Detail Letting Schedule for Upshur County (FY 2007)

 
 
Last Update: Monday, August 6, 2007
Upshur County (FY 2007)

CCSJ: 0392-02-075

District: Atlanta Let Date: JUL 2007
Highway: US 259 Let Status: Actual
Project ID: STP 2007(682)SB CSJ: 0392-02-075
Description: INSTALL A CABLE SAFETY SYSTEM MEDIAN BARRIER Handling
Code:
 
Limits From: MORRIS COUNTY LINE Fund Cat: 8
Limits To: 0.7 MI N OF FM 1649 Estimate: $664,536
Length: 5.1 Miles Actual: $463,614
 
District: Atlanta Let Date: JUL 2007
Highway: US 259 Let Status: Actual
Project ID: STP 2007(682)SB CSJ: 0392-02-076
Description: INSTALL A CABLE SAFETY SYSTEM MEDIAN BARRIER Handling
Code:
 
Limits From: FM 3245 Fund Cat: 8
Limits To: GREGG COUNTY LINE Estimate: $282,668
Length: 1.9 Miles Actual: $209,470
 
Bid Tabulations
Award Status
Back...

Totals for 0392-02-075
Length: 7.0 Miles
Estimate: $947,204
Actual: $673,084

CCSJ: 0520-02-036

District: Atlanta Let Date: JUL 2007
Highway: SH 155 Let Status: Actual
Project ID: BR 2007(683) CSJ: 0520-02-036
Description: REPLACE BRIDGE AND APPROACHES Handling
Code:
 
Limits From: AT BIG SANDY CREEK Fund Cat: 1
Limits To: 0.6 MI S OF FM 1002 Estimate: $7,085,027
Length: 1.4 Miles Actual: $6,020,884
 
Bid Tabulations
Award Status
Back...

Totals for 0520-02-036
Length: 1.4 Miles
Estimate: $7,085,027
Actual: $6,020,884

CCSJ: 0520-02-050

District: Atlanta Let Date: JUL 2007
Highway: SH 155 Let Status: Actual
Project ID: C 520-2-50 CSJ: 0520-02-050
Description: RESURFACE EXISTNG 2 - LANE HIGHWAY Handling
Code:
 
Limits From: 0.3 MI. S. OF US 271 IN GILMER Fund Cat: 1
Limits To: 0.1 MI. S. OF FM 1404 AT PRITCHETT Estimate: $1,021,018
Length: 5.3 Miles Actual: $855,448
 
Bid Tabulations
Award Status
Back...

Totals for 0520-02-050
Length: 5.3 Miles
Estimate: $1,021,018
Actual: $855,448


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract