Detail Letting Schedule for Dallas County (FY 2013)

Last Update: Thursday, November 14, 2013
Dallas County (FY 2013)

CCSJ: 0009-02-059

District: Dallas Let Date: JAN 2013
Highway: SH 78 Let Status: Actual
Project ID: NH 2013(316) CSJ: 0009-02-059
Description: FDR, MILL, ACP OVERLAY AND PVMNT MARKINGS Handling
Code:
 
Limits From: LOOP 12 Fund Cat: 1
Limits To: IH 635 Estimate: $1,404,827
Length: 3.0 Miles Actual: $1,361,188
 
Back...

Totals for 0009-02-059
Length: 3.0 Miles
Estimate: $1,404,827
Actual: $1,361,188

CCSJ: 0009-02-060

District: Dallas Let Date: MAY 2013
Highway: SH 78 Let Status: Actual
Project ID: NH 2013(664) CSJ: 0009-02-060
Description: FULL DEPTH CONC PAVMNT REPAIR. Handling
Code:
 
Limits From: GARLAND AVENUE Fund Cat: 1
Limits To: FIRST STREET Estimate: $956,136
Length: 1.0 Miles Actual: $715,014
 
Back...

Totals for 0009-02-060
Length: 1.0 Miles
Estimate: $956,136
Actual: $715,014

CCSJ: 0009-11-228

District: Dallas Let Date: JUN 2013
Highway: IH 30 Let Status: Actual
Project ID: IM 0305(084) CSJ: 0009-11-228
Description: LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING, Handling
Code:
 
Limits From: WEST OF WINSLOW AVE. Fund Cat: 10
Limits To: EAST OF DOLPHIN ROAD Estimate: $261,178
Length: 0.9 Miles Actual: $226,790
 
Back...

Totals for 0009-11-228
Length: 0.9 Miles
Estimate: $261,178
Actual: $226,790

CCSJ: 0048-01-060

District: Dallas Let Date: MAY 2013
Highway: SH 342 Let Status: Actual
Project ID: NH 2013(731) CSJ: 0048-01-060
Description: FULL DEPTH CONCRETE PAVEMENT REPAIR Handling
Code:
 
Limits From: W 8TH ST Fund Cat: 1
Limits To: WINTERGREEN Estimate: $791,887
Length: 1.4 Miles Actual: $548,845
 
Back...

Totals for 0048-01-060
Length: 1.4 Miles
Estimate: $791,887
Actual: $548,845

CCSJ: 0091-06-049

District: Dallas Let Date: MAY 2013
Highway: SH 289 Let Status: Actual
Project ID: STP 2013(727)MM CSJ: 0091-06-049
Description: NB / SB DUAL LEFT TURN LANES Handling
Code:
 
Limits From: ON SH 289 (PRESTON) Fund Cat: 7
Limits To: AT ROYAL Estimate: $569,242
Length: 0.2 Miles Actual: $674,541
 
District: Dallas Let Date: MAY 2013
Highway: SH 289 Let Status: Actual
Project ID: STP 2012(375)MM CSJ: 0091-06-055
Description: RIGHT OF WAY ACQUISITION & UTILITY ADJUSTMENTS Handling
Code:
 
Limits From: ON SH 289 Fund Cat: ROW
Limits To: AT ROYAL LANE Estimate:  
Length: 0.0 Miles Actual: $44,708
 
Back...

Totals for 0091-06-049
Length: 0.2 Miles
Estimate: $569,242
Actual: $719,249

CCSJ: 0092-07-045

District: Dallas Let Date: JUL 2013
Highway: SH 356 Let Status: Actual
Project ID: BR 2013(827) CSJ: 0092-07-045
Description: REHABILITATE BRIDGE Handling
Code:
 
Limits From: EB OVERPASS AT TRE & MACARTHUR BLVD Fund Cat: 6
Limits To: . Estimate: $292,896
Length: 0.1 Miles Actual: $448,138
 
Back...

Totals for 0092-07-045
Length: 0.1 Miles
Estimate: $292,896
Actual: $448,138

CCSJ: 0094-07-041

District: Dallas Let Date: APR 2013
Highway: SH 183 Let Status: Actual
Project ID: NH 2013(651) CSJ: 0094-07-041
Description: MILL AND INLAY MAIN LANES, SHOULDERS, AND RAMPS, FULL DEPTH Handling
Code:
 
Limits From: E. ABUTMENT OF TRINITY RIVER BRIDGE Fund Cat: 1
Limits To: IH 35E Estimate: $2,307,459
Length: 1.5 Miles Actual: $2,164,097
 
Back...

Totals for 0094-07-041
Length: 1.5 Miles
Estimate: $2,307,459
Actual: $2,164,097

CCSJ: 0095-02-109

District: Dallas Let Date: FEB 2013
Highway: US 80 Let Status: Actual
Project ID: NH 2013(381) CSJ: 0095-02-109
Description: REPAIR SLOPE WITH HEADWALL Handling
Code:
 
Limits From: CULVERT 0.3 MI E OF E FORK RD Fund Cat: 1
Limits To: . Estimate: $242,603
Length: 0.0 Miles Actual: $256,468
 
Back...

Totals for 0095-02-109
Length: 0.0 Miles
Estimate: $242,603
Actual: $256,468

CCSJ: 0196-03-257

District: Dallas Let Date: SEP 2012
Highway: IH 35E Let Status: Actual
Project ID: IM 0356(436) CSJ: 0196-03-257
Description: FULL DEPTH REPAIR OF SOUTHBOUND FRONTAGE ROAD Handling
Code:
 
Limits From: COMMERCE ST Fund Cat: 1
Limits To: OAKLAWN AVE Estimate: $394,141
Length: 1.6 Miles Actual: $402,996
 
Back...

Totals for 0196-03-257
Length: 1.6 Miles
Estimate: $394,141
Actual: $402,996

CCSJ: 0196-03-259

District: Dallas Let Date: OCT 2012
Highway: IH 35E Let Status: Actual
Project ID: IM 0356(435) CSJ: 0196-03-259
Description: FULL DEPTH REPAIR AND ACP OVERLAY OF FRONTAGE ROADS Handling
Code:
 
Limits From: VALLEY VIEW LANE Fund Cat: 1
Limits To: WHITLOCK LN/SANDY LAKE ROAD Estimate: $2,104,171
Length: 3.4 Miles Actual: $1,743,691
 
Back...

Totals for 0196-03-259
Length: 3.4 Miles
Estimate: $2,104,171
Actual: $1,743,691

CCSJ: 0196-03-264

District: Dallas Let Date: AUG 2013
Highway: US 75 Let Status: Actual
Project ID: CC 47-6-151 CSJ: 0047-06-151
Description: UPDATE OF SIGNS ON TXDOT FACILITIES WITH NTTA INTERCHANGES Handling
Code:
 
Limits From: AT PGBT Fund Cat: 3
Limits To: . Estimate: $52,685
Length: 0.0 Miles Actual: $56,054
 
District: Dallas Let Date: AUG 2013
Highway: IH 35E Let Status: Actual
Project ID: CC 196-3-264 CSJ: 0196-03-264
Description: UPDATE OF SIGNS ON TXDOT FACILITIES WITH NTTA INTERCHANGES Handling
Code:
 
Limits From: AT DNT Fund Cat: 3
Limits To: . Estimate: $33,686
Length: 0.0 Miles Actual: $26,049
 
District: Dallas Let Date: AUG 2013
Highway: IH 635 Let Status: Actual
Project ID: CC 2374-7-68 CSJ: 2374-07-068
Description: UPDATE OF SIGNS ON TXDOT FACILITIES WITH NTTA INTERCHANGES Handling
Code:
 
Limits From: AT PGBT Fund Cat: 3
Limits To: . Estimate: $80,122
Length: 0.0 Miles Actual: $84,630
 
Back...

Totals for 0196-03-264
Length: 0.0 Miles
Estimate: $166,493
Actual: $166,733

CCSJ: 0197-01-011

District: Dallas Let Date: OCT 2012
Highway: SH 352 Let Status: Actual
Project ID: NH 2013(096) CSJ: 0197-01-011
Description: FULL DEPTH CONCRETE PAVEMENT REPAIR Handling
Code:
 
Limits From: ASH LN. Fund Cat: 1
Limits To: SPRING AVE. Estimate: $161,190
Length: 1.5 Miles Actual: $134,489
 
District: Dallas Let Date: OCT 2012
Highway: SH 352 Let Status: Actual
Project ID: NH 2013(096) CSJ: 0430-01-055
Description: FULL DEPTH CONCRETE PAVEMENT REPAIR Handling
Code:
 
Limits From: SPRING AVE Fund Cat: 1
Limits To: 150 FT EAST OF HATCHER Estimate: $33,284
Length: 0.6 Miles Actual: $35,925
 
Back...

Totals for 0197-01-011
Length: 2.1 Miles
Estimate: $194,474
Actual: $170,414

CCSJ: 0197-02-106

District: Dallas Let Date: JAN 2013
Highway: US 175 Let Status: Actual
Project ID: NH 2013(317) CSJ: 0197-02-106
Description: FDR, ACP OVERLAY AND PAVEMENT MARKING Handling
Code:
 
Limits From: LAKE JUNE ROAD Fund Cat: 1
Limits To: IH 20 Estimate: $3,194,802
Length: 5.2 Miles Actual: $2,490,573
 
Back...

Totals for 0197-02-106
Length: 5.2 Miles
Estimate: $3,194,802
Actual: $2,490,573

CCSJ: 0261-02-072

District: Dallas Let Date: OCT 2012
Highway: US 67 Let Status: Actual
Project ID: NH 2013(098) CSJ: 0261-02-072
Description: FULL DEPTH REPAIR CONCRETE PAVEMENT AND HMAC OVERLAY Handling
Code:
 
Limits From: ELLIS COUNTY LINE Fund Cat: 1
Limits To: WHEATLAND RD Estimate: $683,043
Length: 8.8 Miles Actual: $541,245
 
Back...

Totals for 0261-02-072
Length: 8.8 Miles
Estimate: $683,043
Actual: $541,245

CCSJ: 0281-03-045

District: Dallas Let Date: APR 2013
Highway: SH 78 Let Status: Actual
Project ID: STP 2013(532) CSJ: 0281-02-068
Description: CONCRETE FULL DEPTH REPAIR AND PAVEMENT MARKINGS Handling
Code:
 
Limits From: DALLAS COUNTY LINE Fund Cat: 1
Limits To: SACHSE CITY LIMIT Estimate: $212,911
Length: 1.5 Miles Actual: $201,829
 
District: Dallas Let Date: APR 2013
Highway: SH 78 Let Status: Actual
Project ID: STP 2013(532) CSJ: 0281-03-045
Description: CONCRETE FULL DEPTH REPAIR AND PAVEMENT MARKINGS Handling
Code:
 
Limits From: NORTH OF PGBT Fund Cat: 1
Limits To: DALLAS / COLLIN COUNTY LINE Estimate: $566,703
Length: 3.1 Miles Actual: $538,095
 
Back...

Totals for 0281-03-045
Length: 4.6 Miles
Estimate: $779,614
Actual: $739,924

CCSJ: 0353-04-093

District: Dallas Let Date: SEP 2012
Highway: SP 348 Let Status: Actual
Project ID: NH 2013(009) CSJ: 0353-04-093
Description: LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING Handling
Code:
 
Limits From: AT RIVERSIDE DRIVE Fund Cat: 10
Limits To: IN IRVING Estimate: $131,488
Length: 0.3 Miles Actual: $114,284
 
Back...

Totals for 0353-04-093
Length: 0.3 Miles
Estimate: $131,488
Actual: $114,284

CCSJ: 0364-02-017

District: Fort Worth Let Date: JUL 2013
Highway: SH 121 Let Status: Actual
Project ID: NH 2013(829) CSJ: 0364-01-137
Description: RECONSTRUCT FROM 4 TO 10 LANE FREEWAY, RAMPS AND FR RDS; Handling
Code:
 
Limits From: SOUTH OF FM 2499 Fund Cat: 1
Limits To: TARRANT/DALLAS COUNTY LINE Estimate: $8,019,691
Length: 0.5 Miles Actual: $8,074,988
 
District: Dallas Let Date: JUL 2013
Highway: SH 121 Let Status: Actual
Project ID: NH 2013(829) CSJ: 0364-02-017
Description: CONVERT 4 LN DIV TO 10 LANE FREEWAY WITH FRONTAGE ROADS Handling
Code:
 
Limits From: TARRANT/DALLAS COUNTY LINE Fund Cat: 1
Limits To: BUSINESS 121H Estimate: $52,680,260
Length: 1.7 Miles Actual: $50,411,507
 
District: Dallas Let Date: JUL 2013
Highway: SH 121 Let Status: Actual
Project ID: NH 2013(829) CSJ: 3547-03-004
Description: CONSTRUCT CONCRETE TRAFFIC BARRIER AND TRANSITIONS FROM Handling
Code:
 
Limits From: DALLAS/DENTON COUNTY LINE Fund Cat: 1
Limits To: NORTH OF 121 BYPASS Estimate: $100,900
Length: 0.2 Miles Actual: $241,118
 
District: Dallas Let Date: JUL 2013
Highway: SH 121 Let Status: Actual
Project ID: NH 2013(829) CSJ: 3547-04-001
Description: TRANSITION OF FREEWAY WIDENING Handling
Code:
 
Limits From: BUSINESS 121H Fund Cat: 1
Limits To: DALLAS/DENTON COUNTY LINE Estimate: $47,336
Length: 0.1 Miles Actual: $77,621
 
Back...

Totals for 0364-02-017
Length: 2.5 Miles
Estimate: $60,848,187
Actual: $58,805,234

CCSJ: 0442-02-152

District: Dallas Let Date: AUG 2013
Highway: IH 35E Let Status: Actual
Project ID: IM 0356(442) CSJ: 0442-02-152
Description: FULL DEPTH REPAIR OF MAINLANES Handling
Code:
 
Limits From: IH 20 Fund Cat: 1
Limits To: US 67 Estimate: $1,648,667
Length: 4.9 Miles Actual: $1,434,180
 
Back...

Totals for 0442-02-152
Length: 4.9 Miles
Estimate: $1,648,667
Actual: $1,434,180

CCSJ: 0581-01-134

District: Dallas Let Date: DEC 2012
Highway: LP 12 Let Status: Actual
Project ID: NH 2013(259) CSJ: 0581-01-134
Description: FULL DEPTH REPAIR , MILL & ACP OVERLAY Handling
Code:
 
Limits From: SH 78 Fund Cat: 1
Limits To: SPUR 244 Estimate: $1,110,672
Length: 2.2 Miles Actual: $1,070,331
 
Back...

Totals for 0581-01-134
Length: 2.2 Miles
Estimate: $1,110,672
Actual: $1,070,331

CCSJ: 0581-01-135

District: Dallas Let Date: MAR 2013
Highway: LP 12 Let Status: Actual
Project ID: NH 2013(449) CSJ: 0581-01-135
Description: REPAIR SLOPE WITH RETAINING WALL Handling
Code:
 
Limits From: AT UNION PACIFIC RR Fund Cat: 1
Limits To: NEAR SH 310 Estimate: $595,567
Length: 0.1 Miles Actual: $655,042
 
Back...

Totals for 0581-01-135
Length: 0.1 Miles
Estimate: $595,567
Actual: $655,042

CCSJ: 0581-01-136

District: Dallas Let Date: JUN 2013
Highway: LP 12 Let Status: Actual
Project ID: NH 2013(812) CSJ: 0581-01-136
Description: CONCRETE FULL DEPTH REPAIR & PVMT MKGS Handling
Code:
 
Limits From: BONNIE VIEW ROAD Fund Cat: 1
Limits To: IH 45 Estimate: $141,894
Length: 0.9 Miles Actual: $114,722
 
Back...

Totals for 0581-01-136
Length: 0.9 Miles
Estimate: $141,894
Actual: $114,722

CCSJ: 0581-02-134

District: Dallas Let Date: DEC 2012
Highway: LP 12 Let Status: Actual
Project ID: NH 2013(260) CSJ: 0581-02-134
Description: INSTALL HIGH MAST ILLUMINATION Handling
Code:
 
Limits From: SPUR 408 Fund Cat: 1
Limits To: IH 30 Estimate: $1,566,359
Length: 2.8 Miles Actual: $1,270,329
 
Official Notice
Back...

Totals for 0581-02-134
Length: 2.8 Miles
Estimate: $1,566,359
Actual: $1,270,329

CCSJ: 0918-00-162

District: Dallas Let Date: MAR 2013
Highway: VA Let Status: Actual
Project ID: STP 2013(452) CSJ: 0918-00-162
Description: NON - SITE SPECIFIC INSTALLATION OF GUIDE SIGNS (ON - SYSTEM) Handling
Code:
 
Limits From: DISTRICTWIDE Fund Cat: 1
Limits To: . Estimate: $400,000
Length: 0.0 Miles Actual: $336,140
 
Back...

Totals for 0918-00-162
Length: 0.0 Miles
Estimate: $400,000
Actual: $336,140

CCSJ: 0918-00-165

District: Dallas Let Date: MAR 2013
Highway: VA Let Status: Actual
Project ID: STP 2013(726) CSJ: 0918-00-165
Description: UPGRADE AND REPAIR ITS EQUIPMENT Handling
Code:
XX
Limits From: VARIOUS LOCATIONS Fund Cat: 1
Limits To: IN DALLAS DISTRICT Estimate: $300,000
Length: 0.0 Miles Actual: $300,000
 
Back...

Totals for 0918-00-165
Length: 0.0 Miles
Estimate: $300,000
Actual: $300,000

CCSJ: 0918-00-186

District: Dallas Let Date: APR 2013
Highway: VA Let Status: Actual
Project ID: STP 2013(533) CSJ: 0918-00-186
Description: NON - SITE SPECIFIC SIGNAL CONTRACT ON NEW LOCATIONS Handling
Code:
 
Limits From: VARIOUS LOCATIONS Fund Cat: 1
Limits To: IN DALLAS DISTRICT Estimate: $1,425,000
Length: 0.0 Miles Actual: $1,598,000
 
Back...

Totals for 0918-00-186
Length: 0.0 Miles
Estimate: $1,425,000
Actual: $1,598,000

CCSJ: 0918-00-200

District: Dallas Let Date: APR 2013
Highway: VA Let Status: Actual
Project ID: STP 2013(534) CSJ: 0918-00-200
Description: UPGRADE VIDEO DETECTION FOR HIGH SPEED APPROACHES Handling
Code:
 
Limits From: VARIOUS LOCATIONS Fund Cat: 1
Limits To: IN DALLAS DISTRICT Estimate: $291,152
Length: 0.0 Miles Actual: $278,458
 
Back...

Totals for 0918-00-200
Length: 0.0 Miles
Estimate: $291,152
Actual: $278,458

CCSJ: 0918-00-204

District: Dallas Let Date: JUN 2013
Highway: VA Let Status: Actual
Project ID: CM 2013(645) CSJ: 0918-00-204
Description: REGIONAL EMISSIONS REDUCTION PROGRAM IMPLEMENTATION Handling
Code:
XX
Limits From: REGIONAL EMISSIONS REDUCTION Fund Cat: 5
Limits To: PROGRAM IN D/FW METROPLEX (OFF-SYS) Estimate: $1,250,000
Length: 0.0 Miles Actual: $1,250,000
 
Back...

Totals for 0918-00-204
Length: 0.0 Miles
Estimate: $1,250,000
Actual: $1,250,000

CCSJ: 0918-00-220

District: Dallas Let Date: JUL 2013
Highway: VA Let Status: Actual
Project ID: STP 1302(054)MM CSJ: 0918-00-220
Description: DEPARTMENTAL STREAMLINING POLICIES AND PROCEDURES Handling
Code:
XX
Limits From: M&O PROGRAM OVERSIGHT COORDINATION Fund Cat: 7
Limits To: FY 2013 Estimate: $975,000
Length: 0.0 Miles Actual: $975,000
 
Back...

Totals for 0918-00-220
Length: 0.0 Miles
Estimate: $975,000
Actual: $975,000

CCSJ: 0918-00-222

District: Dallas Let Date: AUG 2013
Highway: VA Let Status: Actual
Project ID: STP 1302(073)MM CSJ: 0918-00-222
Description: REGIONAL TRIP REDUCTION PROGRAM, VANPOOL PGM, BIKE / PEDESTRIAN Handling
Code:
XX
Limits From: REGIONAL M&O PROGRAMS (FY 2013) Fund Cat: 7
Limits To: D/FW METROPLEX Estimate: $3,055,492
Length: 0.0 Miles Actual: $3,055,492
 
Back...

Totals for 0918-00-222
Length: 0.0 Miles
Estimate: $3,055,492
Actual: $3,055,492

CCSJ: 0918-00-223

District: Dallas Let Date: DEC 2012
Highway: VA Let Status: Actual
Project ID: STP 2013(411)MM CSJ: 0918-00-223
Description: PROVIDE ASSISTANCE TO STRANDED MOTORISTS OR NON INJURY Handling
Code:
XX
Limits From: MOBILITY ASSISTANCE PATROL Fund Cat: 7
Limits To: FY 2013 Estimate: $3,000,000
Length: 0.0 Miles Actual: $3,000,000
 
Back...

Totals for 0918-00-223
Length: 0.0 Miles
Estimate: $3,000,000
Actual: $3,000,000

CCSJ: 0918-00-224

District: Dallas Let Date: AUG 2013
Highway: VA Let Status: Actual
Project ID: STP 1302(071)MM CSJ: 0918-00-224
Description: TRAVEL SURVEY AND DATA COLLECTION EFFORT FOR PROJECTS IN MPO Handling
Code:
XX
Limits From: REGIONAL TRAVEL SURVEY Fund Cat: 7
Limits To: FY 2013 Estimate: $2,013,334
Length: 0.0 Miles Actual: $2,013,334
 
Back...

Totals for 0918-00-224
Length: 0.0 Miles
Estimate: $2,013,334
Actual: $2,013,334

CCSJ: 0918-00-230

District: Dallas Let Date: JAN 2013
Highway: VA Let Status: Actual
Project ID: CM 2013(508) CSJ: 0918-00-230
Description: FREEWAY INCIDENT MANAGEMENT PROGRAM; FY 2013 FUNDING; Handling
Code:
XX
Limits From: M&O - REGIONAL COMMUNICATION SYSTEM Fund Cat: 5
Limits To: (EASTERN SUB) Estimate: $1,250,000
Length: 0.0 Miles Actual: $1,250,000
 
Back...

Totals for 0918-00-230
Length: 0.0 Miles
Estimate: $1,250,000
Actual: $1,250,000

CCSJ: 0918-00-232

District: Dallas Let Date: AUG 2013
Highway: VA Let Status: Actual
Project ID: STP 1302(092)MM CSJ: 0918-00-232
Description: REGIONAL CONGESTION MANAGEMENT PLANNING & DATA COLLECTION - Handling
Code:
XX
Limits From: REGIONAL CONGESTION MGMT PLANNING & Fund Cat: 3
Limits To: DATA COLLECITON (FY 2013) Estimate: $305,891
Length: 0.0 Miles Actual: $306,891
 
Back...

Totals for 0918-00-232
Length: 0.0 Miles
Estimate: $305,891
Actual: $306,891

CCSJ: 0918-00-241

District: Dallas Let Date: AUG 2013
Highway: VA Let Status: Actual
Project ID: STEP 2013(896) CSJ: 0918-00-241
Description: NCTCOG TO IMPLEMENT FRAMEWORK TO ASSESS CLIMATE CHANGE AND Handling
Code:
XX
Limits From: NCTCOG PLANNING AREA Fund Cat: 10
Limits To: . Estimate: $150,000
Length: 0.0 Miles Actual: $150,000
 
Back...

Totals for 0918-00-241
Length: 0.0 Miles
Estimate: $150,000
Actual: $150,000

CCSJ: 0918-00-242

District: Dallas Let Date: AUG 2013
Highway: VA Let Status: Actual
Project ID: CM 1302(093) CSJ: 0918-00-242
Description: SAFETY PATROL PILOT PROGRAM; FOUR OBJECTIVES: DESIGN; Handling
Code:
XX
Limits From: VARIOUS HIGHWAYS Fund Cat: 3
Limits To: IN DALLAS DISTRICT (FY 2013) Estimate: $7,600,000
Length: 0.0 Miles Actual: $7,600,100
 
Back...

Totals for 0918-00-242
Length: 0.0 Miles
Estimate: $7,600,000
Actual: $7,600,100

CCSJ: 0918-00-244

District: Dallas Let Date: AUG 2013
Highway: VA Let Status: Actual
Project ID: SHRP 1302(053) CSJ: 0918-00-244
Description: IMPLEMENTING ECO - LOGICAL FROM SHRP2 TO BRING EARLY CONSIDER - Handling
Code:
XX
Limits From: NCTCOG PLANNING AREA Fund Cat: 10
Limits To: . Estimate: $225,000
Length: 0.0 Miles Actual: $225,000
 
Back...

Totals for 0918-00-244
Length: 0.0 Miles
Estimate: $225,000
Actual: $225,000

CCSJ: 0918-45-843

District: Dallas Let Date: MAR 2013
Highway: CS Let Status: Actual
Project ID: STP 2013(409) CSJ: 0918-45-843
Description: STREET CLOSURES AT MACON & SUNDAY STREETS; INSTALL FENCING Handling
Code:
LC
Limits From: UP RAILROAD FROM MUNICIPAL ST Fund Cat: 3
Limits To: SCYENE ST IN CITY OF DALLAS Estimate: $1,386,134
Length: 0.0 Miles Actual: $917,943
 
Back...

Totals for 0918-45-843
Length: 0.0 Miles
Estimate: $1,386,134
Actual: $917,943

CCSJ: 0918-45-844

District: Dallas Let Date: DEC 2012
Highway: CS Let Status: Actual
Project ID: HP 2010(854) CSJ: 0918-45-844
Description: WIDEN 2 TO 4 LANE DIV (ULTIMATE 6) WITH GRADE SEPARATION AND Handling
Code:
 
Limits From: ON PLEASANT RUN RD, E OF SUNRISE RD Fund Cat: 7
Limits To: WEST OF IH 45 Estimate: $8,521,018
Length: 0.8 Miles Actual: $7,719,832
 
Official Notice
Back...

Totals for 0918-45-844
Length: 0.8 Miles
Estimate: $8,521,018
Actual: $7,719,832

CCSJ: 0918-45-897

District: Dallas Let Date: OCT 2012
Highway: CS Let Status: Actual
Project ID: STP 2011(219)TE CSJ: 0918-45-897
Description: LAKERIDGE PKWY IMPROVEMENTS IN CITY OF CEDAR HILL INCL. Handling
Code:
LC
Limits From: LAKERIDGE PARKWAY IMPROVEMENTS: Fund Cat: 3
Limits To: FROM MANSFIELD RD TO US HWY 67 FR Estimate: $3,739,844
Length: 3.5 Miles Actual: $3,147,651
 
Back...

Totals for 0918-45-897
Length: 3.5 Miles
Estimate: $3,739,844
Actual: $3,147,651

CCSJ: 0918-47-075

District: Dallas Let Date: AUG 2013
Highway: VA Let Status: Actual
Project ID: CM 1302(084) CSJ: 0918-47-075
Description: CONSTRUCT 2ND TRACK ON TRINITY RAILWAY EXPRESS (TRE) Handling
Code:
TR
Limits From: ON TRE FROM VALLEY VIEW (TAR/DAL)CL Fund Cat: 5
Limits To: WEST IRVING TRE STATION Estimate: $4,752,000
Length: 0.0 Miles Actual: $4,752,000
 
Back...

Totals for 0918-47-075
Length: 0.0 Miles
Estimate: $4,752,000
Actual: $4,752,000

CCSJ: 0918-47-083

District: Dallas Let Date: MAY 2013
Highway: VA Let Status: Actual
Project ID: STP 2013(924)MM CSJ: 0918-47-083
Description: LIGHT RAIL BED, TRACK, VEHICLES, OVERHEADS, AND FACILITIES Handling
Code:
TR
Limits From: ON IRVING CORRIDOR LIGHT RAIL Fund Cat: 7
Limits To: FROM BACHMAN STA TO BELTLINE STA Estimate: $3,502,294
Length: 0.0 Miles Actual: $3,502,294
 
Back...

Totals for 0918-47-083
Length: 0.0 Miles
Estimate: $3,502,294
Actual: $3,502,294

CCSJ: 1047-03-064

District: Dallas Let Date: SEP 2012
Highway: FM 1382 Let Status: Actual
Project ID: NH 2013(139) CSJ: 1047-03-064
Description: FULL DEPTH REPAIR AND PAVEMENT MARKINGS Handling
Code:
 
Limits From: SOUTH OF SP 303 Fund Cat: 1
Limits To: SKYLINE DRIVE Estimate: $662,964
Length: 1.8 Miles Actual: $407,131
 
Back...

Totals for 1047-03-064
Length: 1.8 Miles
Estimate: $662,964
Actual: $407,131

CCSJ: 1068-04-116

District: Dallas Let Date: MAR 2013
Highway: IH 30 Let Status: Actual
Project ID: IM 0305(083) CSJ: 0009-11-226
Description: RECONSTRUCT INTERCHANGE WITH 5 MAINLANES, 6 COLLECTOR Handling
Code:
DB
Limits From: IH 35E INTERCHANGE Fund Cat: 3
Limits To: WEST OF IH 45 INTERCHANGE Estimate: 114,200,000
Length: 0.5 Miles Actual: 113,613,778
 
District: Dallas Let Date: MAR 2013
Highway: IH 35E Let Status: Actual
Project ID: IM 0305(083) CSJ: 0196-03-205
Description: RECONSTRUCT INTERCHANGE WITH 11 MAINLANES, 2 HOV / MANAGED_LANE Handling
Code:
DB
Limits From: AT IH 30 Fund Cat: 3
Limits To: . Estimate: 228,400,000
Length: 0.8 Miles Actual: 233,293,797
 
District: Dallas Let Date: MAR 2013
Highway: IH 35E Let Status: Actual
Project ID: BR 2004(426) CSJ: 0442-02-118
Description: REPLACE BRIDGES OVER TRINITY R; WIDEN & RECONSTRUCT 7 ML'S Handling
Code:
DB
Limits From: AT TRINITY RIVER Fund Cat: 3
Limits To: NB & SB Estimate: 101,000,000
Length: 0.5 Miles Actual: 101,219,548
 
District: Dallas Let Date: MAR 2013
Highway: IH 35E Let Status: Actual
Project ID: BOR 2003(38) CSJ: 0442-02-132
Description: WIDEN AND RECONSTRUCT 7 MAINLANES, 9 COLLECTOR / DISTRIBUTOR Handling
Code:
DB
Limits From: EIGHTH STREET Fund Cat: 3
Limits To: SOUTH OF IH 30 Estimate: $62,000,000
Length: 0.5 Miles Actual: $71,161,330
 
District: Dallas Let Date: MAR 2013
Highway: IH 30 Let Status: Actual
Project ID: BR 2013(353) CSJ: 1068-04-099
Description: REPLACE BRIDGE AND APPROACHES WITH 10 MAINLANES, Handling
Code:
DB
Limits From: AT BECKLEY, AT TRINITY RIVER, AND Fund Cat: 3
Limits To: AT RIVERFRONT BLVD Estimate: $42,000,000
Length: 0.0 Miles Actual: $39,248,396
 
District: Dallas Let Date: MAR 2013
Highway: IH 30 Let Status: Actual
Project ID: IMD 2002(40) CSJ: 1068-04-116
Description: WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV / Handling
Code:
DB
Limits From: EAST OF SYLVAN AVE Fund Cat: 3
Limits To: IH 35E___090300077 Estimate: $95,065,553
Length: 1.5 Miles Actual: $99,402,055
 
District: Dallas Let Date: MAR 2013
Highway: IH 30 Let Status: Actual
Project ID: HP 2013(306) CSJ: 1068-04-157
Description: WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV / Handling
Code:
DB
Limits From: EAST OF SYLVAN AVE Fund Cat: 10
Limits To: IH 35E Estimate: $1,001,475
Length: 1.5 Miles Actual: $1,001,475
 
District: Dallas Let Date: MAR 2013
Highway: IH 30 Let Status: Actual
Project ID: HP 2013(307) CSJ: 1068-04-158
Description: WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV / Handling
Code:
DB
Limits From: EAST OF SYLVAN AVE Fund Cat: 10
Limits To: IH 35E Estimate: $34,050,152
Length: 1.5 Miles Actual: $34,050,152
 
District: Dallas Let Date: MAR 2013
Highway: IH 30 Let Status: Actual
Project ID: HP 2013(308) CSJ: 1068-04-159
Description: WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV / Handling
Code:
DB
Limits From: EAST OF SYLVAN AVE Fund Cat: 10
Limits To: IH 35E Estimate: $1,001,475
Length: 1.5 Miles Actual: $1,001,475
 
District: Dallas Let Date: MAR 2013
Highway: IH 30 Let Status: Actual
Project ID: HP 2013(309) CSJ: 1068-04-160
Description: WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV / Handling
Code:
DB
Limits From: EAST OF SYLVAN AVE Fund Cat: 10
Limits To: IH 35E Estimate: $21,281,345
Length: 1.5 Miles Actual: $21,281,345
 
Back...

Totals for 1068-04-116
Length: 9.8 Miles
Estimate: 700,000,000
Actual: 715,273,351

CCSJ: 1068-04-147

District: Dallas Let Date: DEC 2012
Highway: LP 12 Let Status: Actual
Project ID: NH 2013(262) CSJ: 0581-02-136
Description: FIBER OPTIC CABLE TO CONNECT IH 30 MANAGED LANES ITS Handling
Code:
 
Limits From: IH 30 Fund Cat: 11
Limits To: 0.5 MILE NORTH OF IH 30 Estimate: $548,092
Length: 0.5 Miles Actual: $278,656
 
District: Fort Worth Let Date: DEC 2012
Highway: IH 30 Let Status: Actual
Project ID: C 1068-2-135 CSJ: 1068-02-135
Description: CONSTRUCT MANAGED / HOV LANE GANTRIES Handling
Code:
 
Limits From: 0.5 MILES WEST OF N. FIELDER ROAD Fund Cat: 3
Limits To: DALLAS/TARRANT COUNTY LINE Estimate: $8,361,292
Length: 6.1 Miles Actual: $6,960,302
 
District: Dallas Let Date: DEC 2012
Highway: IH 30 Let Status: Actual
Project ID: IM 0305(082) CSJ: 1068-04-147
Description: CONSTRUCT MANAGED / HOV LANES WITH TWO SETS OF WISHBONE RAMPS Handling
Code:
 
Limits From: TARRANT/DALLAS COUNTY LINE Fund Cat: 3
Limits To: SYLVAN AVE. Estimate: $59,062,300
Length: 12.2 Miles Actual: $55,842,812
 
Back...

Totals for 1068-04-147
Length: 18.8 Miles
Estimate: $67,971,684
Actual: $63,081,770

CCSJ: 1068-04-153

District: Dallas Let Date: OCT 2012
Highway: IH 30 Let Status: Actual
Project ID: C 1068-4-153 CSJ: 1068-04-153
Description: RELOCATE EXISTING EASTBOUND EXIT RAMP & CONSTRUCT TWO LANE Handling
Code:
 
Limits From: 0.5 MILES WEST OF WESTMORELAND RD Fund Cat: 3
Limits To: EAST OF WESTMORELAND RD Estimate: $2,658,811
Length: 0.6 Miles Actual: $2,655,000
 
Back...

Totals for 1068-04-153
Length: 0.6 Miles
Estimate: $2,658,811
Actual: $2,655,000

CCSJ: 2374-01-170

District: Dallas Let Date: APR 2013
Highway: IH 635 Let Status: Actual
Project ID: IM 6356(441) CSJ: 2374-01-170
Description: FULL DEPTH CONCRETE PAVEMENT REPAIR Handling
Code:
 
Limits From: GREENVILLE AVENUE Fund Cat: 1
Limits To: FOREST LANE Estimate: $543,714
Length: 0.9 Miles Actual: $417,260
 
Back...

Totals for 2374-01-170
Length: 0.9 Miles
Estimate: $543,714
Actual: $417,260

CCSJ: 2374-03-081

District: Dallas Let Date: JUL 2013
Highway: IH 45 Let Status: Actual
Project ID: IM 0453(134) CSJ: 0092-14-082
Description: LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING AND Handling
Code:
 
Limits From: AT SIMPSON STUART ROAD Fund Cat: 10
Limits To: IN DALLAS Estimate: $40,762
Length: 0.1 Miles Actual: $40,692
 
District: Dallas Let Date: JUL 2013
Highway: LP 12 Let Status: Actual
Project ID: NH 2013(833) CSJ: 0581-01-139
Description: LANDSCAPE TO INCLUDE TREE & SHRUB PLANTING AND IRRIGATION SY Handling
Code:
 
Limits From: UNIVERSITY HILLS DRIVE Fund Cat: 10
Limits To: SINGING HILLS DRIVE Estimate: $25,588
Length: 0.0 Miles Actual: $25,883
 
District: Dallas Let Date: JUL 2013
Highway: IH 20 Let Status: Actual
Project ID: IM 0205(153) CSJ: 2374-03-081
Description: LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING, Handling
Code:
 
Limits From: EAST OF POLK RD Fund Cat: 10
Limits To: EAST OF IH 45 Estimate: $272,402
Length: 6.4 Miles Actual: $223,457
 
District: Dallas Let Date: JUL 2013
Highway: IH 20 Let Status: Actual
Project ID: IM 0205(153) CSJ: 2374-04-075
Description: LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING, Handling
Code:
 
Limits From: WEST OF US 67 Fund Cat: 10
Limits To: EAST OF POLK RD Estimate: $110,017
Length: 3.1 Miles Actual: $109,240
 
Back...

Totals for 2374-03-081
Length: 9.6 Miles
Estimate: $448,769
Actual: $399,272

CCSJ: 2374-04-072

District: Dallas Let Date: JUL 2013
Highway: IH 20 Let Status: Actual
Project ID: IM 0205(154) CSJ: 2374-04-072
Description: FULL DEPTH REPAIR, MILL AND INLAY OF MAINLANES Handling
Code:
 
Limits From: TARRANT COUNTY LINE Fund Cat: 1
Limits To: EAST OF CARRIER PARKWAY Estimate: $2,684,702
Length: 1.8 Miles Actual: $3,004,430
 
Back...

Totals for 2374-04-072
Length: 1.8 Miles
Estimate: $2,684,702
Actual: $3,004,430


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract