Detail Letting Schedule for Dallas County (FY 2013)
Dallas County (FY 2013) |
CCSJ: 0009-02-059 | |||
District: | Dallas | Let Date: | JAN 2013 |
Highway: | SH 78 | Let Status: | Actual |
Project ID: | NH 2013(316) | CSJ: | 0009-02-059 |
Description: | FDR, MILL, ACP OVERLAY AND PVMNT MARKINGS | Handling Code: |
|
Limits From: | LOOP 12 | Fund Cat: | 1 |
Limits To: | IH 635 | Estimate: | $1,404,827 |
Length: | 3.0 Miles | Actual: | $1,361,188 |
Back... |
Totals for 0009-02-059 | ||
---|---|---|---|
Length: | 3.0 Miles | ||
Estimate: | $1,404,827 | ||
Actual: | $1,361,188 | ||
CCSJ: 0009-02-060 | |||
District: | Dallas | Let Date: | MAY 2013 |
Highway: | SH 78 | Let Status: | Actual |
Project ID: | NH 2013(664) | CSJ: | 0009-02-060 |
Description: | FULL DEPTH CONC PAVMNT REPAIR. | Handling Code: |
|
Limits From: | GARLAND AVENUE | Fund Cat: | 1 |
Limits To: | FIRST STREET | Estimate: | $956,136 |
Length: | 1.0 Miles | Actual: | $715,014 |
Back... |
Totals for 0009-02-060 | ||
Length: | 1.0 Miles | ||
Estimate: | $956,136 | ||
Actual: | $715,014 | ||
CCSJ: 0009-11-228 | |||
District: | Dallas | Let Date: | JUN 2013 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | IM 0305(084) | CSJ: | 0009-11-228 |
Description: | LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING, | Handling Code: |
|
Limits From: | WEST OF WINSLOW AVE. | Fund Cat: | 10 |
Limits To: | EAST OF DOLPHIN ROAD | Estimate: | $261,178 |
Length: | 0.9 Miles | Actual: | $226,790 |
Back... |
Totals for 0009-11-228 | ||
Length: | 0.9 Miles | ||
Estimate: | $261,178 | ||
Actual: | $226,790 | ||
CCSJ: 0048-01-060 | |||
District: | Dallas | Let Date: | MAY 2013 |
Highway: | SH 342 | Let Status: | Actual |
Project ID: | NH 2013(731) | CSJ: | 0048-01-060 |
Description: | FULL DEPTH CONCRETE PAVEMENT REPAIR | Handling Code: |
|
Limits From: | W 8TH ST | Fund Cat: | 1 |
Limits To: | WINTERGREEN | Estimate: | $791,887 |
Length: | 1.4 Miles | Actual: | $548,845 |
Back... |
Totals for 0048-01-060 | ||
Length: | 1.4 Miles | ||
Estimate: | $791,887 | ||
Actual: | $548,845 | ||
CCSJ: 0091-06-049 | |||
District: | Dallas | Let Date: | MAY 2013 |
Highway: | SH 289 | Let Status: | Actual |
Project ID: | STP 2013(727)MM | CSJ: | 0091-06-049 |
Description: | NB / SB DUAL LEFT TURN LANES | Handling Code: |
|
Limits From: | ON SH 289 (PRESTON) | Fund Cat: | 7 |
Limits To: | AT ROYAL | Estimate: | $569,242 |
Length: | 0.2 Miles | Actual: | $674,541 |
District: | Dallas | Let Date: | MAY 2013 |
Highway: | SH 289 | Let Status: | Actual |
Project ID: | STP 2012(375)MM | CSJ: | 0091-06-055 |
Description: | RIGHT OF WAY ACQUISITION & UTILITY ADJUSTMENTS | Handling Code: |
|
Limits From: | ON SH 289 | Fund Cat: | ROW |
Limits To: | AT ROYAL LANE | Estimate: | |
Length: | 0.0 Miles | Actual: | $44,708 |
Back... |
Totals for 0091-06-049 | ||
Length: | 0.2 Miles | ||
Estimate: | $569,242 | ||
Actual: | $719,249 | ||
CCSJ: 0092-07-045 | |||
District: | Dallas | Let Date: | JUL 2013 |
Highway: | SH 356 | Let Status: | Actual |
Project ID: | BR 2013(827) | CSJ: | 0092-07-045 |
Description: | REHABILITATE BRIDGE | Handling Code: |
|
Limits From: | EB OVERPASS AT TRE & MACARTHUR BLVD | Fund Cat: | 6 |
Limits To: | . | Estimate: | $292,896 |
Length: | 0.1 Miles | Actual: | $448,138 |
Back... |
Totals for 0092-07-045 | ||
Length: | 0.1 Miles | ||
Estimate: | $292,896 | ||
Actual: | $448,138 | ||
CCSJ: 0094-07-041 | |||
District: | Dallas | Let Date: | APR 2013 |
Highway: | SH 183 | Let Status: | Actual |
Project ID: | NH 2013(651) | CSJ: | 0094-07-041 |
Description: | MILL AND INLAY MAIN LANES, SHOULDERS, AND RAMPS, FULL DEPTH | Handling Code: |
|
Limits From: | E. ABUTMENT OF TRINITY RIVER BRIDGE | Fund Cat: | 1 |
Limits To: | IH 35E | Estimate: | $2,307,459 |
Length: | 1.5 Miles | Actual: | $2,164,097 |
Back... |
Totals for 0094-07-041 | ||
Length: | 1.5 Miles | ||
Estimate: | $2,307,459 | ||
Actual: | $2,164,097 | ||
CCSJ: 0095-02-109 | |||
District: | Dallas | Let Date: | FEB 2013 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | NH 2013(381) | CSJ: | 0095-02-109 |
Description: | REPAIR SLOPE WITH HEADWALL | Handling Code: |
|
Limits From: | CULVERT 0.3 MI E OF E FORK RD | Fund Cat: | 1 |
Limits To: | . | Estimate: | $242,603 |
Length: | 0.0 Miles | Actual: | $256,468 |
Back... |
Totals for 0095-02-109 | ||
Length: | 0.0 Miles | ||
Estimate: | $242,603 | ||
Actual: | $256,468 | ||
CCSJ: 0196-03-257 | |||
District: | Dallas | Let Date: | SEP 2012 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | IM 0356(436) | CSJ: | 0196-03-257 |
Description: | FULL DEPTH REPAIR OF SOUTHBOUND FRONTAGE ROAD | Handling Code: |
|
Limits From: | COMMERCE ST | Fund Cat: | 1 |
Limits To: | OAKLAWN AVE | Estimate: | $394,141 |
Length: | 1.6 Miles | Actual: | $402,996 |
Back... |
Totals for 0196-03-257 | ||
Length: | 1.6 Miles | ||
Estimate: | $394,141 | ||
Actual: | $402,996 | ||
CCSJ: 0196-03-259 | |||
District: | Dallas | Let Date: | OCT 2012 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | IM 0356(435) | CSJ: | 0196-03-259 |
Description: | FULL DEPTH REPAIR AND ACP OVERLAY OF FRONTAGE ROADS | Handling Code: |
|
Limits From: | VALLEY VIEW LANE | Fund Cat: | 1 |
Limits To: | WHITLOCK LN/SANDY LAKE ROAD | Estimate: | $2,104,171 |
Length: | 3.4 Miles | Actual: | $1,743,691 |
Back... |
Totals for 0196-03-259 | ||
Length: | 3.4 Miles | ||
Estimate: | $2,104,171 | ||
Actual: | $1,743,691 | ||
CCSJ: 0196-03-264 | |||
District: | Dallas | Let Date: | AUG 2013 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | CC 47-6-151 | CSJ: | 0047-06-151 |
Description: | UPDATE OF SIGNS ON TXDOT FACILITIES WITH NTTA INTERCHANGES | Handling Code: |
|
Limits From: | AT PGBT | Fund Cat: | 3 |
Limits To: | . | Estimate: | $52,685 |
Length: | 0.0 Miles | Actual: | $56,054 |
District: | Dallas | Let Date: | AUG 2013 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | CC 196-3-264 | CSJ: | 0196-03-264 |
Description: | UPDATE OF SIGNS ON TXDOT FACILITIES WITH NTTA INTERCHANGES | Handling Code: |
|
Limits From: | AT DNT | Fund Cat: | 3 |
Limits To: | . | Estimate: | $33,686 |
Length: | 0.0 Miles | Actual: | $26,049 |
District: | Dallas | Let Date: | AUG 2013 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | CC 2374-7-68 | CSJ: | 2374-07-068 |
Description: | UPDATE OF SIGNS ON TXDOT FACILITIES WITH NTTA INTERCHANGES | Handling Code: |
|
Limits From: | AT PGBT | Fund Cat: | 3 |
Limits To: | . | Estimate: | $80,122 |
Length: | 0.0 Miles | Actual: | $84,630 |
Back... |
Totals for 0196-03-264 | ||
Length: | 0.0 Miles | ||
Estimate: | $166,493 | ||
Actual: | $166,733 | ||
CCSJ: 0197-01-011 | |||
District: | Dallas | Let Date: | OCT 2012 |
Highway: | SH 352 | Let Status: | Actual |
Project ID: | NH 2013(096) | CSJ: | 0197-01-011 |
Description: | FULL DEPTH CONCRETE PAVEMENT REPAIR | Handling Code: |
|
Limits From: | ASH LN. | Fund Cat: | 1 |
Limits To: | SPRING AVE. | Estimate: | $161,190 |
Length: | 1.5 Miles | Actual: | $134,489 |
District: | Dallas | Let Date: | OCT 2012 |
Highway: | SH 352 | Let Status: | Actual |
Project ID: | NH 2013(096) | CSJ: | 0430-01-055 |
Description: | FULL DEPTH CONCRETE PAVEMENT REPAIR | Handling Code: |
|
Limits From: | SPRING AVE | Fund Cat: | 1 |
Limits To: | 150 FT EAST OF HATCHER | Estimate: | $33,284 |
Length: | 0.6 Miles | Actual: | $35,925 |
Back... |
Totals for 0197-01-011 | ||
Length: | 2.1 Miles | ||
Estimate: | $194,474 | ||
Actual: | $170,414 | ||
CCSJ: 0197-02-106 | |||
District: | Dallas | Let Date: | JAN 2013 |
Highway: | US 175 | Let Status: | Actual |
Project ID: | NH 2013(317) | CSJ: | 0197-02-106 |
Description: | FDR, ACP OVERLAY AND PAVEMENT MARKING | Handling Code: |
|
Limits From: | LAKE JUNE ROAD | Fund Cat: | 1 |
Limits To: | IH 20 | Estimate: | $3,194,802 |
Length: | 5.2 Miles | Actual: | $2,490,573 |
Back... |
Totals for 0197-02-106 | ||
Length: | 5.2 Miles | ||
Estimate: | $3,194,802 | ||
Actual: | $2,490,573 | ||
CCSJ: 0261-02-072 | |||
District: | Dallas | Let Date: | OCT 2012 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | NH 2013(098) | CSJ: | 0261-02-072 |
Description: | FULL DEPTH REPAIR CONCRETE PAVEMENT AND HMAC OVERLAY | Handling Code: |
|
Limits From: | ELLIS COUNTY LINE | Fund Cat: | 1 |
Limits To: | WHEATLAND RD | Estimate: | $683,043 |
Length: | 8.8 Miles | Actual: | $541,245 |
Back... |
Totals for 0261-02-072 | ||
Length: | 8.8 Miles | ||
Estimate: | $683,043 | ||
Actual: | $541,245 | ||
CCSJ: 0281-03-045 | |||
District: | Dallas | Let Date: | APR 2013 |
Highway: | SH 78 | Let Status: | Actual |
Project ID: | STP 2013(532) | CSJ: | 0281-02-068 |
Description: | CONCRETE FULL DEPTH REPAIR AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | DALLAS COUNTY LINE | Fund Cat: | 1 |
Limits To: | SACHSE CITY LIMIT | Estimate: | $212,911 |
Length: | 1.5 Miles | Actual: | $201,829 |
District: | Dallas | Let Date: | APR 2013 |
Highway: | SH 78 | Let Status: | Actual |
Project ID: | STP 2013(532) | CSJ: | 0281-03-045 |
Description: | CONCRETE FULL DEPTH REPAIR AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | NORTH OF PGBT | Fund Cat: | 1 |
Limits To: | DALLAS / COLLIN COUNTY LINE | Estimate: | $566,703 |
Length: | 3.1 Miles | Actual: | $538,095 |
Back... |
Totals for 0281-03-045 | ||
Length: | 4.6 Miles | ||
Estimate: | $779,614 | ||
Actual: | $739,924 | ||
CCSJ: 0353-04-093 | |||
District: | Dallas | Let Date: | SEP 2012 |
Highway: | SP 348 | Let Status: | Actual |
Project ID: | NH 2013(009) | CSJ: | 0353-04-093 |
Description: | LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING | Handling Code: |
|
Limits From: | AT RIVERSIDE DRIVE | Fund Cat: | 10 |
Limits To: | IN IRVING | Estimate: | $131,488 |
Length: | 0.3 Miles | Actual: | $114,284 |
Back... |
Totals for 0353-04-093 | ||
Length: | 0.3 Miles | ||
Estimate: | $131,488 | ||
Actual: | $114,284 | ||
CCSJ: 0364-02-017 | |||
District: | Fort Worth | Let Date: | JUL 2013 |
Highway: | SH 121 | Let Status: | Actual |
Project ID: | NH 2013(829) | CSJ: | 0364-01-137 |
Description: | RECONSTRUCT FROM 4 TO 10 LANE FREEWAY, RAMPS AND FR RDS; | Handling Code: |
|
Limits From: | SOUTH OF FM 2499 | Fund Cat: | 1 |
Limits To: | TARRANT/DALLAS COUNTY LINE | Estimate: | $8,019,691 |
Length: | 0.5 Miles | Actual: | $8,074,988 |
District: | Dallas | Let Date: | JUL 2013 |
Highway: | SH 121 | Let Status: | Actual |
Project ID: | NH 2013(829) | CSJ: | 0364-02-017 |
Description: | CONVERT 4 LN DIV TO 10 LANE FREEWAY WITH FRONTAGE ROADS | Handling Code: |
|
Limits From: | TARRANT/DALLAS COUNTY LINE | Fund Cat: | 1 |
Limits To: | BUSINESS 121H | Estimate: | $52,680,260 |
Length: | 1.7 Miles | Actual: | $50,411,507 |
District: | Dallas | Let Date: | JUL 2013 |
Highway: | SH 121 | Let Status: | Actual |
Project ID: | NH 2013(829) | CSJ: | 3547-03-004 |
Description: | CONSTRUCT CONCRETE TRAFFIC BARRIER AND TRANSITIONS FROM | Handling Code: |
|
Limits From: | DALLAS/DENTON COUNTY LINE | Fund Cat: | 1 |
Limits To: | NORTH OF 121 BYPASS | Estimate: | $100,900 |
Length: | 0.2 Miles | Actual: | $241,118 |
District: | Dallas | Let Date: | JUL 2013 |
Highway: | SH 121 | Let Status: | Actual |
Project ID: | NH 2013(829) | CSJ: | 3547-04-001 |
Description: | TRANSITION OF FREEWAY WIDENING | Handling Code: |
|
Limits From: | BUSINESS 121H | Fund Cat: | 1 |
Limits To: | DALLAS/DENTON COUNTY LINE | Estimate: | $47,336 |
Length: | 0.1 Miles | Actual: | $77,621 |
Back... |
Totals for 0364-02-017 | ||
Length: | 2.5 Miles | ||
Estimate: | $60,848,187 | ||
Actual: | $58,805,234 | ||
CCSJ: 0442-02-152 | |||
District: | Dallas | Let Date: | AUG 2013 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | IM 0356(442) | CSJ: | 0442-02-152 |
Description: | FULL DEPTH REPAIR OF MAINLANES | Handling Code: |
|
Limits From: | IH 20 | Fund Cat: | 1 |
Limits To: | US 67 | Estimate: | $1,648,667 |
Length: | 4.9 Miles | Actual: | $1,434,180 |
Back... |
Totals for 0442-02-152 | ||
Length: | 4.9 Miles | ||
Estimate: | $1,648,667 | ||
Actual: | $1,434,180 | ||
CCSJ: 0581-01-134 | |||
District: | Dallas | Let Date: | DEC 2012 |
Highway: | LP 12 | Let Status: | Actual |
Project ID: | NH 2013(259) | CSJ: | 0581-01-134 |
Description: | FULL DEPTH REPAIR , MILL & ACP OVERLAY | Handling Code: |
|
Limits From: | SH 78 | Fund Cat: | 1 |
Limits To: | SPUR 244 | Estimate: | $1,110,672 |
Length: | 2.2 Miles | Actual: | $1,070,331 |
Back... |
Totals for 0581-01-134 | ||
Length: | 2.2 Miles | ||
Estimate: | $1,110,672 | ||
Actual: | $1,070,331 | ||
CCSJ: 0581-01-135 | |||
District: | Dallas | Let Date: | MAR 2013 |
Highway: | LP 12 | Let Status: | Actual |
Project ID: | NH 2013(449) | CSJ: | 0581-01-135 |
Description: | REPAIR SLOPE WITH RETAINING WALL | Handling Code: |
|
Limits From: | AT UNION PACIFIC RR | Fund Cat: | 1 |
Limits To: | NEAR SH 310 | Estimate: | $595,567 |
Length: | 0.1 Miles | Actual: | $655,042 |
Back... |
Totals for 0581-01-135 | ||
Length: | 0.1 Miles | ||
Estimate: | $595,567 | ||
Actual: | $655,042 | ||
CCSJ: 0581-01-136 | |||
District: | Dallas | Let Date: | JUN 2013 |
Highway: | LP 12 | Let Status: | Actual |
Project ID: | NH 2013(812) | CSJ: | 0581-01-136 |
Description: | CONCRETE FULL DEPTH REPAIR & PVMT MKGS | Handling Code: |
|
Limits From: | BONNIE VIEW ROAD | Fund Cat: | 1 |
Limits To: | IH 45 | Estimate: | $141,894 |
Length: | 0.9 Miles | Actual: | $114,722 |
Back... |
Totals for 0581-01-136 | ||
Length: | 0.9 Miles | ||
Estimate: | $141,894 | ||
Actual: | $114,722 | ||
CCSJ: 0581-02-134 | |||
District: | Dallas | Let Date: | DEC 2012 |
Highway: | LP 12 | Let Status: | Actual |
Project ID: | NH 2013(260) | CSJ: | 0581-02-134 |
Description: | INSTALL HIGH MAST ILLUMINATION | Handling Code: |
|
Limits From: | SPUR 408 | Fund Cat: | 1 |
Limits To: | IH 30 | Estimate: | $1,566,359 |
Length: | 2.8 Miles | Actual: | $1,270,329 |
Official Notice Back... |
Totals for 0581-02-134 | ||
Length: | 2.8 Miles | ||
Estimate: | $1,566,359 | ||
Actual: | $1,270,329 | ||
CCSJ: 0918-00-162 | |||
District: | Dallas | Let Date: | MAR 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2013(452) | CSJ: | 0918-00-162 |
Description: | NON - SITE SPECIFIC INSTALLATION OF GUIDE SIGNS (ON - SYSTEM) | Handling Code: |
|
Limits From: | DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $400,000 |
Length: | 0.0 Miles | Actual: | $336,140 |
Back... |
Totals for 0918-00-162 | ||
Length: | 0.0 Miles | ||
Estimate: | $400,000 | ||
Actual: | $336,140 | ||
CCSJ: 0918-00-165 | |||
District: | Dallas | Let Date: | MAR 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2013(726) | CSJ: | 0918-00-165 |
Description: | UPGRADE AND REPAIR ITS EQUIPMENT | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | IN DALLAS DISTRICT | Estimate: | $300,000 |
Length: | 0.0 Miles | Actual: | $300,000 |
Back... |
Totals for 0918-00-165 | ||
Length: | 0.0 Miles | ||
Estimate: | $300,000 | ||
Actual: | $300,000 | ||
CCSJ: 0918-00-186 | |||
District: | Dallas | Let Date: | APR 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2013(533) | CSJ: | 0918-00-186 |
Description: | NON - SITE SPECIFIC SIGNAL CONTRACT ON NEW LOCATIONS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | IN DALLAS DISTRICT | Estimate: | $1,425,000 |
Length: | 0.0 Miles | Actual: | $1,598,000 |
Back... |
Totals for 0918-00-186 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,425,000 | ||
Actual: | $1,598,000 | ||
CCSJ: 0918-00-200 | |||
District: | Dallas | Let Date: | APR 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2013(534) | CSJ: | 0918-00-200 |
Description: | UPGRADE VIDEO DETECTION FOR HIGH SPEED APPROACHES | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | IN DALLAS DISTRICT | Estimate: | $291,152 |
Length: | 0.0 Miles | Actual: | $278,458 |
Back... |
Totals for 0918-00-200 | ||
Length: | 0.0 Miles | ||
Estimate: | $291,152 | ||
Actual: | $278,458 | ||
CCSJ: 0918-00-204 | |||
District: | Dallas | Let Date: | JUN 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2013(645) | CSJ: | 0918-00-204 |
Description: | REGIONAL EMISSIONS REDUCTION PROGRAM IMPLEMENTATION | Handling Code: |
XX |
Limits From: | REGIONAL EMISSIONS REDUCTION | Fund Cat: | 5 |
Limits To: | PROGRAM IN D/FW METROPLEX (OFF-SYS) | Estimate: | $1,250,000 |
Length: | 0.0 Miles | Actual: | $1,250,000 |
Back... |
Totals for 0918-00-204 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,250,000 | ||
Actual: | $1,250,000 | ||
CCSJ: 0918-00-220 | |||
District: | Dallas | Let Date: | JUL 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1302(054)MM | CSJ: | 0918-00-220 |
Description: | DEPARTMENTAL STREAMLINING POLICIES AND PROCEDURES | Handling Code: |
XX |
Limits From: | M&O PROGRAM OVERSIGHT COORDINATION | Fund Cat: | 7 |
Limits To: | FY 2013 | Estimate: | $975,000 |
Length: | 0.0 Miles | Actual: | $975,000 |
Back... |
Totals for 0918-00-220 | ||
Length: | 0.0 Miles | ||
Estimate: | $975,000 | ||
Actual: | $975,000 | ||
CCSJ: 0918-00-222 | |||
District: | Dallas | Let Date: | AUG 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1302(073)MM | CSJ: | 0918-00-222 |
Description: | REGIONAL TRIP REDUCTION PROGRAM, VANPOOL PGM, BIKE / PEDESTRIAN | Handling Code: |
XX |
Limits From: | REGIONAL M&O PROGRAMS (FY 2013) | Fund Cat: | 7 |
Limits To: | D/FW METROPLEX | Estimate: | $3,055,492 |
Length: | 0.0 Miles | Actual: | $3,055,492 |
Back... |
Totals for 0918-00-222 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,055,492 | ||
Actual: | $3,055,492 | ||
CCSJ: 0918-00-223 | |||
District: | Dallas | Let Date: | DEC 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2013(411)MM | CSJ: | 0918-00-223 |
Description: | PROVIDE ASSISTANCE TO STRANDED MOTORISTS OR NON INJURY | Handling Code: |
XX |
Limits From: | MOBILITY ASSISTANCE PATROL | Fund Cat: | 7 |
Limits To: | FY 2013 | Estimate: | $3,000,000 |
Length: | 0.0 Miles | Actual: | $3,000,000 |
Back... |
Totals for 0918-00-223 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,000,000 | ||
Actual: | $3,000,000 | ||
CCSJ: 0918-00-224 | |||
District: | Dallas | Let Date: | AUG 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1302(071)MM | CSJ: | 0918-00-224 |
Description: | TRAVEL SURVEY AND DATA COLLECTION EFFORT FOR PROJECTS IN MPO | Handling Code: |
XX |
Limits From: | REGIONAL TRAVEL SURVEY | Fund Cat: | 7 |
Limits To: | FY 2013 | Estimate: | $2,013,334 |
Length: | 0.0 Miles | Actual: | $2,013,334 |
Back... |
Totals for 0918-00-224 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,013,334 | ||
Actual: | $2,013,334 | ||
CCSJ: 0918-00-230 | |||
District: | Dallas | Let Date: | JAN 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2013(508) | CSJ: | 0918-00-230 |
Description: | FREEWAY INCIDENT MANAGEMENT PROGRAM; FY 2013 FUNDING; | Handling Code: |
XX |
Limits From: | M&O - REGIONAL COMMUNICATION SYSTEM | Fund Cat: | 5 |
Limits To: | (EASTERN SUB) | Estimate: | $1,250,000 |
Length: | 0.0 Miles | Actual: | $1,250,000 |
Back... |
Totals for 0918-00-230 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,250,000 | ||
Actual: | $1,250,000 | ||
CCSJ: 0918-00-232 | |||
District: | Dallas | Let Date: | AUG 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1302(092)MM | CSJ: | 0918-00-232 |
Description: | REGIONAL CONGESTION MANAGEMENT PLANNING & DATA COLLECTION - | Handling Code: |
XX |
Limits From: | REGIONAL CONGESTION MGMT PLANNING & | Fund Cat: | 3 |
Limits To: | DATA COLLECITON (FY 2013) | Estimate: | $305,891 |
Length: | 0.0 Miles | Actual: | $306,891 |
Back... |
Totals for 0918-00-232 | ||
Length: | 0.0 Miles | ||
Estimate: | $305,891 | ||
Actual: | $306,891 | ||
CCSJ: 0918-00-241 | |||
District: | Dallas | Let Date: | AUG 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | STEP 2013(896) | CSJ: | 0918-00-241 |
Description: | NCTCOG TO IMPLEMENT FRAMEWORK TO ASSESS CLIMATE CHANGE AND | Handling Code: |
XX |
Limits From: | NCTCOG PLANNING AREA | Fund Cat: | 10 |
Limits To: | . | Estimate: | $150,000 |
Length: | 0.0 Miles | Actual: | $150,000 |
Back... |
Totals for 0918-00-241 | ||
Length: | 0.0 Miles | ||
Estimate: | $150,000 | ||
Actual: | $150,000 | ||
CCSJ: 0918-00-242 | |||
District: | Dallas | Let Date: | AUG 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 1302(093) | CSJ: | 0918-00-242 |
Description: | SAFETY PATROL PILOT PROGRAM; FOUR OBJECTIVES: DESIGN; | Handling Code: |
XX |
Limits From: | VARIOUS HIGHWAYS | Fund Cat: | 3 |
Limits To: | IN DALLAS DISTRICT (FY 2013) | Estimate: | $7,600,000 |
Length: | 0.0 Miles | Actual: | $7,600,100 |
Back... |
Totals for 0918-00-242 | ||
Length: | 0.0 Miles | ||
Estimate: | $7,600,000 | ||
Actual: | $7,600,100 | ||
CCSJ: 0918-00-244 | |||
District: | Dallas | Let Date: | AUG 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | SHRP 1302(053) | CSJ: | 0918-00-244 |
Description: | IMPLEMENTING ECO - LOGICAL FROM SHRP2 TO BRING EARLY CONSIDER - | Handling Code: |
XX |
Limits From: | NCTCOG PLANNING AREA | Fund Cat: | 10 |
Limits To: | . | Estimate: | $225,000 |
Length: | 0.0 Miles | Actual: | $225,000 |
Back... |
Totals for 0918-00-244 | ||
Length: | 0.0 Miles | ||
Estimate: | $225,000 | ||
Actual: | $225,000 | ||
CCSJ: 0918-45-843 | |||
District: | Dallas | Let Date: | MAR 2013 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2013(409) | CSJ: | 0918-45-843 |
Description: | STREET CLOSURES AT MACON & SUNDAY STREETS; INSTALL FENCING | Handling Code: |
LC |
Limits From: | UP RAILROAD FROM MUNICIPAL ST | Fund Cat: | 3 |
Limits To: | SCYENE ST IN CITY OF DALLAS | Estimate: | $1,386,134 |
Length: | 0.0 Miles | Actual: | $917,943 |
Back... |
Totals for 0918-45-843 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,386,134 | ||
Actual: | $917,943 | ||
CCSJ: 0918-45-844 | |||
District: | Dallas | Let Date: | DEC 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | HP 2010(854) | CSJ: | 0918-45-844 |
Description: | WIDEN 2 TO 4 LANE DIV (ULTIMATE 6) WITH GRADE SEPARATION AND | Handling Code: |
|
Limits From: | ON PLEASANT RUN RD, E OF SUNRISE RD | Fund Cat: | 7 |
Limits To: | WEST OF IH 45 | Estimate: | $8,521,018 |
Length: | 0.8 Miles | Actual: | $7,719,832 |
Official Notice Back... |
Totals for 0918-45-844 | ||
Length: | 0.8 Miles | ||
Estimate: | $8,521,018 | ||
Actual: | $7,719,832 | ||
CCSJ: 0918-45-897 | |||
District: | Dallas | Let Date: | OCT 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2011(219)TE | CSJ: | 0918-45-897 |
Description: | LAKERIDGE PKWY IMPROVEMENTS IN CITY OF CEDAR HILL INCL. | Handling Code: |
LC |
Limits From: | LAKERIDGE PARKWAY IMPROVEMENTS: | Fund Cat: | 3 |
Limits To: | FROM MANSFIELD RD TO US HWY 67 FR | Estimate: | $3,739,844 |
Length: | 3.5 Miles | Actual: | $3,147,651 |
Back... |
Totals for 0918-45-897 | ||
Length: | 3.5 Miles | ||
Estimate: | $3,739,844 | ||
Actual: | $3,147,651 | ||
CCSJ: 0918-47-075 | |||
District: | Dallas | Let Date: | AUG 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 1302(084) | CSJ: | 0918-47-075 |
Description: | CONSTRUCT 2ND TRACK ON TRINITY RAILWAY EXPRESS (TRE) | Handling Code: |
TR |
Limits From: | ON TRE FROM VALLEY VIEW (TAR/DAL)CL | Fund Cat: | 5 |
Limits To: | WEST IRVING TRE STATION | Estimate: | $4,752,000 |
Length: | 0.0 Miles | Actual: | $4,752,000 |
Back... |
Totals for 0918-47-075 | ||
Length: | 0.0 Miles | ||
Estimate: | $4,752,000 | ||
Actual: | $4,752,000 | ||
CCSJ: 0918-47-083 | |||
District: | Dallas | Let Date: | MAY 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2013(924)MM | CSJ: | 0918-47-083 |
Description: | LIGHT RAIL BED, TRACK, VEHICLES, OVERHEADS, AND FACILITIES | Handling Code: |
TR |
Limits From: | ON IRVING CORRIDOR LIGHT RAIL | Fund Cat: | 7 |
Limits To: | FROM BACHMAN STA TO BELTLINE STA | Estimate: | $3,502,294 |
Length: | 0.0 Miles | Actual: | $3,502,294 |
Back... |
Totals for 0918-47-083 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,502,294 | ||
Actual: | $3,502,294 | ||
CCSJ: 1047-03-064 | |||
District: | Dallas | Let Date: | SEP 2012 |
Highway: | FM 1382 | Let Status: | Actual |
Project ID: | NH 2013(139) | CSJ: | 1047-03-064 |
Description: | FULL DEPTH REPAIR AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SOUTH OF SP 303 | Fund Cat: | 1 |
Limits To: | SKYLINE DRIVE | Estimate: | $662,964 |
Length: | 1.8 Miles | Actual: | $407,131 |
Back... |
Totals for 1047-03-064 | ||
Length: | 1.8 Miles | ||
Estimate: | $662,964 | ||
Actual: | $407,131 | ||
CCSJ: 1068-04-116 | |||
District: | Dallas | Let Date: | MAR 2013 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | IM 0305(083) | CSJ: | 0009-11-226 |
Description: | RECONSTRUCT INTERCHANGE WITH 5 MAINLANES, 6 COLLECTOR | Handling Code: |
DB |
Limits From: | IH 35E INTERCHANGE | Fund Cat: | 3 |
Limits To: | WEST OF IH 45 INTERCHANGE | Estimate: | 114,200,000 |
Length: | 0.5 Miles | Actual: | 113,613,778 |
District: | Dallas | Let Date: | MAR 2013 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | IM 0305(083) | CSJ: | 0196-03-205 |
Description: | RECONSTRUCT INTERCHANGE WITH 11 MAINLANES, 2 HOV / MANAGED_LANE | Handling Code: |
DB |
Limits From: | AT IH 30 | Fund Cat: | 3 |
Limits To: | . | Estimate: | 228,400,000 |
Length: | 0.8 Miles | Actual: | 233,293,797 |
District: | Dallas | Let Date: | MAR 2013 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | BR 2004(426) | CSJ: | 0442-02-118 |
Description: | REPLACE BRIDGES OVER TRINITY R; WIDEN & RECONSTRUCT 7 ML'S | Handling Code: |
DB |
Limits From: | AT TRINITY RIVER | Fund Cat: | 3 |
Limits To: | NB & SB | Estimate: | 101,000,000 |
Length: | 0.5 Miles | Actual: | 101,219,548 |
District: | Dallas | Let Date: | MAR 2013 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | BOR 2003(38) | CSJ: | 0442-02-132 |
Description: | WIDEN AND RECONSTRUCT 7 MAINLANES, 9 COLLECTOR / DISTRIBUTOR | Handling Code: |
DB |
Limits From: | EIGHTH STREET | Fund Cat: | 3 |
Limits To: | SOUTH OF IH 30 | Estimate: | $62,000,000 |
Length: | 0.5 Miles | Actual: | $71,161,330 |
District: | Dallas | Let Date: | MAR 2013 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | BR 2013(353) | CSJ: | 1068-04-099 |
Description: | REPLACE BRIDGE AND APPROACHES WITH 10 MAINLANES, | Handling Code: |
DB |
Limits From: | AT BECKLEY, AT TRINITY RIVER, AND | Fund Cat: | 3 |
Limits To: | AT RIVERFRONT BLVD | Estimate: | $42,000,000 |
Length: | 0.0 Miles | Actual: | $39,248,396 |
District: | Dallas | Let Date: | MAR 2013 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | IMD 2002(40) | CSJ: | 1068-04-116 |
Description: | WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV / | Handling Code: |
DB |
Limits From: | EAST OF SYLVAN AVE | Fund Cat: | 3 |
Limits To: | IH 35E___090300077 | Estimate: | $95,065,553 |
Length: | 1.5 Miles | Actual: | $99,402,055 |
District: | Dallas | Let Date: | MAR 2013 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | HP 2013(306) | CSJ: | 1068-04-157 |
Description: | WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV / | Handling Code: |
DB |
Limits From: | EAST OF SYLVAN AVE | Fund Cat: | 10 |
Limits To: | IH 35E | Estimate: | $1,001,475 |
Length: | 1.5 Miles | Actual: | $1,001,475 |
District: | Dallas | Let Date: | MAR 2013 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | HP 2013(307) | CSJ: | 1068-04-158 |
Description: | WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV / | Handling Code: |
DB |
Limits From: | EAST OF SYLVAN AVE | Fund Cat: | 10 |
Limits To: | IH 35E | Estimate: | $34,050,152 |
Length: | 1.5 Miles | Actual: | $34,050,152 |
District: | Dallas | Let Date: | MAR 2013 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | HP 2013(308) | CSJ: | 1068-04-159 |
Description: | WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV / | Handling Code: |
DB |
Limits From: | EAST OF SYLVAN AVE | Fund Cat: | 10 |
Limits To: | IH 35E | Estimate: | $1,001,475 |
Length: | 1.5 Miles | Actual: | $1,001,475 |
District: | Dallas | Let Date: | MAR 2013 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | HP 2013(309) | CSJ: | 1068-04-160 |
Description: | WIDEN AND RECONSTRUCT 10 MAINLANES WITH 1 REVERSIBLE HOV / | Handling Code: |
DB |
Limits From: | EAST OF SYLVAN AVE | Fund Cat: | 10 |
Limits To: | IH 35E | Estimate: | $21,281,345 |
Length: | 1.5 Miles | Actual: | $21,281,345 |
Back... |
Totals for 1068-04-116 | ||
Length: | 9.8 Miles | ||
Estimate: | 700,000,000 | ||
Actual: | 715,273,351 | ||
CCSJ: 1068-04-147 | |||
District: | Dallas | Let Date: | DEC 2012 |
Highway: | LP 12 | Let Status: | Actual |
Project ID: | NH 2013(262) | CSJ: | 0581-02-136 |
Description: | FIBER OPTIC CABLE TO CONNECT IH 30 MANAGED LANES ITS | Handling Code: |
|
Limits From: | IH 30 | Fund Cat: | 11 |
Limits To: | 0.5 MILE NORTH OF IH 30 | Estimate: | $548,092 |
Length: | 0.5 Miles | Actual: | $278,656 |
District: | Fort Worth | Let Date: | DEC 2012 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | C 1068-2-135 | CSJ: | 1068-02-135 |
Description: | CONSTRUCT MANAGED / HOV LANE GANTRIES | Handling Code: |
|
Limits From: | 0.5 MILES WEST OF N. FIELDER ROAD | Fund Cat: | 3 |
Limits To: | DALLAS/TARRANT COUNTY LINE | Estimate: | $8,361,292 |
Length: | 6.1 Miles | Actual: | $6,960,302 |
District: | Dallas | Let Date: | DEC 2012 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | IM 0305(082) | CSJ: | 1068-04-147 |
Description: | CONSTRUCT MANAGED / HOV LANES WITH TWO SETS OF WISHBONE RAMPS | Handling Code: |
|
Limits From: | TARRANT/DALLAS COUNTY LINE | Fund Cat: | 3 |
Limits To: | SYLVAN AVE. | Estimate: | $59,062,300 |
Length: | 12.2 Miles | Actual: | $55,842,812 |
Back... |
Totals for 1068-04-147 | ||
Length: | 18.8 Miles | ||
Estimate: | $67,971,684 | ||
Actual: | $63,081,770 | ||
CCSJ: 1068-04-153 | |||
District: | Dallas | Let Date: | OCT 2012 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | C 1068-4-153 | CSJ: | 1068-04-153 |
Description: | RELOCATE EXISTING EASTBOUND EXIT RAMP & CONSTRUCT TWO LANE | Handling Code: |
|
Limits From: | 0.5 MILES WEST OF WESTMORELAND RD | Fund Cat: | 3 |
Limits To: | EAST OF WESTMORELAND RD | Estimate: | $2,658,811 |
Length: | 0.6 Miles | Actual: | $2,655,000 |
Back... |
Totals for 1068-04-153 | ||
Length: | 0.6 Miles | ||
Estimate: | $2,658,811 | ||
Actual: | $2,655,000 | ||
CCSJ: 2374-01-170 | |||
District: | Dallas | Let Date: | APR 2013 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | IM 6356(441) | CSJ: | 2374-01-170 |
Description: | FULL DEPTH CONCRETE PAVEMENT REPAIR | Handling Code: |
|
Limits From: | GREENVILLE AVENUE | Fund Cat: | 1 |
Limits To: | FOREST LANE | Estimate: | $543,714 |
Length: | 0.9 Miles | Actual: | $417,260 |
Back... |
Totals for 2374-01-170 | ||
Length: | 0.9 Miles | ||
Estimate: | $543,714 | ||
Actual: | $417,260 | ||
CCSJ: 2374-03-081 | |||
District: | Dallas | Let Date: | JUL 2013 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 0453(134) | CSJ: | 0092-14-082 |
Description: | LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING AND | Handling Code: |
|
Limits From: | AT SIMPSON STUART ROAD | Fund Cat: | 10 |
Limits To: | IN DALLAS | Estimate: | $40,762 |
Length: | 0.1 Miles | Actual: | $40,692 |
District: | Dallas | Let Date: | JUL 2013 |
Highway: | LP 12 | Let Status: | Actual |
Project ID: | NH 2013(833) | CSJ: | 0581-01-139 |
Description: | LANDSCAPE TO INCLUDE TREE & SHRUB PLANTING AND IRRIGATION SY | Handling Code: |
|
Limits From: | UNIVERSITY HILLS DRIVE | Fund Cat: | 10 |
Limits To: | SINGING HILLS DRIVE | Estimate: | $25,588 |
Length: | 0.0 Miles | Actual: | $25,883 |
District: | Dallas | Let Date: | JUL 2013 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | IM 0205(153) | CSJ: | 2374-03-081 |
Description: | LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING, | Handling Code: |
|
Limits From: | EAST OF POLK RD | Fund Cat: | 10 |
Limits To: | EAST OF IH 45 | Estimate: | $272,402 |
Length: | 6.4 Miles | Actual: | $223,457 |
District: | Dallas | Let Date: | JUL 2013 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | IM 0205(153) | CSJ: | 2374-04-075 |
Description: | LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING, | Handling Code: |
|
Limits From: | WEST OF US 67 | Fund Cat: | 10 |
Limits To: | EAST OF POLK RD | Estimate: | $110,017 |
Length: | 3.1 Miles | Actual: | $109,240 |
Back... |
Totals for 2374-03-081 | ||
Length: | 9.6 Miles | ||
Estimate: | $448,769 | ||
Actual: | $399,272 | ||
CCSJ: 2374-04-072 | |||
District: | Dallas | Let Date: | JUL 2013 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | IM 0205(154) | CSJ: | 2374-04-072 |
Description: | FULL DEPTH REPAIR, MILL AND INLAY OF MAINLANES | Handling Code: |
|
Limits From: | TARRANT COUNTY LINE | Fund Cat: | 1 |
Limits To: | EAST OF CARRIER PARKWAY | Estimate: | $2,684,702 |
Length: | 1.8 Miles | Actual: | $3,004,430 |
Back... |
Totals for 2374-04-072 | ||
Length: | 1.8 Miles | ||
Estimate: | $2,684,702 | ||
Actual: | $3,004,430 |
|