Detail Letting Schedule for Bexar County (FY 2014)

Last Update: Monday, November 17, 2014
Bexar County (FY 2014)

CCSJ: 0017-09-096

District: San Antonio Let Date: MAY 2014
Highway: IH 35 Let Status: Actual
Project ID: NH 2014(622) CSJ: 0017-09-096
Description: LANDSCAPE PLANTNG AND IRRIGATION Handling
Code:
 
Limits From: 0.2 MILES NORTH OF US 90 Fund Cat: 10
Limits To: 0.2 MILES SOUTH OF US 90 Estimate: $761,433
Length: 0.4 Miles Actual: $748,708
 
Back...

Totals for 0017-09-096
Length: 0.4 Miles
Estimate: $761,433
Actual: $748,708

CCSJ: 0017-10-253

District: San Antonio Let Date: SEP 2013
Highway: IH 35 Let Status: Actual
Project ID: BR 2013(757) CSJ: 0017-10-253
Description: SEGMENTAL STRUCTURES - DRAINAGE REPAIR, POST TENSIONING DUCT Handling
Code:
 
Limits From: VARIOUS LOCATIONS ON IH 35 Fund Cat: 1
Limits To: LAREDO ST TO 0.2 MI W OF IH 37 Estimate: $6,817,150
Length: 2.9 Miles Actual: $7,975,735
 
District: San Antonio Let Date: SEP 2013
Highway: IH 10 Let Status: Actual
Project ID: BR 2013(757) CSJ: 0072-12-193
Description: SEGMENTAL STRUCTURES - DRAINAGE REPAIR, POST TENSIONING DUCT Handling
Code:
 
Limits From: VARIOUS LOCATIONS ON IH 10 Fund Cat: 1
Limits To: MULBERRY TO POPLAR ST Estimate: $3,067,500
Length: 1.8 Miles Actual: $2,727,430
 
Back...

Totals for 0017-10-253
Length: 4.7 Miles
Estimate: $9,884,650
Actual: $10,703,165

CCSJ: 0017-10-268

District: San Antonio Let Date: AUG 2014
Highway: IH 35 Let Status: Actual
Project ID: STP 1402(062)MM CSJ: 0017-10-268
Description: OPERATIONAL IMPROVEMENTS TO INCLUDE SOUTH BOUND AUXILLIARY Handling
Code:
 
Limits From: US 281 Fund Cat: 7
Limits To: 0.5 MI N OF US 281 Estimate: $1,705,498
Length: 0.5 Miles Actual: $2,120,939
 
Bid Tabulations
Back...

Totals for 0017-10-268
Length: 0.5 Miles
Estimate: $1,705,498
Actual: $2,120,939

CCSJ: 0017-10-269

District: San Antonio Let Date: AUG 2014
Highway: IH 35 Let Status: Actual
Project ID: STP 1402(063)MM CSJ: 0017-10-269
Description: OPERATIONAL IMPROVEMENTS TO INCLUDE RAMP REVISIONS AND Handling
Code:
 
Limits From: 1.1 MI S OF IH 410 SOUTH CONNECTOR Fund Cat: 7
Limits To: IH 410 SOUTH CONNECTOR Estimate: $9,150,357
Length: 1.0 Miles Actual: $8,209,727
 
Bid Tabulations
Back...

Totals for 0017-10-269
Length: 1.0 Miles
Estimate: $9,150,357
Actual: $8,209,727

CCSJ: 0025-02-196

District: San Antonio Let Date: JUN 2014
Highway: IH 10 Let Status: Actual
Project ID: NH 2014(853) CSJ: 0025-02-196
Description: OVERLAY AND PAVEMENT MARKINGS ON MAINLANES Handling
Code:
 
Limits From: IH 35 Fund Cat: 1
Limits To: 0.1 MI W. OF S. NEW BRAUNFELS AVE. Estimate: $5,864,232
Length: 3.0 Miles Actual: $4,673,605
 
District: San Antonio Let Date: JUN 2014
Highway: IH 10 Let Status: Actual
Project ID: NH 2014(853) CSJ: 0025-02-197
Description: BASE REPAIR, MILL, OVERLAY AND PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.1 MI E. OF S. WALTERS ST Fund Cat: 1
Limits To: IH 410 EAST Estimate: $7,212,221
Length: 4.5 Miles Actual: $5,828,748
 
Back...

Totals for 0025-02-196
Length: 7.5 Miles
Estimate: $13,076,453
Actual: $10,502,353

CCSJ: 0025-09-075

District: San Antonio Let Date: JUL 2014
Highway: FM 78 Let Status: Actual
Project ID: STP 2014(981)HES CSJ: 0025-09-075
Description: UPGRADE TRAFFIC SIGNAL INSTALL RADAR FOR ADVANCE DETECTION Handling
Code:
 
Limits From: AT WALZEM Fund Cat: 8
Limits To: . Estimate: $53,196
Length: 0.1 Miles Actual: $49,290
 
District: San Antonio Let Date: JUL 2014
Highway: US 90 Let Status: Actual
Project ID: STP 2014(983)HES CSJ: 0029-02-048
Description: UPGRADE TRAFFIC SIGNAL INSTALL RADAR FOR ADVANCE DETECTION Handling
Code:
 
Limits From: AT SH 123 Fund Cat: 8
Limits To: . Estimate: $26,394
Length: 0.0 Miles Actual: $26,200
 
District: San Antonio Let Date: JUL 2014
Highway: US 281 Let Status: Actual
Project ID: STP 2014(984)HES CSJ: 0253-04-144
Description: UPGRADE TRAFFIC SIGNAL INSTALL RADAR FOR ADVANCE DETECTION Handling
Code:
 
Limits From: AT E BORGFELD DRIVE Fund Cat: 8
Limits To: . Estimate: $19,795
Length: 0.0 Miles Actual: $19,650
 
District: San Antonio Let Date: JUL 2014
Highway: SH 16 Let Status: Actual
Project ID: STP 2014(985)HES CSJ: 0291-10-102
Description: UPGRADE TRAFFIC SIGNAL Handling
Code:
 
Limits From: AT WURZBACH ROAD Fund Cat: 8
Limits To: . Estimate: $55,089
Length: 0.0 Miles Actual: $56,844
 
District: San Antonio Let Date: JUL 2014
Highway: SL 1604 Let Status: Actual
Project ID: STP 2014(989)HES CSJ: 1479-01-022
Description: INSTALL INTERSECTION FLASHING BEACONS Handling
Code:
 
Limits From: EAST CONNECTION TO US 281 S Fund Cat: 8
Limits To: WEST CONNECTION TO US 281 S Estimate: $84,949
Length: 0.6 Miles Actual: $99,718
 
District: San Antonio Let Date: JUL 2014
Highway: SL 1604 Let Status: Actual
Project ID: STP 0114(988)HES CSJ: 2255-01-078
Description: INSTALL INTERSECTION FLASHING BEACON Handling
Code:
 
Limits From: AT FM 1303 Fund Cat: 8
Limits To: . Estimate: $49,682
Length: 0.1 Miles Actual: $58,947
 
District: San Antonio Let Date: JUL 2014
Highway: SL 1604 Let Status: Actual
Project ID: STP 2014(987)HES CSJ: 2452-01-054
Description: UPGRADE TRAFFIC SIGNAL INSTALL RADAR FOR ADVANCE DETECTION Handling
Code:
 
Limits From: AT FM 1957 Fund Cat: 8
Limits To: . Estimate: $26,394
Length: 0.0 Miles Actual: $26,200
 
District: San Antonio Let Date: JUL 2014
Highway: SL 1604 Let Status: Actual
Project ID: STP 2014(986)HES CSJ: 2452-02-084
Description: UPGRADE TRAFFIC SIGNAL INSTALL RADAR FOR ADVANCE DETECTION Handling
Code:
 
Limits From: AT KYLE SEALE PARKWAY Fund Cat: 8
Limits To: . Estimate: $19,795
Length: 0.0 Miles Actual: $19,650
 
Back...

Totals for 0025-09-075
Length: 0.8 Miles
Estimate: $335,294
Actual: $356,499

CCSJ: 0072-07-059

District: San Antonio Let Date: JUL 2014
Highway: IH 10 Let Status: Actual
Project ID: IM 4104(382) CSJ: 0072-07-059
Description: WIDEN & CONVERT FRONTAGE ROADS TO ONE WAY, ADD NEW RAMP & Handling
Code:
 
Limits From: FM 3351 Fund Cat: 1
Limits To: DOMINION DRIVE Estimate: $18,358,511
Length: 2.1 Miles Actual: $18,426,876
 
District: San Antonio Let Date: JUL 2014
Highway: IH 10 Let Status: Actual
Project ID: RW 72-7-65 CSJ: 0072-07-065
Description: ADJUSTMENT OF UTILITIES Handling
Code:
 
Limits From: FM 3351 Fund Cat: ROW
Limits To: DOMINION DRIVE Estimate:  
Length: 7.4 Miles Actual: $915,396
 
Back...

Totals for 0072-07-059
Length: 9.5 Miles
Estimate: $18,358,511
Actual: $19,342,272

CCSJ: 0521-01-049

District: San Antonio Let Date: AUG 2014
Highway: SL 13 Let Status: Actual
Project ID: CRX 521-1-49 CSJ: 0521-01-049
Description: REPLACE CROSSING SURFACE AT UPRR DOT 742 926S Handling
Code:
XX
Limits From: 0.4 MI NORTH OF IH 10 Fund Cat: 10
Limits To: 0.3 MI NORTH OF IH 10 Estimate: $90,240
Length: 0.1 Miles Actual: $90,240
 
Back...

Totals for 0521-01-049
Length: 0.1 Miles
Estimate: $90,240
Actual: $90,240

CCSJ: 0521-02-038

District: San Antonio Let Date: AUG 2014
Highway: SL 13 Let Status: Actual
Project ID: CRX 521-2-38 CSJ: 0521-02-038
Description: REPLACE CROSSING SURFACE AT URPP DOT 435 956N Handling
Code:
XX
Limits From: 1.3 MI EAST OF LP 353 Fund Cat: 10
Limits To: 1.4 MI EAST OF LP 353 Estimate: $78,208
Length: 0.1 Miles Actual: $78,208
 
Back...

Totals for 0521-02-038
Length: 0.1 Miles
Estimate: $78,208
Actual: $78,208

CCSJ: 0521-02-039

District: San Antonio Let Date: AUG 2014
Highway: SL 13 Let Status: Actual
Project ID: CRX 521-2-39 CSJ: 0521-02-039
Description: REPLACE CROSSING SURFACE AT UPRR DOT 764 253T Handling
Code:
XX
Limits From: 0.2 MI WEST OF US 181 Fund Cat: 10
Limits To: 0.1 MI WEST OF US 181 Estimate: $78,208
Length: 0.1 Miles Actual: $78,208
 
Back...

Totals for 0521-02-039
Length: 0.1 Miles
Estimate: $78,208
Actual: $78,208

CCSJ: 0521-05-139

District: San Antonio Let Date: JUN 2014
Highway: IH 410 Let Status: Actual
Project ID: NH 2014(854) CSJ: 0521-05-139
Description: MILL & INLAY, OVERLAY, SLOPE REPAIR, REMOVE & REPLACE MBGF & Handling
Code:
 
Limits From: MEDINA BASE RD. Fund Cat: 1
Limits To: 0.6 MILES EAST OF IH 35 Estimate: $5,692,550
Length: 4.8 Miles Actual: $6,711,712
 
Back...

Totals for 0521-05-139
Length: 4.8 Miles
Estimate: $5,692,550
Actual: $6,711,712

CCSJ: 0915-00-155

District: San Antonio Let Date: APR 2014
Highway: VA Let Status: Actual
Project ID: STP 2014(562) CSJ: 0915-00-155
Description: DISTRICTWIDE GUIDESIGNS FY14 Handling
Code:
 
Limits From: DISTRICTWIDE GUIDESIGNS FY14 Fund Cat: 1
Limits To: . Estimate: $1,212,760
Length: 0.0 Miles Actual: $998,524
 
Back...

Totals for 0915-00-155
Length: 0.0 Miles
Estimate: $1,212,760
Actual: $998,524

CCSJ: 0915-00-156

District: San Antonio Let Date: MAR 2014
Highway: VA Let Status: Actual
Project ID: STP 2014(538) CSJ: 0915-00-156
Description: DISTRICTWIDE NON - SITE SPECIFIC TRAFFIC SIGNALS - FY 2014 Handling
Code:
 
Limits From: DISTRICTWIDE TRAFFIC CNTRL FY 2014 Fund Cat: 1
Limits To: . Estimate: $1,282,433
Length: 0.0 Miles Actual: $1,299,950
 
Back...

Totals for 0915-00-156
Length: 0.0 Miles
Estimate: $1,282,433
Actual: $1,299,950

CCSJ: 0915-00-171

District: San Antonio Let Date: SEP 2013
Highway: VA Let Status: Actual
Project ID: STP 2014(322) CSJ: 0915-00-171
Description: DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 2014 Handling
Code:
XX
Limits From: DISTRICTWIDE ITS FY 2014 Fund Cat: 1
Limits To: . Estimate: $3,000,000
Length: 0.0 Miles Actual: $3,000,000
 
Back...

Totals for 0915-00-171
Length: 0.0 Miles
Estimate: $3,000,000
Actual: $3,000,000

CCSJ: 0915-12-218

District: San Antonio Let Date: MAR 2014
Highway: CS Let Status: Actual
Project ID: BR 96(351) CSJ: 0915-12-218
Description: REHABILITATE BRIDGE & APPROACHES Handling
Code:
 
Limits From: IN SAN ANTONIO ON SOMERSET RD Fund Cat: 6
Limits To: AT LEON CREEK Estimate: $388,630
Length: 0.0 Miles Actual: $425,302
 
Back...

Totals for 0915-12-218
Length: 0.0 Miles
Estimate: $388,630
Actual: $425,302

CCSJ: 0915-12-394

District: San Antonio Let Date: OCT 2013
Highway: CS Let Status: Actual
Project ID: STP 2013(935)MM CSJ: 0915-12-394
Description: CONSTRUCT BIKE LANE Handling
Code:
LC
Limits From: SALADO CREEK BIKE PATH Fund Cat: 3
Limits To: WEST AVENUE TO US 281 Estimate: $676,938
Length: 0.1 Miles Actual: $748,040
 
Back...

Totals for 0915-12-394
Length: 0.1 Miles
Estimate: $676,938
Actual: $748,040

CCSJ: 0915-12-493

District: San Antonio Let Date: AUG 2014
Highway: VA Let Status: Actual
Project ID: STP 1402(236)MM CSJ: 0915-12-493
Description: ALAMO AREA COMMUTE SOLUTION PGM - FY 2014 Handling
Code:
XX
Limits From: IN SAN ANTONIO/BEXAR CO AREA Fund Cat: 7
Limits To: . Estimate: $267,000
Length: 0.0 Miles Actual: $277,680
 
Back...

Totals for 0915-12-493
Length: 0.0 Miles
Estimate: $267,000
Actual: $277,680

CCSJ: 0915-12-510

District: San Antonio Let Date: NOV 2013
Highway: CS Let Status: Actual
Project ID: STP 2013(364)MM CSJ: 0915-12-510
Description: RECONSTRUCT ROADWAY AND INCLUDES SIDEWALKS, CURB, DRAINAGE Handling
Code:
LC
Limits From: IN UNIVERSAL CITY, ON KITTY HAWK Fund Cat: 3
Limits To: FROM LP 1604 TO SH 218 (PAT BOOKER) Estimate: $3,306,583
Length: 0.7 Miles Actual: $3,189,748
 
Back...

Totals for 0915-12-510
Length: 0.7 Miles
Estimate: $3,306,583
Actual: $3,189,748

CCSJ: 0915-12-521

District: San Antonio Let Date: MAY 2014
Highway: VA Let Status: Actual
Project ID: STP 2014(623) CSJ: 0915-12-521
Description: CONSTRUCT CURB RAMPS FOR ADA COMPLIANCE ON FM 1957, FM 471 Handling
Code:
 
Limits From: VARIOUS LOCATIONS IN BEXAR COUNTY Fund Cat: 10
Limits To: . Estimate: $2,180,110
Length: 0.0 Miles Actual: $1,885,777
 
Back...

Totals for 0915-12-521
Length: 0.0 Miles
Estimate: $2,180,110
Actual: $1,885,777

CCSJ: 0915-12-535

District: San Antonio Let Date: MAR 2014
Highway: VA Let Status: Actual
Project ID: STP 2014(160)TE CSJ: 0915-12-535
Description: BICYCLE SAFE RESOURCES FOR 8 TO 80 - YEAR - OLDS Handling
Code:
XX
Limits From: CITY OF SAN ANTONIO Fund Cat: 3
Limits To: . Estimate: $142,600
Length: 0.0 Miles Actual: $143,600
 
Back...

Totals for 0915-12-535
Length: 0.0 Miles
Estimate: $142,600
Actual: $143,600

CCSJ: 0915-12-539

District: San Antonio Let Date: AUG 2014
Highway: VA Let Status: Actual
Project ID: STP 1402(220)MM CSJ: 0915-12-539
Description: CONSTRUCT MULTI - MODAL TRANSIT FACILTY Handling
Code:
TR
Limits From: IN SAN ANTONIO ADJACENT TO US 281 Fund Cat: 7
Limits To: AND STONE OAK PARKWAY Estimate: $15,000,000
Length: 0.0 Miles Actual: $15,000,000
 
Back...

Totals for 0915-12-539
Length: 0.0 Miles
Estimate: $15,000,000
Actual: $15,000,000

CCSJ: 0915-12-540

District: San Antonio Let Date: AUG 2014
Highway: VA Let Status: Actual
Project ID: STP 1402(221)MM CSJ: 0915-12-540
Description: CONSTRUCTION OF VARIOUS TRANSIT AMENITIES THROUGHOUT THE VIA Handling
Code:
TR
Limits From: VIA SERVICE AREA Fund Cat: 7
Limits To: . Estimate: $2,000,000
Length: 0.0 Miles Actual: $2,000,000
 
Back...

Totals for 0915-12-540
Length: 0.0 Miles
Estimate: $2,000,000
Actual: $2,000,000

CCSJ: 0915-12-542

District: San Antonio Let Date: AUG 2014
Highway: VA Let Status: Actual
Project ID: STP 1402(234)MM CSJ: 0915-12-542
Description: STRATEGIC MULTI - MODAL TRANSPORTATION PLAN Handling
Code:
XX
Limits From: WITHIN CITY OF SAN ANTONIO ETJ Fund Cat: 3
Limits To: . Estimate: $2,500,000
Length: 0.0 Miles Actual: $2,500,000
 
Back...

Totals for 0915-12-542
Length: 0.0 Miles
Estimate: $2,500,000
Actual: $2,500,000

CCSJ: 1502-03-002

District: San Antonio Let Date: APR 2014
Highway: PA 1502 Let Status: Actual
Project ID: NH 2014(625) CSJ: 1502-03-002
Description: THIN OVERLAY AND PAVEMENT MARKINGS Handling
Code:
 
Limits From: O'CONNER Fund Cat: 1
Limits To: WETMORE Estimate: $3,647,370
Length: 4.8 Miles Actual: $2,894,774
 
Back...

Totals for 1502-03-002
Length: 4.8 Miles
Estimate: $3,647,370
Actual: $2,894,774

CCSJ: 2104-02-030

District: San Antonio Let Date: JUL 2014
Highway: FM 1957 Let Status: Actual
Project ID: PTF 2013(997) CSJ: 2104-02-030
Description: RELOCATE FENCING AND CLEAR ROW Handling
Code:
LC
Limits From: SH 211 Fund Cat: 3
Limits To: LOOP 1604 Estimate: $208,448
Length: 4.7 Miles Actual: $220,229
 
Back...

Totals for 2104-02-030
Length: 4.7 Miles
Estimate: $208,448
Actual: $220,229

CCSJ: 2230-02-004

District: San Antonio Let Date: MAY 2014
Highway: SP 53 Let Status: Actual
Project ID: STP 2013(714)MM CSJ: 2230-02-004
Description: EXPAND 2 LANES TO 4 LANES WITH LEFT TURN LANES, BIKE LANES Handling
Code:
 
Limits From: EDWARD XIMENES AVENUE Fund Cat: 7
Limits To: IH 10 Estimate: $7,486,265
Length: 1.5 Miles Actual: $6,984,126
 
District: San Antonio Let Date: MAY 2014
Highway: SP 53 Let Status: Actual
Project ID: RW 2230-2-6 CSJ: 2230-02-006
Description: RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS Handling
Code:
 
Limits From: EDWARD XIMENES AVENUE Fund Cat: ROW
Limits To: IH 10 Estimate:  
Length: 1.5 Miles Actual: $313,245
 
Back...

Totals for 2230-02-004
Length: 3.0 Miles
Estimate: $7,486,265
Actual: $7,297,371

CCSJ: 2452-01-055

District: San Antonio Let Date: MAR 2014
Highway: LP 1604 Let Status: Actual
Project ID: C 2452-1-55 CSJ: 2452-01-055
Description: EXPAND TO 4 LANE EXPRESSWAY (4 NON - TOLL LANES) Handling
Code:
DB
Limits From: FM 471 Fund Cat: 3
Limits To: SH 16 Estimate: $66,070,421
Length: 7.2 Miles Actual: $81,520,732
 
Back...

Totals for 2452-01-055
Length: 7.2 Miles
Estimate: $66,070,421
Actual: $81,520,732

CCSJ: 2452-03-108

District: San Antonio Let Date: JAN 2014
Highway: LP 1604 Let Status: Actual
Project ID: PTF 2013(998) CSJ: 2452-03-108
Description: EXPAND 2 LANES TO 4 LANE DIVIDED Handling
Code:
LC
Limits From: LOWER SEQUIN ROAD Fund Cat: 3
Limits To: IH 10 (EAST) Estimate: $23,520,000
Length: 2.8 Miles Actual: $23,589,306
 
Back...

Totals for 2452-03-108
Length: 2.8 Miles
Estimate: $23,520,000
Actual: $23,589,306


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract