Detail Letting Schedule for Dallas County (FY 2014)
Dallas County (FY 2014) |
CCSJ: 0009-02-061 | |||
District: | Dallas | Let Date: | JUN 2014 |
Highway: | SH 78 | Let Status: | Actual |
Project ID: | NH 2014(759) | CSJ: | 0009-02-061 |
Description: | FDR, MILL, ACP OVERLAY AND PVMNT MARKINGS | Handling Code: |
|
Limits From: | WINSLOW AVE | Fund Cat: | 1 |
Limits To: | SHADYSIDE LN | Estimate: | $1,047,820 |
Length: | 1.1 Miles | Actual: | $1,048,057 |
Back... |
Totals for 0009-02-061 | ||
---|---|---|---|
Length: | 1.1 Miles | ||
Estimate: | $1,047,820 | ||
Actual: | $1,048,057 | ||
CCSJ: 0009-02-062 | |||
District: | Dallas | Let Date: | MAR 2014 |
Highway: | SH 78 | Let Status: | Actual |
Project ID: | CC 9-2-62 | CSJ: | 0009-02-062 |
Description: | CONSTRUCT UNDERGROUND WALKWAY | Handling Code: |
LC |
Limits From: | AT DALLAS ARBORETUM | Fund Cat: | 3 |
Limits To: | . | Estimate: | $2,050,000 |
Length: | 0.0 Miles | Actual: | $2,579,907 |
Back... |
Totals for 0009-02-062 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,050,000 | ||
Actual: | $2,579,907 | ||
CCSJ: 0009-11-227 | |||
District: | Dallas | Let Date: | AUG 2014 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | CM 1402(021) | CSJ: | 0009-11-227 |
Description: | ITS INSTALLATION | Handling Code: |
|
Limits From: | IH 635 | Fund Cat: | 5 |
Limits To: | CHAHA RD. | Estimate: | $2,511,874 |
Length: | 5.7 Miles | Actual: | $1,942,949 |
District: | Dallas | Let Date: | AUG 2014 |
Highway: | SL 12 | Let Status: | Actual |
Project ID: | CM 1402(021) | CSJ: | 0581-02-137 |
Description: | INSTALLATION OF INCIDENT, DETECTION AND RESPONSE SYSTEM | Handling Code: |
|
Limits From: | SH 183 | Fund Cat: | 5 |
Limits To: | SL 12 | Estimate: | $753,587 |
Length: | 2.1 Miles | Actual: | $756,818 |
District: | Dallas | Let Date: | AUG 2014 |
Highway: | SP 348 | Let Status: | Actual |
Project ID: | CM 1402(021) | CSJ: | 0581-02-138 |
Description: | INSTALLATION OF INCIDENT, DETECTION AND RESPONSE SYSTEM | Handling Code: |
|
Limits From: | SL 12 | Fund Cat: | 5 |
Limits To: | IH 35E | Estimate: | $50,356 |
Length: | 0.6 Miles | Actual: | $49,544 |
Bid Tabulations Back... |
Totals for 0009-11-227 | ||
Length: | 8.4 Miles | ||
Estimate: | $3,315,817 | ||
Actual: | $2,749,311 | ||
CCSJ: 0009-11-230 | |||
District: | Dallas | Let Date: | MAR 2014 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | IM 0305(085) | CSJ: | 0009-11-230 |
Description: | CONCRETE FULL DEPTH REPAIR ON FRONTAGE ROADS | Handling Code: |
|
Limits From: | HASKELL AVE | Fund Cat: | 1 |
Limits To: | SH 78 | Estimate: | $643,282 |
Length: | 1.2 Miles | Actual: | $638,199 |
Back... |
Totals for 0009-11-230 | ||
Length: | 1.2 Miles | ||
Estimate: | $643,282 | ||
Actual: | $638,199 | ||
CCSJ: 0009-11-234 | |||
District: | Dallas | Let Date: | AUG 2014 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | STP 1402(022)MM | CSJ: | 0009-11-234 |
Description: | INSTALL SIGNING OF TRUCK LANE RESTRICTIONS | Handling Code: |
|
Limits From: | BELT LINE RD | Fund Cat: | 7 |
Limits To: | ROCKWALL COUNTY LINE | Estimate: | $143,519 |
Length: | 5.1 Miles | Actual: | $158,848 |
District: | Dallas | Let Date: | AUG 2014 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | STP 1402(022)MM | CSJ: | 0009-12-210 |
Description: | INSTALL SIGNING FOR TRUCK LANE RESTRICTIONS | Handling Code: |
|
Limits From: | DALLAS COUNTY LINE | Fund Cat: | 7 |
Limits To: | SH 205 | Estimate: | $97,323 |
Length: | 5.6 Miles | Actual: | $102,063 |
District: | Dallas | Let Date: | AUG 2014 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | STP 1402(022)MM | CSJ: | 0047-06-155 |
Description: | INSTALL SIGNING FOR TRUCK LANE RESTRICTIONS | Handling Code: |
|
Limits From: | DALLAS COUNTY LINE | Fund Cat: | 7 |
Limits To: | SAM RAYBURN TOLLWAY | Estimate: | $106,153 |
Length: | 1.8 Miles | Actual: | $108,522 |
District: | Dallas | Let Date: | AUG 2014 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | STP 1402(022)MM | CSJ: | 0047-07-224 |
Description: | INSTALL SIGNING FOR TRUCK LANE RESTRICTIONS | Handling Code: |
|
Limits From: | IH 635 | Fund Cat: | 7 |
Limits To: | COLLIN COUNTY LINE | Estimate: | $49,761 |
Length: | 4.1 Miles | Actual: | $48,111 |
District: | Dallas | Let Date: | AUG 2014 |
Highway: | US 175 | Let Status: | Actual |
Project ID: | STP 1402(022)MM | CSJ: | 0197-02-117 |
Description: | INSTALL SIGNING FOR TRUCK LANE RESTRICTIONS | Handling Code: |
|
Limits From: | SH 310 | Fund Cat: | 7 |
Limits To: | IH 20 | Estimate: | $110,648 |
Length: | 8.6 Miles | Actual: | $113,958 |
District: | Dallas | Let Date: | AUG 2014 |
Highway: | SH 114 | Let Status: | Actual |
Project ID: | STP 1402(022)MM | CSJ: | 0353-04-097 |
Description: | INSTALL SIGNING OF TRUCK LANE RESTRICTIONS | Handling Code: |
|
Limits From: | WEST OF FREEPORT (TARRANT CO LINE) | Fund Cat: | 7 |
Limits To: | SH 183 | Estimate: | $40,386 |
Length: | 5.6 Miles | Actual: | $42,044 |
District: | Dallas | Let Date: | AUG 2014 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | STP 1402(022)MM | CSJ: | 2374-01-174 |
Description: | INSTALL SIGNING FOR TRUCK LANE RESTRICTIONS | Handling Code: |
|
Limits From: | US 75 | Fund Cat: | 7 |
Limits To: | KCS RR | Estimate: | $53,231 |
Length: | 5.6 Miles | Actual: | $57,107 |
District: | Dallas | Let Date: | AUG 2014 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | STP 1402(022)MM | CSJ: | 2374-02-140 |
Description: | INSTALL SIGNING FOR TRUCK LANE RESTRICTIONS | Handling Code: |
|
Limits From: | KCS RR | Fund Cat: | 7 |
Limits To: | IH 20 | Estimate: | $18,105 |
Length: | 13.4 Miles | Actual: | $19,481 |
Bid Tabulations Back... |
Totals for 0009-11-234 | ||
Length: | 49.8 Miles | ||
Estimate: | $619,126 | ||
Actual: | $650,134 | ||
CCSJ: 0047-07-206 | |||
District: | Dallas | Let Date: | JUN 2014 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | STP 2014(760)MM | CSJ: | 0047-06-147 |
Description: | MOBILITY AND SAFETY INTERSECTION IMPROVEMENTS; | Handling Code: |
|
Limits From: | FRONTAGE RDS IN RICHARDSON; | Fund Cat: | 7 |
Limits To: | FROM DALLAS COUNTY LINE TO PGBT | Estimate: | $297,879 |
Length: | 1.2 Miles | Actual: | $366,719 |
District: | Dallas | Let Date: | JUN 2014 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | STP 2014(760)MM | CSJ: | 0047-07-206 |
Description: | MOBILITY AND SAFETY INTERSECTION IMPROVEMENTS; CONSTRUCT | Handling Code: |
|
Limits From: | FRONTAGE RDS IN RICHARDSON | Fund Cat: | 7 |
Limits To: | NORTH OF MIDPARK TO COLLIN C/L | Estimate: | $511,236 |
Length: | 4.1 Miles | Actual: | $624,884 |
Back... |
Totals for 0047-07-206 | ||
Length: | 5.3 Miles | ||
Estimate: | $809,115 | ||
Actual: | $991,603 | ||
CCSJ: 0048-01-062 | |||
District: | Dallas | Let Date: | OCT 2013 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | NH 2014(067) | CSJ: | 0047-14-076 |
Description: | SEAL COAT, PAVEMENT MARKINGS ON FRONTAGE ROADS | Handling Code: |
|
Limits From: | MELISSA RD | Fund Cat: | 1 |
Limits To: | FM 455 | Estimate: | $276,205 |
Length: | 4.2 Miles | Actual: | $239,744 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | SH 342 | Let Status: | Actual |
Project ID: | NH 2014(067) | CSJ: | 0048-01-062 |
Description: | SEAL COAT, PVMT MKGS | Handling Code: |
|
Limits From: | 3.131 MILES N OF ELLIS C/L | Fund Cat: | 1 |
Limits To: | NEAR RED OAK RD | Estimate: | $679,218 |
Length: | 3.1 Miles | Actual: | $628,087 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 426 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 0081-11-024 |
Description: | SEAL COAT, PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | SL 288 | Fund Cat: | 1 |
Limits To: | GRISSON RD (MPT 570+00) | Estimate: | $78,958 |
Length: | 1.6 Miles | Actual: | $70,095 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | SH 310 | Let Status: | Actual |
Project ID: | NH 2014(067) | CSJ: | 0092-01-058 |
Description: | SEAL COAT, PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | 1/2 MILE N OF OVERTON RD | Fund Cat: | 1 |
Limits To: | US 175 | Estimate: | $71,089 |
Length: | 0.9 Miles | Actual: | $65,430 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 0453(135) | CSJ: | 0092-02-121 |
Description: | SEAL COAT, PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | ELLIS C/L (SERVICE RD) | Fund Cat: | 1 |
Limits To: | 1/2 MI S OF IH 20 | Estimate: | $432,440 |
Length: | 8.4 Miles | Actual: | $396,770 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | BI 45-F | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 0092-13-022 |
Description: | SEAL COAT, PVMT MKGS | Handling Code: |
|
Limits From: | IH 45 SOUTH OF CORSICANA | Fund Cat: | 1 |
Limits To: | 12TH AVE. SOUTH | Estimate: | $134,630 |
Length: | 1.9 Miles | Actual: | $127,141 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | NH 2014(067) | CSJ: | 0095-02-111 |
Description: | SEAL COAT, PVMT MKGS | Handling Code: |
|
Limits From: | 0.9 MI WEST OF GUS THOMASSON RD | Fund Cat: | 1 |
Limits To: | KAUFMAN CO LINE | Estimate: | $340,074 |
Length: | 7.7 Miles | Actual: | $297,629 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | NH 2014(067) | CSJ: | 0095-10-054 |
Description: | SEAL COAT, PAVEMENT MARKINGS (FRONTAGE ROAD) | Handling Code: |
|
Limits From: | IH 30 | Fund Cat: | 1 |
Limits To: | 0.4 MI E OF N TOWN EAST BLVD | Estimate: | $42,531 |
Length: | 1.5 Miles | Actual: | $26,776 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | BU 287T | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 0122-01-036 |
Description: | SEAL COAT, PVMT MKGS | Handling Code: |
|
Limits From: | IH 45 | Fund Cat: | 1 |
Limits To: | BI 45 | Estimate: | $42,870 |
Length: | 0.8 Miles | Actual: | $38,820 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | US 287 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 0122-01-037 |
Description: | SEAL COAT / PVMT MKGS | Handling Code: |
|
Limits From: | FM 739 | Fund Cat: | 1 |
Limits To: | IH 45 | Estimate: | $208,648 |
Length: | 3.4 Miles | Actual: | $195,652 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | US 287 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 0172-07-027 |
Description: | SEAL COAT, PVMT MKGS | Handling Code: |
|
Limits From: | WEST OF CR 421 | Fund Cat: | 1 |
Limits To: | CONTROL SECTION BREAK | Estimate: | $234,971 |
Length: | 2.7 Miles | Actual: | $224,474 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | US 287 | Let Status: | Actual |
Project ID: | NH 2014(067) | CSJ: | 0172-08-096 |
Description: | SEAL COAT, PVMT MKGS | Handling Code: |
|
Limits From: | CONTROL SECTION BREAK | Fund Cat: | 1 |
Limits To: | BUS 287 ENNIS | Estimate: | $406,058 |
Length: | 4.2 Miles | Actual: | $390,860 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | SH 352 | Let Status: | Actual |
Project ID: | NH 2014(067) | CSJ: | 0430-01-056 |
Description: | SEAL COAT, PAVEMNT MARKINGS | Handling Code: |
|
Limits From: | E SCYENE RD | Fund Cat: | 1 |
Limits To: | US 80 | Estimate: | $64,179 |
Length: | 1.7 Miles | Actual: | $59,158 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | SH 198 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 0443-02-020 |
Description: | SEAL COAT, PVMT MKGS | Handling Code: |
|
Limits From: | US 175 | Fund Cat: | 1 |
Limits To: | VAN ZANDT C/L | Estimate: | $88,284 |
Length: | 1.8 Miles | Actual: | $80,251 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | SH 205 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 0451-03-012 |
Description: | SEAL COAT, PVMT MKGS | Handling Code: |
|
Limits From: | SH 78 | Fund Cat: | 1 |
Limits To: | COLLIN CO LINE | Estimate: | $160,013 |
Length: | 2.9 Miles | Actual: | $150,295 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 1129 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 0719-02-028 |
Description: | SEAL COAT / PVMT MKGS | Handling Code: |
|
Limits From: | SH 31 | Fund Cat: | 1 |
Limits To: | FM 85 | Estimate: | $538,011 |
Length: | 14.9 Miles | Actual: | $481,146 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 85 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 0719-02-029 |
Description: | SEAL COAT / PVMT MKGS | Handling Code: |
|
Limits From: | FM 1129 | Fund Cat: | 1 |
Limits To: | HENDERSON C/L | Estimate: | $78,790 |
Length: | 1.3 Miles | Actual: | $73,456 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 148 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 0751-03-036 |
Description: | SEAL COAT, PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 2613 | Fund Cat: | 1 |
Limits To: | SH 274 | Estimate: | $188,636 |
Length: | 4.8 Miles | Actual: | $169,087 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 455 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 0816-02-074 |
Description: | SEAL COAT, PVMT MKGS | Handling Code: |
|
Limits From: | FM 2450 | Fund Cat: | 1 |
Limits To: | US 377 | Estimate: | $590,876 |
Length: | 17.7 Miles | Actual: | $516,011 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 1192 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 0816-06-004 |
Description: | SEAL COAT, PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | END OF STATE MAINTENANCE | Fund Cat: | 1 |
Limits To: | BU 377 E | Estimate: | $59,933 |
Length: | 1.8 Miles | Actual: | $52,632 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 0918-00-240 |
Description: | RE - STRIPE FY 2013 SEAL COAT ROADWAYS | Handling Code: |
|
Limits From: | VARIOUS HIGHWAYS | Fund Cat: | 1 |
Limits To: | IN DALLAS DISTRICT | Estimate: | $935,242 |
Length: | 0.0 Miles | Actual: | $880,235 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 744 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 0997-01-043 |
Description: | SEAL COAT, PVMT MKGS | Handling Code: |
|
Limits From: | FM 639 | Fund Cat: | 1 |
Limits To: | FM 1578 | Estimate: | $73,722 |
Length: | 2.4 Miles | Actual: | $70,360 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 85 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 1050-01-016 |
Description: | SEAL COAT PVMT MKGS | Handling Code: |
|
Limits From: | IH 45 | Fund Cat: | 1 |
Limits To: | ELLIS CO LINE | Estimate: | $492,877 |
Length: | 10.8 Miles | Actual: | $449,099 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 85 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 1050-02-010 |
Description: | SEAL COAT / PVMT MKGS | Handling Code: |
|
Limits From: | ELLIS C/L | Fund Cat: | 1 |
Limits To: | FM 1129 | Estimate: | $182,824 |
Length: | 3.1 Miles | Actual: | $172,201 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 1173 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 1059-01-045 |
Description: | SEAL COAT, PVMT MKGS | Handling Code: |
|
Limits From: | FM 455 | Fund Cat: | 1 |
Limits To: | IH 35 | Estimate: | $703,937 |
Length: | 14.4 Miles | Actual: | $651,402 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 1446 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 1160-02-017 |
Description: | SEAL COAT, PVMT MKGS | Handling Code: |
|
Limits From: | END OF STATE MAINTENANCE | Fund Cat: | 1 |
Limits To: | IH 35 | Estimate: | $333,054 |
Length: | 7.3 Miles | Actual: | $304,740 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 744 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 1663-02-011 |
Description: | SEAL COAT, PVMT MKGS | Handling Code: |
|
Limits From: | HILL C/L | Fund Cat: | 1 |
Limits To: | FM 639 | Estimate: | $116,022 |
Length: | 3.4 Miles | Actual: | $102,150 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 744 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 1663-03-018 |
Description: | SEAL COAT, PVMT MKGS | Handling Code: |
|
Limits From: | FM 1578 | Fund Cat: | 1 |
Limits To: | FM 55 | Estimate: | $182,918 |
Length: | 5.3 Miles | Actual: | $159,497 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 2181 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 2054-02-019 |
Description: | SEAL COAT, PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | HELM LN (MPT 238+00) | Fund Cat: | 1 |
Limits To: | OAK CREEK DR (242+00) | Estimate: | $134,009 |
Length: | 3.1 Miles | Actual: | $116,275 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 2551 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 2056-01-047 |
Description: | SEAL COAT, PVMT MKGS | Handling Code: |
|
Limits From: | FM 2514 | Fund Cat: | 1 |
Limits To: | FM 2170 | Estimate: | $121,341 |
Length: | 3.1 Miles | Actual: | $104,588 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 2728 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 2512-01-013 |
Description: | SEAL COAT, PAVEMNT MARKINGS | Handling Code: |
|
Limits From: | FM 429 | Fund Cat: | 1 |
Limits To: | US 80 | Estimate: | $293,557 |
Length: | 8.7 Miles | Actual: | $260,694 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 548 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 2588-01-013 |
Description: | SEAL COAT, PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | FM 740 | Fund Cat: | 1 |
Limits To: | FM 1641 | Estimate: | $188,541 |
Length: | 3.0 Miles | Actual: | $176,596 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 2514 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 2679-02-010 |
Description: | SEAL COAT, PVMT MKGS | Handling Code: |
|
Limits From: | FM 2551 | Fund Cat: | 1 |
Limits To: | FM 1378 | Estimate: | $108,782 |
Length: | 2.5 Miles | Actual: | $97,403 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | FM 2514 | Let Status: | Actual |
Project ID: | STP 2014(066) | CSJ: | 2679-03-013 |
Description: | SEAL COAT, PVMT MKGS | Handling Code: |
|
Limits From: | FM 1378 | Fund Cat: | 1 |
Limits To: | 1/2 MILE EAST OF FM 1378 | Estimate: | $25,457 |
Length: | 0.5 Miles | Actual: | $21,446 |
Back... |
Totals for 0048-01-062 | ||
Length: | 154.9 Miles | ||
Estimate: | $8,608,697 | ||
Actual: | $7,850,200 | ||
CCSJ: 0092-14-083 | |||
District: | Dallas | Let Date: | AUG 2014 |
Highway: | IH 345 | Let Status: | Actual |
Project ID: | NH 1402(023) | CSJ: | 0092-14-083 |
Description: | REPAIR BENT CAPS AND GIRDERS | Handling Code: |
|
Limits From: | SOUTH OF IH 30, NB AND SB | Fund Cat: | 1 |
Limits To: | US 75 IN CITY OF DALLAS | Estimate: | $727,823 |
Length: | 1.2 Miles | Actual: | $598,250 |
District: | Dallas | Let Date: | AUG 2014 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | NH 1402(023) | CSJ: | 0092-14-084 |
Description: | REPAIR BENT CAPS AND GIRDERS | Handling Code: |
|
Limits From: | AT MARTIN LUTHER KING JR BLVD | Fund Cat: | 1 |
Limits To: | IN CITY OF DALLAS | Estimate: | $64,625 |
Length: | 1.2 Miles | Actual: | $67,775 |
Bid Tabulations Back... |
Totals for 0092-14-083 | ||
Length: | 2.4 Miles | ||
Estimate: | $792,448 | ||
Actual: | $666,025 | ||
CCSJ: 0095-02-113 | |||
District: | Dallas | Let Date: | AUG 2014 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | CM 1402(024) | CSJ: | 0095-02-113 |
Description: | INSTALLATION OF WIRELESS ITS SYSTEM | Handling Code: |
|
Limits From: | TOWN EAST | Fund Cat: | 5 |
Limits To: | IH 635 | Estimate: | $1,223,775 |
Length: | 0.9 Miles | Actual: | $466,030 |
District: | Dallas | Let Date: | AUG 2014 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | CM 1402(024) | CSJ: | 0095-10-052 |
Description: | WIRELESS ITS | Handling Code: |
|
Limits From: | IH 30 | Fund Cat: | 5 |
Limits To: | TOWNE EAST BLVD | Estimate: | $104,634 |
Length: | 1.7 Miles | Actual: | $103,499 |
District: | Dallas | Let Date: | AUG 2014 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | CM 1402(024) | CSJ: | 0195-02-070 |
Description: | INSTALLATION OF ITS SYSTEM (WIRELESS) | Handling Code: |
|
Limits From: | US 77 | Fund Cat: | 5 |
Limits To: | COOKE COUNTY LINE | Estimate: | $627,443 |
Length: | 11.2 Miles | Actual: | $613,497 |
District: | Dallas | Let Date: | AUG 2014 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | CM 1402(024) | CSJ: | 0195-03-085 |
Description: | INSTALLATION OF ITS SYSTEM (WIRELESS) | Handling Code: |
|
Limits From: | IH 35E | Fund Cat: | 5 |
Limits To: | US 77, NORTH OF DENTON | Estimate: | $220,467 |
Length: | 3.7 Miles | Actual: | $211,714 |
District: | Dallas | Let Date: | AUG 2014 |
Highway: | US 175 | Let Status: | Actual |
Project ID: | CM 1402(024) | CSJ: | 0197-02-105 |
Description: | WIRELESS ITS | Handling Code: |
|
Limits From: | BEXAR STREET | Fund Cat: | 5 |
Limits To: | IH 20 | Estimate: | $569,128 |
Length: | 8.5 Miles | Actual: | $554,966 |
Bid Tabulations Back... |
Totals for 0095-02-113 | ||
Length: | 26.0 Miles | ||
Estimate: | $2,745,447 | ||
Actual: | $1,949,706 | ||
CCSJ: 0196-03-267 | |||
District: | Dallas | Let Date: | MAY 2014 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | NH 2014(654) | CSJ: | 0196-03-267 |
Description: | INSTALLATION OF FIBER OPTIC CABLE | Handling Code: |
|
Limits From: | EMPIRE CENTRAL | Fund Cat: | 1 |
Limits To: | SL 12 | Estimate: | $363,522 |
Length: | 2.8 Miles | Actual: | $364,834 |
Back... |
Totals for 0196-03-267 | ||
Length: | 2.8 Miles | ||
Estimate: | $363,522 | ||
Actual: | $364,834 | ||
CCSJ: 0196-06-028 | |||
District: | Dallas | Let Date: | JUL 2014 |
Highway: | SL 354 | Let Status: | Actual |
Project ID: | STP 2014(655)MM | CSJ: | 0196-06-028 |
Description: | PEDESTRIAN STRUCTURES AND SIDEWALKS (ON - SYSTEM) | Handling Code: |
|
Limits From: | MANANA DRIVE | Fund Cat: | 3 |
Limits To: | NORTH OF ROYAL LANE | Estimate: | $4,935,177 |
Length: | 1.7 Miles | Actual: | $4,677,811 |
District: | Dallas | Let Date: | JUL 2014 |
Highway: | SL 354 | Let Status: | Actual |
Project ID: | RW 196-6-29 | CSJ: | 0196-06-029 |
Description: | ACQUISITION AND UTILITIES | Handling Code: |
|
Limits From: | MANANA DRIVE | Fund Cat: | ROW |
Limits To: | NORTH OF ROYAL LANE | Estimate: | |
Length: | 1.6 Miles | Actual: | $172,634 |
Back... |
Totals for 0196-06-028 | ||
Length: | 3.3 Miles | ||
Estimate: | $4,935,177 | ||
Actual: | $4,850,445 | ||
CCSJ: 0197-02-110 | |||
District: | Dallas | Let Date: | FEB 2014 |
Highway: | US 175 | Let Status: | Actual |
Project ID: | NH 2014(391) | CSJ: | 0197-02-110 |
Description: | REPAIR WB TO SB CONNECTOR RAMP | Handling Code: |
|
Limits From: | AT IH 20 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $552,335 |
Length: | 0.7 Miles | Actual: | $380,242 |
Back... |
Totals for 0197-02-110 | ||
Length: | 0.7 Miles | ||
Estimate: | $552,335 | ||
Actual: | $380,242 | ||
CCSJ: 0197-02-111 | |||
District: | Dallas | Let Date: | JAN 2014 |
Highway: | US 175 | Let Status: | Actual |
Project ID: | NH 2014(351) | CSJ: | 0197-02-111 |
Description: | REPAIR DAMAGED 33" STORM DRAIN RCP | Handling Code: |
|
Limits From: | AT ST. AUGUSTINE RD. | Fund Cat: | 1 |
Limits To: | . | Estimate: | $201,453 |
Length: | 0.2 Miles | Actual: | $207,035 |
Back... |
Totals for 0197-02-111 | ||
Length: | 0.2 Miles | ||
Estimate: | $201,453 | ||
Actual: | $207,035 | ||
CCSJ: 0197-02-112 | |||
District: | Dallas | Let Date: | JUN 2014 |
Highway: | US 175 | Let Status: | Actual |
Project ID: | NH 2014(762) | CSJ: | 0197-02-112 |
Description: | MILL, CONCRETE FULL DEPTH REPAIR AND ACP OVERLAY ON FRONTAGE | Handling Code: |
|
Limits From: | IH 20 | Fund Cat: | 1 |
Limits To: | KAUFMAN COUNTY LINE | Estimate: | $3,094,168 |
Length: | 7.2 Miles | Actual: | $2,707,489 |
Back... |
Totals for 0197-02-112 | ||
Length: | 7.2 Miles | ||
Estimate: | $3,094,168 | ||
Actual: | $2,707,489 | ||
CCSJ: 0197-02-114 | |||
District: | Dallas | Let Date: | APR 2014 |
Highway: | US 175 | Let Status: | Actual |
Project ID: | STP 2014(696)HESG | CSJ: | 0197-02-114 |
Description: | INSTALL SAFETY LIGHTING | Handling Code: |
|
Limits From: | 0.5 MI WEST OF SIMONDS | Fund Cat: | 8 |
Limits To: | 1800' EAST OF MALLOY BRIDGE RD | Estimate: | $547,500 |
Length: | 2.3 Miles | Actual: | $446,623 |
District: | Dallas | Let Date: | APR 2014 |
Highway: | US 175 | Let Status: | Actual |
Project ID: | NH 2014(796) | CSJ: | 0197-03-068 |
Description: | INSTALL SAFETY LIGHTING | Handling Code: |
|
Limits From: | 0.5 MI WEST OF FM 1389 | Fund Cat: | 1 |
Limits To: | 0.5 MI EAST OF FM 1389 | Estimate: | $206,329 |
Length: | 1.0 Miles | Actual: | $171,097 |
Back... |
Totals for 0197-02-114 | ||
Length: | 3.3 Miles | ||
Estimate: | $753,829 | ||
Actual: | $617,720 | ||
CCSJ: 0261-03-065 | |||
District: | Dallas | Let Date: | MAY 2014 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | STP 2014(656)HES | CSJ: | 0261-03-065 |
Description: | INSTALL PROTECTION | Handling Code: |
|
Limits From: | 0.1 MI SOUTH OF RED BIRD MP | Fund Cat: | 8 |
Limits To: | 0.1 MI NORTH OF LP 12 | Estimate: | $160,300 |
Length: | 1.9 Miles | Actual: | $226,683 |
District: | Dallas | Let Date: | MAY 2014 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | STP 2014(657)HES | CSJ: | 0442-02-155 |
Description: | INSTALL PROTECTION | Handling Code: |
|
Limits From: | 0.1 MI SOUTH OF OVERTON | Fund Cat: | 8 |
Limits To: | 0.1 MI NORTH OF 12TH ST MP | Estimate: | $55,028 |
Length: | 3.1 Miles | Actual: | $105,336 |
District: | Dallas | Let Date: | MAY 2014 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | STP 2014(658)HES | CSJ: | 2374-04-073 |
Description: | INSTALL PROTECTION | Handling Code: |
|
Limits From: | 0.1 MI WEST OF CEDAR RIDGE | Fund Cat: | 8 |
Limits To: | 0.1 MI EAST OF CEDAR RIDGE | Estimate: | $38,188 |
Length: | 0.2 Miles | Actual: | $84,676 |
Back... |
Totals for 0261-03-065 | ||
Length: | 5.2 Miles | ||
Estimate: | $253,516 | ||
Actual: | $416,695 | ||
CCSJ: 0261-03-066 | |||
District: | Dallas | Let Date: | AUG 2014 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | NH 1402(047) | CSJ: | 0261-03-066 |
Description: | LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING AND | Handling Code: |
|
Limits From: | IH 20 | Fund Cat: | 10 |
Limits To: | 0.2 MI NORTH OF CAMP WISDOM RD | Estimate: | $142,616 |
Length: | 0.9 Miles | Actual: | $140,431 |
Bid Tabulations Back... |
Totals for 0261-03-066 | ||
Length: | 0.9 Miles | ||
Estimate: | $142,616 | ||
Actual: | $140,431 | ||
CCSJ: 0353-05-088 | |||
District: | Dallas | Let Date: | AUG 2014 |
Highway: | SL 12 | Let Status: | Actual |
Project ID: | CM 1402(026) | CSJ: | 0353-05-088 |
Description: | INTERSECTION IMPROVEMENT | Handling Code: |
|
Limits From: | WEST OF MIDWAY | Fund Cat: | 5 |
Limits To: | US 75 | Estimate: | $4,942,450 |
Length: | 3.9 Miles | Actual: | $6,564,020 |
District: | Dallas | Let Date: | AUG 2014 |
Highway: | SL 12 | Let Status: | Actual |
Project ID: | CM 2005(517) | CSJ: | 0353-05-107 |
Description: | ACQUISITION, UTILITIES AND RELOCATION | Handling Code: |
|
Limits From: | WEST OF MIDWAY | Fund Cat: | ROW |
Limits To: | US 75 | Estimate: | $1 |
Length: | 3.9 Miles | Actual: | $1,087,941 |
Bid Tabulations Back... |
Totals for 0353-05-088 | ||
Length: | 7.8 Miles | ||
Estimate: | $4,942,451 | ||
Actual: | $7,651,961 | ||
CCSJ: 0442-02-148 | |||
District: | Dallas | Let Date: | DEC 2013 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | IM 0356(444) | CSJ: | 0442-02-148 |
Description: | INSTALL HIGH MAST ILLUMINATION | Handling Code: |
|
Limits From: | IH 20 | Fund Cat: | 1 |
Limits To: | LOOP 12 | Estimate: | $1,315,304 |
Length: | 3.1 Miles | Actual: | $948,487 |
Back... |
Totals for 0442-02-148 | ||
Length: | 3.1 Miles | ||
Estimate: | $1,315,304 | ||
Actual: | $948,487 | ||
CCSJ: 0442-02-156 | |||
District: | Dallas | Let Date: | APR 2014 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | IM 0356(446) | CSJ: | 0442-02-156 |
Description: | INSTALL SIGNING FOR TRUCK LANE RESTRICTIONS | Handling Code: |
|
Limits From: | ELLIS/DALLAS CL | Fund Cat: | 1 |
Limits To: | 8TH STREET | Estimate: | $198,635 |
Length: | 14.8 Miles | Actual: | $203,962 |
District: | Dallas | Let Date: | APR 2014 |
Highway: | IH 35E | Let Status: | Actual |
Project ID: | IM 0356(446) | CSJ: | 0442-03-040 |
Description: | INSTALL SIGNING FOR TRUCK LANE RESTRICTIONS | Handling Code: |
|
Limits From: | US 77 MERGE (NORTH) | Fund Cat: | 1 |
Limits To: | ELLIS/DALLAS CL | Estimate: | $121,480 |
Length: | 3.4 Miles | Actual: | $124,607 |
Back... |
Totals for 0442-02-156 | ||
Length: | 18.2 Miles | ||
Estimate: | $320,115 | ||
Actual: | $328,569 | ||
CCSJ: 0581-02-139 | |||
District: | Dallas | Let Date: | APR 2014 |
Highway: | LP 12 | Let Status: | Actual |
Project ID: | NH 2014(581) | CSJ: | 0581-02-139 |
Description: | BRIDGE DECK AND JOINT REPAIRS | Handling Code: |
|
Limits From: | COCKRELL HILL ROAD | Fund Cat: | 1 |
Limits To: | ANDERSON ST | Estimate: | $321,571 |
Length: | 5.1 Miles | Actual: | $253,576 |
Back... |
Totals for 0581-02-139 | ||
Length: | 5.1 Miles | ||
Estimate: | $321,571 | ||
Actual: | $253,576 | ||
CCSJ: 0581-02-140 | |||
District: | Dallas | Let Date: | MAY 2014 |
Highway: | LP 12 | Let Status: | Actual |
Project ID: | NH 2014(659) | CSJ: | 0581-02-140 |
Description: | FULL DEPTH REPAIR, MILL AND OVERLAY | Handling Code: |
|
Limits From: | SP 408 | Fund Cat: | 1 |
Limits To: | WEST FORK OF TRINITY RIVER | Estimate: | $3,022,909 |
Length: | 4.4 Miles | Actual: | $2,679,704 |
Back... |
Totals for 0581-02-140 | ||
Length: | 4.4 Miles | ||
Estimate: | $3,022,909 | ||
Actual: | $2,679,704 | ||
CCSJ: 0918-00-185 | |||
District: | Dallas | Let Date: | AUG 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1402(027) | CSJ: | 0918-00-185 |
Description: | NON - SITE SPECIFIC SIGNAL CONTRACT ON NEW LOCATIONS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | IN DALLAS DISTRICT | Estimate: | $1,432,500 |
Length: | 0.0 Miles | Actual: | $1,297,700 |
Bid Tabulations Back... |
Totals for 0918-00-185 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,432,500 | ||
Actual: | $1,297,700 | ||
CCSJ: 0918-00-192 | |||
District: | Dallas | Let Date: | MAR 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2014(839)MM | CSJ: | 0918-00-192 |
Description: | PROVIDE ASSISTANCE TO STRANDED MOTORISTS OR NON INJURY | Handling Code: |
XX |
Limits From: | MOBILITY ASSISTANCE PATROL | Fund Cat: | 7 |
Limits To: | FY 2014 | Estimate: | $3,300,000 |
Length: | 0.0 Miles | Actual: | $3,300,000 |
Back... |
Totals for 0918-00-192 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,300,000 | ||
Actual: | $3,300,000 | ||
CCSJ: 0918-00-207 | |||
District: | Dallas | Let Date: | MAY 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 1402(011) | CSJ: | 0918-00-207 |
Description: | REGIONAL EMISSIONS REDUCTION PROGRAM IMPLEMENTATION | Handling Code: |
XX |
Limits From: | REGIONAL EMISSIONS REDUCTION | Fund Cat: | 5 |
Limits To: | PROGRAM IN D/FW METROPLEX (OFF-SYS) | Estimate: | $3,125,000 |
Length: | 0.0 Miles | Actual: | $3,125,000 |
Back... |
Totals for 0918-00-207 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,125,000 | ||
Actual: | $3,125,000 | ||
CCSJ: 0918-00-209 | |||
District: | Dallas | Let Date: | MAY 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1402(010)MM | CSJ: | 0918-00-209 |
Description: | DEPARTMENTAL STREAMLINING POLICIES AND PROCEDURES | Handling Code: |
XX |
Limits From: | M&O PROGRAM OVERSIGHT COORDINATION | Fund Cat: | 7 |
Limits To: | FY 2014 | Estimate: | $450,000 |
Length: | 0.0 Miles | Actual: | $450,000 |
Back... |
Totals for 0918-00-209 | ||
Length: | 0.0 Miles | ||
Estimate: | $450,000 | ||
Actual: | $450,000 | ||
CCSJ: 0918-00-210 | |||
District: | Dallas | Let Date: | MAY 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1402(009)MM | CSJ: | 0918-00-210 |
Description: | REGIONAL TRIP REDUCTION PROGRAM, VANPOOL PGM, BIKE / PEDESTRIAN | Handling Code: |
XX |
Limits From: | REGIONAL M&O PROGRAMS (FY 2014) | Fund Cat: | 7 |
Limits To: | D/FW METROPLEX | Estimate: | $2,140,150 |
Length: | 0.0 Miles | Actual: | $2,140,150 |
Back... |
Totals for 0918-00-210 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,140,150 | ||
Actual: | $2,140,150 | ||
CCSJ: 0918-00-228 | |||
District: | Dallas | Let Date: | FEB 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2014(390) | CSJ: | 0918-00-228 |
Description: | NON - SITE SPECIFIC INSTALLATION OF GUIDE SIGNS ON NEW | Handling Code: |
|
Limits From: | AT VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | IN DALLAS DISTRICT | Estimate: | $400,000 |
Length: | 0.0 Miles | Actual: | $479,587 |
Back... |
Totals for 0918-00-228 | ||
Length: | 0.0 Miles | ||
Estimate: | $400,000 | ||
Actual: | $479,587 | ||
CCSJ: 0918-00-234 | |||
District: | Dallas | Let Date: | JAN 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 918-00-234 | CSJ: | 0918-00-234 |
Description: | WRONG WAY DRIVING PROGRAM; PILOT STUDY & IMPLEMENTATION TO | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 3 |
Limits To: | AT DIAMOND INTERSECTIONS | Estimate: | $792,720 |
Length: | 0.0 Miles | Actual: | $714,066 |
Back... |
Totals for 0918-00-234 | ||
Length: | 0.0 Miles | ||
Estimate: | $792,720 | ||
Actual: | $714,066 | ||
CCSJ: 0918-00-235 | |||
District: | Dallas | Let Date: | DEC 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 1302(098) | CSJ: | 0918-00-235 |
Description: | NCTCOG - - 511 TRAVELER INFORMATION SYSTEM; DEVELOP 511 SYSTEM | Handling Code: |
TR |
Limits From: | NCTCOG--511 TRAVELER INFORMATION | Fund Cat: | 5 |
Limits To: | SYSTEM IN DALLAS | Estimate: | $311,000 |
Length: | 0.0 Miles | Actual: | $311,000 |
Back... |
Totals for 0918-00-235 | ||
Length: | 0.0 Miles | ||
Estimate: | $311,000 | ||
Actual: | $311,000 | ||
CCSJ: 0918-00-236 | |||
District: | Dallas | Let Date: | AUG 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 1402(232) | CSJ: | 0918-00-236 |
Description: | NCTCOG - - 511 TRAVELER INFORMATION SYSTEM; DEVELOP 511 SYSTEM | Handling Code: |
TR |
Limits From: | NCTCOG--511 TRAVELER INFORMATION | Fund Cat: | 5 |
Limits To: | SYSTEM IN DALLAS | Estimate: | $946,333 |
Length: | 0.0 Miles | Actual: | $946,333 |
Back... |
Totals for 0918-00-236 | ||
Length: | 0.0 Miles | ||
Estimate: | $946,333 | ||
Actual: | $946,333 | ||
CCSJ: 0918-00-247 | |||
District: | Dallas | Let Date: | AUG 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 1402(231) | CSJ: | 0918-00-247 |
Description: | POSITIVE TRAIN CONTROL | Handling Code: |
TR |
Limits From: | DART/TRE | Fund Cat: | 7 |
Limits To: | . | Estimate: | $15,625,000 |
Length: | 0.0 Miles | Actual: | $15,625,000 |
Back... |
Totals for 0918-00-247 | ||
Length: | 0.0 Miles | ||
Estimate: | $15,625,000 | ||
Actual: | $15,625,000 | ||
CCSJ: 0918-45-731 | |||
District: | Dallas | Let Date: | JUL 2014 |
Highway: | CS | Let Status: | Actual |
Project ID: | BR 2006(473) | CSJ: | 0918-45-731 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | ON PLEASANT RUN RD. AT BEE BRANCH | Fund Cat: | 6 |
Limits To: | IN CITY OF DESOTO | Estimate: | $2,277,317 |
Length: | 0.3 Miles | Actual: | $3,181,747 |
Back... |
Totals for 0918-45-731 | ||
Length: | 0.3 Miles | ||
Estimate: | $2,277,317 | ||
Actual: | $3,181,747 | ||
CCSJ: 0918-45-761 | |||
District: | Dallas | Let Date: | JUN 2014 |
Highway: | CS | Let Status: | Actual |
Project ID: | BR 2007(306) | CSJ: | 0918-45-761 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | S MARSALIS AVE AT FIVEMILE CREEK | Fund Cat: | 6 |
Limits To: | . | Estimate: | $2,447,264 |
Length: | 0.1 Miles | Actual: | $2,688,948 |
District: | Dallas | Let Date: | JUN 2014 |
Highway: | CS | Let Status: | Actual |
Project ID: | RW 918-47-85 | CSJ: | 0918-47-085 |
Description: | ADJUSTMENT OF UTILITIES | Handling Code: |
|
Limits From: | S MARSALIS AVE AT FIVEMILE CREEK | Fund Cat: | ROW |
Limits To: | . | Estimate: | |
Length: | 0.1 Miles | Actual: | $255,487 |
Back... |
Totals for 0918-45-761 | ||
Length: | 0.2 Miles | ||
Estimate: | $2,447,264 | ||
Actual: | $2,944,435 | ||
CCSJ: 0918-45-864 | |||
District: | Dallas | Let Date: | JUL 2014 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2009(860)MM | CSJ: | 0918-45-864 |
Description: | RECONSTRUCT 4 LANE UNDIVIDED TO FOUR LANE DIVIDED | Handling Code: |
|
Limits From: | ON WHITLOCK RD, FROM IH 35E | Fund Cat: | 3 |
Limits To: | OLD DENTON RD IN CARROLLTON | Estimate: | $3,833,962 |
Length: | 0.5 Miles | Actual: | $3,063,573 |
District: | Dallas | Let Date: | JUL 2014 |
Highway: | CS | Let Status: | Actual |
Project ID: | RW 918-47-116 | CSJ: | 0918-47-116 |
Description: | ADJUSTMENT OF UTILITIES IN CONSTRUCTION CONTRACT | Handling Code: |
|
Limits From: | ON WHITLOCK RD, FROM IH 35E | Fund Cat: | ROW |
Limits To: | OLD DENTON RD IN CARROLLTON | Estimate: | |
Length: | 0.5 Miles | Actual: | $372,164 |
Back... |
Totals for 0918-45-864 | ||
Length: | 1.0 Miles | ||
Estimate: | $3,833,962 | ||
Actual: | $3,435,737 | ||
CCSJ: 0918-45-898 | |||
District: | Dallas | Let Date: | AUG 2014 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2011(220)TE | CSJ: | 0918-45-898 |
Description: | TRAFFIC CONTROL & SAFETY TREATMENTS FOR TRAIL / ROAD CROSSINGS | Handling Code: |
LC |
Limits From: | VARIOUS TRAIL/ROAD CROSSINGS IN | Fund Cat: | 3 |
Limits To: | CITY OF DALLAS | Estimate: | $700,819 |
Length: | 0.0 Miles | Actual: | $663,639 |
Back... |
Totals for 0918-45-898 | ||
Length: | 0.0 Miles | ||
Estimate: | $700,819 | ||
Actual: | $663,639 | ||
CCSJ: 0918-47-012 | |||
District: | Dallas | Let Date: | OCT 2013 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2013(304)SRS | CSJ: | 0918-47-012 |
Description: | PEDESTRIAN WALKWAY IMPROVEMENTS | Handling Code: |
LC |
Limits From: | AT RICHLAND ELEMENTARY SCHOOL | Fund Cat: | 3 |
Limits To: | IN RICHARDSON | Estimate: | $332,081 |
Length: | 0.0 Miles | Actual: | $384,015 |
District: | Dallas | Let Date: | OCT 2013 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2013(304)SRS | CSJ: | 0918-47-013 |
Description: | PEDESTRIAN WALKWAY IMPROVEMENTS | Handling Code: |
LC |
Limits From: | AT YALE ELEMENTARY SCHOOL | Fund Cat: | 3 |
Limits To: | IN RICHARDSON | Estimate: | $422,130 |
Length: | 0.0 Miles | Actual: | $512,195 |
Back... |
Totals for 0918-47-012 | ||
Length: | 0.0 Miles | ||
Estimate: | $754,211 | ||
Actual: | $896,210 | ||
CCSJ: 0918-47-052 | |||
District: | Dallas | Let Date: | JUN 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1102(553) | CSJ: | 0918-47-052 |
Description: | CONSTRUCT CURB RAMPS ON IH 635, SH 114, SH 161, SH 183, | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS ON STATE HIGHWAYS | Fund Cat: | 10 |
Limits To: | IN DALLAS COUNTY | Estimate: | $2,125,203 |
Length: | 0.0 Miles | Actual: | $2,270,944 |
Back... |
Totals for 0918-47-052 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,125,203 | ||
Actual: | $2,270,944 | ||
CCSJ: 0918-47-078 | |||
District: | Dallas | Let Date: | JAN 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2014(557) | CSJ: | 0918-47-078 |
Description: | LIGHT RAIL BED, TRACK, VEHICLES, OVERHEADS AND FACILITIES | Handling Code: |
TR |
Limits From: | ON IRVING CORRIDOR LIGHT RAIL | Fund Cat: | 5 |
Limits To: | FROM BACHMAN STA TO BELT LINE ST | Estimate: | $15,075,000 |
Length: | 0.0 Miles | Actual: | $15,075,000 |
Back... |
Totals for 0918-47-078 | ||
Length: | 0.0 Miles | ||
Estimate: | $15,075,000 | ||
Actual: | $15,075,000 | ||
CCSJ: 0918-47-084 | |||
District: | Dallas | Let Date: | MAY 2014 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2013(653) | CSJ: | 0918-47-084 |
Description: | IMPLEMENT PROGRAM TO RECRUIT, TRAIN, & CERTIFY DISADVANTAGED | Handling Code: |
XX |
Limits From: | DISADVANTAGED COMMUNITY TRAINING, | Fund Cat: | 12 |
Limits To: | EMPLOYMENT,& MINORITY CONTRACTING | Estimate: | $1,000,000 |
Length: | 0.0 Miles | Actual: | $1,000,000 |
Back... |
Totals for 0918-47-084 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,000,000 | ||
Actual: | $1,000,000 | ||
CCSJ: 0918-47-111 | |||
District: | Dallas | Let Date: | AUG 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 1402(230) | CSJ: | 0918-47-111 |
Description: | PURCHASE OF 1 NEW LOCOMOTIVE FOR TRE | Handling Code: |
TR |
Limits From: | TRE RR | Fund Cat: | 5 |
Limits To: | . | Estimate: | $5,750,000 |
Length: | 0.0 Miles | Actual: | $5,750,000 |
Back... |
Totals for 0918-47-111 | ||
Length: | 0.0 Miles | ||
Estimate: | $5,750,000 | ||
Actual: | $5,750,000 | ||
CCSJ: 1047-03-063 | |||
District: | Dallas | Let Date: | NOV 2013 |
Highway: | FM 1382 | Let Status: | Actual |
Project ID: | C 1047-3-63 | CSJ: | 1047-03-063 |
Description: | WIDEN FROM 4 LANES TO 6 LANES AND UPGRADE TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | NEW CLARK ROAD | Fund Cat: | 3 |
Limits To: | WEST OF STRAUS RD IN CEDAR HILL | Estimate: | $2,422,070 |
Length: | 0.5 Miles | Actual: | $1,893,194 |
Back... |
Totals for 1047-03-063 | ||
Length: | 0.5 Miles | ||
Estimate: | $2,422,070 | ||
Actual: | $1,893,194 | ||
CCSJ: 1068-04-154 | |||
District: | Dallas | Let Date: | JUL 2014 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | C 1068-4-154 | CSJ: | 1068-04-154 |
Description: | CONSTRUCT TWO LANE WESTBOUND FRONTAGE ROAD | Handling Code: |
|
Limits From: | COCKRELL HILL ROAD | Fund Cat: | 3 |
Limits To: | WESTMORELAND RD IN DALLAS | Estimate: | $6,390,093 |
Length: | 1.4 Miles | Actual: | $6,026,098 |
District: | Dallas | Let Date: | JUL 2014 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | C 1068-4-156 | CSJ: | 1068-04-156 |
Description: | CONSTRUCT TWO LANE EASTBOUND FRONTAGE ROAD; PHASE 2 | Handling Code: |
|
Limits From: | COCKRELL HILL RD | Fund Cat: | 3 |
Limits To: | WESTMORELAND RD | Estimate: | $4,079,657 |
Length: | 1.4 Miles | Actual: | $3,788,744 |
Back... |
Totals for 1068-04-154 | ||
Length: | 2.8 Miles | ||
Estimate: | $10,469,750 | ||
Actual: | $9,814,842 | ||
CCSJ: 2374-02-136 | |||
District: | Dallas | Let Date: | AUG 2014 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | CM 1402(030) | CSJ: | 2374-02-136 |
Description: | INSTALLATION OF FULL ITS SYSTEM | Handling Code: |
|
Limits From: | IH 20 | Fund Cat: | 5 |
Limits To: | IH 30 | Estimate: | $4,658,526 |
Length: | 8.2 Miles | Actual: | $3,858,952 |
District: | Dallas | Let Date: | AUG 2014 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | CM 1402(030) | CSJ: | 2374-03-080 |
Description: | INSTALLATION OF FULL ITS SYSTEM | Handling Code: |
|
Limits From: | IH 45 | Fund Cat: | 5 |
Limits To: | IH 635 | Estimate: | $2,639,204 |
Length: | 6.6 Miles | Actual: | $2,735,819 |
Bid Tabulations Back... |
Totals for 2374-02-136 | ||
Length: | 14.8 Miles | ||
Estimate: | $7,297,730 | ||
Actual: | $6,594,771 | ||
CCSJ: 2374-03-076 | |||
District: | Dallas | Let Date: | SEP 2013 |
Highway: | US 75 | Let Status: | Actual |
Project ID: | NH 2013(988) | CSJ: | 0047-07-221 |
Description: | REHABILITATION OF ITS SYSTEM | Handling Code: |
|
Limits From: | SPUR 366 | Fund Cat: | 1 |
Limits To: | IH 635 | Estimate: | $185,250 |
Length: | 9.2 Miles | Actual: | $27,783 |
District: | Dallas | Let Date: | SEP 2013 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | CM 2013(987) | CSJ: | 2374-03-076 |
Description: | INSTALLATION OF FULL ITS SYSTEM | Handling Code: |
|
Limits From: | IH 35E | Fund Cat: | 5 |
Limits To: | IH 45 | Estimate: | $2,163,098 |
Length: | 5.8 Miles | Actual: | $1,831,137 |
Back... |
Totals for 2374-03-076 | ||
Length: | 15.0 Miles | ||
Estimate: | $2,348,348 | ||
Actual: | $1,858,920 | ||
CCSJ: 2374-07-058 | |||
District: | Dallas | Let Date: | JUN 2014 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | CC 2374-7-58 | CSJ: | 2374-07-058 |
Description: | CONSTRUCT 0 TO 2 LANE WB FRONTAGE ROAD | Handling Code: |
|
Limits From: | BELTLINE ROAD | Fund Cat: | 3 |
Limits To: | 0.55 MILES WEST OF BELTINE ROAD | Estimate: | $1,611,490 |
Length: | 0.7 Miles | Actual: | $2,084,782 |
Back... |
Totals for 2374-07-058 | ||
Length: | 0.7 Miles | ||
Estimate: | $1,611,490 | ||
Actual: | $2,084,782 | ||
CCSJ: 2374-07-067 | |||
District: | Dallas | Let Date: | APR 2014 |
Highway: | IH 635 | Let Status: | Actual |
Project ID: | IM 6356(447) | CSJ: | 2374-07-067 |
Description: | FULL DEPTH REPAIR AND MILL AND OVERLAY MAINLANES AND | Handling Code: |
|
Limits From: | BELTLINE RD | Fund Cat: | 1 |
Limits To: | FARMERS BRANCH CREEK | Estimate: | $2,741,920 |
Length: | 5.2 Miles | Actual: | $2,938,210 |
Back... |
Totals for 2374-07-067 | ||
Length: | 5.2 Miles | ||
Estimate: | $2,741,920 | ||
Actual: | $2,938,210 | ||
CCSJ: 2964-01-022 | |||
District: | Dallas | Let Date: | JAN 2014 |
Highway: | SH 161 | Let Status: | Actual |
Project ID: | NH 2014(352) | CSJ: | 2964-01-022 |
Description: | INTERIM OPERATIONAL BOTTLENECK IMPROVEMENT | Handling Code: |
|
Limits From: | SOUTH OF CONFLANS RD | Fund Cat: | 3 |
Limits To: | NORTH OF SH 114 | Estimate: | $5,134,658 |
Length: | 6.3 Miles | Actual: | $3,796,615 |
Back... |
Totals for 2964-01-022 | ||
Length: | 6.3 Miles | ||
Estimate: | $5,134,658 | ||
Actual: | $3,796,615 | ||
CCSJ: 2964-01-045 | |||
District: | Dallas | Let Date: | MAR 2014 |
Highway: | SH 161 | Let Status: | Actual |
Project ID: | STP 2013(227)MM | CSJ: | 2964-01-045 |
Description: | INSTALL CCTV CAMERAS AND ARTERIAL DIRECTIONAL CMS AT MAJOR | Handling Code: |
LC |
Limits From: | IH 20 | Fund Cat: | 3 |
Limits To: | ROCK ISLAND | Estimate: | $677,364 |
Length: | 0.0 Miles | Actual: | $866,004 |
Back... |
Totals for 2964-01-045 | ||
Length: | 0.0 Miles | ||
Estimate: | $677,364 | ||
Actual: | $866,004 |
|