Detail Letting Schedule for Guadalupe County (FY 2012)
Detail Letting Schedule for Guadalupe County (FY 2012) | ||||
Last Update: Monday, September 24, 2012 |
Guadalupe County (FY 2012) |
CCSJ: 0016-06-046 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 16-6-46 | CSJ: | 0016-06-046 |
Description: | EXPAND FROM 6 TO 8 LANE EXPRESSWAY | Handling Code: |
|
Limits From: | BEXAR / GUADALUPE COUNTY LINE | Fund Cat: | 3 |
Limits To: | FM 3009 | Estimate: | $8,489,928 |
Length: | 2.1 Miles | Actual: | $9,163,402 |
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | C 16-7-129 | CSJ: | 0016-07-129 |
Description: | LP 1604 TO GUADALUPE C / L; EXPAND FROM 6 TO 8 LANE EXPRESSWAY | Handling Code: |
|
Limits From: | JUDSON ROAD | Fund Cat: | 3 |
Limits To: | GUADALUPE / BEXAR COUNTY LINE | Estimate: | $11,992,919 |
Length: | 3.7 Miles | Actual: | $12,427,317 |
Award Status Bid Tabulations Back... |
Totals for 0016-06-046 | ||
---|---|---|---|
Length: | 5.8 Miles | ||
Estimate: | $20,482,847 | ||
Actual: | $21,590,719 | ||
CCSJ: 0025-03-093 | |||
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0025-03-093 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | IH 10 | Fund Cat: | 1 |
Limits To: | US 90A | Estimate: | $178,991 |
Length: | 3.1 Miles | Actual: | $142,374 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0025-03-096 |
Description: | SEAL COAT AND PAVEMENT MARKINGS (WB FRONTAGE RDS) | Handling Code: |
|
Limits From: | CIBOLO CREEK | Fund Cat: | 1 |
Limits To: | FM 725 | Estimate: | $378,453 |
Length: | 10.0 Miles | Actual: | $329,506 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | FM 78 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0025-10-084 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | GUADALUPE RIVER | Fund Cat: | 1 |
Limits To: | US 90 | Estimate: | $279,367 |
Length: | 4.0 Miles | Actual: | $226,622 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0029-01-026 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 90A | Fund Cat: | 1 |
Limits To: | PREXY ST | Estimate: | $80,896 |
Length: | 1.3 Miles | Actual: | $65,000 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0036-08-050 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 1.7 MILES SOUTH OF SH 127 | Fund Cat: | 1 |
Limits To: | SH 55 | Estimate: | $637,362 |
Length: | 19.3 Miles | Actual: | $531,529 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | US 87 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0072-02-019 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | GILLESPIE/KENDALL C/L | Fund Cat: | 1 |
Limits To: | KENDALL/KERR C/L | Estimate: | $168,960 |
Length: | 2.9 Miles | Actual: | $140,076 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | US 87 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0072-03-015 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | KENDALL / KERR COUNTY LINE | Fund Cat: | 1 |
Limits To: | KERR / KENDALL COUNTY LINE | Estimate: | $76,533 |
Length: | 1.3 Miles | Actual: | $62,218 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | US 87 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0072-04-034 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | KERR/KENDALL C/L | Fund Cat: | 1 |
Limits To: | CROSSOVER SOUTH OF IH 10 | Estimate: | $421,353 |
Length: | 7.3 Miles | Actual: | $349,873 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | US 181 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0100-04-036 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | .30 MI S FM 537 | Fund Cat: | 1 |
Limits To: | .51 MI SOUTH OF RR OVERPASS | Estimate: | $485,371 |
Length: | 5.6 Miles | Actual: | $399,803 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | SH 27 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0142-03-028 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 0.1 MI NORTH OF IH 10 (WEST END) | Fund Cat: | 1 |
Limits To: | SH 39 | Estimate: | $634,385 |
Length: | 13.9 Miles | Actual: | $524,158 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | FM 725 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0215-08-019 |
Description: | SEAL COAT AND PAVEMENT MARKINGS4 | Handling Code: |
|
Limits From: | IH 35 | Fund Cat: | 1 |
Limits To: | COMAL/GUADALUPE C/L | Estimate: | $76,015 |
Length: | 1.1 Miles | Actual: | $61,421 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0291-07-031 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 0.2 MI SOUTH OF FM 1283 | Fund Cat: | 1 |
Limits To: | BANDERA/MEDINA C/L | Estimate: | $437,566 |
Length: | 7.9 Miles | Actual: | $362,160 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | SH 119 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0359-05-009 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 87 | Fund Cat: | 1 |
Limits To: | FM 1347 (DENHAWKEN) | Estimate: | $134,512 |
Length: | 4.0 Miles | Actual: | $110,255 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | FM 1347 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0366-08-009 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 123 | Fund Cat: | 1 |
Limits To: | SH 119 | Estimate: | $63,309 |
Length: | 2.0 Miles | Actual: | $51,883 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | FM 541 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0366-09-028 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | MARCELINAS CRK | Fund Cat: | 1 |
Limits To: | SH 123 | Estimate: | $172,270 |
Length: | 6.7 Miles | Actual: | $139,610 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | RM 32 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0511-02-019 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 3432 | Fund Cat: | 1 |
Limits To: | COMAL/HAYS C/L | Estimate: | $186,961 |
Length: | 3.7 Miles | Actual: | $156,202 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | SL 98 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0526-01-017 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 0.1 MI SOUTH OF JAMES RD | Fund Cat: | 1 |
Limits To: | SHEPPARD REESE RD | Estimate: | $45,870 |
Length: | 1.2 Miles | Actual: | $37,318 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0535-01-070 |
Description: | SEAL COAT AND PAVEMENT MARKINGS (EB FRONTAGE RDS) | Handling Code: |
|
Limits From: | FM 725 | Fund Cat: | 1 |
Limits To: | GUADALUPE RIVER | Estimate: | $20,693 |
Length: | 0.6 Miles | Actual: | $20,292 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0535-01-071 |
Description: | SEAL COAT AND PAVEMENT MARKINGS (WB FRONTAGE RDS) | Handling Code: |
|
Limits From: | FM 725 | Fund Cat: | 1 |
Limits To: | GUADALUPE RIVER | Estimate: | $21,726 |
Length: | 0.6 Miles | Actual: | $21,234 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | SH 173 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0609-01-021 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 16 | Fund Cat: | 1 |
Limits To: | 1.6 MILES EAST OF SH 16 | Estimate: | $109,575 |
Length: | 1.6 Miles | Actual: | $89,002 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | RM 187 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0678-02-034 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | BANDERA/KERR C/L | Fund Cat: | 1 |
Limits To: | 10.1 MI OF BANDERA C/L(LOST MAPLES) | Estimate: | $244,768 |
Length: | 10.1 Miles | Actual: | $192,310 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | FM 3432 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0850-04-024 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | CR 324 | Fund Cat: | 1 |
Limits To: | FM 775 | Estimate: | $149,529 |
Length: | 4.1 Miles | Actual: | $122,483 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | FM 1350 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0855-05-011 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | RM 480 | Fund Cat: | 1 |
Limits To: | SH 27 | Estimate: | $80,386 |
Length: | 2.1 Miles | Actual: | $67,079 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | RM 334 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 0876-03-009 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | UVALDE/KINNEY C/L | Fund Cat: | 1 |
Limits To: | SH 55 (LAGUNA) | Estimate: | $192,253 |
Length: | 7.2 Miles | Actual: | $150,206 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | FM 536 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 1009-01-037 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | ATASCSOSA C/L | Fund Cat: | 1 |
Limits To: | FM 252579 | Estimate: | $303,547 |
Length: | 9.5 Miles | Actual: | $251,849 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | FM 541 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 1011-01-034 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | ATASCOSA C/L | Fund Cat: | 1 |
Limits To: | US 181 | Estimate: | $405,981 |
Length: | 14.4 Miles | Actual: | $337,163 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | FM 1435 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 1167-02-010 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | US 90 | Fund Cat: | 1 |
Limits To: | US 83 | Estimate: | $44,704 |
Length: | 1.1 Miles | Actual: | $34,864 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | FM 3447 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 2175-04-004 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 2369 | Fund Cat: | 1 |
Limits To: | US 90 | Estimate: | $36,860 |
Length: | 1.3 Miles | Actual: | $30,823 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | FM 539 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 2233-01-015 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 1.22 MILES NORTH US 87 | Fund Cat: | 1 |
Limits To: | GUDALUPE C/L | Estimate: | $222,544 |
Length: | 6.6 Miles | Actual: | $183,633 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | RM 2690 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 2661-01-013 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SH 27 | Fund Cat: | 1 |
Limits To: | US 83 | Estimate: | $287,037 |
Length: | 11.4 Miles | Actual: | $242,519 |
District: | San Antonio | Let Date: | NOV 2011 |
Highway: | FM 1435 | Let Status: | Actual |
Project ID: | STP 2012(121) | CSJ: | 3514-01-007 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 2369 | Fund Cat: | 1 |
Limits To: | US 90 | Estimate: | $82,450 |
Length: | 2.0 Miles | Actual: | $66,776 |
Back... |
Totals for 0025-03-093 | ||
Length: | 167.9 Miles | ||
Estimate: | $6,660,227 | ||
Actual: | $5,500,241 | ||
CCSJ: 0025-10-089 | |||
District: | San Antonio | Let Date: | DEC 2011 |
Highway: | FM 78 | Let Status: | Actual |
Project ID: | CRX 25-10-89 | CSJ: | 0025-10-089 |
Description: | RAILROAD GRADE CROSSING REPLANKING | Handling Code: |
XX |
Limits From: | ON FM 78 IN MCQUEENEY W OF FM 725 | Fund Cat: | 10 |
Limits To: | AT UPRR DOT #742652T | Estimate: | $66,176 |
Length: | 0.1 Miles | Actual: | $66,176 |
Back... |
Totals for 0025-10-089 | ||
Length: | 0.1 Miles | ||
Estimate: | $66,176 | ||
Actual: | $66,176 | ||
CCSJ: 0366-03-062 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | SH 123 | Let Status: | Actual |
Project ID: | C 366-3-62 | CSJ: | 0366-03-062 |
Description: | WIDEN ROADWAY TO PROVIDE PASSING LANES | Handling Code: |
|
Limits From: | GUADALUP/WILSON COUNTY LINE | Fund Cat: | 3 |
Limits To: | BS 123 | Estimate: | $4,890,395 |
Length: | 10.0 Miles | Actual: | $3,685,247 |
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | SH 123 | Let Status: | Actual |
Project ID: | C 366-4-19 | CSJ: | 0366-04-019 |
Description: | WIDEN ROADWAY TO PROVIDE PASSING LANES | Handling Code: |
|
Limits From: | BS 87 | Fund Cat: | 3 |
Limits To: | GUADALUPE/WILSON COUNTY LINE | Estimate: | $5,350,193 |
Length: | 9.9 Miles | Actual: | $3,807,444 |
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | SH 123 | Let Status: | Actual |
Project ID: | C 366-5-43 | CSJ: | 0366-05-043 |
Description: | WIDEN ROADWAY TO PROVIDE PASSING LANES | Handling Code: |
|
Limits From: | WILSON/KARNES COUNTY LINE | Fund Cat: | 3 |
Limits To: | BS 87 | Estimate: | $1,991,032 |
Length: | 11.7 Miles | Actual: | $1,412,492 |
Award Status Bid Tabulations Back... |
Totals for 0366-03-062 | ||
Length: | 31.6 Miles | ||
Estimate: | $12,231,620 | ||
Actual: | $8,905,183 | ||
CCSJ: 0915-46-038 | |||
District: | San Antonio | Let Date: | JUN 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1102(123)SRS | CSJ: | 0915-46-038 |
Description: | CONSTRUCT SIDEWALK, BIKE PATHS, BIKE RACKS, CROSSWALK | Handling Code: |
|
Limits From: | SCHOOL CAMPUSES IN MARION, TX | Fund Cat: | 8 |
Limits To: | . | Estimate: | $561,563 |
Length: | 0.0 Miles | Actual: | $542,082 |
Back... |
Totals for 0915-46-038 | ||
Length: | 0.0 Miles | ||
Estimate: | $561,563 | ||
Actual: | $542,082 | ||
CCSJ: 1542-01-017 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | FM 1518 | Let Status: | Actual |
Project ID: | STP 2012(401)FRS | CSJ: | 1542-01-017 |
Description: | STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS | Handling Code: |
XX |
Limits From: | FM 1518 | Fund Cat: | 8 |
Limits To: | AT UPRR | Estimate: | $212,667 |
Length: | 1.0 Miles | Actual: | $212,667 |
Back... |
Totals for 1542-01-017 | ||
Length: | 1.0 Miles | ||
Estimate: | $212,667 | ||
Actual: | $212,667 | ||
CCSJ: 3107-02-032 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | FM 3009 | Let Status: | Actual |
Project ID: | STP 2012(401)FRS | CSJ: | 3107-02-032 |
Description: | STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS | Handling Code: |
XX |
Limits From: | FM 3009 | Fund Cat: | 8 |
Limits To: | AT UPRR | Estimate: | $212,667 |
Length: | 1.0 Miles | Actual: | $212,667 |
Back... |
Totals for 3107-02-032 | ||
Length: | 1.0 Miles | ||
Estimate: | $212,667 | ||
Actual: | $212,667 |
|
|