Letting Schedule for Houston District (FY 2013)
| Houston District (FY 2013) |
| Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller | ||||||
Brazoria County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
|---|---|---|---|---|---|---|
| 0111-04-034 | FM 521 | Approved | MAY 2013 | $1,852,832 | 1 | PAVEMENT REPAIR, SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS |
| 0111-07-038 | BS 288B | Actual | OCT 2012 | $6,891,170 | 6 | REPLACE BRIDGE AND APPROACHES |
| 0111-09-041 | BS 288B | Approved | JUL 2013 | $424,308 | 3 | RAISED MEDIAN IN ANGLETON |
| 0178-03-145 | SH 35 | Actual | APR 2013 | $1,405,314 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12020017803025) |
| 0178-03-149 | SH 35 | Approved | JUL 2013 | $1,498,558 | 8 | ADD CROSSOVER LEFT TURN LANE |
| 0178-08-014 | BS 35-C | Actual | OCT 2012 | $1,535,744 | 1 | ACP OVERLAY AND PAVEMENT MARKINGS |
| 0179-02-083 | SH 35 | Actual | MAR 2013 | $4,815,959 | 1 | SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS |
| 0586-01-064 | SH 332 | Actual | JAN 2013 | $684,632 | 1 | ACP OVERLAY |
| 0598-04-025 | SH 288 | Actual | OCT 2012 | $216,060 | 1 | CONSTRUCT TURNAROUND |
| 0912-31-211 | VA | Actual | APR 2013 | $422,144 | 1 | MBGF UPGRADES |
| 0912-31-224 | CR | Approved | AUG 2013 | $12,159,874 | 3 | RECONSTRUCT AND WIDEN TO 4 LANES DIVIDED |
| 0912-31-264 | CS | Approved | MAY 2013 | $421,533 | 6 | REPLACE BRIDGE (NBI# 12020U00010001) |
| 0912-31-270 | CS | Approved | AUG 2013 | $4,416,560 | 3 | CONSTRUCT 4 LANE DIVIDED ROADWAY WITH RAISED MEDIANS |
| 0912-31-274 | VA | Actual | DEC 2012 | $3,269,202 | 3 | CONSTRUCTION AND INTEGRATION OF A COMPREHENSIVE INTELLIGENT |
| 1003-01-090 | FM 523 | Actual | DEC 2012 | $481,934 | 1 | INSTALL LEFT TURN LANES |
| 1414-03-039 | FM 1462 | Approved | JUL 2013 | $402,546 | 1 | INTERSECTION IMPROVEMENTS |
| 1524-01-077 | SH 332 | Approved | MAY 2013 | $1,675,307 | 1 | BASE REPAIR, PLANING & 1.5" ACP OVERLAY |
Fort Bend County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
| 0187-05-050 | SP 10 | Approved | AUG 2013 | $21,999,740 | 3 | CONSTRUCT 2 - LANE RURAL FACILITY ON A NEW LOCATION AND REMOVE |
| 0271-05-039 | IH 10 | Approved | JUL 2013 | $191,002 | 10 | LANDSCAPE |
| 0912-34-146 | CS | Actual | APR 2013 | $4,836,269 | 3 | CONSTRUCT 4 - LANE ROADWAY |
| 0912-34-147 | VA | Actual | MAR 2013 | $3,130,219 | 5 | WESTPARK TOLLROAD PARK & RIDE |
| 0912-34-158 | CR | Approved | JUL 2013 | $233,803 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12080AA0962002) |
| 0912-34-159 | CR | Approved | AUG 2013 | $279,000 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12080AA0905001) |
| 0912-34-171 | VA | Actual | OCT 2012 | $591,980 | 1 | CIPP PIPE LINER AT CROSS CULVERTS |
| 0912-34-178 | CS | Approved | MAY 2013 | $3,681,745 | 3 | WIDEN 2 - LANE ROADWAY TO 4 - LANE BOULEVARD WITH CURB & GUTTER |
| 1258-02-033 | FM 1093 | Actual | MAR 2013 | $535,317 | 1 | BASE REPAIR & OVERLAY |
| 1258-03-042 | FM 1093 | Approved | AUG 2013 | $32,000,000 | 3 | CONSTRUCT 4 TOLL LANES WITH TWO 2 - LANE FRONTAGE ROADS |
| 1258-03-043 | FM 1093 | Approved | AUG 2013 | $28,000,000 | 3 | 4 TOLL LNS FROM W OF SPRING GREEN TO W OF KATY - GASTON & TWO |
| 1415-02-045 | FM 1464 | Approved | JUL 2013 | $517,005 | 1 | CONSTRUCT 1 DETENTION POND |
| 2105-01-046 | FM 2234 | Approved | JUL 2013 | $9,577,047 | 3 | RECONSTRUCT AND WIDEN FROM 2 LANES TO 4 - LANE DIVIDED RURAL |
| 2105-01-047 | FM 2234 | Approved | MAY 2013 | $1,506,548 | 3 | SIGNAL SYSTEM UPGRADE AND RECONFIGURATION |
| 3048-01-014 | FM 2977 | Actual | NOV 2012 | $1,473,222 | 1 | INSTALL LEFT TURN LANES |
| 3510-04-047 | SH 99 | Actual | OCT 2012 | $25,978,009 | 3 | CONSTRUCT OVERPASS AND APPROACHES |
Galveston County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
| 0192-04-103 | SH 6 | Actual | JAN 2013 | $2,714,894 | 1 | BASE REPAIR, SEAL COAT AND 1.5" PFC ACP O / L |
| 0912-73-120 | CR | Approved | AUG 2013 | $355,000 | 6 | REPLACE BRIDGE |
| 0912-73-141 | VA | Actual | OCT 2012 | $2,393,028 | 3 | CONSTRUCTION OF TRANSIT / PEDESTRIAN TRAIL |
| 0976-03-100 | FM 518 | Approved | AUG 2013 | $2,410,400 | 3 | ACCESS MANAGEMENT IMPROVEMENTS INCLUDING RAISED MEDIANS, |
| 0978-02-068 | FM 646 | Actual | APR 2013 | $847,434 | 1 | BASE REPAIR, PLANNING AND ACP OVERLAY |
| 1607-01-050 | FM 1764 | Approved | JUN 2013 | $759,396 | 3 | LANDSCAPE AND PEDESTRIAN IMPROVEMENTS WITH FREEWAY |
| 1911-01-020 | FM 2004 | Actual | JAN 2013 | $2,133,995 | 1 | ACP OVERLAY |
| 1911-01-021 | FM 2004 | Actual | NOV 2012 | $189,987 | 1 | INSTALL TURN LANES |
| 2523-01-024 | FM 2004 | Approved | AUG 2013 | $1,026,796 | 1 | INTERSECTION IMPROVEMENTS |
Harris County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
| 0027-09-099 | US 90A | Approved | JUL 2013 | $1,009,380 | 8 | INSTALL MEDIAN BARRIER |
| 0027-09-100 | US 90A | Approved | AUG 2013 | $1,662,239 | 8 | INSTALL SAFTY LIGHTING |
| 0027-10-069 | US 90A | Actual | APR 2013 | $2,433,337 | 1 | RECONSTRUCT INTERSECTION AT IH45, FLEXIBLE PAVEMENT REPAIR, |
| 0027-13-190 | US 59 | Actual | NOV 2012 | $18,777,770 | 1 | RECONSTRUCT FRONTAGE ROADS AND INTERSECTIONS |
| 0027-13-202 | US 59 | Approved | JUL 2013 | $11,942,348 | 1 | SEAL COAT, CAM LEVEL UP, THIN ASPHALT OVERLAY AND PAVEMENT |
| 0027-13-208 | US 59 | Approved | JUL 2013 | $1,076,468 | 11 | RECONSTRUCTION OF NB BRIDGE SLAB |
| 0028-01-095 | BU 90-U | Actual | SEP 2012 | $2,893,768 | 1 | BASE REPAIR & ACP OVERLAY |
| 0050-06-081 | US 290 | Approved | AUG 2013 | $85,000,000 | 2M | RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE |
| 0050-06-082 | US 290 | Actual | SEP 2012 | $7,088,544 | 5 | INTERSECTION IMPROVEMENTS |
| 0050-08-086 | US 290 | Actual | MAR 2013 | $57,979,155 | 3 | WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE MANAGED LANES, |
| 0050-08-087 | US 290 | Actual | APR 2013 | 135,455,756 | 5 | RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE |
| 0050-09-069 | US 290 | Approved | MAY 2013 | 140,521,096 | ROW | RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 3 REVERSIBLE |
| 0050-09-070 | US 290 | Actual | APR 2013 | 153,351,431 | ROW | RECONST & WIDEN TO 8 MAIN LNS, 3 REVERSIBLE MANAGED LNS, AUX |
| 0050-09-071 | US 290 | Actual | SEP 2012 | 110,414,014 | ROW | CONSTRUCT 5 MAIN LANES WITH AUXILIARY LANES & 2 OR 3 LANE |
| 0051-02-079 | SH 3 | Approved | AUG 2013 | $1,824,030 | 1 | ADDITION OF RIGHT TURN LANE STORAGE, SIDEWALKS, RAILROAD |
| 0051-02-091 | SH 3 | Approved | MAY 2013 | $1,270,392 | 1 | DRAINAGE IMPROVEMENTS (PHASE V) |
| 0110-05-117 | IH 45 | Actual | OCT 2012 | $187,376 | 1 | REPLACE EXISTING TWLTL WITH RAISED MEDIAN, CURB AND RIPRAP |
| 0271-14-213 | IH 610 | Approved | AUG 2013 | 130,000,000 | 5 | RECONSTRUCT US 290 / IH 610 INTERCHANGE WITH DIRECT CONNECTORS |
| 0271-14-224 | IH 610 | Approved | AUG 2013 | $1,800,000 | 1 | ASPHALT OVERLAY OF IH 610 MAIN LANES AT IH 45 |
| 0271-14-228 | IH 610 | Actual | OCT 2012 | 107,046,836 | ROW | RECONSTRUCT US 290 / IH 610 INCLUDING IH 10 TO US 290 OUTBOUND |
| 0271-16-130 | IH 610 | Approved | JUL 2013 | $1,801,800 | 1 | HIGH MAST ILLUMINATION |
| 0271-16-137 | IH 610 | Approved | JUL 2013 | $413,683 | 1 | INSTALL PAVEMENT STRIPES\MARKERS |
| 0271-17-154 | IH 610 | Actual | SEP 2012 | $315,518 | 1 | SEAL RETAINING WALL JOINTS ON SB FRONTAGE ROAD |
| 0389-13-056 | SH 146 | Actual | NOV 2012 | $6,585,238 | 12 | CONSTRUCT DIRECT CONNECTOR (RAMP C DC EB TO NB) |
| 0500-03-042 | IH 45 | Actual | NOV 2012 | $93,288,285 | ROW | WIDEN AND RECONSTRUCT TO 10 MAIN LANES, TWO 3 - LANE FRONTAGE |
| 0500-03-556 | IH 45 | Approved | JUL 2013 | $1,852,090 | 1 | DESIGN AND CONSTRUCTION OF 3 DETENTION FACILITIES |
| 0500-03-574 | IH 45 | Approved | AUG 2013 | $45,000,000 | 7 | CONSTRUCT DIRECT CONNECTOR IH 610 EB TO IH 45 NB |
| 0500-03-577 | IH 45 | Actual | FEB 2013 | $24,847,758 | 3 | TRANSPORTATION MANAGEMENT SYSTEM IMPROVEMENTS CONSTRUCT |
| 0508-01-276 | IH 10 | Approved | AUG 2013 | $38,328,980 | ROW | REPLACE BRIDGE AND APPROACHES |
| 0508-01-332 | IH 10 | Actual | JAN 2013 | $2,460,155 | 1 | HIGH MAST ILLUMINATION |
| 0508-01-335 | IH 10 | Actual | OCT 2012 | $1,650,456 | 3 | INTERSECTION IMPROVEMENTS |
| 0508-07-281 | SP 330 | Actual | FEB 2013 | $1,510,503 | 1 | FULL DEPTH REPAIR, MILLING, CURB REPAIR AND ASPHALTIC |
| 0912-00-381 | VA | Actual | MAR 2013 | $1,787,200 | 1 | UPGRADE / RECONSTRUCT TRAFFIC SIGNALS |
| 0912-00-413 | VA | Actual | APR 2013 | $1,456,617 | 1 | NEW TRAFFIC SIGNALS |
| 0912-00-418 | VA | Actual | JAN 2013 | $598,106 | 1 | NEW SATELLITE BUILDING POWER SYSTEMS |
| 0912-00-420 | VA | Actual | JAN 2013 | $1,899,904 | 1 | NEW TRAFFIC SIGNALS |
| 0912-00-424 | VA | Approved | AUG 2013 | $2,213,019 | 3 | PEDESTRIAN AND SIGNAL IMPROVEMENTS IN AIRLINE DISTRICT |
| 0912-00-447 | VA | Actual | DEC 2012 | $1,675,754 | 3 | MONTROSE NEIGHBORHOOD PEDESTRIAN IMPROVEMENTS |
| 0912-00-456 | VA | Actual | JAN 2013 | $200,000 | 1 | ITS COMMUNICATIONS (NON LETTING) |
| 0912-00-484 | VA | Approved | AUG 2013 | $700,000 | 8 | UPGRADE & MODERNIZE SIGNALS |
| 0912-70-064 | CS | Approved | JUN 2013 | $16,500,000 | 3 | RECONSTRUCT 4 - LN BOULEVARD W / PAVING, CURBS, STREET LIGHTING |
| 0912-70-065 | CS | Actual | DEC 2012 | $7,922,595 | 3 | RECONSTRUCT BOULEVARD ROADWAY WITH PAVING, CURBS, STREET |
| 0912-70-077 | VA | Actual | APR 2013 | $1,525,267 | 3 | 10 - FOOT WIDE SHARED USE PATH ON SOUTH BANK OF BRAYS BAYOU W / |
| 0912-70-078 | VA | Approved | JUN 2013 | $2,523,356 | 3 | LANDSCAPE WITH PEDESTRIAN IMPROVEMENTS ADJ.TO RDWY WITHIN |
| 0912-70-085 | VA | Approved | MAY 2013 | $748,836 | 10 | LANDSCAPE DEVELOPMENT |
| 0912-71-001 | VA | Actual | NOV 2012 | $6,250,000 | 12 | PRELIMINARY ENGINEERING / ENVIRONMENTAL ANALYSIS FOR URBAN |
| 0912-71-005 | VA | Approved | AUG 2013 | $1,300,000 | 3 | INSTALL UPS / BATTERY BACKUPS AT VARIOUS LOCATIONS CITYWIDE |
| 0912-71-627 | VA | Approved | JUL 2013 | $2,881,790 | 3 | CITY OF HOUSTON RCTSS PROGRAM |
| 0912-71-688 | CS | Actual | FEB 2013 | $13,480,682 | 3 | RECONSTRUCT AND WIDEN TO 6 LANE DIVIDED (WITH RAISED MEDIAN) |
| 0912-71-797 | CR | Approved | JUL 2013 | $1,255,542 | 3 | GREENS BAYOU TRAIL SYSTEM IN GREATER GREENSPOINT MANAGEMENT |
| 0912-71-895 | CR | Actual | NOV 2012 | $7,785,991 | ROW | CONSTRUCT 4 LANE CONCRETE DIVIDED SECTION WITH CURB AND |
| 0912-72-004 | CS | Actual | NOV 2012 | $2,483,337 | 3 | LANDSCAPE (CITY OF HOUSTON SECTION 115 EARMARK) |
| 0912-72-050 | CS | Actual | SEP 2012 | $1,384,264 | 6 | REHABILITATE BRIDGE AND APPROACHES |
| 0912-72-061 | CR | Approved | AUG 2013 | $722,819 | 6 | REPLACE BRIDGE (NBI# 12102AA0207001) |
| 0912-72-175 | VA | Actual | OCT 2012 | $2,370,426 | 7 | TRANSTAR OPERATIONS AND MANAGEMENT (NEW PARKING LOT AND |
| 0912-72-195 | CS | Actual | DEC 2012 | $2,895,120 | 3 | CREATE SMART ARTERIAL CORRIDORS |
| 0912-72-199 | VA | Approved | AUG 2013 | $4,133,875 | 3 | HARRIS COUNTY RCTSS PROGRAM PHASE 3 |
| 0912-72-229 | CS | Approved | JUL 2013 | $557,713 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12102B02249004) |
| 0912-72-241 | VA | Approved | MAY 2013 | $2,070,493 | 1 | SLOPE REPAIR, CHANNEL STABILIZATION, RETAINING WALL, AND |
| 0912-72-288 | VA | Actual | MAR 2013 | $1,189,354 | 10 | CONSTRUCT ADA CURB RAMPS ALONG IH 45 AND SH 288 IN HARRIS |
| 0912-72-293 | CS | Actual | FEB 2013 | $3,559,738 | 3 | BASE REPAIR, PLANING, 2" OVERLAY AND STRIPING |
| 0976-01-019 | FM 865 | Approved | AUG 2013 | $12,600,000 | 3 | WIDEN FROM 2 TO 4 LANES WITH CURB AND GUTTER |
| 1006-01-059 | FM 529 | Actual | OCT 2012 | $7,690,214 | 1 | WIDEN TO 4 LANE ROADWAY WITH CENTER LEFT TURN LANE AND |
| 1062-02-023 | FM 2100 | Approved | MAY 2013 | $9,117,627 | 1 | MILL & ACP OVERLAY |
| 1258-04-056 | FM 1093 | Approved | JUL 2013 | $2,038,034 | 1 | IMPLEMENTATION OF ACCESS MANAGEMENT (PHASE II) , SIDEWALKS |
| 1685-02-049 | FM 1960 | Actual | SEP 2012 | $546,380 | 1 | PAVEMENT MARKINGS |
| 1685-07-019 | BF1960A | Approved | AUG 2013 | $10,280,376 | 3 | BASE REPAIR, MILL, SEAL COAT, 1.5" ACP OVERLAY, |
| 2941-01-021 | FM 2920 | Approved | JUL 2013 | $2,990,414 | 1 | INTERSECTION IMPROVEMENTS |
Montgomery County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
| 0338-03-087 | SH 105 | Approved | JUN 2013 | $1,188,255 | 1 | WIDEN WESTBOUND FROM 2 TO 3 LANES |
| 0338-11-051 | LP 336 | Approved | AUG 2013 | $5,701,486 | 1 | WIDEN TO 4 LANES UNDIVIDED RURAL |
| 0523-10-034 | FM 1488 | Approved | JUL 2013 | $31,446,266 | 3 | CONSTUCT RAILROAD GRADE SEPARATION OVER FM 149 AND BNSF RR |
| 0675-08-107 | IH 45 | Approved | MAY 2013 | $829,829 | 10 | LANDSCAPE DEVELOPMENT |
| 0912-37-140 | CR | Approved | JUL 2013 | $2,069,830 | 3 | CONSTRUCT 2 - LANE ROADWAY (MISSING SEGMENT) |
| 0912-37-206 | CR | Actual | NOV 2012 | $561,551 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12170AA1352055) |
| 3158-01-035 | FM 3083 | Approved | JUL 2013 | $2,978,041 | 3 | WIDEN TO 4 - LANE DIVIDED RURAL |
| 3538-01-030 | SH 242 | Actual | JAN 2013 | $33,998,617 | 3 | CONSTRUCT ELECTRONICALLY TOLLED DIRECT CONNECTORS FROM WB SH |
Waller County | ||||||
| CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
| 0912-56-046 | CR | Approved | JUL 2013 | $1,159,000 | 6 | REPLACE BRIDGE (NBI# 12237AA0257001) |
| 1745-01-019 | FM 1887 | Actual | APR 2013 | $5,083,866 | 1 | FULL DEPTH RECLAMATION, SEAL COAT, LEVEL - UP, ACP |
| 3445-01-007 | FM 3346 | Actual | NOV 2012 | $798,979 | 1 | ACP OVERLAY |
|