Detail Letting Schedule for Harris County (FY 2014)
Harris County (FY 2014) |
CCSJ: 0027-10-062 | |||
District: | Houston | Let Date: | JUL 2014 |
Highway: | US 90A | Let Status: | Actual |
Project ID: | BR 2013(572) | CSJ: | 0027-10-062 |
Description: | REPLACE TWO BRIDGES (NBI# 12102002710257 NB AND | Handling Code: |
|
Limits From: | 0.19 MI S. OF U.P.R.R. BASIN YARD | Fund Cat: | 6 |
Limits To: | 0.20 MI N. OF U.P.R.R. BASIN YARD | Estimate: | $10,666,091 |
Length: | 0.4 Miles | Actual: | $13,996,561 |
Back... |
Totals for 0027-10-062 | ||
---|---|---|---|
Length: | 0.4 Miles | ||
Estimate: | $10,666,091 | ||
Actual: | $13,996,561 | ||
CCSJ: 0027-10-072 | |||
District: | Houston | Let Date: | AUG 2014 |
Highway: | US 90A | Let Status: | Actual |
Project ID: | CRX 27-10-72 | CSJ: | 0027-10-072 |
Description: | FY 2014 RAILROAD GRADE CROSSING REPLANKING PROGRAM | Handling Code: |
XX |
Limits From: | US 90A IN HOUSTON AT UPRR | Fund Cat: | 10 |
Limits To: | . | Estimate: | $108,288 |
Length: | 0.0 Miles | Actual: | $108,288 |
Back... |
Totals for 0027-10-072 | ||
Length: | 0.0 Miles | ||
Estimate: | $108,288 | ||
Actual: | $108,288 | ||
CCSJ: 0027-13-203 | |||
District: | Houston | Let Date: | JUL 2014 |
Highway: | IH 69 | Let Status: | Actual |
Project ID: | NH 2014(951) | CSJ: | 0027-13-203 |
Description: | PLANNING, SEAL COAT AND THIN OVERLAY (FRONTAGE ROADS) | Handling Code: |
|
Limits From: | 0.924 MI SOUTH OF BISSONNET | Fund Cat: | 1 |
Limits To: | 0.341 MI NORTH OF S. RICE AVE | Estimate: | $3,917,476 |
Length: | 7.2 Miles | Actual: | $4,080,887 |
Back... |
Totals for 0027-13-203 | ||
Length: | 7.2 Miles | ||
Estimate: | $3,917,476 | ||
Actual: | $4,080,887 | ||
CCSJ: 0028-02-090 | |||
District: | Houston | Let Date: | AUG 2014 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | NH 1402(082) | CSJ: | 0028-02-090 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | IH 610 | Fund Cat: | 10 |
Limits To: | BW 8 | Estimate: | $519,427 |
Length: | 0.0 Miles | Actual: | $574,853 |
District: | Houston | Let Date: | AUG 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 1402(082) | CSJ: | 0912-00-490 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS WITHIN DISTRICT | Fund Cat: | 10 |
Limits To: | . | Estimate: | $936,461 |
Length: | 0.0 Miles | Actual: | $869,547 |
Bid Tabulations Back... |
Totals for 0028-02-090 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,455,888 | ||
Actual: | $1,444,400 | ||
CCSJ: 0050-06-080 | |||
District: | Houston | Let Date: | JUL 2014 |
Highway: | US 290 | Let Status: | Actual |
Project ID: | NH 2014(953) | CSJ: | 0050-06-080 |
Description: | RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE | Handling Code: |
|
Limits From: | WEST OF MASON ROAD | Fund Cat: | 2M |
Limits To: | EAST OF MUESCHKE ROAD (SEGMENT 10A) | Estimate: | $51,770,527 |
Length: | 2.3 Miles | Actual: | $48,599,234 |
Back... |
Totals for 0050-06-080 | ||
Length: | 2.3 Miles | ||
Estimate: | $51,770,527 | ||
Actual: | $48,599,234 | ||
CCSJ: 0050-06-081 | |||
District: | Houston | Let Date: | NOV 2013 |
Highway: | US 290 | Let Status: | Actual |
Project ID: | NH 2013(983) | CSJ: | 0050-06-081 |
Description: | RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE | Handling Code: |
|
Limits From: | EAST OF MUESCHKE ROAD | Fund Cat: | 2M |
Limits To: | EAST OF TELGE ROAD (SEGMENT 9) | Estimate: | $94,520,145 |
Length: | 5.0 Miles | Actual: | $85,215,954 |
Back... |
Totals for 0050-06-081 | ||
Length: | 5.0 Miles | ||
Estimate: | $94,520,145 | ||
Actual: | $85,215,954 | ||
CCSJ: 0271-14-213 | |||
District: | Houston | Let Date: | NOV 2013 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | CM 2013(991) | CSJ: | 0271-14-213 |
Description: | RECONSTRUCT US 290 / IH 610 INTERCHANGE WITH DIRECT CONNECTORS | Handling Code: |
|
Limits From: | W OF W 34TH ST ON US 290 (SEG 3) | Fund Cat: | 3 |
Limits To: | ON IH 610 | Estimate: | 147,729,286 |
Length: | 0.2 Miles | Actual: | 151,543,734 |
Back... |
Totals for 0271-14-213 | ||
Length: | 0.2 Miles | ||
Estimate: | 147,729,286 | ||
Actual: | 151,543,734 | ||
CCSJ: 0271-16-134 | |||
District: | Houston | Let Date: | MAR 2014 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | STP 2014(484)HES | CSJ: | 0271-16-134 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | AT CRESTMONT STREET | Fund Cat: | 8 |
Limits To: | . | Estimate: | $343,292 |
Length: | 0.2 Miles | Actual: | $250,183 |
District: | Houston | Let Date: | MAR 2014 |
Highway: | IH 610 | Let Status: | Actual |
Project ID: | STP 2014(485)HES | CSJ: | 0271-16-135 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | AT US 90A | Fund Cat: | 8 |
Limits To: | . | Estimate: | $557,936 |
Length: | 0.2 Miles | Actual: | $448,819 |
Back... |
Totals for 0271-16-134 | ||
Length: | 0.4 Miles | ||
Estimate: | $901,228 | ||
Actual: | $699,002 | ||
CCSJ: 0389-12-090 | |||
District: | Houston | Let Date: | AUG 2014 |
Highway: | SH 146 | Let Status: | Actual |
Project ID: | NH 1402(100) | CSJ: | 0389-12-090 |
Description: | STAY CABLE MAINTENANCE | Handling Code: |
|
Limits From: | AT FRED HARTMAN BRIDGE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $4,656,431 |
Length: | 0.5 Miles | Actual: | $5,139,060 |
Bid Tabulations Back... |
Totals for 0389-12-090 | ||
Length: | 0.5 Miles | ||
Estimate: | $4,656,431 | ||
Actual: | $5,139,060 | ||
CCSJ: 0500-03-044 | |||
District: | Houston | Let Date: | JUL 2014 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | BR 2014(952) | CSJ: | 0500-03-044 |
Description: | REPLACE BRIDGE AND APPROACHES (NBI# 121020050003112) | Handling Code: |
|
Limits From: | IH 45 NB AT WHITE OAK BAYOU | Fund Cat: | 6 |
Limits To: | . | Estimate: | $13,014,004 |
Length: | 0.5 Miles | Actual: | $16,272,065 |
District: | Houston | Let Date: | JUL 2014 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | NH 2014(962) | CSJ: | 0500-03-585 |
Description: | DECK REPLACEMENT AND MAINTENANCE | Handling Code: |
|
Limits From: | MEMORIAL DRIVE | Fund Cat: | 1 |
Limits To: | IH-10 | Estimate: | $4,015,941 |
Length: | 0.0 Miles | Actual: | $3,084,493 |
District: | Houston | Let Date: | JUL 2014 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | ROW 500-3-589 | CSJ: | 0500-03-589 |
Description: | ACQUISITION AND UTILITY ADJUSTMENTS | Handling Code: |
|
Limits From: | IH 45 NB AT WHITE OAK BAYOU | Fund Cat: | ROW |
Limits To: | . | Estimate: | |
Length: | 0.5 Miles | Actual: | $281,265 |
Back... |
Totals for 0500-03-044 | ||
Length: | 1.0 Miles | ||
Estimate: | $17,029,945 | ||
Actual: | $19,637,823 | ||
CCSJ: 0500-03-567 | |||
District: | Houston | Let Date: | APR 2014 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 0451(347) | CSJ: | 0500-03-567 |
Description: | MILL AND OVERLAY | Handling Code: |
|
Limits From: | IH 10 | Fund Cat: | 1 |
Limits To: | IH 610 NORTH LOOP | Estimate: | $4,488,764 |
Length: | 2.6 Miles | Actual: | $5,091,080 |
Back... |
Totals for 0500-03-567 | ||
Length: | 2.6 Miles | ||
Estimate: | $4,488,764 | ||
Actual: | $5,091,080 | ||
CCSJ: 0500-03-573 | |||
District: | Houston | Let Date: | FEB 2014 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | IM 0451(346) | CSJ: | 0500-03-573 |
Description: | CONSTRUCT DIRECT CONNECTOR IH 45 SB TO IH 610 WB | Handling Code: |
|
Limits From: | AT IH 610 S | Fund Cat: | 1 |
Limits To: | . | Estimate: | $27,621,988 |
Length: | 3.0 Miles | Actual: | $24,062,148 |
Back... |
Totals for 0500-03-573 | ||
Length: | 3.0 Miles | ||
Estimate: | $27,621,988 | ||
Actual: | $24,062,148 | ||
CCSJ: 0500-03-574 | |||
District: | Houston | Let Date: | OCT 2013 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | CM 2013(984) | CSJ: | 0500-03-574 |
Description: | CONSTRUCT DIRECT CONNECTOR IH 610 EB TO IH 45 NB | Handling Code: |
|
Limits From: | AT IH 610 E | Fund Cat: | 1 |
Limits To: | . | Estimate: | $49,723,540 |
Length: | 2.2 Miles | Actual: | $48,776,267 |
Back... |
Totals for 0500-03-574 | ||
Length: | 2.2 Miles | ||
Estimate: | $49,723,540 | ||
Actual: | $48,776,267 | ||
CCSJ: 0500-03-586 | |||
District: | Houston | Let Date: | JUL 2014 |
Highway: | IH 45 | Let Status: | Actual |
Project ID: | NH 2014(993) | CSJ: | 0500-03-586 |
Description: | CLEAN AND PAINT STEEL BRIDGE MEMBERS | Handling Code: |
|
Limits From: | MEMORIAL DRIVE | Fund Cat: | 1 |
Limits To: | IH-10 | Estimate: | $8,665,500 |
Length: | 0.9 Miles | Actual: | $3,918,000 |
Back... |
Totals for 0500-03-586 | ||
Length: | 0.9 Miles | ||
Estimate: | $8,665,500 | ||
Actual: | $3,918,000 | ||
CCSJ: 0502-01-207 | |||
District: | Houston | Let Date: | OCT 2013 |
Highway: | SH 225 | Let Status: | Actual |
Project ID: | NH 2014(054) | CSJ: | 0502-01-207 |
Description: | CLEAN AND SEAL JOINTS, FULL DEPTH REPAIR, MILLING AND 1.5" | Handling Code: |
|
Limits From: | 0.23 MILES WEST OF RICHEY | Fund Cat: | 1 |
Limits To: | 0.36 MILES EAST OF RED BLUFF | Estimate: | $1,008,443 |
Length: | 1.4 Miles | Actual: | $1,050,534 |
Back... |
Totals for 0502-01-207 | ||
Length: | 1.4 Miles | ||
Estimate: | $1,008,443 | ||
Actual: | $1,050,534 | ||
CCSJ: 0508-01-034 | |||
District: | Houston | Let Date: | APR 2014 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0107(443) | CSJ: | 0508-01-034 |
Description: | INSTALL CTMS | Handling Code: |
|
Limits From: | CROSBY-LYNCHBURG ROAD | Fund Cat: | 1 |
Limits To: | GARTH ROAD | Estimate: | $2,133,225 |
Length: | 4.7 Miles | Actual: | $2,122,123 |
Back... |
Totals for 0508-01-034 | ||
Length: | 4.7 Miles | ||
Estimate: | $2,133,225 | ||
Actual: | $2,122,123 | ||
CCSJ: 0508-01-276 | |||
District: | Houston | Let Date: | SEP 2013 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0107(442) | CSJ: | 0508-01-276 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | ON ELYSIAN ST.; FROM COMMERCE ST. | Fund Cat: | 3 |
Limits To: | BROOKS ST. | Estimate: | $38,776,514 |
Length: | 1.1 Miles | Actual: | $34,623,242 |
Back... |
Totals for 0508-01-276 | ||
Length: | 1.1 Miles | ||
Estimate: | $38,776,514 | ||
Actual: | $34,623,242 | ||
CCSJ: 0508-01-344 | |||
District: | Houston | Let Date: | APR 2014 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0107(445) | CSJ: | 0508-01-344 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | IH 45 | Fund Cat: | 10 |
Limits To: | CHAMBERS COUNTY LINE | Estimate: | $1,604,808 |
Length: | 0.0 Miles | Actual: | $1,351,370 |
Back... |
Totals for 0508-01-344 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,604,808 | ||
Actual: | $1,351,370 | ||
CCSJ: 0720-03-102 | |||
District: | Houston | Let Date: | DEC 2013 |
Highway: | SH 249 | Let Status: | Actual |
Project ID: | CC 720-3-102 | CSJ: | 0720-03-102 |
Description: | CONSTRUCT 6 - LANE TOLLWAY WITH BRIDGES AT WILLOW CREEK, | Handling Code: |
LC |
Limits From: | 0.2 MILES SOUTH OF WILLOW CREEK | Fund Cat: | 3 |
Limits To: | 0.34 MI SOUTH OF BROWN RD (PHASE 2) | Estimate: | $50,000,000 |
Length: | 2.0 Miles | Actual: | $39,448,254 |
Back... |
Totals for 0720-03-102 | ||
Length: | 2.0 Miles | ||
Estimate: | $50,000,000 | ||
Actual: | $39,448,254 | ||
CCSJ: 0720-03-103 | |||
District: | Houston | Let Date: | NOV 2013 |
Highway: | SH 249 | Let Status: | Actual |
Project ID: | CC 720-3-103 | CSJ: | 0720-03-103 |
Description: | CONSTRUCT 6 - LANE TOLLWAY AND TSM (PHASE 2) WITH GRADE | Handling Code: |
LC |
Limits From: | SPRING CYPRESS ROAD | Fund Cat: | 3 |
Limits To: | 0.2 M S OF WILLOW CREEK (PHASE 2) | Estimate: | $60,000,001 |
Length: | 2.5 Miles | Actual: | $54,992,819 |
Back... |
Totals for 0720-03-103 | ||
Length: | 2.5 Miles | ||
Estimate: | $60,000,001 | ||
Actual: | $54,992,819 | ||
CCSJ: 0720-03-120 | |||
District: | Houston | Let Date: | AUG 2014 |
Highway: | SH 249 | Let Status: | Actual |
Project ID: | CC 720-3-120 | CSJ: | 0720-03-120 |
Description: | CONSTRUCT SB - WB DIRECT CONNECTOR | Handling Code: |
LC |
Limits From: | AT BW 8 | Fund Cat: | 3 |
Limits To: | . | Estimate: | $9,700,000 |
Length: | 1.0 Miles | Actual: | $22,109,000 |
Back... |
Totals for 0720-03-120 | ||
Length: | 1.0 Miles | ||
Estimate: | $9,700,000 | ||
Actual: | $22,109,000 | ||
CCSJ: 0720-03-128 | |||
District: | Houston | Let Date: | JUN 2014 |
Highway: | SH 249 | Let Status: | Actual |
Project ID: | STP 2014(742)HES | CSJ: | 0720-03-127 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | AT FM 1960 | Fund Cat: | 8 |
Limits To: | . | Estimate: | $57,350 |
Length: | 0.2 Miles | Actual: | $38,625 |
District: | Houston | Let Date: | JUN 2014 |
Highway: | SH 249 | Let Status: | Actual |
Project ID: | STP 2014(743)HES | CSJ: | 0720-03-128 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | AT VETERANS MEMORIAL DRIVE | Fund Cat: | 8 |
Limits To: | . | Estimate: | $280,296 |
Length: | 0.2 Miles | Actual: | $215,411 |
Back... |
Totals for 0720-03-128 | ||
Length: | 0.4 Miles | ||
Estimate: | $337,646 | ||
Actual: | $254,036 | ||
CCSJ: 0912-00-424 | |||
District: | Houston | Let Date: | OCT 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 1102(560) | CSJ: | 0912-00-424 |
Description: | PEDESTRIAN AND SIGNAL IMPROVEMENTS IN AIRLINE DISTRICT | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN HARRIS COUNTY | Fund Cat: | 3 |
Limits To: | . | Estimate: | $2,606,745 |
Length: | 1.4 Miles | Actual: | $2,697,458 |
Back... |
Totals for 0912-00-424 | ||
Length: | 1.4 Miles | ||
Estimate: | $2,606,745 | ||
Actual: | $2,697,458 | ||
CCSJ: 0912-00-441 | |||
District: | Houston | Let Date: | DEC 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2014(297) | CSJ: | 0912-00-441 |
Description: | UPGRADE / RECONSTRUCT TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,495,424 |
Length: | 0.0 Miles | Actual: | $1,210,348 |
Back... |
Totals for 0912-00-441 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,495,424 | ||
Actual: | $1,210,348 | ||
CCSJ: 0912-00-442 | |||
District: | Houston | Let Date: | AUG 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2014(545) | CSJ: | 0912-00-442 |
Description: | REPLACE 6 AGING DYNAMIC MESSAGE SIGNS | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $500,000 |
Length: | 0.0 Miles | Actual: | $500,000 |
Back... |
Totals for 0912-00-442 | ||
Length: | 0.0 Miles | ||
Estimate: | $500,000 | ||
Actual: | $500,000 | ||
CCSJ: 0912-00-443 | |||
District: | Houston | Let Date: | DEC 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2014(298) | CSJ: | 0912-00-443 |
Description: | INSTALL SUPPLEMENTAL CCTV CAMERAS AT CRITICAL LOCAITONS | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | . | Estimate: | $296,629 |
Length: | 0.0 Miles | Actual: | $243,957 |
Back... |
Totals for 0912-00-443 | ||
Length: | 0.0 Miles | ||
Estimate: | $296,629 | ||
Actual: | $243,957 | ||
CCSJ: 0912-00-462 | |||
District: | Houston | Let Date: | AUG 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 1402(207) | CSJ: | 0912-00-462 |
Description: | CLEAN AIR ACTION PROGRAM DEVELOPMENT IMPLEMENTATION | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 3 |
Limits To: | . | Estimate: | $1,952,500 |
Length: | 0.0 Miles | Actual: | $1,875,400 |
Back... |
Totals for 0912-00-462 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,952,500 | ||
Actual: | $1,875,400 | ||
CCSJ: 0912-00-467 | |||
District: | Houston | Let Date: | NOV 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2014(452) | CSJ: | 0912-00-467 |
Description: | CLEAN CITIES / CLEAN VEHICLES PROGRAM (FY 2013) (NON - LETTING) | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 5 |
Limits To: | . | Estimate: | $7,500,000 |
Length: | 0.0 Miles | Actual: | $7,500,000 |
Back... |
Totals for 0912-00-467 | ||
Length: | 0.0 Miles | ||
Estimate: | $7,500,000 | ||
Actual: | $7,500,000 | ||
CCSJ: 0912-00-473 | |||
District: | Houston | Let Date: | AUG 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1402(204)MM | CSJ: | 0912-00-473 |
Description: | REGIONAL VANPOOL PROGRAM (FY 2014) | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 3 |
Limits To: | . | Estimate: | $3,750,000 |
Length: | 0.0 Miles | Actual: | $3,751,000 |
Back... |
Totals for 0912-00-473 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,750,000 | ||
Actual: | $3,751,000 | ||
CCSJ: 0912-00-475 | |||
District: | Houston | Let Date: | MAY 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2014(994) | CSJ: | 0912-00-475 |
Description: | CLEAN CITIES / CLEAN VEHICLES PROGRAM (FY 2014) (NON - LETTING) | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 5 |
Limits To: | . | Estimate: | $7,500,000 |
Length: | 0.0 Miles | Actual: | $7,500,000 |
Back... |
Totals for 0912-00-475 | ||
Length: | 0.0 Miles | ||
Estimate: | $7,500,000 | ||
Actual: | $7,500,000 | ||
CCSJ: 0912-00-477 | |||
District: | Houston | Let Date: | AUG 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 1402(203) | CSJ: | 0912-00-477 |
Description: | REGIONAL VANPOOL PROGRAM (FY 2014) | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 3 |
Limits To: | . | Estimate: | $2,000,000 |
Length: | 0.0 Miles | Actual: | $2,000,000 |
Back... |
Totals for 0912-00-477 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,000,000 | ||
Actual: | $2,000,000 | ||
CCSJ: 0912-00-486 | |||
District: | Houston | Let Date: | AUG 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1402(206)MM | CSJ: | 0912-00-486 |
Description: | REGIONAL FREEWAY INCIDENT MANAGEMENT (YEAR 1) | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 3 |
Limits To: | . | Estimate: | $6,250,000 |
Length: | 0.0 Miles | Actual: | $6,251,000 |
Back... |
Totals for 0912-00-486 | ||
Length: | 0.0 Miles | ||
Estimate: | $6,250,000 | ||
Actual: | $6,251,000 | ||
CCSJ: 0912-00-489 | |||
District: | Houston | Let Date: | JUN 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2014(744) | CSJ: | 0912-00-489 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS WITHIN DISTRICT | Fund Cat: | 10 |
Limits To: | . | Estimate: | $1,063,648 |
Length: | 0.0 Miles | Actual: | $887,551 |
Back... |
Totals for 0912-00-489 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,063,648 | ||
Actual: | $887,551 | ||
CCSJ: 0912-00-491 | |||
District: | Houston | Let Date: | MAR 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2014(671)MM | CSJ: | 0912-00-491 |
Description: | LIVABLE CENTERS PLANNING STUDIES | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 3 |
Limits To: | . | Estimate: | $1,500,000 |
Length: | 0.0 Miles | Actual: | $1,501,000 |
Back... |
Totals for 0912-00-491 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,500,000 | ||
Actual: | $1,501,000 | ||
CCSJ: 0912-00-498 | |||
District: | Houston | Let Date: | NOV 2013 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2014(453) | CSJ: | 0912-00-498 |
Description: | COMMUTE SOLUTIONS STAFF AND OUTREACH (C.S. FUNDING INCLUDING | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 5 |
Limits To: | . | Estimate: | $1,380,000 |
Length: | 0.0 Miles | Actual: | $1,380,000 |
Back... |
Totals for 0912-00-498 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,380,000 | ||
Actual: | $1,380,000 | ||
CCSJ: 0912-00-505 | |||
District: | Houston | Let Date: | MAY 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2014(998) | CSJ: | 0912-00-505 |
Description: | DEVELOPING TRANSIT MARKET FLEET EXPANSION PROGRAM (YEAR 1) | Handling Code: |
TR |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 5 |
Limits To: | . | Estimate: | $3,000,000 |
Length: | 0.0 Miles | Actual: | $3,000,000 |
Back... |
Totals for 0912-00-505 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,000,000 | ||
Actual: | $3,000,000 | ||
CCSJ: 0912-70-068 | |||
District: | Houston | Let Date: | JUL 2014 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2014(745)SRS | CSJ: | 0912-70-068 |
Description: | WHITE OAK BAYOU SAFE ROUTE TO SCHOOL TRIAL, WEST HARRIS | Handling Code: |
|
Limits From: | AT BANG ELEMENTARY SCHOOL | Fund Cat: | 3 |
Limits To: | . | Estimate: | $370,112 |
Length: | 1.5 Miles | Actual: | $499,114 |
Back... |
Totals for 0912-70-068 | ||
Length: | 1.5 Miles | ||
Estimate: | $370,112 | ||
Actual: | $499,114 | ||
CCSJ: 0912-70-099 | |||
District: | Houston | Let Date: | MAY 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | NH 2014(640) | CSJ: | 0912-70-099 |
Description: | CONSTRUCT CURB RAMPS ON IH 45, SH 249, SS 261, FM 525 AND | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN HARRIS COUNTY | Fund Cat: | 10 |
Limits To: | . | Estimate: | $2,565,223 |
Length: | 0.0 Miles | Actual: | $2,767,523 |
Back... |
Totals for 0912-70-099 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,565,223 | ||
Actual: | $2,767,523 | ||
CCSJ: 0912-71-046 | |||
District: | Houston | Let Date: | AUG 2014 |
Highway: | CS | Let Status: | Actual |
Project ID: | C 912-71-46 | CSJ: | 0912-71-046 |
Description: | ITS FOR HIGH DEMAND ARTERIAL STREETS (RCTSS) HARRIS COUNTY | Handling Code: |
|
Limits From: | VARIOUS LOCATION IN HARRIS COUNTY | Fund Cat: | 3 |
Limits To: | PRECINCT 1 | Estimate: | $3,659,965 |
Length: | 0.0 Miles | Actual: | $4,241,560 |
Bid Tabulations Back... |
Totals for 0912-71-046 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,659,965 | ||
Actual: | $4,241,560 | ||
CCSJ: 0912-71-459 | |||
District: | Houston | Let Date: | MAY 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 95(105)TE | CSJ: | 0912-71-459 |
Description: | RECONSTRUCT STREET | Handling Code: |
LC |
Limits From: | IN FREEDMANS TOWN | Fund Cat: | 3 |
Limits To: | IN HOUSTON | Estimate: | $662,000 |
Length: | 1.5 Miles | Actual: | $4,851,470 |
Back... |
Totals for 0912-71-459 | ||
Length: | 1.5 Miles | ||
Estimate: | $662,000 | ||
Actual: | $4,851,470 | ||
CCSJ: 0912-71-797 | |||
District: | Houston | Let Date: | FEB 2014 |
Highway: | CR | Let Status: | Actual |
Project ID: | STP 2002(149)TE | CSJ: | 0912-71-797 |
Description: | GREENS BAYOU TRAIL SYSTEM IN GREATER GREENSPOINT MANAGEMENT | Handling Code: |
|
Limits From: | KNOBCREST DRIVE TO GREENS ROAD | Fund Cat: | 3 |
Limits To: | AND IMPERIAL VALLEY TO BRADFIELD RD | Estimate: | $1,387,233 |
Length: | 2.2 Miles | Actual: | $1,424,413 |
Back... |
Totals for 0912-71-797 | ||
Length: | 2.2 Miles | ||
Estimate: | $1,387,233 | ||
Actual: | $1,424,413 | ||
CCSJ: 0912-71-894 | |||
District: | Houston | Let Date: | JUL 2014 |
Highway: | CR | Let Status: | Actual |
Project ID: | C 912-71-894 | CSJ: | 0912-71-894 |
Description: | CONSTRUCT 4 - LANE BOULEVARD | Handling Code: |
|
Limits From: | BEAMER RD; W OF TALL SHIPS LN | Fund Cat: | 3 |
Limits To: | WEST BAY AREA BOULEVARD | Estimate: | $10,302,599 |
Length: | 1.3 Miles | Actual: | $10,341,416 |
Back... |
Totals for 0912-71-894 | ||
Length: | 1.3 Miles | ||
Estimate: | $10,302,599 | ||
Actual: | $10,341,416 | ||
CCSJ: 0912-72-063 | |||
District: | Houston | Let Date: | AUG 2014 |
Highway: | CS | Let Status: | Actual |
Project ID: | HP 2010(834) | CSJ: | 0912-72-063 |
Description: | CONSTRUCT 4 - LANE DIVIDED THOROUGHFARE | Handling Code: |
|
Limits From: | PRESTON ROAD - FROM BW 8 | Fund Cat: | 3 |
Limits To: | GENOA RED BLUFF ROAD | Estimate: | $1,261,257 |
Length: | 0.2 Miles | Actual: | $1,156,420 |
Bid Tabulations Back... |
Totals for 0912-72-063 | ||
Length: | 0.2 Miles | ||
Estimate: | $1,261,257 | ||
Actual: | $1,156,420 | ||
CCSJ: 0912-72-184 | |||
District: | Houston | Let Date: | MAY 2014 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 1102(104) | CSJ: | 0912-72-184 |
Description: | CONSTRUCT HIKE AND BIKE TRAIL, BENCHES, LIGHTING AND BRIDGES | Handling Code: |
|
Limits From: | CYPRESS CREEK;FROM TIMBER LANE PARK | Fund Cat: | 3 |
Limits To: | NORTH WERRINGTON WAY | Estimate: | $3,377,897 |
Length: | 2.6 Miles | Actual: | $3,942,249 |
Back... |
Totals for 0912-72-184 | ||
Length: | 2.6 Miles | ||
Estimate: | $3,377,897 | ||
Actual: | $3,942,249 | ||
CCSJ: 0912-72-190 | |||
District: | Houston | Let Date: | AUG 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 912-72-190 | CSJ: | 0912-72-190 |
Description: | ITS FOR HIGH DEMAND ARTERIAL STREETS (RCTSS) HARRIS COUNTY | Handling Code: |
|
Limits From: | VARIOUS LOCATIONS IN HARRIS COUNTY | Fund Cat: | 3 |
Limits To: | PRECINCT 2 | Estimate: | $1,822,386 |
Length: | 0.0 Miles | Actual: | $1,906,720 |
Bid Tabulations Back... |
Totals for 0912-72-190 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,822,386 | ||
Actual: | $1,906,720 | ||
CCSJ: 0912-72-308 | |||
District: | Houston | Let Date: | AUG 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2014(929) | CSJ: | 0912-72-308 |
Description: | TRAFFIC SIGNAL CONTROL SOFTWARE (CENTRAL ADMIN AND FIELD | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS WITHIN THE CITY | Fund Cat: | 3 |
Limits To: | OF HOUSTON | Estimate: | $3,000,000 |
Length: | 0.0 Miles | Actual: | $3,001,000 |
Back... |
Totals for 0912-72-308 | ||
Length: | 0.0 Miles | ||
Estimate: | $3,000,000 | ||
Actual: | $3,001,000 | ||
CCSJ: 0912-72-316 | |||
District: | Houston | Let Date: | APR 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2014(609) | CSJ: | 0912-72-316 |
Description: | PE FOR INTERSECTION IMPROVEMENTS AND NEW SIDEWALKS | Handling Code: |
TR |
Limits From: | IN GREATER EAST END MANAGEMENT DIST | Fund Cat: | 3 |
Limits To: | . | Estimate: | $514,875 |
Length: | 0.0 Miles | Actual: | $514,875 |
Back... |
Totals for 0912-72-316 | ||
Length: | 0.0 Miles | ||
Estimate: | $514,875 | ||
Actual: | $514,875 | ||
CCSJ: 0912-72-317 | |||
District: | Houston | Let Date: | APR 2014 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2014(547) | CSJ: | 0912-72-317 |
Description: | PED / BIKE IMPROVEMENTS INCLUDING CONNECTIONS BTWN EXISTING | Handling Code: |
TR |
Limits From: | IN GREATER EAST END MANAGEMENT DIST | Fund Cat: | 3 |
Limits To: | . | Estimate: | $390,375 |
Length: | 0.0 Miles | Actual: | $390,375 |
Back... |
Totals for 0912-72-317 | ||
Length: | 0.0 Miles | ||
Estimate: | $390,375 | ||
Actual: | $390,375 | ||
CCSJ: 0912-72-323 | |||
District: | Houston | Let Date: | MAY 2014 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1402(005)MM | CSJ: | 0912-72-323 |
Description: | DESIGN AND RECONSTRUCT ROADWAY WITH TRANSITWAY (YEAR 1) | Handling Code: |
TR |
Limits From: | POST OAK BLVD; IH 610 | Fund Cat: | 3 |
Limits To: | RICHMOND AVE | Estimate: | $7,000,000 |
Length: | 0.0 Miles | Actual: | $7,000,000 |
Back... |
Totals for 0912-72-323 | ||
Length: | 0.0 Miles | ||
Estimate: | $7,000,000 | ||
Actual: | $7,000,000 | ||
CCSJ: 0912-72-326 | |||
District: | Houston | Let Date: | MAY 2014 |
Highway: | CS | Let Status: | Actual |
Project ID: | CM 2014(999) | CSJ: | 0912-72-326 |
Description: | DESIGN AND CONSTRUCT MULTIMODAL TRANSIT CENTER / PARK & RIDE | Handling Code: |
TR |
Limits From: | UPTOWN MULTIMODAL TRANSIT CENTER | Fund Cat: | 5 |
Limits To: | POST OAK BLVD AT WESTPARK DR | Estimate: | $1,875,000 |
Length: | 0.0 Miles | Actual: | $1,875,000 |
Back... |
Totals for 0912-72-326 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,875,000 | ||
Actual: | $1,875,000 | ||
CCSJ: 0976-01-019 | |||
District: | Houston | Let Date: | NOV 2013 |
Highway: | FM 865 | Let Status: | Actual |
Project ID: | C 976-1-19 | CSJ: | 0976-01-019 |
Description: | WIDEN FROM 2 TO 4 LANES WITH CURB AND GUTTER | Handling Code: |
|
Limits From: | ALMEDA-GENOA | Fund Cat: | 3 |
Limits To: | BW 8 | Estimate: | $14,160,757 |
Length: | 1.3 Miles | Actual: | $13,285,921 |
Back... |
Totals for 0976-01-019 | ||
Length: | 1.3 Miles | ||
Estimate: | $14,160,757 | ||
Actual: | $13,285,921 | ||
CCSJ: 1685-03-092 | |||
District: | Houston | Let Date: | APR 2014 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | STP 2014(585)HES | CSJ: | 1685-03-092 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | AT LEE ROAD | Fund Cat: | 8 |
Limits To: | . | Estimate: | $398,255 |
Length: | 0.2 Miles | Actual: | $297,454 |
District: | Houston | Let Date: | APR 2014 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | STP 2014(586)HES | CSJ: | 1685-03-093 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | AT TOWNSEN BLVD | Fund Cat: | 8 |
Limits To: | . | Estimate: | $254,028 |
Length: | 0.2 Miles | Actual: | $215,285 |
District: | Houston | Let Date: | APR 2014 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | STP 2014(587)HES | CSJ: | 1685-03-094 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: |
|
Limits From: | AT ATASCOCITA ROAD | Fund Cat: | 8 |
Limits To: | . | Estimate: | $232,374 |
Length: | 0.2 Miles | Actual: | $219,495 |
Back... |
Totals for 1685-03-092 | ||
Length: | 0.6 Miles | ||
Estimate: | $884,657 | ||
Actual: | $732,234 | ||
CCSJ: 1685-05-104 | |||
District: | Houston | Let Date: | FEB 2014 |
Highway: | FM 1960 | Let Status: | Actual |
Project ID: | NH 2014(300) | CSJ: | 1685-01-100 |
Description: | IMPLEMENTATION OF ACCESS MANAGEMENT | Handling Code: |
|
Limits From: | US 290 | Fund Cat: | 1 |
Limits To: | SH 249 | Estimate: | $1,037,375 |
Length: | 3.4 Miles | Actual: | $1,198,241 |
District: | Houston | Let Date: | FEB 2014 |
Highway: | SH 6 | Let Status: | Actual |
Project ID: | NH 2014(300) | CSJ: | 1685-05-104 |
Description: | IMPLEMENTATION OF ACCESS MANAGEMENT | Handling Code: |
|
Limits From: | IH 10 W. | Fund Cat: | 1 |
Limits To: | US 290 | Estimate: | $2,547,155 |
Length: | 8.8 Miles | Actual: | $2,655,604 |
Back... |
Totals for 1685-05-104 | ||
Length: | 12.2 Miles | ||
Estimate: | $3,584,530 | ||
Actual: | $3,853,845 | ||
CCSJ: 3187-01-005 | |||
District: | Houston | Let Date: | JUL 2014 |
Highway: | SH 99 | Let Status: | Actual |
Project ID: | C 3187-1-5 | CSJ: | 3187-01-005 |
Description: | CONSTRUCT TWO 2 - LN FRONTAGE ROADS | Handling Code: |
|
Limits From: | BS 146 EAST (SEGMENT 1-2) | Fund Cat: | 3 |
Limits To: | CHAMBERS COUNTY LINE | Estimate: | $11,179,215 |
Length: | 1.0 Miles | Actual: | $12,835,842 |
District: | Beaumont | Let Date: | JUL 2014 |
Highway: | SH 99 | Let Status: | Actual |
Project ID: | C 3187-2-6 | CSJ: | 3187-02-006 |
Description: | CONSTRUCT TWO 2 - LN FRONTAGE ROADS | Handling Code: |
|
Limits From: | HARRIS C/L | Fund Cat: | 3 |
Limits To: | FM 1405 (SEGMENT I-2) | Estimate: | $22,657,627 |
Length: | 2.1 Miles | Actual: | $22,325,545 |
Back... |
Totals for 3187-01-005 | ||
Length: | 3.1 Miles | ||
Estimate: | $33,836,842 | ||
Actual: | $35,161,387 | ||
CCSJ: 3256-01-096 | |||
District: | Houston | Let Date: | JUL 2014 |
Highway: | BW 8 | Let Status: | Actual |
Project ID: | NH 2014(955) | CSJ: | 3256-01-096 |
Description: | CHANNEL IMPROVEMENTS | Handling Code: |
|
Limits From: | AT WHITE OAK BAYOU | Fund Cat: | 1 |
Limits To: | . | Estimate: | $251,468 |
Length: | 0.0 Miles | Actual: | $275,178 |
Back... |
Totals for 3256-01-096 | ||
Length: | 0.0 Miles | ||
Estimate: | $251,468 | ||
Actual: | $275,178 | ||
CCSJ: 3256-04-061 | |||
District: | Houston | Let Date: | AUG 2014 |
Highway: | BW 8 | Let Status: | Actual |
Project ID: | NH 1402(198) | CSJ: | 3256-04-061 |
Description: | EXTEND BW 8 WITH GRADE SEPARATIONS & TWO 2 - LANE FRONTAGE | Handling Code: |
|
Limits From: | AT MYKAWA AND SFRR | Fund Cat: | 1 |
Limits To: | . | Estimate: | $8,294,171 |
Length: | 1.0 Miles | Actual: | $10,329,185 |
Bid Tabulations Back... |
Totals for 3256-04-061 | ||
Length: | 1.0 Miles | ||
Estimate: | $8,294,171 | ||
Actual: | $10,329,185 |
|