Letting Schedule for Dallas District (FY 2012)

 
 
Last Update: Monday, September 24, 2012
Dallas District (FY 2012)
Collin | Dallas | Denton | Ellis | Kaufman | Navarro | Rockwall

Collin County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0047-06-146 US 75 Actual MAY 2012 $670,566 1 FULL DEPTH CONCRETE PAVEMENT REPAIR
0047-06-148 US 75 Actual JUL 2012 $149,916 1 ITS INTERAGENCY CONNECTION
0047-09-027 SH 5 Actual JUL 2012 $3,522,660 1 REALIGN HIGHWAY AND REMOVE UNDERPASS
0047-14-067 US 75 Actual DEC 2011 $68,107,530 3 RECONSTRUCT AND WIDEN 4 LANE TO 8 LANES AND 3 LANE FRONTAGE
0047-14-068 US 75 Actual AUG 2012 $63,579,302 3 RECONSTRUCT AND WIDEN 4 LANE TO 6 LANES AND 2 LANE FRONTAGE
0047-14-070 US 75 Actual FEB 2012 $7,108,802 1 FULL DEPTH CONCRETE PAVEMENT REPAIR AND OVERLAY
0047-14-073 US 75 Actual JAN 2012 $360,000 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING
0091-03-021 SH 289 Actual JUN 2012 $15,996,401 3 RECONSTRUCT AND WIDEN TWO LANE RURAL HIGHWAY TO FOUR LANE
0091-09-014 BS 289C Actual DEC 2011 $22,400 10 RAILROAD CROSSING REPLANKING
0281-01-030 SH 78 Actual APR 2012 $24,832,811 3 WIDEN FROM 2 LANE TO 6 LANE DIVIDED URBAN
0281-02-039 SH 78 Actual JUN 2012 $21,337,008 3 WIDEN TO SIX LANE DIVIDED
0281-02-067 SH 78 Actual APR 2012 $203,919 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING
0281-07-007 BS 78-F Actual DEC 2011 $35,200 10 RAILROAD CROSSING REPLANKING
0619-03-055 FM 544 Actual DEC 2011 $158,400 10 RAILROAD CROSSING REPLANKING
0918-24-125 CS Actual JUL 2012 $649,934 6 REPLACE BRIDGE AND APPROACHES
1013-01-030 FM 546 Actual APR 2012 $141,808 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING AND
1746-01-021 FM 1827 Actual MAY 2012 $756,412 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH

Dallas County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0008-08-072 SH 180 Actual APR 2012 $3,049,464 6 REPLACE BRIDGE AND APPROACHES
0009-11-223 IH 30 Actual FEB 2012 $2,314,841 1 PLANING, ACP INLAY, SHOULDER REPAIR AND PAVEMENT MARKINGS
0092-14-079 IH 45 Actual APR 2012 $496,968 12 INSTALLATION OF WIRELESS ITS SYSTEM
0094-03-112 SH 183 Actual JAN 2012 $79,658 5 UPGRADE EXISTING ISDN TO WIRELESS ITS SYSTEM
0095-13-025 IH 20 Actual MAY 2012 $4,972,861 12 CONSTRUCT TWO NEW RAMPS CONNECTING IH 20 WITH KLEBERG RD.
0095-13-034 IH 20 Actual FEB 2012 $730,589 1 FULL DEPTH CONCRETE PAVEMENT REPAIR
0197-02-104 US 175 Actual APR 2012 $133,554 1 INSTALL GUIDE SIGNS
0261-03-062 US 67 Actual MAY 2012 $524,774 1 FULL DEPTH REPAIR CONCRETE PAVEMENT
0442-02-149 IH 35E Actual DEC 2011 $1,974,332 1 HIGH MAST ILLUMINATION
0442-02-150 IH 35E Actual JUN 2012 $6,148,724 1 OVERLAY AND FULL DEPTH REPAIR OF MAINLANES
0442-02-151 IH 35E Actual AUG 2012 $689,824 1 FULL DEPTH REPAIR OF FRONTAGE ROADS AND RAMPS
0442-02-153 IH 35E Actual JAN 2012 $224,828 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING
0581-01-129 LP 12 Actual MAR 2012 $2,836,135 1 FULL DEPTH REPAIR, MILL & ACP OVERLAY
0581-01-130 LP 12 Actual APR 2012 $3,252,791 1 PLANING AND FULL DEPTH CONCRETE PAVEMENT REPAIR AND OVERLAY
0581-01-132 LP 12 Actual DEC 2011 $89,600 10 RAILROAD CROSSING REPLANKING
0918-00-160 VA Actual DEC 2011 $883,958 10 NON - SITE SPECIFIC SIGN REPLACEMENT AND REFURBISHING
0918-00-184 VA Actual AUG 2012 $181,228 1 UPGRADE VIDEO DETECTION FOR HIGH SPEED APPROACHES
0918-00-188 VA Actual SEP 2011 $3,700,000 7 PROVIDE ASSISTANCE TO STRANDED MOTORISTS OR NON INJURY
0918-00-189 VA Actual JAN 2012 $1,250,000 5 FREEWAY INCIDENT MANAGEMENT PROGRAM; FY 2012 FUNDING;
0918-00-190 VA Actual JAN 2012 $625,000 5 REGIONAL EMISSIONS REDUCTION PROGRAM IMPLEMENTATION
0918-00-194 VA Actual OCT 2011 $200,000 10 INTRODUCE TRANSIT CREDITS AND PARKING PRICING TO INCREASE
0918-00-196 VA Actual FEB 2012 $4,953,750 12 REGIONAL TRIP REDUCTION PROGRAM, VANPOOL PGM, BIKE / PEDESTRIAN
0918-00-199 VA Actual AUG 2012 $187,500 12 NCTCOG REGIONAL ITS DATA ARCHIVING (FY 2012)
0918-45-756 CS Actual APR 2012 $1,578,831 6 REPLACE BRIDGE AND APPROACHES
0918-45-816 CS Actual DEC 2011 $352,665 5 RIGHT TURN LANE, 8' SIDEWALK W / ADA RAMPS, SIGNAL
0918-45-821 CS Actual SEP 2011 $3,062,543 ROW EXTEND EXISTING GRADE SEPARATION OF GALATYN PARKWAY AND
0918-45-889 VA Actual AUG 2012 $2,500,000 3 TRE OVERHAUL OF FLEET
0918-45-890 VA Actual AUG 2012 $4,178,125 3 PHASE 2 - CONSTRUCTION OF RAIL STATION ON DART BLUELINE IN
0918-47-038 VA Actual OCT 2011 $319,812 1 REFURBISH ITS
0918-47-049 CS Actual AUG 2012 $5,737,500 3 NORTHWEST CORRIDOR LIGHT RAIL BED, TRACK, OVERHEADS AND
0918-47-050 VA Actual AUG 2012 $6,700,000 3 NORTHWEST CORRIDOR SEGMENT FROM BACHMAN STATION IN DALLAS
0918-47-059 VA Actual APR 2012 $2,762,500 12 NORTHWEST CORRIDOR LIGHT RAIL BED, TRACK, OVERHEADS AND
0918-47-060 VA Actual APR 2012 $3,825,000 5 NORTHWEST CORRIDOR LIGHT RAIL BED, TRACK, OVERHEADS AND
0918-47-061 VA Actual APR 2012 $2,300,000 5 NORTHWEST CORRIDOR SEGMENT FROM BACHMAN STATION IN DALLAS
0918-47-063 VA Actual AUG 2012 $17,015,000 12 LIGHT RAIL BED, TRACK, VEHICLES, OVERHEADS AND FACILITIES
0918-47-066 CS Actual AUG 2012 $175,133 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0918-47-067 CS Actual AUG 2012 $78,708 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0918-47-068 CS Actual AUG 2012 $186,977 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
3000-01-022 SP 408 Actual JAN 2012 $79,693 1 REFURBISH ITS

Denton County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0134-09-029 US 380 Actual DEC 2011 $26,379,472 1 WIDEN TWO LANE RURAL HIGHWAY TO FOUR LANE DIVIDED RURAL
0134-09-063 US 380 Actual JUL 2012 $39,346,680 1 WIDEN TWO LANE RURAL HIGHWAY TO SIX LANE DIVIDED URBAN
0195-03-075 IH 35E Actual DEC 2011 $2,571,349 3 CONSTRUCT PEDESTRIAN BRIDGE OVER IH 35E AT UNIVERSITY OF
0196-02-121 IH 35E Actual APR 2012 $517,521 1 FULL DEPTH PAVEMENT REPAIR OF FRONTAGE ROADS
0353-02-029 SH 114 Actual JUN 2012 $28,612,477 3 WIDEN 2 TO 4 LANE DIVIDED RURAL
0918-46-260 CS Actual AUG 2012 $4,196,789 3 ON STONEBROOK, LEBANON, AND LONE STAR PKWYS; CONSTRUCT
0918-46-264 CS Actual AUG 2012 $230,400 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0918-46-265 CS Actual AUG 2012 $228,708 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0918-46-266 CS Actual AUG 2012 $314,759 8 INSTALL RAILROAD SIGNALS AND GATES
1059-01-043 FM 1173 Actual MAY 2012 $28,000 10 RAILROAD GRADE CROSSING REPLANKING PROGRAM
1310-01-040 FM 407 Actual MAY 2012 $36,096 10 RAILROAD GRADE CROSSING REPLANKING PROGRAM
1311-01-051 FM 1171 Actual MAY 2012 $628,000 10 LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING AND
1311-01-052 FM 1171 Actual AUG 2012 $363,989 1 REPAIR EDGES AND FULL DEPTH BASE FAILURES
1567-02-020 FM 423 Actual SEP 2011 $51,864,363 ROW SH 121 TO COUGAR ALLEY;WIDEN 4 TO 8 LN DIVIDED URBAN;COUGAR
1568-02-007 FM 407 Actual AUG 2012 $1,303,238 6 REPLACE BRIDGE AND APPROACHES
2681-01-020 FM 2499 Actual AUG 2012 $979,910 3 LANDSCAPE DEVELOPMENT

Ellis County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0048-03-085 US 77 Actual AUG 2012 $212,667 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0048-08-046 IH 35E Actual AUG 2012 $74,459 1 INSTALL GUIDE SIGNS
0092-08-016 BI 45-G Actual FEB 2012 $2,116,721 1 MILL REPAIR AND OVERLAY
0092-12-004 BI 45-H Actual JAN 2012 $2,029,788 1 MILL, REPAIR AND OVERLAY
0172-04-042 US 287 Actual JUN 2012 $4,420,538 1 ACP OVERLAY AND PAVEMENT MARKINGS
0172-05-108 US 287 Actual MAR 2012 $5,279,327 1 REPAIR AND OVERLAY
0172-08-057 US 287 Actual FEB 2012 $2,487,388 1 MILL, REPAIR AND RESURFACE
0261-01-037 US 67 Actual JUN 2012 $8,956,101 3 CONSTRUCT NEW FRONTAGE ROADS OVER UP RR
0568-01-047 SH 34 Actual AUG 2012 $71,929 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0918-22-139 CS Actual APR 2012 $603,653 3 SIDEWALK ALONG FARLEY RD CONNECTING ELEMENTARY SCHOOL
0918-22-147 CS Actual AUG 2012 $384,536 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0918-22-148 CS Actual AUG 2012 $170,000 8 CLOSE BRITTON RD AT UNION PACIFIC RAILROAD
0918-22-149 CS Actual AUG 2012 $170,000 8 CLOSE CROSSING

Kaufman County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0095-03-083 US 80 Actual DEC 2011 $158,951 1 REFURBISH GUIDE SIGNS
0095-04-064 US 80 Actual JAN 2012 $17,050,215 3 CONSTRUCT NEW LOCATION INTERCHANGE
0095-14-016 IH 20 Actual OCT 2011 $3,165,908 1 OVERLAY HIGHWAY AND PAVEMENT MARKINGS
0173-04-052 SH 34 Actual AUG 2012 $212,667 8 INSTALL SIGNAL PREEMPTION
0751-01-047 FM 148 Actual AUG 2012 $212,667 8 INSTALL SIGNAL PREEMPTION
0918-11-076 CR Actual MAR 2012 $1,974,520 6 REPLACE BRIDGE AND APPROACHES
2512-01-012 FM 2728 Actual DEC 2011 $24,064 10 RAILROAD CROSSING REPLANKING
3022-02-007 FM 2965 Actual DEC 2011 $676,817 1 RESTORATION OF EXISTING ROAD

Navarro County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0093-01-090 IH 45 Actual OCT 2011 $10,460,766 1 SEAL COAT FRONTAGE ROAD SHOULDERS
0163-01-062 SH 31 Actual DEC 2011 $44,800 10 RAILROAD CROSSING REPLANKING
0574-01-028 SH 309 Actual FEB 2012 $1,485,000 6 REPLACE BRIDGES AND APPROACHES
0918-18-123 CR Actual APR 2012 $1,416,000 6 REPLACE BRIDGE AND APPROACHES
0918-18-127 CR Actual AUG 2012 $185,822 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0918-18-128 CS Actual AUG 2012 $355,776 8 INSTALL RAILROAD SIGNALS AND GATES
0995-01-025 FM 637 Actual DEC 2011 $22,400 10 RAILROAD CROSSING REPLANKING
0998-03-024 FM 416 Actual JUL 2012 $2,482,686 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
1288-01-017 FM 1393 Actual DEC 2011 $24,064 10 RAILROAD CROSSING REPLANKING
1289-01-030 FM 1126 Actual DEC 2011 $24,064 10 RAILROAD CROSSING REPLANKING
1451-03-013 FM 55 Actual AUG 2012 $2,796,268 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH

Rockwall County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0009-12-074 IH 30 Actual JAN 2012 $19,988,909 3 CONSTRUCT INTERCHANGE AT ERBY CAMPBELL BLVD
0451-01-047 SH 205 Actual AUG 2012 $1,969,765 6 REPLACE BRIDGE AND APPROACHES
1014-03-050 FM 550 Actual AUG 2012 $2,519,946 6 REPLACE BRIDGE AND APPROACHES
1014-03-057 FM 740 Actual MAY 2012 $507,683 10 LANDSCAPE DEVELOPMENT
1015-01-076 FM 3549 Actual MAY 2012 $24,064 10 RAILROAD GRADE CROSSING REPLANKING PROGRAM


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract