Detail Letting Schedule for Taylor County (FY 2012)

 
 
Last Update: Monday, September 24, 2012
Taylor County (FY 2012)

CCSJ: 0006-05-107

District: Abilene Let Date: MAR 2012
Highway: IH 20 Let Status: Actual
Project ID: IM 0202(238) CSJ: 0006-05-107
Description: ACP OVERLAY Handling
Code:
 
Limits From: 0.35 MI W OF WELLS LANE Fund Cat: 1
Limits To: SHIRLEY ROAD Estimate: $3,882,401
Length: 8.0 Miles Actual: $4,298,257
 
Back...

Totals for 0006-05-107
Length: 8.0 Miles
Estimate: $3,882,401
Actual: $4,298,257

CCSJ: 0006-06-093

District: Abilene Let Date: JUN 2012
Highway: IH 20 Let Status: Actual
Project ID: IM 0202(234) CSJ: 0006-06-093
Description: RECONSTRUCT FRONTAGE ROADS, RELOCATE RAMPS, AND ADD TURN - Handling
Code:
 
Limits From: PINE STREET Fund Cat: 1
Limits To: LP 322__(FRONTAGE ROADS ONLY) Estimate: $11,294,700
Length: 4.0 Miles Actual: $12,481,302
 
Back...

Totals for 0006-06-093
Length: 4.0 Miles
Estimate: $11,294,700
Actual: $12,481,302

CCSJ: 0034-01-123

District: Abilene Let Date: SEP 2011
Highway: US 83 Let Status: Actual
Project ID: NH 2012(003) CSJ: 0034-01-123
Description: IMPROVE INTERSECTION MOVEMENTS Handling
Code:
 
Limits From: AT ANTILLEY ROAD IN ABILENE Fund Cat: 1
Limits To: . Estimate: $272,237
Length: 0.0 Miles Actual: $365,702
 
Back...

Totals for 0034-01-123
Length: 0.0 Miles
Estimate: $272,237
Actual: $365,702

CCSJ: 0699-03-016

District: Abilene Let Date: MAY 2012
Highway: FM 613 Let Status: Actual
Project ID: CRX 699-3-16 CSJ: 0699-03-016
Description: REPLANK RAILROAD GRADE CROSSING Handling
Code:
XX
Limits From: AT THE BNSF RR IN BUFFALO GAP Fund Cat: 10
Limits To: DOT #021290T Estimate: $22,400
Length: 0.0 Miles Actual: $22,400
 
Back...

Totals for 0699-03-016
Length: 0.0 Miles
Estimate: $22,400
Actual: $22,400

CCSJ: 0974-04-020

District: Abilene Let Date: MAY 2012
Highway: FM 604 Let Status: Actual
Project ID: CRX 974-4-20 CSJ: 0974-04-020
Description: REPLANK RAILROAD GRADE CROSSING Handling
Code:
XX
Limits From: AT THE BNSF RR IN LAWN Fund Cat: 10
Limits To: DOT #021275R Estimate: $56,000
Length: 0.0 Miles Actual: $56,000
 
Back...

Totals for 0974-04-020
Length: 0.0 Miles
Estimate: $56,000
Actual: $56,000

CCSJ: 2032-04-009

District: Abilene Let Date: MAR 2012
Highway: FM 600 Let Status: Actual
Project ID: STP 2012(364) CSJ: 2032-03-011
Description: ASPHALT CONCRETE PAVEMENT LEVEL - UP AND OVERLAY, SIDEWALK AND Handling
Code:
 
Limits From: FM 3034 Fund Cat: 1
Limits To: TAYLOR COUNTY LINE Estimate: $177,765
Length: 0.4 Miles Actual: $172,856
 
District: Abilene Let Date: MAR 2012
Highway: FM 600 Let Status: Actual
Project ID: STP 2012(364) CSJ: 2032-04-009
Description: ASPHALT CONCRETE PAVEMENT LEVEL - UP AND OVERLAY, SIDEWALK AND Handling
Code:
 
Limits From: JONES COUNTY LINE Fund Cat: 1
Limits To: IH 20 Estimate: $1,163,857
Length: 2.1 Miles Actual: $1,063,475
 
Back...

Totals for 2032-04-009
Length: 2.5 Miles
Estimate: $1,341,622
Actual: $1,236,331

CCSJ: 2270-01-022

District: Abilene Let Date: SEP 2011
Highway: FM 3438 Let Status: Actual
Project ID: NH 2012(005) CSJ: 2270-01-022
Description: UPGRADE TRAFFIC SIGNAL Handling
Code:
 
Limits From: AT HARTFORD STREET IN ABILENE Fund Cat: 1
Limits To: . Estimate: $116,945
Length: 0.1 Miles Actual: $131,956
 
Back...

Totals for 2270-01-022
Length: 0.1 Miles
Estimate: $116,945
Actual: $131,956


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract