 $374,020 5 3 INTERSECTION IMPROVEMENTS
0918-45-343 CS Actual AUG 2005 $454,111 5 1 OFF SYSTEM INTERSECTION IMPROVEMENTS
0918-45-344 CS Actual AUG 2005 $2,131,713 5 7 OFF SYSTEM INTERSECTION IMPROVEMENTS
0918-45-350 CS Actual FEB 2005 $116,280 5 2 OFF - SYSTEM INTERSECTION IMPROVEMENTS
0918-45-355 CS Actual AUG 2005 $1,197,406 5 5 OFF SYSTEM INTERSECTION IMPROVEMENTS
0918-45-397 CS Actual AUG 2005 $963,209 5 2 OFF SYSTEM INTERSECTION IMPROVEMENTS
0918-45-486 CS Tentative AUG 2005 $1 5 RIGHT OF WAY ACQUISITION, RELOCATION ASSISTANCE & UTILITY
0918-45-528 VA Approved AUG 2005 $2,063,417 9 BEAUTIFYING & HUMANIZING THE US 75 / DART RAIL GREENVILLE AVE
0918-45-579 VA Actual DEC 2004 $7,584,617 7 ROADWAY WIDENING TO ACCOMMODATE INCREASED TRUCK TRAFFIC WITH
0918-45-628 CS Tentative AUG 2005 $1 5 RIGHT OF WAY ACQUISITION
0918-45-667 VA Approved AUG 2005 $620,172 5 TRAFFIC CONTROL SYSTEM 31 LOCATIONS
0918-45-673 VA Actual AUG 2005 $8,911,000 7 CONSTRUCTION OF THE TXDOT DALLAS CENTRAL CONTROL CENTER
0918-45-674 VA Actual SEP 2004 $20,452,240 5 TRINITY RAILWAY EXPRESS DOUBLE TRACK AND GRADE SEPERATIONS;
0918-45-694 VA Actual APR 2005 $500,000 5 ALTERNATIVE FUELS
0918-45-699 CS Actual JUN 2005 $82,615 9 SIDEWALKS, SCHOOL ZONE FLASHERS, RAMPS RAIL, RETAINING WALL
0918-45-750 VA Actual APR 2005 $3,154,760 1 REPAIR OF CONCRETE AND PAVEMENT REPAIR
0918-45-751 VA Actual APR 2005 $3,435,193 1 REFLECTORIZED PAVEMENT MARKINGS
0918-45-752 VA Actual APR 2005 $400,000 7 EVALUATE IMPACTS OF RESTRICTING TRUCKS TO OPERATE ONLY IN
0918-45-753 VA Actual DEC 2004 $1,500,000 1 ABR TRANSFER FOR SWAO CONCRETE PAVEMENT REPAIR
1047-02-042 FM 1382 Actual DEC 2004 $228,635 10 LANDSCAPE DEVELOPMENT
1068-04-133 IH 30 Actual JAN 2005 $41,735,764 1 RECONSTRUCT FREEWAY AND OVERPASS AT LOOP 12
1068-04-135 IH 30 Actual MAY 2005 $755,000 1 REPLACE WB EXIT RAMP RETAINING WALL
2208-02-018 SP 303 Actual SEP 2004 $1,144,460 1 REHABILITATION OF EXISTING ROADWAY
2374-01-111 IH 635 Actual OCT 2004 $1,142,119 2 3 INTERSECTION IMPROVEMENTS
2374-01-131 IH 635 Actual AUG 2005 $765,803 5 ONE ON SYSTEM INTERSECTION IMPROVEMENT
2374-01-132 IH 635 Actual MAY 2005 $635,839 1 REHABILITATE VARIOUS DYNAMIC MESSAGE SIGNS ON IH 635
2374-01-154 IH 635 Actual NOV 2004 $3,088,045 5 PHASE 1 OF HOV / ITS PROJECT: HIGH MAST ILLUMINATION
2374-02-089 IH 635 Actual AUG 2005 $1,384,842 5 3 ON SYSTEM INTERSECTION IMPROVEMENTS
2374-02-121 IH 635 Actual OCT 2004 $2,500 10 WILDFLOWER SEEDING
2374-03-064 IH 20 Actual JUL 2005 $14,939,000 7 CONSTRUCT 2 LANE FRONTAGE ROADS EASTBOUND AND WESTBOUND
2374-03-068 IH 20 Actual JUL 2005 $5,313,034 1 FULL - DEPTH REPAIR, MILL & OVERLAY, CROSS - STITCHING & SURFACE
2374-04-046 IH 20 Actual MAY 2005 $7,870,576 1 REHAB OF EXISTING FREEWAY
2374-04-058 IH 20 Actual OCT 2004 $3,606,395 5 INSTALL SENSOR STATIONS WITH COMPRESSED CCTV CAMERAS,
2964-01-029 SH 161 Actual JUN 2005 $43,132,516 2 CONSTRUCT 6 LANE FRONTAGE ROAD SECTIONS (PHASE I)
2964-01-030 SH 161 Actual JUL 2005 $24,960,709 2 CONSTRUCT 6 LANE FRONTAGE ROAD SECTIONS (PHASE I)
2964-01-034 SH 161 Actual MAR 2005 $9,432,432 2 COURT MANDATED MITIGATION FOR PARKS IMPACTED BY SH 161
2964-01-035 SH 161 Actual OCT 2004 $5,182,590 1 INSTALLATION / CONSTRUCTION OF CTB
8043-18-005 MH Actual JUL 2005 $38,534,000 7 RECONSTRUCT EXISTING 4 - LANE ROADWAY TO 6 - LANE DIVIDED
8050-18-037 MH Actual SEP 2004 $5,708,080 2 TRINITY RAILWAY EXPRESS DOUBLE TRACK AND GRADE SEPERATIONS;
8050-18-042 MH Actual FEB 2005 $22,509,208 2 RECONSTRUCT EXISTING 4 - LANE DIVIDED RURAL ROADWAY TO

Denton County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0134-09-047 US 380 Actual MAY 2005 $4,257,000 6 REPLACE BRIDGE AND APPROACHES
0134-09-060 US 380 Actual JUN 2005 $1,696,828 1 MILL / INLAY, OVERLAY
0134-09-061 US 380 Actual AUG 2005 $195,602 1 INTERSECTION IMPROVEMENTS
0195-02-056 US 77 Actual MAR 2005 $299,984 10 LANDSCAPE DEVELOPMENT
0195-03-066 IH 35E Actual AUG 2005 $227,814 11 INSTALL RIGHT TURN LANE
0196-01-088 IH 35E Actual JUL 2005 $4,464,054 11 WIDEN FROM 4 TO 6 MAINLANES
0196-01-093 IH 35E Actual NOV 2004 $1,397,298 11 REVERSE NORTHBOUND ENTRANCE AND EXIT RAMPS
0196-02-094 IH 35E Actual JAN 2005 $918,543 7 NB RAMP REVERSAL
0196-02-102 IH 35E Actual AUG 2005 $149,942 7 CONSTRUCT LEFT TURN LANE ON SB APPROADCH
0718-01-048 FM 156 Actual OCT 2004 $159,403 1 INSTALL FLASHING BEACONS, ACP OVERLAY FOR LEFT TURN BAY,
0918-46-042 CR Actual JAN 2005 $683,204 6 REPLACE BRIDGE AND APPROACHES
0918-46-084 CS Actual AUG 2005 $989,604 5 3 OFF SYSTEM INTERSECTION IMPROVEMENTS
0918-46-100 CR Actual APR 2005 $1,048,832 6 REPLACE BRIDGE AND APPROACHES
0918-46-101 CR Actual OCT 2004 $645,361 6 REPLACE BRIDGE AND APPROACHES
0918-46-128 VA Actual JUN 2005 $1,324,684 9 CONSTRUCTION OF (PHASE I) OF HIGHLAND VILLAGE INLAND TRAIL
0918-46-140 CR Actual JAN 2005 $403,932 6 REPLACE BRIDGE AND APPROACHES
0918-46-141 CR Actual DEC 2004 $437,736 6 REPLACE BR & APPRS
0918-46-144 CS Actual JAN 2005 $1,172,366 7 CONSTRUCT 3 ADDITIONAL WESTBOUND MAINLANES TO COMPLETE
0918-46-167 CS Actual JUN 2005 $437,052 6 REPLACE BRIDGE AND APPROACHES
0918-46-193 CS Actual JUN 2005 $1,068,823 7 NEW CITY STREETS
1311-01-044 FM 1171 Actual APR 2005 $30,080 10 RAILROAD GRADE CROSSING REPLANKING
2250-02-015 LP 288 Actual SEP 2004 $820,278 1 INSTALL CTB & HEADLIGHT BARRIER FENCE TO PROVIDE SAFETY
3547-01-010 SH 121 Actual APR 2005 $997,482 1 FULL DEPTH REPAIR

Ellis County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0092-04-067 IH 45 Actual JUN 2005 $8,116,816 1 FRONTAGE ROAD PAVEMENT REPAIR
0173-01-043 SH 34 Actual FEB 2005 $2,592,355 1 CONSTRUCT CONTINUOUS LEFT - TURN LANE
0596-02-031 FM 66 Actual DEC 2004 $2,092,415 6 REPLACE BR & APPRS
0596-02-032 FM 66 Actual AUG 2005 $717,495 6 REPLACE BRIDGE AND APPROACHES
0596-02-033 FM 66 Actual AUG 2005 $6,096,729 8 ADD SHOULDERS AND GUARD FENCE, UPGRADE CULVERT AND BRIDGE
0596-04-037 FM 878 Actual AUG 2005 $925,467 6 REPLACE BRIDGE AND APPROACHES
0918-22-070 CS Actual FEB 2005 $484,812 6 REPLACE BRIDGE & APPROACHES
0918-22-071 CR Actual APR 2005 $679,000 6 REPLACE BRIDGE AND APPROACHES
0918-22-072 CR Actual FEB 2005 $687,770 6 REPLACE BRIDGE & APPROACHES
0918-22-073 CR Actual APR 2005 $1,067,381 6 REPLACE BRIDGE AND APPROACHES
1048-02-027 FM 660 Actual AUG 2005 $1,041,603 6 REPLACE BRIDGE AND APPROACHES
1139-02-014 FM 813 Actual MAY 2005 $1,795,000 1 REPLACE BRIDGE AND APPROACHES
1211-01-016 FM 984 Actual AUG 2005 $605,560 6 REPLACE BRIDGE AND APPROACHES
1211-02-016 FM 984 Actual APR 2005 $22,135 10 RAILROAD GRADE CROSSING REPLANKING

Kaufman County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0095-04-050 US 80 Actual SEP 2004 $1,016,316 6 WIDEN BRIDGES AND APPROACHES
0197-12-004 BU 175D Actual MAY 2005 $711,112 1 MILL AND OVERLAY
0495-01-050 IH 20 Actual MAR 2005 $2,791,797 1 RESTORATION OF IH 20 FOLLOWING EXPIRATION OF TOTAL MAINT
0751-03-033 FM 3094 Actual JUN 2005 $578,377 1 REPLACE BRIDGE AND APPROACHES
0918-11-060 VA Actual JUN 2005 $4,666,649 1 BASE REPAIR AND OVERLAY
0918-11-061 VA Actual JUN 2005 $5,619,443 1 BASE REPAIR AND OVERLAY
0918-11-062 VA Actual JUN 2005 $989,376 1 BRIDGE JOINT REPAIR
1091-01-013 FM 740 Actual MAR 2005 $2,186,530 11 RECONSTRUCT EXISTING 2 - LANE ROADWAY TO 4 - LANES
1091-02-016 FM 740 Actual APR 2005 $30,080 10 RAILROAD GRADE CROSSING REPLANKING
3089-01-009 FM 3039 Actual NOV 2004 $896,831 1 ADD TURN LANES

Navarro County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0093-01-080 IH 45 Actual SEP 2004 $181,492 1 SAFETY LIGHTING
0093-01-082 IH 45 Actual JUN 2005 $1,557,091 8 INSTALL WIRE FENCE IN MEDIAN
0999-01-026 FM 1394 Actual JUN 2005 $6,948,164 1 OV - ASPHALTIC CONCRETE PAVEMENT OVERLAY

Rockwall County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0009-04-057 SH 66 Actual OCT 2004 $161,538 10 LANDSCAPE DEVELOPMENT
0009-12-067 IH 30 Actual JUN 2005 $371,322 11 ADD NEW EXIT RAMP


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract