CCSJ: 0138-13-017

District: Atlanta Let Date: JUN 2013
Highway: FM 2208 Let Status: Actual
Project ID: STP 2013(775) CSJ: 0138-13-017
Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH Handling
Code:
 
Limits From: SH 154 Fund Cat: 8
Limits To: FM 450 Estimate: $293,044
Length: 1.2 Miles Actual: $329,939
 
Back...

Totals for 0138-13-017
Length: 1.2 Miles
Estimate: $293,044
Actual: $329,939

CCSJ: 0402-04-030

District: Atlanta Let Date: JUN 2013
Highway: SH 154 Let Status: Actual
Project ID: BR 2013(815) CSJ: 0402-04-030
Description: REHABILITATE BRIDGE APPROACHES Handling
Code:
 
Limits From: AT LAWRENCE CREEK Fund Cat: 6
Limits To: . Estimate: $519,665
Length: 0.1 Miles Actual: $635,426
 
Back...

Totals for 0402-04-030
Length: 0.1 Miles
Estimate: $519,665
Actual: $635,426

CCSJ: 0495-10-083

District: Atlanta Let Date: MAR 2013
Highway: IH 20 Let Status: Actual
Project ID: IM 0207(071) CSJ: 0495-10-083
Description: RESURFACE EXISTING INTERSTATE FACILITY Handling
Code:
 
Limits From: 0.5 MI W OF US 80 Fund Cat: 1
Limits To: LOUISIANA STATE LINE,WB LANES ONLY Estimate: $1,355,167
Length: 7.9 Miles Actual: $1,247,096
 
Back...

Totals for 0495-10-083
Length: 7.9 Miles
Estimate: $1,355,167
Actual: $1,247,096

CCSJ: 0843-02-012

District: Atlanta Let Date: MAY 2013
Highway: FM 450 Let Status: Actual
Project ID: BR 2013(659) CSJ: 0843-02-012
Description: REPLACE BRIDGE AND APPROACHES Handling
Code:
 
Limits From: AT LITTLE CYPRESS CREEK Fund Cat: 6
Limits To: . Estimate: $8,132,645
Length: 2.0 Miles Actual: $7,845,576
 
Back...

Totals for 0843-02-012
Length: 2.0 Miles
Estimate: $8,132,645
Actual: $7,845,576


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract