Detail Letting Schedule for Harris County (FY 2012)
Detail Letting Schedule for Harris County (FY 2012) | ||||
Last Update: Monday, September 24, 2012 |
Harris County (FY 2012) |
CCSJ: 0027-09-097 | |||
District: | Houston | Let Date: | DEC 2011 |
Highway: | US 90A | Let Status: | Actual |
Project ID: | CRX 27-9-97 | CSJ: | 0027-09-097 |
Description: | FY 2008 RAILROAD GRADE CROSSING REPLANKING PROGRAM | Handling Code: |
XX |
Limits From: | UPRR RR IN HOUSTON AT MAIN STREET | Fund Cat: | 10 |
Limits To: | . | Estimate: | $48,128 |
Length: | 0.0 Miles | Actual: | $48,128 |
Back... |
Totals for 0027-09-097 | ||
---|---|---|---|
Length: | 0.0 Miles | ||
Estimate: | $48,128 | ||
Actual: | $48,128 | ||
CCSJ: 0027-09-098 | |||
District: | Houston | Let Date: | DEC 2011 |
Highway: | US 90A | Let Status: | Actual |
Project ID: | CRX 27-9-98 | CSJ: | 0027-09-098 |
Description: | FY 2010 RAILROAD GRADE CROSSING REPLANKING PROGRAM | Handling Code: |
XX |
Limits From: | US 90A (EAST BOUND) AT UPRR | Fund Cat: | 10 |
Limits To: | . | Estimate: | $98,400 |
Length: | 0.0 Miles | Actual: | $24,064 |
Back... |
Totals for 0027-09-098 | ||
Length: | 0.0 Miles | ||
Estimate: | $98,400 | ||
Actual: | $24,064 | ||
CCSJ: 0027-13-205 | |||
District: | Houston | Let Date: | JUN 2012 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | C 27-13-205 | CSJ: | 0027-13-205 |
Description: | CONSTRUCT FOUTAINVIEW AUXILIARY LANE | Handling Code: |
|
Limits From: | FOUNTAINVIEW ENTRANCE RAMP | Fund Cat: | 3 |
Limits To: | WEST OF IH 610 | Estimate: | $4,997,574 |
Length: | 0.7 Miles | Actual: | $4,414,105 |
Back... |
Totals for 0027-13-205 | ||
Length: | 0.7 Miles | ||
Estimate: | $4,997,574 | ||
Actual: | $4,414,105 | ||
CCSJ: 0028-01-094 | |||
District: | Houston | Let Date: | AUG 2012 |
Highway: | BU 90-U | Let Status: | Actual |
Project ID: | BR 2012(206) | CSJ: | 0028-01-094 |
Description: | REPLACE BRIDGE AND APPROACHES (NBI# 12102002801007) | Handling Code: |
|
Limits From: | AT SAN JACINTO RIVER RELIEF | Fund Cat: | 6 |
Limits To: | . | Estimate: | $2,147,264 |
Length: | 0.2 Miles | Actual: | $2,039,775 |
Award Status Bid Tabulations Back... |
Totals for 0028-01-094 | ||
Length: | 0.2 Miles | ||
Estimate: | $2,147,264 | ||
Actual: | $2,039,775 | ||
CCSJ: 0028-02-082 | |||
District: | Houston | Let Date: | JUN 2012 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | NH 2012(504) | CSJ: | 0028-02-082 |
Description: | ADD RAMP REVERSAL | Handling Code: |
|
Limits From: | SOUTHBOUND EXIT RAMP AT FM 2100 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $869,069 |
Length: | 0.7 Miles | Actual: | $1,119,755 |
Back... |
Totals for 0028-02-082 | ||
Length: | 0.7 Miles | ||
Estimate: | $869,069 | ||
Actual: | $1,119,755 | ||
CCSJ: 0050-06-083 | |||
District: | Houston | Let Date: | JUL 2012 |
Highway: | US 290 | Let Status: | Actual |
Project ID: | C 50-6-83 | CSJ: | 0050-06-083 |
Description: | INTERSECTION IMPROVEMENTS | Handling Code: |
|
Limits From: | AT BARKER CYPRESS ROAD | Fund Cat: | 3 |
Limits To: | . | Estimate: | $2,086,216 |
Length: | 0.4 Miles | Actual: | $2,824,350 |
Bid Tabulations Back... |
Totals for 0050-06-083 | ||
Length: | 0.4 Miles | ||
Estimate: | $2,086,216 | ||
Actual: | $2,824,350 | ||
CCSJ: 0177-06-080 | |||
District: | Houston | Let Date: | NOV 2011 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2012(105) | CSJ: | 0177-06-080 |
Description: | REM CONC PVT, BS, CONC BAR, RR, AND CONST DITCH, FAST TRACK | Handling Code: |
|
Limits From: | AT FM 1960 | Fund Cat: | 1 |
Limits To: | AT FM 1960 | Estimate: | $437,812 |
Length: | 0.3 Miles | Actual: | $349,419 |
Back... |
Totals for 0177-06-080 | ||
Length: | 0.3 Miles | ||
Estimate: | $437,812 | ||
Actual: | $349,419 | ||
CCSJ: 0271-07-303 | |||
District: | Houston | Let Date: | OCT 2011 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | C 271-7-303 | CSJ: | 0271-07-303 |
Description: | CONSTRUCT NOISE WALL | Handling Code: |
NC |
Limits From: | IH 10 AT W OF WILCREST | Fund Cat: | 1 |
Limits To: | . | Estimate: | $156,437 |
Length: | 0.0 Miles | Actual: | $141,823 |
Back... |
Totals for 0271-07-303 | ||
Length: | 0.0 Miles | ||
Estimate: | $156,437 | ||
Actual: | $141,823 | ||
CCSJ: 0271-07-304 | |||
District: | Houston | Let Date: | APR 2012 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0107(433) | CSJ: | 0271-07-304 |
Description: | CONSTRUCT DRAINAGE AND DETENTION FACILITIES | Handling Code: |
|
Limits From: | TC JESTER | Fund Cat: | 1 |
Limits To: | TAYLOR STREET | Estimate: | $1,927,482 |
Length: | 2.1 Miles | Actual: | $2,096,612 |
Back... |
Totals for 0271-07-304 | ||
Length: | 2.1 Miles | ||
Estimate: | $1,927,482 | ||
Actual: | $2,096,612 | ||
CCSJ: 0271-16-131 | |||
District: | Houston | Let Date: | DEC 2011 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | IM 6107(432) | CSJ: | 0271-16-131 |
Description: | HIGH MAST ILLUMINATION | Handling Code: |
|
Limits From: | .122 MILES WST OF SH 35 | Fund Cat: | 1 |
Limits To: | .228 MILES WEST OF LONG DRIVE | Estimate: | $1,211,620 |
Length: | 2.0 Miles | Actual: | $1,018,574 |
Back... |
Totals for 0271-16-131 | ||
Length: | 2.0 Miles | ||
Estimate: | $1,211,620 | ||
Actual: | $1,018,574 | ||
CCSJ: 0271-16-132 | |||
District: | Houston | Let Date: | FEB 2012 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | STP 2012(302)HES | CSJ: | 0271-16-132 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | AT WOODRIDGE | Fund Cat: | 8 |
Limits To: | . | Estimate: | $305,096 |
Length: | 0.0 Miles | Actual: | $309,185 |
Back... |
Totals for 0271-16-132 | ||
Length: | 0.0 Miles | ||
Estimate: | $305,096 | ||
Actual: | $309,185 | ||
CCSJ: 0389-05-119 | |||
District: | Houston | Let Date: | JUN 2012 |
Highway: | SH 146 | Let Status: | Actual |
Project ID: | HP 2012(220) | CSJ: | 0389-05-119 |
Description: | CONSTRUCT NB DIRECT CONNECTOR | Handling Code: |
|
Limits From: | AT BNSF RR/PORT ROAD | Fund Cat: | 1 |
Limits To: | . | Estimate: | $9,873,643 |
Length: | 0.5 Miles | Actual: | $11,747,790 |
Back... |
Totals for 0389-05-119 | ||
Length: | 0.5 Miles | ||
Estimate: | $9,873,643 | ||
Actual: | $11,747,790 | ||
CCSJ: 0389-13-058 | |||
District: | Houston | Let Date: | AUG 2012 |
Highway: | SH 146 | Let Status: | Actual |
Project ID: | NH 2012(812) | CSJ: | 0389-13-058 |
Description: | LANDSCAPE DEVELOPMENT (PURCHASE OF MATERIALS ONLY) (NON - LET) | Handling Code: |
XX |
Limits From: | GARTH RD | Fund Cat: | 10 |
Limits To: | NORTH MAIN IN CITY OF BAYTOWN | Estimate: | $100,000 |
Length: | 0.0 Miles | Actual: | $100,000 |
Back... |
Totals for 0389-13-058 | ||
Length: | 0.0 Miles | ||
Estimate: | $100,000 | ||
Actual: | $100,000 | ||
CCSJ: 0500-03-569 | |||
District: | Houston | Let Date: | MAR 2012 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | STP 2012(373)HES | CSJ: | 0500-03-569 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | AT DOWLING STREET | Fund Cat: | 8 |
Limits To: | . | Estimate: | $302,064 |
Length: | 0.0 Miles | Actual: | $256,944 |
Back... |
Totals for 0500-03-569 | ||
Length: | 0.0 Miles | ||
Estimate: | $302,064 | ||
Actual: | $256,944 | ||
CCSJ: 0502-01-206 | |||
District: | Houston | Let Date: | JUL 2012 |
Highway: | SH 225 | Let Status: | Actual |
Project ID: | NH 2012(669) | CSJ: | 0502-01-206 |
Description: | HIGH MAST ILLUMINATION | Handling Code: |
|
Limits From: | WAFER STREET | Fund Cat: | 1 |
Limits To: | BW 8 | Estimate: | $2,213,011 |
Length: | 3.5 Miles | Actual: | $1,874,035 |
Bid Tabulations Back... |
Totals for 0502-01-206 | ||
Length: | 3.5 Miles | ||
Estimate: | $2,213,011 | ||
Actual: | $1,874,035 | ||
CCSJ: 0502-01-208 | |||
District: | Houston | Let Date: | AUG 2012 |
Highway: | SH 225 | Let Status: | Actual |
Project ID: | NH 2012(709) | CSJ: | 0502-01-208 |
Description: | FULL DEPTH REPAIR, MILLING, CURB REPAIR & ACP OVERLAY | Handling Code: |
|
Limits From: | GOODYEAR ROAD | Fund Cat: | 1 |
Limits To: | RED BLUFF | Estimate: | $2,260,329 |
Length: | 3.5 Miles | Actual: | $2,342,263 |
Award Status Bid Tabulations Back... |
Totals for 0502-01-208 | ||
Length: | 3.5 Miles | ||
Estimate: | $2,260,329 | ||
Actual: | $2,342,263 | ||
CCSJ: 0508-01-331 | |||
District: | Houston | Let Date: | SEP 2011 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0107(429) | CSJ: | 0508-01-331 |
Description: | INSTALLATION OF EAST / WEST U - TURNS, CONCRETE PAVING, | Handling Code: |
|
Limits From: | AT WAYSIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,463,468 |
Length: | 0.2 Miles | Actual: | $1,550,849 |
Back... |
Totals for 0508-01-331 | ||
Length: | 0.2 Miles | ||
Estimate: | $1,463,468 | ||
Actual: | $1,550,849 | ||
CCSJ: 0598-01-094 | |||
District: | Houston | Let Date: | AUG 2012 |
Highway: | SH 288 | Let Status: | Actual |
Project ID: | C 598-1-94 | CSJ: | 0598-01-094 |
Description: | CONSTRUCT TWO LANE DIRECT CONNECTOR FROM IH 610 EB TO SH 288 | Handling Code: |
|
Limits From: | AT IH 610 | Fund Cat: | 3 |
Limits To: | . | Estimate: | $744,298 |
Length: | 0.3 Miles | Actual: | $953,843 |
Award Status Bid Tabulations Back... |
Totals for 0598-01-094 | ||
Length: | 0.3 Miles | ||
Estimate: | $744,298 | ||
Actual: | $953,843 | ||
CCSJ: 0720-03-124 | |||
District: | Houston | Let Date: | DEC 2011 |
Highway: | SH 249 | Let Status: | Actual |
Project ID: | CRX 720-3-127 | CSJ: | 0720-03-124 |
Description: | FY 2010 RAILROAD GRADE CROSSING REPLANKING PROGRAM | Handling Code: |
XX |
Limits From: | SH 249 (WEST BOUND) AT BNSF | Fund Cat: | 10 |
Limits To: | . | Estimate: | $84,000 |
Length: | 0.0 Miles | Actual: | $8,400 |
Back... |
Totals for 0720-03-124 | ||
Length: | 0.0 Miles | ||
Estimate: | $84,000 | ||
Actual: | $8,400 | ||
CCSJ: 0720-03-125 | |||
District: | Houston | Let Date: | DEC 2011 |
Highway: | SH 249 | Let Status: | Actual |
Project ID: | CRX 720-3-125 | CSJ: | 0720-03-125 |
Description: | FY 2010 RAILROAD GRADE CROSSING REPLANKING PROGRAM | Handling Code: |
XX |
Limits From: | SH 249 (EAST BOUND) AT BNSF | Fund Cat: | 10 |
Limits To: | . | Estimate: | $67,200 |
Length: | 0.0 Miles | Actual: | $67,200 |
Back... |
Totals for 0720-03-125 | ||
Length: | 0.0 Miles | ||
Estimate: | $67,200 | ||
Actual: | $67,200 | ||
CCSJ: 0912-00-283 | |||
District: | Houston | Let Date: | OCT 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(190) | CSJ: | 0912-00-283 |
Description: | TMS MAINTENANCE | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,500,000 |
Length: | 0.0 Miles | Actual: | $1,500,000 |
Back... |
Totals for 0912-00-283 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,500,000 | ||
Actual: | $1,500,000 | ||
CCSJ: 0912-00-324 | |||
District: | Houston | Let Date: | JUN 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(602) | CSJ: | 0912-00-324 |
Description: | INSTALL BATTERY BACK UP AND UPGRADE POWER METERS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS ON SH 6 & FM 1960 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $748,150 |
Length: | 0.0 Miles | Actual: | $555,317 |
Back... |
Totals for 0912-00-324 | ||
Length: | 0.0 Miles | ||
Estimate: | $748,150 | ||
Actual: | $555,317 | ||
CCSJ: 0912-00-337 | |||
District: | Houston | Let Date: | AUG 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(782) | CSJ: | 0912-00-337 |
Description: | SIGNAL SYSTEM ITS (NON - LETTING) | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $90,000 |
Length: | 1.4 Miles | Actual: | $90,000 |
Back... |
Totals for 0912-00-337 | ||
Length: | 1.4 Miles | ||
Estimate: | $90,000 | ||
Actual: | $90,000 | ||
CCSJ: 0912-00-380 | |||
District: | Houston | Let Date: | SEP 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(020) | CSJ: | 0912-00-380 |
Description: | NEW TRAFFIC SIGNALS_ (NON - SITE SPECIFIC) | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,550,930 |
Length: | 0.0 Miles | Actual: | $1,515,999 |
Back... |
Totals for 0912-00-380 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,550,930 | ||
Actual: | $1,515,999 | ||
CCSJ: 0912-00-404 | |||
District: | Houston | Let Date: | NOV 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(106) | CSJ: | 0912-00-404 |
Description: | REPAIR OF BRIDGE APPROACHES | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,895,086 |
Length: | 0.0 Miles | Actual: | $1,680,068 |
Back... |
Totals for 0912-00-404 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,895,086 | ||
Actual: | $1,680,068 | ||
CCSJ: 0912-00-414 | |||
District: | Houston | Let Date: | APR 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(663) | CSJ: | 0912-00-414 |
Description: | FLOW SIGNAL REHABILITATION | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $300,000 |
Length: | 0.0 Miles | Actual: | $300,000 |
Back... |
Totals for 0912-00-414 | ||
Length: | 0.0 Miles | ||
Estimate: | $300,000 | ||
Actual: | $300,000 | ||
CCSJ: 0912-00-417 | |||
District: | Houston | Let Date: | APR 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(462) | CSJ: | 0912-00-417 |
Description: | NEW / UPGRADE HPS LIGHT ASSEMBLIES TO LED LIGHT ASSEMBLIES | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,581,028 |
Length: | 0.0 Miles | Actual: | $859,065 |
Back... |
Totals for 0912-00-417 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,581,028 | ||
Actual: | $859,065 | ||
CCSJ: 0912-00-445 | |||
District: | Houston | Let Date: | SEP 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1102(522) | CSJ: | 0912-00-445 |
Description: | ITS - MAINTENANCE (NON - LETTING) | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $3,000,000 |
Length: | 0.0 Miles | Actual: | $3,000,000 |
Back... |
Totals for 0912-00-445 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,000,000 | ||
Actual: | $3,000,000 | ||
CCSJ: 0912-00-448 | |||
District: | Houston | Let Date: | MAY 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(661)MM | CSJ: | 0912-00-448 |
Description: | REGIONAL VANPOOL PROGRAM (FY 2012) | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 7 |
Limits To: | . | Estimate: | $3,750,000 |
Length: | 0.0 Miles | Actual: | $3,000,000 |
Back... |
Totals for 0912-00-448 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,750,000 | ||
Actual: | $3,000,000 | ||
CCSJ: 0912-00-453 | |||
District: | Houston | Let Date: | DEC 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1102(352) | CSJ: | 0912-00-453 |
Description: | REGIONAL VANPOOL PROGRAM (FY 2011) | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 7 |
Limits To: | . | Estimate: | $2,062,500 |
Length: | 0.0 Miles | Actual: | $2,062,500 |
Back... |
Totals for 0912-00-453 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,062,500 | ||
Actual: | $2,062,500 | ||
CCSJ: 0912-00-457 | |||
District: | Houston | Let Date: | APR 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(543) | CSJ: | 0912-00-457 |
Description: | ASR REMEDIATION OF HIGH MAST FOUNDATIONS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,138,016 |
Length: | 0.0 Miles | Actual: | $632,075 |
Back... |
Totals for 0912-00-457 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,138,016 | ||
Actual: | $632,075 | ||
CCSJ: 0912-00-459 | |||
District: | Houston | Let Date: | AUG 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2012(739) | CSJ: | 0912-00-459 |
Description: | CLEAN AIR ACTION PROGRAM STAFF MARKETING AND OUTREACH | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 5 |
Limits To: | . | Estimate: | $437,500 |
Length: | 0.0 Miles | Actual: | $437,500 |
Back... |
Totals for 0912-00-459 | ||
Length: | 0.0 Miles | ||
Estimate: | $437,500 | ||
Actual: | $437,500 | ||
CCSJ: 0912-00-461 | |||
District: | Houston | Let Date: | MAY 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2012(662) | CSJ: | 0912-00-461 |
Description: | REGIONAL VANPOOL PROGRAM (FY 2012) | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 5 |
Limits To: | . | Estimate: | $2,000,000 |
Length: | 0.0 Miles | Actual: | $2,000,000 |
Back... |
Totals for 0912-00-461 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,000,000 | ||
Actual: | $2,000,000 | ||
CCSJ: 0912-00-468 | |||
District: | Houston | Let Date: | APR 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | IM 0451(341) | CSJ: | 0912-00-468 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS ON IH 45 | Fund Cat: | 10 |
Limits To: | . | Estimate: | $1,251,432 |
Length: | 52.7 Miles | Actual: | $1,130,845 |
Back... |
Totals for 0912-00-468 | ||
Length: | 52.7 Miles | ||
Estimate: | $1,251,432 | ||
Actual: | $1,130,845 | ||
CCSJ: 0912-00-469 | |||
District: | Houston | Let Date: | MAY 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2012(513) | CSJ: | 0912-00-469 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 10 |
Limits To: | ALL LOCATIONS ON US 59 & IH 610 | Estimate: | $818,525 |
Length: | 0.0 Miles | Actual: | $778,293 |
Back... |
Totals for 0912-00-469 | ||
Length: | 0.0 Miles | ||
Estimate: | $818,525 | ||
Actual: | $778,293 | ||
CCSJ: 0912-70-008 | |||
District: | Houston | Let Date: | OCT 2011 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2008(191) | CSJ: | 0912-70-008 |
Description: | MIDTOWN LIVABLE COMMUNITIES INITIATIVE (PHASE II) | Handling Code: |
TR |
Limits From: | GRAY (SMITH TO MAIN) AND | Fund Cat: | 5 |
Limits To: | ALABAMA (MILAM TO CHENEVERT) | Estimate: | $2,500,000 |
Length: | 0.0 Miles | Actual: | $2,500,000 |
Back... |
Totals for 0912-70-008 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,500,000 | ||
Actual: | $2,500,000 | ||
CCSJ: 0912-70-081 | |||
District: | Houston | Let Date: | MAR 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2012(345) | CSJ: | 0912-70-081 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | BW 8, FROM HOLLISTER | Fund Cat: | 10 |
Limits To: | MESA | Estimate: | $1,076,042 |
Length: | 14.4 Miles | Actual: | $1,200,453 |
Back... |
Totals for 0912-70-081 | ||
Length: | 14.4 Miles | ||
Estimate: | $1,076,042 | ||
Actual: | $1,200,453 | ||
CCSJ: 0912-70-084 | |||
District: | Houston | Let Date: | SEP 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2011(559) | CSJ: | 0912-70-084 |
Description: | INSTALL 3 NEW INTERSECTIONS | Handling Code: |
TR |
Limits From: | FAIRDALE AT POST OAK,CENTRE AT POST | Fund Cat: | 5 |
Limits To: | OAK AND WESTBRIAR AT POST OAK | Estimate: | $2,700,000 |
Length: | 0.0 Miles | Actual: | $2,700,000 |
Back... |
Totals for 0912-70-084 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,700,000 | ||
Actual: | $2,700,000 | ||
CCSJ: 0912-70-095 | |||
District: | Houston | Let Date: | AUG 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(814)MM | CSJ: | 0912-70-095 |
Description: | MOTORIST ASSISTANCE PROGRAM OPERATING EXPENSES | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS IN HARRIS COUNTY | Fund Cat: | 7 |
Limits To: | . | Estimate: | $1,000,000 |
Length: | 0.0 Miles | Actual: | $1,000,000 |
Back... |
Totals for 0912-70-095 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,000,000 | ||
Actual: | $1,000,000 | ||
CCSJ: 0912-71-002 | |||
District: | Houston | Let Date: | AUG 2012 |
Highway: | CR | Let Status: | Actual |
Project ID: | CM 2012(603) | CSJ: | 0912-71-002 |
Description: | INSTALL 3, 900 FEET TRACK & RAIL CROSSING THRU W BELT JCT & | Handling Code: |
XX |
Limits From: | BELT JUNCTION; E OF W HARDY BETWEEN | Fund Cat: | 3 |
Limits To: | CROSSTIMBERS AND CAPLIN STREET | Estimate: | $13,744,258 |
Length: | 0.0 Miles | Actual: | $13,744,578 |
Back... |
Totals for 0912-71-002 | ||
Length: | 0.0 Miles | ||
Estimate: | $13,744,258 | ||
Actual: | $13,744,578 | ||
CCSJ: 0912-71-042 | |||
District: | Houston | Let Date: | SEP 2011 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 1102(577) | CSJ: | 0912-71-042 |
Description: | UPTOWN MANAGEMENT PEDESTRIAN IMPROVEMENTS | Handling Code: |
TR |
Limits From: | VARIOUS LOCATIONS IN HOUSTON | Fund Cat: | 5 |
Limits To: | . | Estimate: | $7,669,961 |
Length: | 0.0 Miles | Actual: | $7,669,961 |
Back... |
Totals for 0912-71-042 | ||
Length: | 0.0 Miles | ||
Estimate: | $7,669,961 | ||
Actual: | $7,669,961 | ||
CCSJ: 0912-71-631 | |||
District: | Houston | Let Date: | AUG 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 99(567) | CSJ: | 0912-71-631 |
Description: | CONSTRUCT HIKE & BIKE TRAIL - KEEGANS BAYOU TRAIL | Handling Code: |
|
Limits From: | KEEGANS BAYOU TRAIL: GESSNER | Fund Cat: | 3 |
Limits To: | KIRKWOOD | Estimate: | $5,706,039 |
Length: | 4.0 Miles | Actual: | $5,688,316 |
Award Status Bid Tabulations Back... |
Totals for 0912-71-631 | ||
Length: | 4.0 Miles | ||
Estimate: | $5,706,039 | ||
Actual: | $5,688,316 | ||
CCSJ: 0912-71-701 | |||
District: | Houston | Let Date: | MAR 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2000(591)TE | CSJ: | 0912-71-701 |
Description: | HERSHEY PARK PEDESTRIAN AND BICYCLE TIE - IN | Handling Code: |
|
Limits From: | AT TERRY HERSHEY PARK IN HOUSTON | Fund Cat: | 3 |
Limits To: | . | Estimate: | $1,447,622 |
Length: | 1.6 Miles | Actual: | $1,411,826 |
Back... |
Totals for 0912-71-701 | ||
Length: | 1.6 Miles | ||
Estimate: | $1,447,622 | ||
Actual: | $1,411,826 | ||
CCSJ: 0912-71-794 | |||
District: | Houston | Let Date: | DEC 2011 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2002(146)TE | CSJ: | 0912-71-794 |
Description: | BELLAIRE BOULEVARD BEAUTIFICATION IN SOUTHSIDE PLACE | Handling Code: |
|
Limits From: | W OF ACADEMY ST | Fund Cat: | 3 |
Limits To: | E OF EDLOE ST ON BELLAIRE BLVD | Estimate: | $475,250 |
Length: | 0.7 Miles | Actual: | $462,463 |
Back... |
Totals for 0912-71-794 | ||
Length: | 0.7 Miles | ||
Estimate: | $475,250 | ||
Actual: | $462,463 | ||
CCSJ: 0912-71-888 | |||
District: | Houston | Let Date: | SEP 2011 |
Highway: | PW | Let Status: | Actual |
Project ID: | C 912-71-888 | CSJ: | 0912-71-888 |
Description: | CONST EMBANKMENT, FLEXIBLE BASE, ACP, STRUCTURES, CULVERTS, | Handling Code: |
|
Limits From: | PR 138 INSIDE SHELDON LAKE STATE PK | Fund Cat: | 10 |
Limits To: | . | Estimate: | $3,745,935 |
Length: | 2.2 Miles | Actual: | $3,457,061 |
Back... |
Totals for 0912-71-888 | ||
Length: | 2.2 Miles | ||
Estimate: | $3,745,935 | ||
Actual: | $3,457,061 | ||
CCSJ: 0912-72-117 | |||
District: | Houston | Let Date: | OCT 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(066) | CSJ: | 0912-72-117 |
Description: | UPGRADE VIA'S THROUGHOUT CENTRAL HOUSTON | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,350,140 |
Length: | 0.0 Miles | Actual: | $991,340 |
Back... |
Totals for 0912-72-117 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,350,140 | ||
Actual: | $991,340 | ||
CCSJ: 0912-72-174 | |||
District: | Houston | Let Date: | JUL 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2008(271)MM | CSJ: | 0912-72-174 |
Description: | TRANSTAR EMERGENCY OPERATIONS CENTER EXPANSION | Handling Code: |
LN |
Limits From: | TRANSTAR | Fund Cat: | 3 |
Limits To: | . | Estimate: | $7,894,561 |
Length: | 0.0 Miles | Actual: | $6,900,000 |
Back... |
Totals for 0912-72-174 | ||
Length: | 0.0 Miles | ||
Estimate: | $7,894,561 | ||
Actual: | $6,900,000 | ||
CCSJ: 0912-72-180 | |||
District: | Houston | Let Date: | DEC 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(148) | CSJ: | 0912-72-180 |
Description: | FULL DEPTH REPAIR, BRIDGE REPAIR, BARRIER REPAIR, ARMOR | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,803,711 |
Length: | 0.0 Miles | Actual: | $1,464,292 |
Back... |
Totals for 0912-72-180 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,803,711 | ||
Actual: | $1,464,292 | ||
CCSJ: 0912-72-213 | |||
District: | Houston | Let Date: | OCT 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2012(067) | CSJ: | 0912-72-213 |
Description: | SHOULDER & GORE RECONSTRUCTION, BRIDGE REPAIR, SHEET PILING, | Handling Code: |
|
Limits From: | VAR LOCATIONS IN CENTRAL HOUSTON | Fund Cat: | 1 |
Limits To: | . | Estimate: | $2,710,916 |
Length: | 0.0 Miles | Actual: | $1,887,400 |
Back... |
Totals for 0912-72-213 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,710,916 | ||
Actual: | $1,887,400 | ||
CCSJ: 0912-72-240 | |||
District: | Houston | Let Date: | SEP 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(023) | CSJ: | 0912-72-240 |
Description: | CRACK SEAL AND SPALL REPAIR | Handling Code: |
|
Limits From: | VA LOCATIONS IN WEST HARRIS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $257,200 |
Length: | 0.0 Miles | Actual: | $209,638 |
Back... |
Totals for 0912-72-240 | ||
Length: | 0.0 Miles | ||
Estimate: | $257,200 | ||
Actual: | $209,638 | ||
CCSJ: 0912-72-278 | |||
District: | Houston | Let Date: | MAY 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(514) | CSJ: | 0912-72-278 |
Description: | REPLACE ARMOR JOINTS, REPAIR SPALLED CONSTRUCTION JOINTS AND | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS ON IH 45, US 59, | Fund Cat: | 1 |
Limits To: | BW 8 AND FM 525 AND SH 249 | Estimate: | $709,822 |
Length: | 0.0 Miles | Actual: | $497,714 |
District: | Houston | Let Date: | MAY 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(514) | CSJ: | 0912-72-279 |
Description: | REPLACE BRIDGE BEARING PADS AT LOCATIONS INDENTIFIED IN | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS ON IH 45, FM 1960 | Fund Cat: | 1 |
Limits To: | BW 8, FM 525 AND SH 134 | Estimate: | $340,850 |
Length: | 0.0 Miles | Actual: | $292,000 |
Back... |
Totals for 0912-72-278 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,050,672 | ||
Actual: | $789,714 | ||
CCSJ: 0912-72-287 | |||
District: | Houston | Let Date: | MAY 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(515) | CSJ: | 0912-72-287 |
Description: | ADA CURB RAMP PROGRAM FY 12 (VARIOUS LOCATIONS IN HARRIS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 10 |
Limits To: | US 59,US 90A,IH 610,SH 225 ETCETERA | Estimate: | $2,281,124 |
Length: | 0.0 Miles | Actual: | $2,475,888 |
Back... |
Totals for 0912-72-287 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,281,124 | ||
Actual: | $2,475,888 | ||
CCSJ: 0912-72-295 | |||
District: | Houston | Let Date: | AUG 2012 |
Highway: | CR | Let Status: | Actual |
Project ID: | STP 2012(401)FRS | CSJ: | 0912-72-295 |
Description: | FY 2012 RR SIGNAL & WARNING DEVICES (UPRR DOT# 743 638B) | Handling Code: |
XX |
Limits From: | HUFFMEISTER RD IN HOUSTON AT UPRR | Fund Cat: | 8 |
Limits To: | . | Estimate: | $212,667 |
Length: | 0.0 Miles | Actual: | $212,667 |
Back... |
Totals for 0912-72-295 | ||
Length: | 0.0 Miles | ||
Estimate: | $212,667 | ||
Actual: | $212,667 | ||
CCSJ: 1005-01-041 | |||
District: | Houston | Let Date: | MAY 2012 |
Highway: | FM 525 | Let Status: | Actual |
Project ID: | STP 2012(520)HES | CSJ: | 1005-01-041 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | AT HARDY ROAD | Fund Cat: | 8 |
Limits To: | . | Estimate: | $245,621 |
Length: | 0.0 Miles | Actual: | $213,761 |
Back... |
Totals for 1005-01-041 | ||
Length: | 0.0 Miles | ||
Estimate: | $245,621 | ||
Actual: | $213,761 | ||
CCSJ: 1006-01-066 | |||
District: | Houston | Let Date: | DEC 2011 |
Highway: | FM 529 | Let Status: | Actual |
Project ID: | CRX 1006-1-66 | CSJ: | 1006-01-066 |
Description: | FY 2010 RAILROAD GRADE CROSSING REPLANKING PROGRAM | Handling Code: |
XX |
Limits From: | FM 529 AT UPRR | Fund Cat: | 10 |
Limits To: | . | Estimate: | $78,208 |
Length: | 0.0 Miles | Actual: | $78,208 |
Back... |
Totals for 1006-01-066 | ||
Length: | 0.0 Miles | ||
Estimate: | $78,208 | ||
Actual: | $78,208 | ||
CCSJ: 1006-01-068 | |||
District: | Houston | Let Date: | AUG 2012 |
Highway: | FM 529 | Let Status: | Actual |
Project ID: | C 1006-1-68 | CSJ: | 1006-01-068 |
Description: | IMPLEMENTATION OF ACCESS MANAGEMENT | Handling Code: |
|
Limits From: | GREENHOUSE RD | Fund Cat: | 3 |
Limits To: | US 290 | Estimate: | $1,465,478 |
Length: | 8.1 Miles | Actual: | $1,457,279 |
Award Status Bid Tabulations Back... |
Totals for 1006-01-068 | ||
Length: | 8.1 Miles | ||
Estimate: | $1,465,478 | ||
Actual: | $1,457,279 | ||
CCSJ: 1062-02-024 | |||
District: | Houston | Let Date: | JUN 2012 |
Highway: | FM 1485 | Let Status: | Actual |
Project ID: | STP 2012(604)MM | CSJ: | 1062-02-024 |
Description: | INSTALL LEFT TURN LANE (WB - SB) | Handling Code: |
|
Limits From: | AT HUFFMAN NEW CANEY RD WESTBOUND | Fund Cat: | 1 |
Limits To: | . | Estimate: | $316,430 |
Length: | 0.4 Miles | Actual: | $275,929 |
District: | Houston | Let Date: | JUN 2012 |
Highway: | FM 2100 | Let Status: | Actual |
Project ID: | STP 2012(604)MM | CSJ: | 1062-04-056 |
Description: | INSTALL LEFT TURN LANES | Handling Code: |
|
Limits From: | SUNDOWN MEADOW SB,HUFFMAN CLEVELAND | Fund Cat: | 1 |
Limits To: | AND SUNOCO/SADDLE CREEK NORTHBOUND | Estimate: | $824,533 |
Length: | 0.7 Miles | Actual: | $711,190 |
Back... |
Totals for 1062-02-024 | ||
Length: | 1.1 Miles | ||
Estimate: | $1,140,963 | ||
Actual: | $987,119 | ||
CCSJ: 1685-01-098 | |||
District: | Houston | Let Date: | DEC 2011 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | CRX 1685-1-98 | CSJ: | 1685-01-098 |
Description: | FY 2010 RAILROAD GRADE CROSSING REPLANKING PROGRAM | Handling Code: |
XX |
Limits From: | FM 1960 AT BNSF | Fund Cat: | 10 |
Limits To: | . | Estimate: | $67,200 |
Length: | 0.0 Miles | Actual: | $67,200 |
Back... |
Totals for 1685-01-098 | ||
Length: | 0.0 Miles | ||
Estimate: | $67,200 | ||
Actual: | $67,200 | ||
CCSJ: 1685-03-089 | |||
District: | Houston | Let Date: | AUG 2012 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | STP 2012(521)HES | CSJ: | 1685-03-089 |
Description: | IMPROVE TRAFFIC SIGNAL AND REALIGNING EB AND WB LEFT TURN | Handling Code: |
|
Limits From: | AT W LAKE HOUSTON PARKWAY | Fund Cat: | 8 |
Limits To: | . | Estimate: | $715,058 |
Length: | 0.3 Miles | Actual: | $962,619 |
Award Status Bid Tabulations Back... |
Totals for 1685-03-089 | ||
Length: | 0.3 Miles | ||
Estimate: | $715,058 | ||
Actual: | $962,619 | ||
CCSJ: 1812-01-019 | |||
District: | Houston | Let Date: | AUG 2012 |
Highway: | FM 1942 | Let Status: | Actual |
Project ID: | STP 2012(605)MM | CSJ: | 1812-01-019 |
Description: | INSTALL LEFT TURN LANE ON FM 1942 EB TO BOHEMIAN RD NB | Handling Code: |
|
Limits From: | AT BOHEMIAN HALL RD | Fund Cat: | 1 |
Limits To: | . | Estimate: | $475,348 |
Length: | 0.4 Miles | Actual: | $506,733 |
Award Status Bid Tabulations Back... |
Totals for 1812-01-019 | ||
Length: | 0.4 Miles | ||
Estimate: | $475,348 | ||
Actual: | $506,733 | ||
CCSJ: 2941-01-022 | |||
District: | Houston | Let Date: | JUL 2012 |
Highway: | FM 2920 | Let Status: | Actual |
Project ID: | C 2941-1-22 | CSJ: | 2941-01-022 |
Description: | INTERSECTION IMPROVEMENTS | Handling Code: |
|
Limits From: | 0.2 MI W OF KICKAPOO RD(IN SECTION) | Fund Cat: | 3 |
Limits To: | 0.2 MI E OF ROSEWOOD TRAIL | Estimate: | $3,486,689 |
Length: | 1.6 Miles | Actual: | $3,658,494 |
Bid Tabulations Back... |
Totals for 2941-01-022 | ||
Length: | 1.6 Miles | ||
Estimate: | $3,486,689 | ||
Actual: | $3,658,494 | ||
CCSJ: 3050-03-015 | |||
District: | Houston | Let Date: | MAR 2012 |
Highway: | FM 2978 | Let Status: | Actual |
Project ID: | STP 2012(376) | CSJ: | 3050-03-015 |
Description: | CONSTRUCT DETENTION FACILITY | Handling Code: |
|
Limits From: | 0.065 MILES SOUTH OF BOGS RD | Fund Cat: | 1 |
Limits To: | 0.145 MILES SOUTH OF BOGS RD | Estimate: | $658,237 |
Length: | 0.1 Miles | Actual: | $848,936 |
Back... |
Totals for 3050-03-015 | ||
Length: | 0.1 Miles | ||
Estimate: | $658,237 | ||
Actual: | $848,936 | ||
CCSJ: 3256-01-097 | |||
District: | Houston | Let Date: | AUG 2012 |
Highway: | BW 8 | Let Status: | Actual |
Project ID: | NH 2012(713) | CSJ: | 3256-01-097 |
Description: | DIAMOND GRINDING & FULL DEPTH CONCRETE REPAIR | Handling Code: |
|
Limits From: | 0.4 MI S OF BISSONNET | Fund Cat: | 1 |
Limits To: | TOWN PARK | Estimate: | $993,710 |
Length: | 3.0 Miles | Actual: | $1,075,234 |
Award Status Bid Tabulations Back... |
Totals for 3256-01-097 | ||
Length: | 3.0 Miles | ||
Estimate: | $993,710 | ||
Actual: | $1,075,234 | ||
CCSJ: 3256-02-040 | |||
District: | Houston | Let Date: | AUG 2012 |
Highway: | BW 8 | Let Status: | Actual |
Project ID: | C 3256-2-40 | CSJ: | 3256-02-040 |
Description: | WIDEN EXISTING TO 6 MAIN LANES | Handling Code: |
|
Limits From: | 0.8 MI W OF US 59(N) | Fund Cat: | 3 |
Limits To: | 0.3 MI E OF OLD HUMBLE RD (PHASE 2) | Estimate: | $9,371,504 |
Length: | 0.3 Miles | Actual: | $8,671,034 |
Award Status Bid Tabulations Back... |
Totals for 3256-02-040 | ||
Length: | 0.3 Miles | ||
Estimate: | $9,371,504 | ||
Actual: | $8,671,034 | ||
CCSJ: 3510-05-017 | |||
District: | Houston | Let Date: | JUL 2012 |
Highway: | SH 99 | Let Status: | Actual |
Project ID: | NH 2012(647) | CSJ: | 3510-05-017 |
Description: | CONSTRUCT 4 DIRECT CONNECTORS (SEGMENT E) (TOLL) | Handling Code: |
|
Limits From: | IH 10 (W) | Fund Cat: | 3 |
Limits To: | . | Estimate: | $28,224,927 |
Length: | 0.3 Miles | Actual: | $31,203,250 |
Bid Tabulations Back... |
Totals for 3510-05-017 | ||
Length: | 0.3 Miles | ||
Estimate: | $28,224,927 | ||
Actual: | $31,203,250 | ||
CCSJ: 8170-12-006 | |||
District: | Houston | Let Date: | OCT 2011 |
Highway: | MH | Let Status: | Actual |
Project ID: | RW 8170-12-2 | CSJ: | 8170-12-002 |
Description: | RIGHT OF WAY RELOCATION ASSISTANCE AND UTILITY ADJUSTMENTS | Handling Code: |
|
Limits From: | HEMPSTEAD RD AT UPRR | Fund Cat: | ROW |
Limits To: | WHITE OAK BAYOU | Estimate: | $1 |
Length: | 1.4 Miles | Actual: | $668,396 |
District: | Houston | Let Date: | OCT 2011 |
Highway: | MH | Let Status: | Actual |
Project ID: | STP 2001(357)MM | CSJ: | 8170-12-004 |
Description: | CONSTRUCT DETENTION CHANNEL (PHASE 1 OF 2) | Handling Code: |
|
Limits From: | HEMPSTEAD RD AT UPRR | Fund Cat: | 1 |
Limits To: | WHITE OAK BAYOU | Estimate: | $4,872,719 |
Length: | 1.5 Miles | Actual: | $3,649,344 |
District: | Houston | Let Date: | OCT 2011 |
Highway: | MH | Let Status: | Actual |
Project ID: | HP 2008(049) | CSJ: | 8170-12-006 |
Description: | CONSTRUCT 8 - LANE DIVIDED (RAISED MEDIAN) URBAN STREET | Handling Code: |
|
Limits From: | ON WASHINGTON/HEMPSTEAD | Fund Cat: | 1 |
Limits To: | WASHINGTON-KATY SPLIT TO IH 10 | Estimate: | $7,566,810 |
Length: | 0.6 Miles | Actual: | $7,080,583 |
Back... |
Totals for 8170-12-006 | ||
Length: | 3.5 Miles | ||
Estimate: | $12,439,530 | ||
Actual: | $11,398,323 |
|
|