Letting Schedule for Houston District (FY 2013)
Houston District (FY 2013) |
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller | ||||||
Brazoria County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0111-04-034 | FM 521 | Actual | MAY 2013 | $1,639,901 | 1 | PAVEMENT REPAIR, SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS |
0111-07-038 | BS 288B | Actual | OCT 2012 | $6,891,170 | 6 | REPLACE BRIDGE AND APPROACHES |
0111-09-041 | BS 288B | Actual | JUL 2013 | $509,258 | 3 | RAISED MEDIAN IN ANGLETON |
0178-03-145 | SH 35 | Actual | APR 2013 | $1,405,314 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12020017803025) |
0178-03-149 | SH 35 | Actual | JUL 2013 | $1,695,830 | 8 | ADD CROSSOVER LEFT TURN LANE |
0178-08-014 | BS 35-C | Actual | OCT 2012 | $1,535,744 | 1 | ACP OVERLAY AND PAVEMENT MARKINGS |
0179-02-083 | SH 35 | Actual | MAR 2013 | $4,815,959 | 1 | SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS |
0188-04-046 | SH 36 | Actual | JUN 2013 | $5,633,087 | 3 | OVERLAY AND WIDEN FROM 2 TO 4 LANES |
0586-01-064 | SH 332 | Actual | JAN 2013 | $684,632 | 1 | ACP OVERLAY |
0598-04-025 | SH 288 | Actual | OCT 2012 | $216,060 | 1 | CONSTRUCT TURNAROUND |
0912-31-211 | VA | Actual | APR 2013 | $422,144 | 1 | MBGF UPGRADES |
0912-31-224 | CR | Actual | AUG 2013 | $14,518,736 | 3 | RECONSTRUCT AND WIDEN TO 4 LANES DIVIDED |
0912-31-264 | CS | Actual | MAY 2013 | $424,008 | 6 | REPLACE BRIDGE (NBI# 12020U00010001) |
0912-31-270 | CS | Actual | AUG 2013 | $4,837,805 | 3 | CONSTRUCT 4 LANE DIVIDED ROADWAY WITH RAISED MEDIANS |
0912-31-274 | VA | Actual | DEC 2012 | $3,269,202 | 3 | CONSTRUCTION AND INTEGRATION OF A COMPREHENSIVE INTELLIGENT |
1003-01-090 | FM 523 | Actual | DEC 2012 | $481,934 | 1 | INSTALL LEFT TURN LANES |
1414-03-039 | FM 1462 | Actual | JUL 2013 | $481,636 | 1 | INTERSECTION IMPROVEMENTS |
1524-01-077 | SH 332 | Actual | MAY 2013 | $1,554,440 | 1 | BASE REPAIR, PLANING & 1.5" ACP OVERLAY |
Fort Bend County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0187-05-050 | SP 10 | Actual | AUG 2013 | $19,773,720 | 3 | CONSTRUCT 2 - LANE RURAL FACILITY ON A NEW LOCATION AND REMOVE |
0192-01-091 | SH 6 | Actual | AUG 2013 | $36,096 | 10 | FY 2013 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0192-01-092 | SH 6 | Actual | AUG 2013 | $30,080 | 10 | FY 2013 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
0912-34-146 | CS | Actual | APR 2013 | $4,836,269 | 3 | CONSTRUCT 4 - LANE ROADWAY |
0912-34-147 | VA | Actual | MAR 2013 | $3,130,219 | 5 | WESTPARK TOLLROAD PARK & RIDE |
0912-34-158 | CR | Actual | JUL 2013 | $344,620 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12080AA0962002) |
0912-34-171 | VA | Actual | OCT 2012 | $591,980 | 1 | CIPP PIPE LINER AT CROSS CULVERTS |
0912-34-178 | CS | Actual | MAY 2013 | $3,589,101 | 3 | WIDEN 2 - LANE ROADWAY TO 4 - LANE BOULEVARD WITH CURB & GUTTER |
1258-02-033 | FM 1093 | Actual | MAR 2013 | $535,317 | 1 | BASE REPAIR & OVERLAY |
2105-01-046 | FM 2234 | Actual | JUL 2013 | $8,068,060 | 3 | RECONSTRUCT AND WIDEN FROM 2 LANES TO 4 - LANE DIVIDED RURAL |
2105-01-047 | FM 2234 | Actual | MAY 2013 | $1,659,984 | 3 | SIGNAL SYSTEM UPGRADE AND RECONFIGURATION |
3048-01-014 | FM 2977 | Actual | NOV 2012 | $1,473,222 | 1 | INSTALL LEFT TURN LANES |
3510-04-047 | SH 99 | Actual | OCT 2012 | $25,978,009 | 3 | CONSTRUCT OVERPASS AND APPROACHES |
Galveston County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0192-04-103 | SH 6 | Actual | JAN 2013 | $2,714,894 | 1 | BASE REPAIR, SEAL COAT AND 1.5" PFC ACP O / L |
0912-73-120 | CR | Actual | AUG 2013 | $550,634 | 6 | REPLACE BRIDGE |
0912-73-141 | VA | Actual | OCT 2012 | $2,393,028 | 3 | CONSTRUCTION OF TRANSIT / PEDESTRIAN TRAIL |
0976-03-100 | FM 518 | Actual | AUG 2013 | $1,295,137 | 3 | ACCESS MANAGEMENT IMPROVEMENTS INCLUDING RAISED MEDIANS, |
0978-02-068 | FM 646 | Actual | APR 2013 | $847,434 | 1 | BASE REPAIR, PLANNING AND ACP OVERLAY |
1607-01-050 | FM 1764 | Actual | JUN 2013 | $704,751 | 3 | LANDSCAPE AND PEDESTRIAN IMPROVEMENTS WITH FREEWAY |
1911-01-020 | FM 2004 | Actual | JAN 2013 | $2,133,995 | 1 | ACP OVERLAY |
1911-01-021 | FM 2004 | Actual | NOV 2012 | $189,987 | 1 | INSTALL TURN LANES |
2523-01-024 | FM 2004 | Actual | AUG 2013 | $1,037,706 | 1 | INTERSECTION IMPROVEMENTS |
2523-01-025 | FM 2004 | Actual | AUG 2013 | $50,400 | 10 | FY 2013 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
3595-01-016 | SH 275 | Actual | AUG 2013 | $121,600 | 10 | FY 2013 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
Harris County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0027-09-099 | US 90A | Actual | JUL 2013 | $1,018,581 | 8 | INSTALL MEDIAN BARRIER |
0027-09-100 | US 90A | Actual | AUG 2013 | $1,190,807 | 8 | INSTALL SAFTY LIGHTING |
0027-10-069 | US 90A | Actual | APR 2013 | $2,433,337 | 1 | RECONSTRUCT INTERSECTION AT IH45, FLEXIBLE PAVEMENT REPAIR, |
0027-13-190 | US 59 | Actual | NOV 2012 | $18,777,770 | 1 | RECONSTRUCT FRONTAGE ROADS AND INTERSECTIONS |
0027-13-202 | US 59 | Actual | JUL 2013 | $13,885,131 | 1 | SEAL COAT, CAM LEVEL UP, THIN ASPHALT OVERLAY AND PAVEMENT |
0027-13-208 | US 59 | Actual | JUL 2013 | $1,616,027 | 11 | RECONSTRUCTION OF NB BRIDGE SLAB |
0028-01-095 | BU 90-U | Actual | SEP 2012 | $2,893,768 | 1 | BASE REPAIR & ACP OVERLAY |
0050-06-082 | US 290 | Actual | SEP 2012 | $7,088,544 | 5 | INTERSECTION IMPROVEMENTS |
0050-08-086 | US 290 | Actual | MAR 2013 | $57,979,155 | 3 | WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE MANAGED LANES, |
0050-08-087 | US 290 | Actual | APR 2013 | 135,455,756 | 5 | RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE |
0050-09-069 | US 290 | Actual | MAY 2013 | 142,790,301 | ROW | RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE |
0050-09-070 | US 290 | Actual | APR 2013 | 153,351,431 | ROW | RECONST & WIDEN TO 8 MAIN LNS, 3 REVERSIBLE MANAGED LNS, AUX |
0050-09-071 | US 290 | Actual | SEP 2012 | 110,414,014 | ROW | CONSTRUCT 5 MAIN LANES WITH AUXILIARY LANES & 2 OR 3 LANE |
0051-02-079 | SH 3 | Actual | AUG 2013 | $1,755,644 | 1 | ADDITION OF RIGHT TURN LANE STORAGE, SIDEWALKS, RAILROAD |
0051-02-091 | SH 3 | Actual | MAY 2013 | $1,261,827 | 1 | DRAINAGE IMPROVEMENTS (PHASE V) |
0110-05-117 | IH 45 | Actual | OCT 2012 | $187,376 | 1 | REPLACE EXISTING TWLTL WITH RAISED MEDIAN, CURB AND RIPRAP |
0271-14-224 | IH 610 | Actual | AUG 2013 | $1,766,701 | 1 | ASPHALT OVERLAY OF IH 610 MAIN LANES AT IH 45 |
0271-14-228 | IH 610 | Actual | OCT 2012 | 107,046,836 | ROW | RECONSTRUCT US 290 / IH 610 INCLUDING IH 10 TO US 290 OUTBOUND |
0271-16-130 | IH 610 | Actual | JUL 2013 | $1,733,013 | 1 | HIGH MAST ILLUMINATION |
0271-17-154 | IH 610 | Actual | SEP 2012 | $315,518 | 1 | SEAL RETAINING WALL JOINTS ON SB FRONTAGE ROAD |
0389-13-056 | SH 146 | Actual | NOV 2012 | $6,585,238 | 12 | CONSTRUCT DIRECT CONNECTOR (RAMP C DC EB TO NB) |
0500-03-042 | IH 45 | Actual | NOV 2012 | $93,288,285 | ROW | WIDEN AND RECONSTRUCT TO 10 MAIN LANES, TWO 3 - LANE FRONTAGE |
0500-03-577 | IH 45 | Actual | FEB 2013 | $24,847,758 | 3 | TRANSPORTATION MANAGEMENT SYSTEM IMPROVEMENTS CONSTRUCT |
0508-01-332 | IH 10 | Actual | JAN 2013 | $2,460,155 | 1 | HIGH MAST ILLUMINATION |
0508-01-335 | IH 10 | Actual | OCT 2012 | $1,650,456 | 3 | INTERSECTION IMPROVEMENTS |
0508-01-343 | IH 10 | Actual | AUG 2013 | $1,881,416 | 6 | REHABILITATION OF BRIDGE DECK (NBI 12102050801223) |
0508-07-281 | SP 330 | Actual | FEB 2013 | $1,510,503 | 1 | FULL DEPTH REPAIR, MILLING, CURB REPAIR AND ASPHALTIC |
0912-00-381 | VA | Actual | MAR 2013 | $1,787,200 | 1 | UPGRADE / RECONSTRUCT TRAFFIC SIGNALS |
0912-00-413 | VA | Actual | APR 2013 | $1,456,617 | 1 | NEW TRAFFIC SIGNALS |
0912-00-418 | VA | Actual | JAN 2013 | $598,106 | 1 | NEW SATELLITE BUILDING POWER SYSTEMS |
0912-00-420 | VA | Actual | JAN 2013 | $1,899,904 | 1 | NEW TRAFFIC SIGNALS |
0912-00-447 | VA | Actual | DEC 2012 | $1,675,754 | 3 | MONTROSE NEIGHBORHOOD PEDESTRIAN IMPROVEMENTS |
0912-00-456 | VA | Actual | JAN 2013 | $200,000 | 1 | ITS COMMUNICATIONS (NON LETTING) |
0912-00-458 | VA | Actual | AUG 2013 | $3,500,000 | 1 | ITS SUPPORT (NON LETTING) |
0912-00-465 | VA | Actual | JUL 2013 | $2,000,000 | 5 | REGIONAL VANPOOL PROGRAM (FY 2013) |
0912-00-466 | VA | Actual | JUL 2013 | $3,750,000 | 3 | REGIONAL VANPOOL PROGRAM (FY 2013) |
0912-00-484 | VA | Actual | AUG 2013 | $557,850 | 1 | UPGRADE & MODERNIZE SIGNALS |
0912-70-064 | CS | Actual | AUG 2013 | $14,907,082 | 3 | RECONSTRUCT 4 - LN BOULEVARD W / PAVING, CURBS, STREET LIGHTING |
0912-70-065 | CS | Actual | DEC 2012 | $7,922,595 | 3 | RECONSTRUCT BOULEVARD ROADWAY WITH PAVING, CURBS, STREET |
0912-70-077 | VA | Actual | APR 2013 | $1,525,267 | 3 | 10 - FOOT WIDE SHARED USE PATH ON SOUTH BANK OF BRAYS BAYOU W / |
0912-70-078 | VA | Actual | JUN 2013 | $2,581,445 | 3 | LANDSCAPE WITH PEDESTRIAN IMPROVEMENTS ADJ.TO RDWY WITHIN |
0912-70-085 | VA | Actual | MAY 2013 | $810,066 | 10 | LANDSCAPE DEVELOPMENT |
0912-70-096 | VA | Actual | AUG 2013 | $1,000,000 | 3 | HARRIS COUNTY SHERRIFF'S MOTORIST ASSISTANCE PROGRAM FY 2013 |
0912-71-001 | VA | Actual | NOV 2012 | $6,250,000 | 12 | PRELIMINARY ENGINEERING / ENVIRONMENTAL ANALYSIS FOR URBAN |
0912-71-005 | VA | Actual | AUG 2013 | $958,854 | 3 | INSTALL UPS / BATTERY BACKUPS AT VARIOUS LOCATIONS CITYWIDE |
0912-71-044 | VA | Actual | AUG 2013 | $10,394,415 | 7 | CONSTRUCT INTERMODAL TRANSIT TERMINAL |
0912-71-688 | CS | Actual | FEB 2013 | $13,480,682 | 3 | RECONSTRUCT AND WIDEN TO 6 LANE DIVIDED (WITH RAISED MEDIAN) |
0912-71-895 | CR | Actual | NOV 2012 | $7,785,991 | ROW | CONSTRUCT 4 LANE CONCRETE DIVIDED SECTION WITH CURB AND |
0912-72-004 | CS | Actual | NOV 2012 | $2,483,337 | 10 | LANDSCAPE (CITY OF HOUSTON SECTION 115 EARMARK) |
0912-72-050 | CS | Actual | SEP 2012 | $1,384,264 | 6 | REHABILITATE BRIDGE AND APPROACHES |
0912-72-061 | CR | Actual | AUG 2013 | $736,542 | 6 | REPLACE BRIDGE (NBI# 121020AA0207001) |
0912-72-175 | VA | Actual | OCT 2012 | $2,370,426 | 7 | TRANSTAR OPERATIONS AND MANAGEMENT (NEW PARKING LOT AND |
0912-72-195 | CS | Actual | DEC 2012 | $2,895,120 | 3 | CREATE SMART ARTERIAL CORRIDORS |
0912-72-199 | VA | Actual | AUG 2013 | $2,561,453 | 3 | ITS FOR HIGH DEMAND ARTERIAL STREETS (RCTSS) HARRIS COUNTY |
0912-72-229 | CS | Actual | JUL 2013 | $600,782 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12102B02249004) |
0912-72-241 | VA | Actual | MAY 2013 | $1,883,747 | 1 | SLOPE REPAIR, CHANNEL STABILIZATION, RETAINING WALL, AND |
0912-72-288 | VA | Actual | MAR 2013 | $1,189,354 | 10 | CONSTRUCT ADA CURB RAMPS ALONG IH 45 AND SH 288 IN HARRIS |
0912-72-293 | CS | Actual | FEB 2013 | $3,559,738 | 3 | BASE REPAIR, PLANING, 2" OVERLAY AND STRIPING |
0912-72-304 | CS | Actual | AUG 2013 | $271,428 | 8 | FY 2013 RR SIGNAL & WARNING DEVICES (BNSF DOT# 023 211L) |
0912-72-305 | CS | Actual | AUG 2013 | $355,951 | 8 | FY 2013 RR SIGNAL & WARNING DEVICES (BNSF DOT# 023 228P) |
0912-72-306 | CS | Actual | AUG 2013 | $381,522 | 8 | FY 2013 RR SIGNAL & WARNING DEVICES (BNSF DOT# 023 212T) |
1006-01-059 | FM 529 | Actual | OCT 2012 | $7,690,214 | 1 | WIDEN TO 4 LANE ROADWAY WITH CENTER LEFT TURN LANE AND |
1062-02-023 | FM 2100 | Actual | MAY 2013 | $5,966,664 | 1 | MILL & ACP OVERLAY |
1258-04-056 | FM 1093 | Actual | JUL 2013 | $2,561,914 | 1 | IMPLEMENTATION OF ACCESS MANAGEMENT (PHASE II) , SIDEWALKS |
1685-02-049 | FM 1960 | Actual | SEP 2012 | $546,380 | 1 | PAVEMENT MARKINGS |
1685-07-019 | BF1960A | Actual | AUG 2013 | $13,293,900 | 3 | BASE REPAIR, MILL, SEAL COAT, 1.5" ACP OVERLAY, |
2941-01-021 | FM 2920 | Actual | JUL 2013 | $3,074,859 | 1 | INTERSECTION IMPROVEMENTS |
2941-02-051 | FM 2920 | Actual | AUG 2013 | $89,600 | 10 | FY 2013 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
Montgomery County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0338-03-087 | SH 105 | Actual | JUN 2013 | $1,127,784 | 1 | WIDEN WESTBOUND FROM 2 TO 3 LANES |
0338-11-051 | LP 336 | Actual | AUG 2013 | $7,593,342 | 1 | WIDEN TO 4 LANES UNDIVIDED RURAL |
0523-10-034 | FM 1488 | Actual | JUL 2013 | $27,649,979 | 3 | CONSTUCT RAILROAD GRADE SEPARATION OVER FM 149 AND BNSF RR |
0675-08-107 | IH 45 | Actual | MAY 2013 | $745,136 | 10 | LANDSCAPE DEVELOPMENT |
0912-37-206 | CR | Actual | NOV 2012 | $561,551 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12170AA1352055) |
1062-03-048 | FM 1485 | Actual | AUG 2013 | $28,000 | 10 | FY 2013 RAILROAD GRADE CROSSING REPLANKING PROGRAM |
3158-01-035 | FM 3083 | Actual | JUL 2013 | $3,065,561 | 3 | WIDEN TO 4 - LANE DIVIDED ROADWAY |
3538-01-030 | SH 242 | Actual | JAN 2013 | $33,998,617 | 3 | CONSTRUCT ELECTRONICALLY TOLLED DIRECT CONNECTORS FROM WB SH |
Waller County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0912-56-046 | CR | Actual | JUL 2013 | $1,001,556 | 6 | REPLACE BRIDGE (NBI# 12237AA0257001) |
0912-56-051 | CR | Actual | AUG 2013 | $150,000 | 8 | FY 2013 RR SIGNAL & WARNING DEVICES (UPRR DOT# 743 130Y) |
1745-01-019 | FM 1887 | Actual | APR 2013 | $5,083,866 | 1 | FULL DEPTH RECLAMATION, SEAL COAT, LEVEL - UP, ACP |
3445-01-007 | FM 3346 | Actual | NOV 2012 | $798,979 | 1 | ACP OVERLAY |
|