Detail Letting Schedule for Shelby County (FY 2013)
Shelby County (FY 2013) |
CCSJ: 0063-06-094 | |||
District: | Lufkin | Let Date: | DEC 2012 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2013(283) | CSJ: | 0063-06-094 |
Description: | REHABILITATE EXISTING PAVEMENT | Handling Code: |
|
Limits From: | PANOLA COUNTY LINE | Fund Cat: | 11 |
Limits To: | SP RAILROAD OVERPASS IN TENAHA | Estimate: | $3,690,278 |
Length: | 2.2 Miles | Actual: | $3,565,080 |
Official Notice Back... |
Totals for 0063-06-094 | ||
---|---|---|---|
Length: | 2.2 Miles | ||
Estimate: | $3,690,278 | ||
Actual: | $3,565,080 | ||
CCSJ: 0064-01-065 | |||
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | SH 87 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0064-01-065 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | FM 417 | Fund Cat: | 1 |
Limits To: | SH 147 | Estimate: | $98,085 |
Length: | 2.7 Miles | Actual: | $99,717 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | SH 19 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0109-05-039 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | LP 304 | Fund Cat: | 1 |
Limits To: | 1.637 MI N OF FM 231 | Estimate: | $285,213 |
Length: | 5.5 Miles | Actual: | $299,876 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | SH 19 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0109-06-039 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | 1.637 MI N OF FM 231 | Fund Cat: | 1 |
Limits To: | LOVELADY CITY LIMITS SOUTH | Estimate: | $347,111 |
Length: | 7.4 Miles | Actual: | $364,252 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | SH 21 | Let Status: | Actual |
Project ID: | NH 2013(168) | CSJ: | 0117-06-043 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | EAST END OF TRINITY RIVER BRIDGE | Fund Cat: | 1 |
Limits To: | AUSTONIO | Estimate: | $280,423 |
Length: | 7.8 Miles | Actual: | $275,841 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | SH 21 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0118-06-065 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | 3.84 MI W OF MILL CREEK | Fund Cat: | 1 |
Limits To: | US 59 | Estimate: | $258,773 |
Length: | 6.8 Miles | Actual: | $261,352 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | SH 21 | Let Status: | Actual |
Project ID: | NH 2013(168) | CSJ: | 0119-04-031 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | SH 87 | Fund Cat: | 1 |
Limits To: | SABINE RIVER BRIDGE | Estimate: | $291,748 |
Length: | 6.7 Miles | Actual: | $292,694 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 415 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0123-08-012 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | SH 87 | Fund Cat: | 1 |
Limits To: | FM 138 | Estimate: | $250,949 |
Length: | 7.8 Miles | Actual: | $250,827 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2013(168) | CSJ: | 0176-05-170 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | MUD CREEK | Fund Cat: | 1 |
Limits To: | 1.06 MI N OF FM 942 (W) | Estimate: | $72,365 |
Length: | 0.8 Miles | Actual: | $79,389 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | US 59 | Let Status: | Actual |
Project ID: | NH 2013(168) | CSJ: | 0176-05-171 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | BU 59-J OVERPASS | Fund Cat: | 1 |
Limits To: | US 190 OVERPASS | Estimate: | $93,470 |
Length: | 2.0 Miles | Actual: | $99,262 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | US 190 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0213-02-042 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | WALKER COUNTY LINE | Fund Cat: | 1 |
Limits To: | 0.26 MI W OF SH 156 | Estimate: | $508,398 |
Length: | 7.2 Miles | Actual: | $500,791 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | US 190 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0213-04-044 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | SH 146 | Fund Cat: | 1 |
Limits To: | 4 MI W OF FM 1276 (END OF 4-LANE) | Estimate: | $569,362 |
Length: | 7.5 Miles | Actual: | $584,792 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | US 190 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0213-05-040 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | 0.25 MI W OF FM 1276 | Fund Cat: | 1 |
Limits To: | TYLER COUNTY LINE | Estimate: | $431,445 |
Length: | 10.1 Miles | Actual: | $416,850 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | SH 87 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0304-01-027 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | SH 147 | Fund Cat: | 1 |
Limits To: | FM 139 | Estimate: | $107,876 |
Length: | 3.8 Miles | Actual: | $106,152 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | SH 7 | Let Status: | Actual |
Project ID: | NH 2013(168) | CSJ: | 0336-01-064 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | LOOP 304 (CROCKETT) | Fund Cat: | 1 |
Limits To: | 0.2 MI E OF FM 232 | Estimate: | $348,878 |
Length: | 8.3 Miles | Actual: | $351,846 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | SH 103 | Let Status: | Actual |
Project ID: | NH 2013(168) | CSJ: | 0336-07-065 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | FM 1751 | Fund Cat: | 1 |
Limits To: | SABINE COUNTY LINE | Estimate: | $103,752 |
Length: | 3.1 Miles | Actual: | $101,187 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | SH 103 | Let Status: | Actual |
Project ID: | NH 2013(168) | CSJ: | 0336-08-025 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | SAN AUGUSTINE COUNTY LINE | Fund Cat: | 1 |
Limits To: | SH 21 | Estimate: | $352,152 |
Length: | 9.6 Miles | Actual: | $352,177 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | US 287 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0340-02-024 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | HOUSTON COUNTY LINE | Fund Cat: | 1 |
Limits To: | SH 94 | Estimate: | $299,821 |
Length: | 9.2 Miles | Actual: | $301,105 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | SH 147 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0390-03-033 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | END OF 4-LANE SECTION | Fund Cat: | 1 |
Limits To: | SH 63 | Estimate: | $144,240 |
Length: | 2.2 Miles | Actual: | $147,272 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 224 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0403-02-017 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | SH 156 | Fund Cat: | 1 |
Limits To: | SH 156 | Estimate: | $276,396 |
Length: | 7.7 Miles | Actual: | $276,762 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | SH 184 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0431-01-028 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | US 96 | Fund Cat: | 1 |
Limits To: | SH 87 | Estimate: | $323,616 |
Length: | 11.1 Miles | Actual: | $318,674 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | SH 7 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0553-02-016 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | US 69 | Fund Cat: | 1 |
Limits To: | NACOGDOCHES COUNTY LINE | Estimate: | $116,002 |
Length: | 3.4 Miles | Actual: | $113,766 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 225 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0594-04-026 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | SH 21 | Fund Cat: | 1 |
Limits To: | 5.12 MI S OF SH 21 | Estimate: | $152,366 |
Length: | 5.1 Miles | Actual: | $151,292 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 139 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0742-01-051 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | FM 2694 | Fund Cat: | 1 |
Limits To: | SH 87 | Estimate: | $360,525 |
Length: | 11.2 Miles | Actual: | $359,706 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 414 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0743-03-017 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | SH 87 | Fund Cat: | 1 |
Limits To: | END OF PAVEMENT | Estimate: | $216,180 |
Length: | 6.7 Miles | Actual: | $215,034 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 417 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0810-01-020 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | SH 87 | Fund Cat: | 1 |
Limits To: | US 96 | Estimate: | $247,832 |
Length: | 7.9 Miles | Actual: | $247,125 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | SH 7 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0894-01-019 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | SH 103 | Fund Cat: | 1 |
Limits To: | US 69 | Estimate: | $251,830 |
Length: | 6.6 Miles | Actual: | $251,687 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 355 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 0930-01-025 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | 7.0 MI S OF US 287 | Fund Cat: | 1 |
Limits To: | FM 356 | Estimate: | $222,107 |
Length: | 7.1 Miles | Actual: | $222,819 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 843 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 1164-01-011 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | US 59 | Fund Cat: | 1 |
Limits To: | US 69 | Estimate: | $219,890 |
Length: | 6.6 Miles | Actual: | $217,421 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 947 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 1195-01-028 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | US 59 IN TIMPSON | Fund Cat: | 1 |
Limits To: | US 59 IN TENAHA | Estimate: | $274,497 |
Length: | 11.3 Miles | Actual: | $282,116 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 1279 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 1409-01-009 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | SH 147 | Fund Cat: | 1 |
Limits To: | SHELBY COUNTY LINE | Estimate: | $46,104 |
Length: | 1.4 Miles | Actual: | $45,898 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 1279 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 1409-02-012 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | SAN AUGUSTINE COUNTY LINE | Fund Cat: | 1 |
Limits To: | SH 87 | Estimate: | $182,697 |
Length: | 5.7 Miles | Actual: | $182,263 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 1514 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 1459-01-012 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | END OF PAVEMENT | Fund Cat: | 1 |
Limits To: | SH 150 | Estimate: | $105,451 |
Length: | 3.0 Miles | Actual: | $105,254 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 1592 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 1510-01-018 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | FM 1 | Fund Cat: | 1 |
Limits To: | SH 184 | Estimate: | $239,656 |
Length: | 8.7 Miles | Actual: | $234,736 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 343 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 2300-01-019 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | FM 225 | Fund Cat: | 1 |
Limits To: | US 59 | Estimate: | $425,569 |
Length: | 14.3 Miles | Actual: | $422,595 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 980 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 2443-02-015 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | WALKER COUNTY LINE | Fund Cat: | 1 |
Limits To: | SP 135 | Estimate: | $246,359 |
Length: | 7.4 Miles | Actual: | $248,429 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 2973 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 3037-01-005 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | FM 1514 | Fund Cat: | 1 |
Limits To: | SH 150 | Estimate: | $46,167 |
Length: | 1.3 Miles | Actual: | $46,355 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 3186 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 3196-02-006 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | US 190 | Fund Cat: | 1 |
Limits To: | END OF PAVEMENT | Estimate: | $66,354 |
Length: | 2.2 Miles | Actual: | $66,043 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 3152 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 3220-01-010 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | US 190 | Fund Cat: | 1 |
Limits To: | FM 350 | Estimate: | $224,031 |
Length: | 6.6 Miles | Actual: | $224,558 |
District: | Lufkin | Let Date: | NOV 2012 |
Highway: | FM 1336 | Let Status: | Actual |
Project ID: | STP 2013(167) | CSJ: | 3418-01-010 |
Description: | RESURFACE WITH SEAL COAT | Handling Code: |
|
Limits From: | FM 324 | Fund Cat: | 1 |
Limits To: | END OF PAVEMENT | Estimate: | $47,854 |
Length: | 1.8 Miles | Actual: | $47,406 |
Back... |
Totals for 0064-01-065 | ||
Length: | 245.6 Miles | ||
Estimate: | $9,135,544 | ||
Actual: | $9,165,321 | ||
CCSJ: 0175-01-005 | |||
District: | Lufkin | Let Date: | JUL 2013 |
Highway: | US 84 | Let Status: | Actual |
Project ID: | BR 2005(5) | CSJ: | 0175-01-005 |
Description: | REPLACE ONE EXISTING BRIDGE WITH TWO PROPOSED BRIDGES | Handling Code: |
|
Limits From: | AT SABINE RIVER | Fund Cat: | 3 |
Limits To: | . | Estimate: | $7,487,483 |
Length: | 0.2 Miles | Actual: | $9,916,183 |
District: | Lufkin | Let Date: | JUL 2013 |
Highway: | US 84 | Let Status: | Actual |
Project ID: | BR 1302(051) | CSJ: | 0175-02-078 |
Description: | CONSTRUCT TWO APPROACHES TO THE SABINE RIVER BRIDGES | Handling Code: |
|
Limits From: | 0.62 MI W OF SABINE RIVER | Fund Cat: | 6 |
Limits To: | SABINE RIVER BRIDGE | Estimate: | $2,936,562 |
Length: | 0.5 Miles | Actual: | $4,226,063 |
District: | Lufkin | Let Date: | JUL 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | CC 911-39-22 | CSJ: | 0911-39-022 |
Description: | CONSTRUCT TWO APPROACHES TO THE SABINE RIVER BRIDGES | Handling Code: |
|
Limits From: | SABINE RIVER BRIDGE | Fund Cat: | 3 |
Limits To: | 0.1 MI E OF LOUISIANA 5 | Estimate: | $4,090,723 |
Length: | 0.5 Miles | Actual: | $6,269,853 |
Back... |
Totals for 0175-01-005 | ||
Length: | 1.2 Miles | ||
Estimate: | $14,514,768 | ||
Actual: | $20,412,099 | ||
CCSJ: 0895-01-014 | |||
District: | Lufkin | Let Date: | DEC 2012 |
Highway: | FM 711 | Let Status: | Actual |
Project ID: | STP 2013(243) | CSJ: | 0895-01-014 |
Description: | RECONSTRUCT AND WIDEN PAVEMENT | Handling Code: |
|
Limits From: | SH 7 | Fund Cat: | 1 |
Limits To: | SAN AUGUSTINE COUNTY LINE | Estimate: | $3,420,599 |
Length: | 8.7 Miles | Actual: | $3,099,170 |
Official Notice Back... |
Totals for 0895-01-014 | ||
Length: | 8.7 Miles | ||
Estimate: | $3,420,599 | ||
Actual: | $3,099,170 | ||
CCSJ: 0911-39-034 | |||
District: | Lufkin | Let Date: | OCT 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2011(258)TE | CSJ: | 0911-39-034 |
Description: | CONSTRUCT SIDEWALKS AND RAMPS TO IMPROVE PEDESTRIAN ELEMENTS | Handling Code: |
LC |
Limits From: | AT VARIOUS LOCATIONS | Fund Cat: | 3 |
Limits To: | IN THE CITY OF CENTER | Estimate: | $1,194,534 |
Length: | 0.1 Miles | Actual: | $1,053,792 |
Back... |
Totals for 0911-39-034 | ||
Length: | 0.1 Miles | ||
Estimate: | $1,194,534 | ||
Actual: | $1,053,792 | ||
CCSJ: 1195-01-029 | |||
District: | Lufkin | Let Date: | AUG 2013 |
Highway: | FM 947 | Let Status: | Actual |
Project ID: | CRX 1195-129 | CSJ: | 1195-01-029 |
Description: | REPLANK EXISTING RAILROAD CROSSING SURFACE | Handling Code: |
XX |
Limits From: | AT BNSF RAILROAD | Fund Cat: | 10 |
Limits To: | .____DOT NO. 023964S | Estimate: | $28,000 |
Length: | 0.1 Miles | Actual: | $28,000 |
Back... |
Totals for 1195-01-029 | ||
Length: | 0.1 Miles | ||
Estimate: | $28,000 | ||
Actual: | $28,000 | ||
CCSJ: 1879-01-022 | |||
District: | Lufkin | Let Date: | SEP 2012 |
Highway: | FM 2026 | Let Status: | Actual |
Project ID: | STP 2013(068) | CSJ: | 1879-01-022 |
Description: | RECONSTRUCT AND WIDEN PAVEMENT TO 28 FT | Handling Code: |
|
Limits From: | FM 1645 | Fund Cat: | 1 |
Limits To: | US 96 | Estimate: | $4,590,799 |
Length: | 10.5 Miles | Actual: | $4,032,482 |
Back... |
Totals for 1879-01-022 | ||
Length: | 10.5 Miles | ||
Estimate: | $4,590,799 | ||
Actual: | $4,032,482 |
|