Letting Schedule for Fort Worth District (FY 2014)

Last Update: Wednesday, April 16, 2014
Fort Worth District (FY 2014)
Erath | Hood | Jack | Johnson | Palo Pinto | Parker | Tarrant | Wise

Erath County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0079-05-052 US 67 Actual NOV 2013 $87,935 1 PLACE GABIONS ALONG INTERIOR BENT AND MATTRESSES BACK TO
0257-06-026 SH 6 Actual APR 2014 $1,433,850 1 FLEX BASE REPAIR, MILL AND HMAC OVERLAY
0902-49-063 CR Actual FEB 2014 $457,948 6 REPLACE BRIDGE AND APPROACHES

Hood County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0902-51-026 CR Tentative AUG 2014 $274,726 8 2014 FSP RR GRADE CROSSING PROGRAM
1598-01-020 FM 167 Approved JUN 2014 $1,994,974 1 WIDEN EXISTING ROADWAY TO '2' LANES AND SHOULDERS

Jack County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0134-04-036 US 380 Approved AUG 2014 $3,767,753 1 MILL, BASE REPAIR, HMAC OVERLAY
0902-40-022 CR Actual DEC 2013 $364,644 6 REPLACE BRIDGE AND APPROACHES
0902-40-025 CR Approved AUG 2014 $466,002 6 REPLACE BRIDGE AND APPROACHES
1309-01-029 FM 1156 Approved JUN 2014 $909,695 6 REPLACE THE BRIDGE AND APPROACHES
1333-03-018 FM 1191 Approved MAY 2014 $4,572,504 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH, PROPOSED 2 - 12'LANES

Johnson County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0259-04-039 US 67 Actual JAN 2014 $3,149,399 1 HOTMIX OVERLAY
0259-05-070 US 67 Actual SEP 2013 $2,820,911 1 RESURFACE ROADWAY
0259-05-071 US 67 Actual OCT 2013 $131,000 1 WORK CONSISTING OF INSTALLATION OF A FULL TRAFFIC - ACTUATED
0259-06-001 US 67 Actual SEP 2013 $28,488,426 1 WIDEN TO 4 LANE DIVIDED
0902-50-079 CS Approved AUG 2014 $1,546,000 3 CONSTRUCT PARK AND RIDE FACILITY
1181-02-035 FM 917 Actual FEB 2014 $2,080,434 1 HOTMIX OVERLAY
1599-02-014 FM 916 Approved AUG 2014 $5,259,283 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
1600-02-016 FM 1807 Tentative AUG 2014 $48,128 10 2014 RAILROAD XING REPLANKING PROGRAM
2213-01-013 FM 2331 Actual SEP 2013 $4,289,115 8 GRADING, BASE AND PAVEMENT
2464-01-014 FM 2415 Approved MAY 2014 $2,926,541 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH FOR A TOTAL OF 28 FT
3010-02-013 FM 2738 Approved JUN 2014 $1,827,934 1 SEAL COAT AND ROADWAY

Palo Pinto County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0250-02-039 US 281 Approved AUG 2014 $9,750,002 6 REHAB EXISTING FAC FOR SB TRAFFIC AND CONSTRUCT NEW NB
0250-02-044 US 281 Actual NOV 2013 $450,283 1 REMOVAL OF ASBESTOS FROM BRIDGE
0362-04-040 SH 16 Approved JUN 2014 $4,263,984 1 BASE REPAIR AND SEAL COAT
0902-39-032 VA Approved JUN 2014 $213,039 3 LANDSCAPE ENHANCEMENT AT TWO LOCATIONS
1178-01-026 FM 919 Actual APR 2014 $391,234 6 REPLACE BRIDGE
1178-02-008 FM 919 Tentative AUG 2014 $30,080 10 2014 RAILROAD XING REPLANKING PROGRAM

Parker County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0008-03-103 IH 20 Approved AUG 2014 $5,029,440 3 WIDEN BRIDGE OVER IH 20 TO ACCOMMODATE 4 THRU LANES AND
0313-02-055 FM 51 Approved AUG 2014 $1,049,000 1 MILL AND OVERLAY
0314-01-076 IH 20 Actual MAR 2014 $2,085,871 1 RESURFACE ROADWAY
0314-07-037 IH 20 Actual OCT 2013 $9,453,090 1 RECONSTRUCT AND EXTEND EBFR TO FM 1884 AND REVERSE ENTRANCE
1468-01-024 FM 1189 Approved AUG 2014 $5,103,000 1 WIDEN TO 2 - 11 FT LANES W / 3 FT SHOULDERS AND OVERLAY
1605-01-014 FM 1886 Actual MAR 2014 $4,834,823 1 WIDEN ROADWAY TO 2 - 12' LANES WITH 4' SHOULDERS; CEMENT TREAT
2291-01-013 FM 1187 Approved JUN 2014 $6,192,762 1 PAVEMENT REHAB, ADD SHOULDERS AND HMAC OVERLAY WITH PAVEMENT

Tarrant County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0014-16-179 IH 35W Actual OCT 2013 129,997,000 12 RECONSTRUCT FREEWAY AND ADD MANAGED TOLL LANES
0080-07-094 US 377 Approved MAY 2014 $19,417,807 3 WIDEN 5 LANE DITCH SECTION TO 6 LANE DIVIDED WITH CURB AND
0081-01-046 US 377 Actual APR 2014 $4,198,919 3 INTERSECTION IMPROVEMENTS TO REDESIGN INTERCHANGE TO
0171-05-081 SH 199 Approved MAY 2014 $69,090,278 3 CONSTRUCT BRIDGE AT NEW LOCATION OF PROPOSED BYPASS CHANNEL
0172-02-072 BU 287P Approved AUG 2014 $921,964 3 CONSTRUCT BIKE / PEDESTRIAN PATH ON KENNEDALE PARKWAY
0172-06-090 US 287 Actual MAR 2014 $1,971,511 1 HMAC OVERLAY; MAIN LANES, SHOULDERS AND RAMPS
0364-01-140 SH 121 Approved AUG 2014 $277,000 3 CONSTRUCT 6' SIDEWALK ALONG WEST SHOULDER OF WILLIAM D. TATE
0364-01-141 SH 121 Approved MAY 2014 $250,000 3 LANDSCAPE ENHANCEMENT
0747-04-065 FM 157 Approved AUG 2014 $8,844,005 1 CONCRETE PAVEMENT REPAIRS, TRAFFIC SIGNAL, REPAIR AND
0902-00-134 VA Actual APR 2014 $476,055 1 NO TRUCKS LEFT LANE SIGN STRUCTURES TO IMPLEMENT
0902-00-136 VA Actual JAN 2014 $1,275,000 1 TRAFFIC SIGNAL INSTALLATION - NON - SITE SPECIFIC
0902-00-139 VA Actual APR 2014 $317,349 3 LANDSCAPE ENHANCEMENT AT FIVE LOCATIONS
0902-00-141 VA Approved JUL 2014 $1,111,559 3 CONSTRUCT BICYCLE / PEDESTRIAN PATH
0902-48-582 CS Approved MAY 2014 $427,893 3 WESTRIDGE VILLAGE PEDESTRIAN DISTRICT INCLUDING CAMP BOWIE,
0902-48-742 CS Approved JUL 2014 $1,988,000 6 REPLACE BRIDGE
0902-48-756 VA Approved MAY 2014 $1,654,750 3 ADDITION OF QUAD GATES AT 3 CROSSINGS
0902-48-775 CS Actual DEC 2013 $10,742,245 3 RECONSTRUCT BRIDGE TO ACCOMMODATE THE UPGRADE OF DIRKS / ALTA
0902-48-777 CS Actual OCT 2013 $384,637 3 2009 SRTS INFRASTRUCTURE PROJECT;CROSSWALK IMPROVEMENTS, BIKE
0902-48-791 VA Approved MAY 2014 $5,520,125 3 CONSTRUCT FIVE PEDESTRIAN AND BICYCLE CONNECTIONS TO TRINITY
0902-48-802 VA Approved MAY 2014 $589,000 7 TRAVEL DEMAND MANAGEMENT - COMPUTERIZED GIS FOR SUPPLY AND
0902-48-831 VA Actual OCT 2013 $31,992,540 3 DEFERRAL REINSTATEMENT
0902-48-838 CS Actual APR 2014 $10,457,967 3 CONSTRUCT NEW ROADWAY AND BRIDGE ACROSS IH 20 - - - EXTENSION OF
0902-48-844 VA Actual OCT 2013 $1,813,397 10 CONSTRUCT CURB RAMPS ON US 377, SH 26, SH 10, FM 1938 AND FM
0902-48-868 VA Tentative AUG 2014 $482,270 3 INSTALL ADDITIONAL BICYCLE STATIONS
0902-48-870 VA Tentative AUG 2014 $3,687,030 1 DFW CONNECTOR COMPREHENSIVE MAINTENANCE AGREEMENT FY14
0902-48-877 CS Tentative AUG 2014 $129,444 8 RAILROAD GRADE CROSSING PROGRAM FY - 13
0902-48-878 CS Tentative AUG 2014 $129,444 8 2014 FSP RR GRADE CROSSING PROGRAM
0902-48-879 VA Actual DEC 2013 $2,000,000 7 VANPOOL PROGRAM FY 15; OPER VANPOOL SUBSIDY INITIATIVE FOR
0902-48-880 VA Actual DEC 2013 $2,000,000 7 VANPOOL PROGRAM FY 14; OPER VANPOOL SUBSIDY INITIATIVE FOR
0902-48-881 VA Actual DEC 2013 $6,467,375 5 PRELIMINARY ENGINEERING AND NEPA CLEARANCE FOR TEXRAIL
0902-48-882 VA Actual DEC 2013 $2,000,438 5 FOR CONSTRUCTION OF STRUCTURES,
0902-48-885 VA Tentative AUG 2014 $14,000,000 11 CONSTRUCT NEW RAIL CONNECTION; DFW INTL AIRPORT INTERMODAL
0902-48-890 VA Actual MAR 2014 $2,041,206 3 MOB ASST, SUST DEVELOP, ITS & OTHER IMPLEM. INIT / DEV AND
0902-48-895 VA Approved AUG 2014 $986,131 1 INSTALL CTB IN FRONT OF BRIDGE COLUMNS ON IH 20, IH 30,
1068-02-129 IH 30 Approved JUL 2014 $350,000 1 REPAIR TO UNDERPASS
1068-02-141 IH 30 Actual FEB 2014 $5,418,485 1 REPAIR FAILURES, HMAC OVERLAY AND PAVEMENT MARKINGS
1603-03-033 FM 1709 Actual JAN 2014 $879,232 3 INTERSECTION IMPROVEMENT; WIDEN PAVEMENT FOR TURN LANE
1978-01-050 FM 1938 Approved AUG 2014 $17,830,890 3 RECONSTRUCT AND WIDEN 2 LANE COUNTY ROAD TO A 4 LANE
2855-01-021 RM 2871 Actual JAN 2014 $2,072,283 1 REPAIR FAILURE, OVERLAY, AND BACKFILL PAVEMENT EDGES

Wise County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0312-04-032 FM 730 Actual OCT 2013 $6,971,232 1 SEAL MAIN LANES AND SHOULDERS
0902-20-100 CR Approved AUG 2014 $1,290,000 6 REPLACE BRIDGE AND APPROACHES
0902-20-108 CR Approved AUG 2014 $535,000 6 REPLACE BRIDGE AND APPROACHES
1310-03-025 FM 2264 Approved AUG 2014 $3,685,309 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH, PROPOSED 2 - 12'LANES


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract