Detail Letting Schedule for Henderson County (FY 2012)

 
 
Last Update: Monday, September 24, 2012
Henderson County (FY 2012)

CCSJ: 0108-05-014

District: Tyler Let Date: AUG 2012
Highway: SH 19 Let Status: Actual
Project ID: C 108-5-14 CSJ: 0108-05-014
Description: WIDEN 2 LN ROADWAY TO SUPER - 2 (3 LANE) _CRITERIA Handling
Code:
 
Limits From: 4.1 MI N OF FM 837 (CR 468N), N Fund Cat: 3
Limits To: 3.5 MI S OF FM 1615 (COON CRK BRG) Estimate: $6,264,366
Length: 4.6 Miles Actual: $6,385,018
 
Award Status
Bid Tabulations
Back...

Totals for 0108-05-014
Length: 4.6 Miles
Estimate: $6,264,366
Actual: $6,385,018

CCSJ: 0198-02-032

District: Tyler Let Date: DEC 2011
Highway: US 175 Let Status: Actual
Project ID: STP 2012(147)HES CSJ: 0198-02-032
Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH Handling
Code:
 
Limits From: 1.4 MI NW OF OF SL 60(N), SE Fund Cat: 8
Limits To: 1.4 MI SE OF SL 60(S) (CR 4403) Estimate: $1,665,156
Length: 3.6 Miles Actual: $1,752,951
 
District: Tyler Let Date: DEC 2011
Highway: FM 47 Let Status: Actual
Project ID: STP 2012(147)HES CSJ: 0646-03-013
Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH Handling
Code:
 
Limits From: 0.4 MI S OF FM 1651, S Fund Cat: 8
Limits To: 1.5 MI N OF SH 198 (CR 2710) Estimate: $693,305
Length: 1.9 Miles Actual: $739,400
 
District: Tyler Let Date: DEC 2011
Highway: FM 773 Let Status: Actual
Project ID: STP 2012(147)HES CSJ: 1099-02-014
Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH Handling
Code:
 
Limits From: S OF FM 1803, SW Fund Cat: 8
Limits To: 2.9 MI N OF SH 31 (CR 3800) Estimate: $869,937
Length: 3.1 Miles Actual: $932,741
 
District: Tyler Let Date: DEC 2011
Highway: FM 773 Let Status: Actual
Project ID: STP 2012(146) CSJ: 1099-02-015
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.2 MI S OF FM2339(VAN ZANDT C/L),S Fund Cat: 1
Limits To: SH 31 IN MURCHISON Estimate: $293,612
Length: 6.7 Miles Actual: $306,620
 
Back...

Totals for 0198-02-032
Length: 15.3 Miles
Estimate: $3,522,010
Actual: $3,731,712


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract