Detail Letting Schedule for Bexar County (FY 2014)
Bexar County (FY 2014) |
CCSJ: 0017-09-096 | |||
District: | San Antonio | Let Date: | MAY 2014 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | NH 2014(622) | CSJ: | 0017-09-096 |
Description: | LANDSCAPE PLANTNG AND IRRIGATION | Handling Code: |
|
Limits From: | 0.2 MILES NORTH OF US 90 | Fund Cat: | 10 |
Limits To: | 0.2 MILES SOUTH OF US 90 | Estimate: | $761,433 |
Length: | 0.4 Miles | Actual: | $748,708 |
Back... |
Totals for 0017-09-096 | ||
---|---|---|---|
Length: | 0.4 Miles | ||
Estimate: | $761,433 | ||
Actual: | $748,708 | ||
CCSJ: 0017-10-253 | |||
District: | San Antonio | Let Date: | SEP 2013 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | BR 2013(757) | CSJ: | 0017-10-253 |
Description: | SEGMENTAL STRUCTURES - DRAINAGE REPAIR, POST TENSIONING DUCT | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS ON IH 35 | Fund Cat: | 1 |
Limits To: | LAREDO ST TO 0.2 MI W OF IH 37 | Estimate: | $6,817,150 |
Length: | 2.9 Miles | Actual: | $7,975,735 |
District: | San Antonio | Let Date: | SEP 2013 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | BR 2013(757) | CSJ: | 0072-12-193 |
Description: | SEGMENTAL STRUCTURES - DRAINAGE REPAIR, POST TENSIONING DUCT | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS ON IH 10 | Fund Cat: | 1 |
Limits To: | MULBERRY TO POPLAR ST | Estimate: | $3,067,500 |
Length: | 1.8 Miles | Actual: | $2,727,430 |
Back... |
Totals for 0017-10-253 | ||
Length: | 4.7 Miles | ||
Estimate: | $9,884,650 | ||
Actual: | $10,703,165 | ||
CCSJ: 0017-10-268 | |||
District: | San Antonio | Let Date: | AUG 2014 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | STP 1402(062)MM | CSJ: | 0017-10-268 |
Description: | OPERATIONAL IMPROVEMENTS TO INCLUDE SOUTH BOUND AUXILLIARY | Handling Code: |
|
Limits From: | US 281 | Fund Cat: | 7 |
Limits To: | 0.5 MI N OF US 281 | Estimate: | $1,705,498 |
Length: | 0.5 Miles | Actual: | $2,120,939 |
Bid Tabulations Back... |
Totals for 0017-10-268 | ||
Length: | 0.5 Miles | ||
Estimate: | $1,705,498 | ||
Actual: | $2,120,939 | ||
CCSJ: 0017-10-269 | |||
District: | San Antonio | Let Date: | AUG 2014 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | STP 1402(063)MM | CSJ: | 0017-10-269 |
Description: | OPERATIONAL IMPROVEMENTS TO INCLUDE RAMP REVISIONS AND | Handling Code: |
|
Limits From: | 1.1 MI S OF IH 410 SOUTH CONNECTOR | Fund Cat: | 7 |
Limits To: | IH 410 SOUTH CONNECTOR | Estimate: | $9,150,357 |
Length: | 1.0 Miles | Actual: | $8,209,727 |
Bid Tabulations Back... |
Totals for 0017-10-269 | ||
Length: | 1.0 Miles | ||
Estimate: | $9,150,357 | ||
Actual: | $8,209,727 | ||
CCSJ: 0025-02-196 | |||
District: | San Antonio | Let Date: | JUN 2014 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2014(853) | CSJ: | 0025-02-196 |
Description: | OVERLAY AND PAVEMENT MARKINGS ON MAINLANES | Handling Code: |
|
Limits From: | IH 35 | Fund Cat: | 1 |
Limits To: | 0.1 MI W. OF S. NEW BRAUNFELS AVE. | Estimate: | $5,864,232 |
Length: | 3.0 Miles | Actual: | $4,673,605 |
District: | San Antonio | Let Date: | JUN 2014 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | NH 2014(853) | CSJ: | 0025-02-197 |
Description: | BASE REPAIR, MILL, OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 0.1 MI E. OF S. WALTERS ST | Fund Cat: | 1 |
Limits To: | IH 410 EAST | Estimate: | $7,212,221 |
Length: | 4.5 Miles | Actual: | $5,828,748 |
Back... |
Totals for 0025-02-196 | ||
Length: | 7.5 Miles | ||
Estimate: | $13,076,453 | ||
Actual: | $10,502,353 | ||
CCSJ: 0025-09-075 | |||
District: | San Antonio | Let Date: | JUL 2014 |
Highway: | FM 78 | Let Status: | Actual |
Project ID: | STP 2014(981)HES | CSJ: | 0025-09-075 |
Description: | UPGRADE TRAFFIC SIGNAL INSTALL RADAR FOR ADVANCE DETECTION | Handling Code: |
|
Limits From: | AT WALZEM | Fund Cat: | 8 |
Limits To: | . | Estimate: | $53,196 |
Length: | 0.1 Miles | Actual: | $49,290 |
District: | San Antonio | Let Date: | JUL 2014 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | STP 2014(983)HES | CSJ: | 0029-02-048 |
Description: | UPGRADE TRAFFIC SIGNAL INSTALL RADAR FOR ADVANCE DETECTION | Handling Code: |
|
Limits From: | AT SH 123 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $26,394 |
Length: | 0.0 Miles | Actual: | $26,200 |
District: | San Antonio | Let Date: | JUL 2014 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2014(984)HES | CSJ: | 0253-04-144 |
Description: | UPGRADE TRAFFIC SIGNAL INSTALL RADAR FOR ADVANCE DETECTION | Handling Code: |
|
Limits From: | AT E BORGFELD DRIVE | Fund Cat: | 8 |
Limits To: | . | Estimate: | $19,795 |
Length: | 0.0 Miles | Actual: | $19,650 |
District: | San Antonio | Let Date: | JUL 2014 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | STP 2014(985)HES | CSJ: | 0291-10-102 |
Description: | UPGRADE TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | AT WURZBACH ROAD | Fund Cat: | 8 |
Limits To: | . | Estimate: | $55,089 |
Length: | 0.0 Miles | Actual: | $56,844 |
District: | San Antonio | Let Date: | JUL 2014 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | STP 2014(989)HES | CSJ: | 1479-01-022 |
Description: | INSTALL INTERSECTION FLASHING BEACONS | Handling Code: |
|
Limits From: | EAST CONNECTION TO US 281 S | Fund Cat: | 8 |
Limits To: | WEST CONNECTION TO US 281 S | Estimate: | $84,949 |
Length: | 0.6 Miles | Actual: | $99,718 |
District: | San Antonio | Let Date: | JUL 2014 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | STP 0114(988)HES | CSJ: | 2255-01-078 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: |
|
Limits From: | AT FM 1303 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $49,682 |
Length: | 0.1 Miles | Actual: | $58,947 |
District: | San Antonio | Let Date: | JUL 2014 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | STP 2014(987)HES | CSJ: | 2452-01-054 |
Description: | UPGRADE TRAFFIC SIGNAL INSTALL RADAR FOR ADVANCE DETECTION | Handling Code: |
|
Limits From: | AT FM 1957 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $26,394 |
Length: | 0.0 Miles | Actual: | $26,200 |
District: | San Antonio | Let Date: | JUL 2014 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | STP 2014(986)HES | CSJ: | 2452-02-084 |
Description: | UPGRADE TRAFFIC SIGNAL INSTALL RADAR FOR ADVANCE DETECTION | Handling Code: |
|
Limits From: | AT KYLE SEALE PARKWAY | Fund Cat: | 8 |
Limits To: | . | Estimate: | $19,795 |
Length: | 0.0 Miles | Actual: | $19,650 |
Back... |
Totals for 0025-09-075 | ||
Length: | 0.8 Miles | ||
Estimate: | $335,294 | ||
Actual: | $356,499 | ||
CCSJ: 0072-07-059 | |||
District: | San Antonio | Let Date: | JUL 2014 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 4104(382) | CSJ: | 0072-07-059 |
Description: | WIDEN & CONVERT FRONTAGE ROADS TO ONE WAY, ADD NEW RAMP & | Handling Code: |
|
Limits From: | FM 3351 | Fund Cat: | 1 |
Limits To: | DOMINION DRIVE | Estimate: | $18,358,511 |
Length: | 2.1 Miles | Actual: | $18,426,876 |
District: | San Antonio | Let Date: | JUL 2014 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | RW 72-7-65 | CSJ: | 0072-07-065 |
Description: | ADJUSTMENT OF UTILITIES | Handling Code: |
|
Limits From: | FM 3351 | Fund Cat: | ROW |
Limits To: | DOMINION DRIVE | Estimate: | |
Length: | 7.4 Miles | Actual: | $915,396 |
Back... |
Totals for 0072-07-059 | ||
Length: | 9.5 Miles | ||
Estimate: | $18,358,511 | ||
Actual: | $19,342,272 | ||
CCSJ: 0521-01-049 | |||
District: | San Antonio | Let Date: | AUG 2014 |
Highway: | SL 13 | Let Status: | Actual |
Project ID: | CRX 521-1-49 | CSJ: | 0521-01-049 |
Description: | REPLACE CROSSING SURFACE AT UPRR DOT 742 926S | Handling Code: |
XX |
Limits From: | 0.4 MI NORTH OF IH 10 | Fund Cat: | 10 |
Limits To: | 0.3 MI NORTH OF IH 10 | Estimate: | $90,240 |
Length: | 0.1 Miles | Actual: | $90,240 |
Back... |
Totals for 0521-01-049 | ||
Length: | 0.1 Miles | ||
Estimate: | $90,240 | ||
Actual: | $90,240 | ||
CCSJ: 0521-02-038 | |||
District: | San Antonio | Let Date: | AUG 2014 |
Highway: | SL 13 | Let Status: | Actual |
Project ID: | CRX 521-2-38 | CSJ: | 0521-02-038 |
Description: | REPLACE CROSSING SURFACE AT URPP DOT 435 956N | Handling Code: |
XX |
Limits From: | 1.3 MI EAST OF LP 353 | Fund Cat: | 10 |
Limits To: | 1.4 MI EAST OF LP 353 | Estimate: | $78,208 |
Length: | 0.1 Miles | Actual: | $78,208 |
Back... |
Totals for 0521-02-038 | ||
Length: | 0.1 Miles | ||
Estimate: | $78,208 | ||
Actual: | $78,208 | ||
CCSJ: 0521-02-039 | |||
District: | San Antonio | Let Date: | AUG 2014 |
Highway: | SL 13 | Let Status: | Actual |
Project ID: | CRX 521-2-39 | CSJ: | 0521-02-039 |
Description: | REPLACE CROSSING SURFACE AT UPRR DOT 764 253T | Handling Code: |
XX |
Limits From: | 0.2 MI WEST OF US 181 | Fund Cat: | 10 |
Limits To: | 0.1 MI WEST OF US 181 | Estimate: | $78,208 |
Length: | 0.1 Miles | Actual: | $78,208 |
Back... |
Totals for 0521-02-039 | ||
Length: | 0.1 Miles | ||
Estimate: | $78,208 | ||
Actual: | $78,208 | ||
CCSJ: 0521-05-139 | |||
District: | San Antonio | Let Date: | JUN 2014 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | NH 2014(854) | CSJ: | 0521-05-139 |
Description: | MILL & INLAY, OVERLAY, SLOPE REPAIR, REMOVE & REPLACE MBGF & | Handling Code: |
|
Limits From: | MEDINA BASE RD. | Fund Cat: | 1 |
Limits To: | 0.6 MILES EAST OF IH 35 | Estimate: | $5,692,550 |
Length: | 4.8 Miles | Actual: | $6,711,712 |
Back... |
Totals for 0521-05-139 | ||
Length: | 4.8 Miles | ||
Estimate: | $5,692,550 | ||
Actual: | $6,711,712 | ||
CCSJ: 0915-00-155 | |||
District: | San Antonio | Let Date: | APR 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2014(562) | CSJ: | 0915-00-155 |
Description: | DISTRICTWIDE GUIDESIGNS FY14 | Handling Code: |
|
Limits From: | DISTRICTWIDE GUIDESIGNS FY14 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,212,760 |
Length: | 0.0 Miles | Actual: | $998,524 |
Back... |
Totals for 0915-00-155 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,212,760 | ||
Actual: | $998,524 | ||
CCSJ: 0915-00-156 | |||
District: | San Antonio | Let Date: | MAR 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2014(538) | CSJ: | 0915-00-156 |
Description: | DISTRICTWIDE NON - SITE SPECIFIC TRAFFIC SIGNALS - FY 2014 | Handling Code: |
|
Limits From: | DISTRICTWIDE TRAFFIC CNTRL FY 2014 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,282,433 |
Length: | 0.0 Miles | Actual: | $1,299,950 |
Back... |
Totals for 0915-00-156 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,282,433 | ||
Actual: | $1,299,950 | ||
CCSJ: 0915-00-171 | |||
District: | San Antonio | Let Date: | SEP 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2014(322) | CSJ: | 0915-00-171 |
Description: | DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 2014 | Handling Code: |
XX |
Limits From: | DISTRICTWIDE ITS FY 2014 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $3,000,000 |
Length: | 0.0 Miles | Actual: | $3,000,000 |
Back... |
Totals for 0915-00-171 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,000,000 | ||
Actual: | $3,000,000 | ||
CCSJ: 0915-12-218 | |||
District: | San Antonio | Let Date: | MAR 2014 |
Highway: | CS | Let Status: | Actual |
Project ID: | BR 96(351) | CSJ: | 0915-12-218 |
Description: | REHABILITATE BRIDGE & APPROACHES | Handling Code: |
|
Limits From: | IN SAN ANTONIO ON SOMERSET RD | Fund Cat: | 6 |
Limits To: | AT LEON CREEK | Estimate: | $388,630 |
Length: | 0.0 Miles | Actual: | $425,302 |
Back... |
Totals for 0915-12-218 | ||
Length: | 0.0 Miles | ||
Estimate: | $388,630 | ||
Actual: | $425,302 | ||
CCSJ: 0915-12-394 | |||
District: | San Antonio | Let Date: | OCT 2013 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2013(935)MM | CSJ: | 0915-12-394 |
Description: | CONSTRUCT BIKE LANE | Handling Code: |
LC |
Limits From: | SALADO CREEK BIKE PATH | Fund Cat: | 3 |
Limits To: | WEST AVENUE TO US 281 | Estimate: | $676,938 |
Length: | 0.1 Miles | Actual: | $748,040 |
Back... |
Totals for 0915-12-394 | ||
Length: | 0.1 Miles | ||
Estimate: | $676,938 | ||
Actual: | $748,040 | ||
CCSJ: 0915-12-493 | |||
District: | San Antonio | Let Date: | AUG 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1402(236)MM | CSJ: | 0915-12-493 |
Description: | ALAMO AREA COMMUTE SOLUTION PGM - FY 2014 | Handling Code: |
XX |
Limits From: | IN SAN ANTONIO/BEXAR CO AREA | Fund Cat: | 7 |
Limits To: | . | Estimate: | $267,000 |
Length: | 0.0 Miles | Actual: | $277,680 |
Back... |
Totals for 0915-12-493 | ||
Length: | 0.0 Miles | ||
Estimate: | $267,000 | ||
Actual: | $277,680 | ||
CCSJ: 0915-12-510 | |||
District: | San Antonio | Let Date: | NOV 2013 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2013(364)MM | CSJ: | 0915-12-510 |
Description: | RECONSTRUCT ROADWAY AND INCLUDES SIDEWALKS, CURB, DRAINAGE | Handling Code: |
LC |
Limits From: | IN UNIVERSAL CITY, ON KITTY HAWK | Fund Cat: | 3 |
Limits To: | FROM LP 1604 TO SH 218 (PAT BOOKER) | Estimate: | $3,306,583 |
Length: | 0.7 Miles | Actual: | $3,189,748 |
Back... |
Totals for 0915-12-510 | ||
Length: | 0.7 Miles | ||
Estimate: | $3,306,583 | ||
Actual: | $3,189,748 | ||
CCSJ: 0915-12-521 | |||
District: | San Antonio | Let Date: | MAY 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2014(623) | CSJ: | 0915-12-521 |
Description: | CONSTRUCT CURB RAMPS FOR ADA COMPLIANCE ON FM 1957, FM 471 | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN BEXAR COUNTY | Fund Cat: | 10 |
Limits To: | . | Estimate: | $2,180,110 |
Length: | 0.0 Miles | Actual: | $1,885,777 |
Back... |
Totals for 0915-12-521 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,180,110 | ||
Actual: | $1,885,777 | ||
CCSJ: 0915-12-535 | |||
District: | San Antonio | Let Date: | MAR 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2014(160)TE | CSJ: | 0915-12-535 |
Description: | BICYCLE SAFE RESOURCES FOR 8 TO 80 - YEAR - OLDS | Handling Code: |
XX |
Limits From: | CITY OF SAN ANTONIO | Fund Cat: | 3 |
Limits To: | . | Estimate: | $142,600 |
Length: | 0.0 Miles | Actual: | $143,600 |
Back... |
Totals for 0915-12-535 | ||
Length: | 0.0 Miles | ||
Estimate: | $142,600 | ||
Actual: | $143,600 | ||
CCSJ: 0915-12-539 | |||
District: | San Antonio | Let Date: | AUG 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1402(220)MM | CSJ: | 0915-12-539 |
Description: | CONSTRUCT MULTI - MODAL TRANSIT FACILTY | Handling Code: |
TR |
Limits From: | IN SAN ANTONIO ADJACENT TO US 281 | Fund Cat: | 7 |
Limits To: | AND STONE OAK PARKWAY | Estimate: | $15,000,000 |
Length: | 0.0 Miles | Actual: | $15,000,000 |
Back... |
Totals for 0915-12-539 | ||
Length: | 0.0 Miles | ||
Estimate: | $15,000,000 | ||
Actual: | $15,000,000 | ||
CCSJ: 0915-12-540 | |||
District: | San Antonio | Let Date: | AUG 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1402(221)MM | CSJ: | 0915-12-540 |
Description: | CONSTRUCTION OF VARIOUS TRANSIT AMENITIES THROUGHOUT THE VIA | Handling Code: |
TR |
Limits From: | VIA SERVICE AREA | Fund Cat: | 7 |
Limits To: | . | Estimate: | $2,000,000 |
Length: | 0.0 Miles | Actual: | $2,000,000 |
Back... |
Totals for 0915-12-540 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,000,000 | ||
Actual: | $2,000,000 | ||
CCSJ: 0915-12-542 | |||
District: | San Antonio | Let Date: | AUG 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1402(234)MM | CSJ: | 0915-12-542 |
Description: | STRATEGIC MULTI - MODAL TRANSPORTATION PLAN | Handling Code: |
XX |
Limits From: | WITHIN CITY OF SAN ANTONIO ETJ | Fund Cat: | 3 |
Limits To: | . | Estimate: | $2,500,000 |
Length: | 0.0 Miles | Actual: | $2,500,000 |
Back... |
Totals for 0915-12-542 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,500,000 | ||
Actual: | $2,500,000 | ||
CCSJ: 1502-03-002 | |||
District: | San Antonio | Let Date: | APR 2014 |
Highway: | PA 1502 | Let Status: | Actual |
Project ID: | NH 2014(625) | CSJ: | 1502-03-002 |
Description: | THIN OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | O'CONNER | Fund Cat: | 1 |
Limits To: | WETMORE | Estimate: | $3,647,370 |
Length: | 4.8 Miles | Actual: | $2,894,774 |
Back... |
Totals for 1502-03-002 | ||
Length: | 4.8 Miles | ||
Estimate: | $3,647,370 | ||
Actual: | $2,894,774 | ||
CCSJ: 2104-02-030 | |||
District: | San Antonio | Let Date: | JUL 2014 |
Highway: | FM 1957 | Let Status: | Actual |
Project ID: | PTF 2013(997) | CSJ: | 2104-02-030 |
Description: | RELOCATE FENCING AND CLEAR ROW | Handling Code: |
LC |
Limits From: | SH 211 | Fund Cat: | 3 |
Limits To: | LOOP 1604 | Estimate: | $208,448 |
Length: | 4.7 Miles | Actual: | $220,229 |
Back... |
Totals for 2104-02-030 | ||
Length: | 4.7 Miles | ||
Estimate: | $208,448 | ||
Actual: | $220,229 | ||
CCSJ: 2230-02-004 | |||
District: | San Antonio | Let Date: | MAY 2014 |
Highway: | SP 53 | Let Status: | Actual |
Project ID: | STP 2013(714)MM | CSJ: | 2230-02-004 |
Description: | EXPAND 2 LANES TO 4 LANES WITH LEFT TURN LANES, BIKE LANES | Handling Code: |
|
Limits From: | EDWARD XIMENES AVENUE | Fund Cat: | 7 |
Limits To: | IH 10 | Estimate: | $7,486,265 |
Length: | 1.5 Miles | Actual: | $6,984,126 |
District: | San Antonio | Let Date: | MAY 2014 |
Highway: | SP 53 | Let Status: | Actual |
Project ID: | RW 2230-2-6 | CSJ: | 2230-02-006 |
Description: | RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS | Handling Code: |
|
Limits From: | EDWARD XIMENES AVENUE | Fund Cat: | ROW |
Limits To: | IH 10 | Estimate: | |
Length: | 1.5 Miles | Actual: | $313,245 |
Back... |
Totals for 2230-02-004 | ||
Length: | 3.0 Miles | ||
Estimate: | $7,486,265 | ||
Actual: | $7,297,371 | ||
CCSJ: 2452-01-055 | |||
District: | San Antonio | Let Date: | MAR 2014 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | C 2452-1-55 | CSJ: | 2452-01-055 |
Description: | EXPAND TO 4 LANE EXPRESSWAY (4 NON - TOLL LANES) | Handling Code: |
DB |
Limits From: | FM 471 | Fund Cat: | 3 |
Limits To: | SH 16 | Estimate: | $66,070,421 |
Length: | 7.2 Miles | Actual: | $81,520,732 |
Back... |
Totals for 2452-01-055 | ||
Length: | 7.2 Miles | ||
Estimate: | $66,070,421 | ||
Actual: | $81,520,732 | ||
CCSJ: 2452-03-108 | |||
District: | San Antonio | Let Date: | JAN 2014 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | PTF 2013(998) | CSJ: | 2452-03-108 |
Description: | EXPAND 2 LANES TO 4 LANE DIVIDED | Handling Code: |
LC |
Limits From: | LOWER SEQUIN ROAD | Fund Cat: | 3 |
Limits To: | IH 10 (EAST) | Estimate: | $23,520,000 |
Length: | 2.8 Miles | Actual: | $23,589,306 |
Back... |
Totals for 2452-03-108 | ||
Length: | 2.8 Miles | ||
Estimate: | $23,520,000 | ||
Actual: | $23,589,306 |
|