Letting Schedule for January, 2014 (FY 2014)
January, 2014 (FY 2014) | (see Links) |
SEP 2013 | OCT 2013 | NOV 2013 | DEC 2013 | JAN 2014 | FEB 2014 | MAR 2014 | APR 2014 | MAY 2014 | JUN 2014 | JUL 2014 | AUG 2014 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0073-06-046 | Atascosa/ San Antonio |
IH 37 | Actual | $3,571,178 | 1 | MILL, BASE REPAIR, SEAL COAT, OVERLAY, PAVEMENT MARKINGS |
0133-04-041 | Baylor/ Wichita Falls |
US 82 | Actual | $97,451 | 8 | CENTERLINE TEXTURING |
2452-03-108 | Bexar/ San Antonio |
LP 1604 | Actual | $23,589,306 | 3 | EXPAND 2 LANES TO 4 LANE DIVIDED |
0179-03-029 | Brazoria/ Houston |
SH 35 | Actual | $2,733,017 | 1 | BASE REPAIR, SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS |
0912-31-276 | Brazoria/ Houston |
VA | Actual | $84,848 | 3 | LANDSCAPE DEVELOPMENT |
0457-01-056 | Burleson/ Bryan |
FM 50 | Actual | $1,532,334 | 1 | REHABILITATE EXISTING ROAD CONSISTING OF GRADING, STRUCTURES |
0331-02-050 | Cameron/ Pharr |
SH 100 | Actual | $740,429 | 8 | CENTERLINE TEXTURING |
0197-02-111 | Dallas/ Dallas |
US 175 | Actual | $207,035 | 1 | REPAIR DAMAGED 33" STORM DRAIN RCP |
0918-00-234 | Dallas/ Dallas |
VA | Actual | $714,066 | 3 | WRONG WAY DRIVING PROGRAM; PILOT STUDY & IMPLEMENTATION TO |
0918-47-078 | Dallas/ Dallas |
VA | Actual | $15,075,000 | 5 | LIGHT RAIL BED, TRACK, VEHICLES, OVERHEADS AND FACILITIES |
2964-01-022 | Dallas/ Dallas |
SH 161 | Actual | $3,796,615 | 3 | INTERIM OPERATIONAL BOTTLENECK IMPROVEMENT |
0081-06-029 | Denton/ Dallas |
US 377 | Actual | $7,501,347 | 3 | CONSTRUCT CONTINUOUS 2 - WAY LEFT TURN LANE |
0923-09-052 | Eastland/ Brownwood |
CR | Actual | $713,911 | 6 | REPLACE BRIDGE AND APPROACHES |
0374-02-099 | El Paso/ El Paso |
US 62 | Actual | $1,920,037 | 1 | OVERLAY |
0924-00-079 | El Paso/ El Paso |
VA | Actual | $1,897,340 | 1 | FY 2014 STRIPING PROJECT |
0924-06-433 | El Paso/ El Paso |
VA | Actual | $44,566 | 7 | TEENS IN THE DRIVER SEAT PROGRAM |
0048-03-084 | Ellis/ Dallas |
US 77 | Actual | $569,367 | 8 | PROFILE PAVEMENT MARKINGS |
0048-08-048 | Ellis/ Dallas |
IH 35E | Actual | $1,574,119 | 1 | REHABILITATE FRONTAGE ROAD PAVEMENT |
0092-11-003 | Ellis/ Dallas |
LP 561 | Actual | $681,040 | 1 | MILL, REPAIR AND RESURFACE |
0027-12-105 | Fort Bend/ Houston |
US 59 | Actual | 135,868,539 | ROW | WIDEN TO 6 - LANE RURAL FREEWAY, FRONTAGE ROADS, ITS AND TSM |
0912-34-130 | Fort Bend/ Houston |
CS | Actual | $4,192,145 | 3 | RECONSTRT 4 - LN BLVD & INT APPROACHES W / TN - LNS & ITS |
0912-34-169 | Fort Bend/ Houston |
CR | Actual | $978,106 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12080AA0955001) |
1415-02-045 | Fort Bend/ Houston |
FM 1464 | Actual | $495,925 | 1 | CONSTRUCT 1 DETENTION POND |
0915-18-028 | Frio/ San Antonio |
CR | Actual | $235,337 | 6 | REPLACE BRIDGE AND APPROACHES |
0389-06-102 | Galveston/ Houston |
SH 146 | Actual | $593,503 | 1 | TEXTURIZE SHOULDERS (PROFILE PAVEMENT MARKERS) |
0500-04-122 | Galveston/ Houston |
IH 45 | Actual | $2,055,734 | 3 | SB RAMP REVERSALS |
0912-73-189 | Galveston/ Houston |
VA | Actual | $629,425 | 10 | REHABILITATE BILGE WATER TREATMENT SYSTEMS AND CONTAINMENT |
2158-01-013 | Gregg/ Tyler |
FM 2275 | Actual | $12,884,789 | 3 | CONSTRUCT 4 LANE DIVIDED ROADWAY ON NEW LOCATION (PH 2 OF 3) |
0016-02-141 | Hays/ Austin |
IH 35 | Actual | $1,039,678 | 1 | OVERLAY SOUTHBOUND MAINLANES |
1776-01-031 | Hays/ Austin |
RM 967 | Actual | $208,169 | 1 | REPAIR, LEVEL - UP, MILL, SEAL, INLAY & THIN OVERLAY MIXTURE |
2299-01-007 | Houston/ Lufkin |
FM 2423 | Actual | $1,440,516 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0913-18-023 | Jackson/ Yoakum |
CR | Actual | $696,018 | 6 | REPLACE BRIDGE AND APPROACHES |
0259-04-039 | Johnson/ Fort Worth |
US 67 | Actual | $3,149,399 | 1 | HOTMIX OVERLAY |
0237-02-016 | La Salle/ Laredo |
SH 44 | Actual | $3,878,123 | 1 | RESTORATION OF EXISTING HIGHWAY |
0435-01-063 | Lamar/ Paris |
FM 38 | Actual | $1,267,350 | 1 | REHAB EXIST ROAD |
0242-02-023 | Liberty/ Beaumont |
SH 61 | Actual | $2,537,337 | 1 | RESTORE EXISTING ROADWAY |
0919-22-031 | Marion/ Atlanta |
CR | Actual | $231,033 | 6 | REPLACE BRIDGE AND APPROACHES |
0024-05-095 | Medina/ San Antonio |
US 90 | Actual | $911,817 | 1 | OVERLAY & PAVEMENT MARKINGS |
0092-06-100 | Navarro/ Dallas |
IH 45 | Actual | $227,139 | 1 | INSTALL GUIDE SIGNS |
0226-03-054 | Oldham/ Amarillo |
US 385 | Actual | $5,497,007 | 1 | RESTORATION OF EXISTING ROADWAY |
0441-05-045 | Reeves/ Odessa |
IH 10 | Actual | $6,430,491 | 1 | FACILITY UPGRADES TO MEET FREEWAY STANDARDS |
0911-30-021 | San Augustine/ Lufkin |
CR | Actual | $510,181 | 6 | REPLACE BRIDGE AND APPROACHES |
0059-04-044 | Shelby/ Lufkin |
SH 7 | Actual | $2,145,521 | 1 | RESURFACE WITH PFC OVERLAY |
0191-01-082 | Smith/ Tyler |
US 69 | Actual | $2,021,973 | 3 | IMPROVE NBL VERTICAL & HORIZONTAL ALIGNMENT |
0902-00-136 | Tarrant/ Fort Worth |
VA | Actual | $1,275,000 | 1 | TRAFFIC SIGNAL INSTALLATION - NON - SITE SPECIFIC |
1603-03-033 | Tarrant/ Fort Worth |
FM 1709 | Actual | $879,232 | 3 | INTERSECTION IMPROVEMENT; WIDEN PAVEMENT FOR TURN LANE |
2855-01-021 | Tarrant/ Fort Worth |
RM 2871 | Actual | $2,072,283 | 1 | REPAIR FAILURE, OVERLAY, AND BACKFILL PAVEMENT EDGES |
0221-05-083 | Titus/ Atlanta |
US 271 | Actual | $1,958,985 | 1 | RESURFACE 2 - LANE RURAL HIGHWAY |
0186-06-078 | Washington/ Bryan |
US 290 | Actual | $1,024,094 | 1 | OVERLAY CONSISTING OF MILL, OCST, PFC OVERLAY & PAVEMENT |
0913-09-046 | Wharton/ Yoakum |
CS | Actual | $540,959 | 3 | CONSTRUCT SIDEWALKS, INSTALL CROSSWALKS |
0204-02-030 | Williamson/ Austin |
US 79 | Actual | $554,433 | 1 | MILL, UNDERSEAL & THIN OVERLAY |
|