Detail Letting Schedule for Anderson County (FY 2015)
Anderson County (FY 2015) |
CCSJ: 0205-07-075 | |||
District: | Tyler | Let Date: | APR 2015 |
Highway: | US 79 | Let Status: | Actual |
Project ID: | NH 1502(049) | CSJ: | 0205-07-075 |
Description: | PLANE, REPAIR & RESURFACE ROADWAY | Handling Code: |
|
Limits From: | SL 256 IN PALESTINE, SW | Fund Cat: | 1 |
Limits To: | 1.4 MI SW OF FM 1990(TILE FCTRY RD) | Estimate: | $2,370,211 |
Length: | 1.7 Miles | Actual: | $2,318,825 |
Back... |
Totals for 0205-07-075 | ||
---|---|---|---|
Length: | 1.7 Miles | ||
Estimate: | $2,370,211 | ||
Actual: | $2,318,825 | ||
CCSJ: 0891-02-019 | |||
District: | Tyler | Let Date: | SEP 2014 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | STP 2014(276)HESG | CSJ: | 0096-01-043 |
Description: | TEXTURIZE SHOULDERS WITH PROFILE PAVEMENT MARKERS | Handling Code: |
|
Limits From: | 0.1 MI E OF FM 1801 IN MINEOLA, E | Fund Cat: | 8 |
Limits To: | FM 3056 | Estimate: | $104,224 |
Length: | 8.7 Miles | Actual: | $65,512 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | SH 19 | Let Status: | Actual |
Project ID: | STP 2015(119)HESG | CSJ: | 0108-01-029 |
Description: | TEXTURIZE SHOULDERS BY ROLLING OR MILLING IN AND | Handling Code: |
|
Limits From: | US 80, S | Fund Cat: | 8 |
Limits To: | 0.2 MI N OF SH 64 IN CANTON | Estimate: | $69,276 |
Length: | 9.0 Miles | Actual: | $64,516 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | SH 19 | Let Status: | Actual |
Project ID: | STP 2015(129)HESG | CSJ: | 0108-02-032 |
Description: | TEXTURIZE SHOULDERS BY ROLLING OR MILLING IN AND | Handling Code: |
|
Limits From: | 0.2 MI N OF SH 64 IN CANTON, S | Fund Cat: | 8 |
Limits To: | N OF FM 1861 AT HENDERSON C/L | Estimate: | $98,718 |
Length: | 13.6 Miles | Actual: | $92,078 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | US 84 | Let Status: | Actual |
Project ID: | STP 2015(101)HESG | CSJ: | 0123-01-036 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | W OF FM 1137, E | Fund Cat: | 8 |
Limits To: | 3.2 MI W OF FM 747 (CHEROKEE C/L) | Estimate: | $81,547 |
Length: | 12.1 Miles | Actual: | $50,871 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | SH 204 | Let Status: | Actual |
Project ID: | STP 2015(102)HESG | CSJ: | 0198-07-013 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | SL 456 IN JACKSONVILLE, SW | Fund Cat: | 8 |
Limits To: | SH 110 NEAR PONTA | Estimate: | $67,259 |
Length: | 9.6 Miles | Actual: | $41,273 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | US 79 | Let Status: | Actual |
Project ID: | STP 2015(097)HESG | CSJ: | 0206-06-030 |
Description: | INSTALL MILLED CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | NE OF SH 42, SW | Fund Cat: | 8 |
Limits To: | NE OF CHEROKEE C/L | Estimate: | $17,142 |
Length: | 4.9 Miles | Actual: | $16,754 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | SH 64 | Let Status: | Actual |
Project ID: | STP 2015(139)HESG | CSJ: | 0245-01-032 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | US 80 IN WILLS POINT, SE | Fund Cat: | 8 |
Limits To: | W OF SH 19 IN CANTON | Estimate: | $73,124 |
Length: | 12.9 Miles | Actual: | $43,997 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | SH 64 | Let Status: | Actual |
Project ID: | STP 2014(282)HESG | CSJ: | 0245-02-030 |
Description: | TEXTURIZE SHOULDERS WITH PROFILE PAVEMENT MARKERS | Handling Code: |
|
Limits From: | 0.3 MI E OF SH 19 IN CANTON, SE | Fund Cat: | 8 |
Limits To: | 0.3 MI N OF FM 279 AT BEN WHEELER | Estimate: | $72,381 |
Length: | 10.2 Miles | Actual: | $45,496 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | SH 110 | Let Status: | Actual |
Project ID: | STP 2015(131)HESG | CSJ: | 0345-03-022 |
Description: | INSTALL MILLED CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | 0.2 MI S OF FM 1089 IN TROUP, S | Fund Cat: | 8 |
Limits To: | US 79 IN NEW SUMMERFIELD | Estimate: | $48,373 |
Length: | 10.8 Miles | Actual: | $47,558 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | SH 110 | Let Status: | Actual |
Project ID: | STP 2015(092)HESG | CSJ: | 0345-04-022 |
Description: | INSTALL MILLED CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | US 79 IN NEW SUMMERFIELD, S | Fund Cat: | 8 |
Limits To: | US 84 IN RUSK | Estimate: | $57,789 |
Length: | 13.1 Miles | Actual: | $56,729 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | SH 135 | Let Status: | Actual |
Project ID: | STP 2015(096)HESG | CSJ: | 0378-01-031 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | SH 42 IN SEXTON CITY, W | Fund Cat: | 8 |
Limits To: | 0.3 MI N OF FM 850 IN OVERTON | Estimate: | $21,095 |
Length: | 3.2 Miles | Actual: | $13,105 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 347 | Let Status: | Actual |
Project ID: | STP 2015(121)HESG | CSJ: | 0378-07-029 |
Description: | INSTALL MILLED CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | N OF SL 456 IN JACKSONVILLE, S | Fund Cat: | 8 |
Limits To: | N OF US 84 | Estimate: | $42,022 |
Length: | 9.1 Miles | Actual: | $40,278 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | SH 149 | Let Status: | Actual |
Project ID: | STP 2015(116)HESG | CSJ: | 0393-02-026 |
Description: | INSTALL MILLED CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | N OF FM 782, SE | Fund Cat: | 8 |
Limits To: | N OF SH 43 IN TATUM | Estimate: | $26,639 |
Length: | 5.5 Miles | Actual: | $25,638 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | SH 154 | Let Status: | Actual |
Project ID: | STP 2015(141)HESG | CSJ: | 0401-03-025 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | SH 37 IN QUITMAN, E | Fund Cat: | 8 |
Limits To: | W OF THE UPSHUR C/L | Estimate: | $108,616 |
Length: | 17.5 Miles | Actual: | $65,597 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | SH 31 | Let Status: | Actual |
Project ID: | STP 2015(103)HESG | CSJ: | 0424-02-043 |
Description: | INSTALL MILLED CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | FM 2012, E | Fund Cat: | 8 |
Limits To: | BU 259G IN KILGORE | Estimate: | $34,556 |
Length: | 5.0 Miles | Actual: | $32,609 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 349 | Let Status: | Actual |
Project ID: | STP 2015(122)HESG | CSJ: | 0424-03-025 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | W OF FM 2087, IN KILGORE, E | Fund Cat: | 8 |
Limits To: | SH 149, IN LAKEPORT | Estimate: | $39,948 |
Length: | 7.9 Miles | Actual: | $24,550 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | SH 204 | Let Status: | Actual |
Project ID: | STP 2015(112)HESG | CSJ: | 0450-01-012 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | SH 110 NEAR PONTA, SW | Fund Cat: | 8 |
Limits To: | 1.7 MI S OF FM 235, RUSK C/L | Estimate: | $42,649 |
Length: | 6.2 Miles | Actual: | $26,916 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 346 | Let Status: | Actual |
Project ID: | STP 2015(117)HESG | CSJ: | 0492-04-035 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | FM 756, E | Fund Cat: | 8 |
Limits To: | SH 110 IN WHITEHOUSE | Estimate: | $5,871 |
Length: | 2.5 Miles | Actual: | $5,615 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | SH 42 | Let Status: | Actual |
Project ID: | STP 2015(134)HESG | CSJ: | 0545-02-037 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | SH 135 IN KILGORE, S | Fund Cat: | 8 |
Limits To: | FM 850 IN NEW LONDON | Estimate: | $51,100 |
Length: | 7.8 Miles | Actual: | $31,561 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | SH 42 | Let Status: | Actual |
Project ID: | STP 2015(095)HESG | CSJ: | 0545-02-038 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | FM 850 IN NEW LONDON, S | Fund Cat: | 8 |
Limits To: | N OF SH 64 AT TURNERTOWN | Estimate: | $32,964 |
Length: | 5.6 Miles | Actual: | $20,634 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | SH 42 | Let Status: | Actual |
Project ID: | STP 2015(113)HESG | CSJ: | 0545-04-047 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | US 80 IN WHITE OAK, S | Fund Cat: | 8 |
Limits To: | IH 20 IN KILGORE | Estimate: | $27,991 |
Length: | 6.0 Miles | Actual: | $17,198 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | SH 42 | Let Status: | Actual |
Project ID: | STP 2015(105)HESG | CSJ: | 0564-01-007 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | W OF BU 259G IN KILGORE, E | Fund Cat: | 8 |
Limits To: | SH 135 | Estimate: | $2,276 |
Length: | 1.2 Miles | Actual: | $1,431 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 13 | Let Status: | Actual |
Project ID: | STP 2015(094)HESG | CSJ: | 0591-02-020 |
Description: | TEXTURIZE SHOULDERS BY ROLLING OR MILLING IN AND | Handling Code: |
|
Limits From: | SH 42, E | Fund Cat: | 8 |
Limits To: | W OF SL 571 IN HENDERSON | Estimate: | $67,979 |
Length: | 6.3 Miles | Actual: | $52,358 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | SH 323 | Let Status: | Actual |
Project ID: | STP 2015(136)HESG | CSJ: | 0592-01-015 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | SH 135 IN OVERTON, SE | Fund Cat: | 8 |
Limits To: | W OF SL 571 IN HENDERSON | Estimate: | $72,867 |
Length: | 11.5 Miles | Actual: | $45,039 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 225 | Let Status: | Actual |
Project ID: | STP 2015(114)HESG | CSJ: | 0594-03-027 |
Description: | INSTALL MILLED CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | US 79 IN HENDERSON, S | Fund Cat: | 8 |
Limits To: | FM 1798 | Estimate: | $52,354 |
Length: | 11.2 Miles | Actual: | $50,722 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 47 | Let Status: | Actual |
Project ID: | STP 2015(118)HESG | CSJ: | 0646-01-031 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | RAINS C/L, SW | Fund Cat: | 8 |
Limits To: | US 80 IN WILLS POINT | Estimate: | $67,292 |
Length: | 10.7 Miles | Actual: | $41,430 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 515 | Let Status: | Actual |
Project ID: | STP 2015(110)HESG | CSJ: | 0657-01-018 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | FM 69 (E) IN COKE, E | Fund Cat: | 8 |
Limits To: | W OF SH 11 IN WINNSBORO | Estimate: | $49,236 |
Length: | 11.1 Miles | Actual: | $29,988 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 95 | Let Status: | Actual |
Project ID: | STP 2015(104)HESG | CSJ: | 0706-02-021 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | S OF US 84, S | Fund Cat: | 8 |
Limits To: | 0.5 N OF FM 1087 (NACOGDOCHES C/L) | Estimate: | $55,441 |
Length: | 7.9 Miles | Actual: | $34,556 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 607 | Let Status: | Actual |
Project ID: | STP 2015(123)HESG | CSJ: | 0745-03-020 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | SH 31 IN BROWNSBORO, S | Fund Cat: | 8 |
Limits To: | N OF FM 317 | Estimate: | $37,663 |
Length: | 5.2 Miles | Actual: | $23,531 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 852 | Let Status: | Actual |
Project ID: | STP 2015(120)HESG | CSJ: | 0767-04-006 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | FM 515 IN WINNSBORO, SE | Fund Cat: | 8 |
Limits To: | N OF FM 2088 AT PERRYVILLE | Estimate: | $72,890 |
Length: | 10.3 Miles | Actual: | $45,430 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 346 | Let Status: | Actual |
Project ID: | STP 2015(106)HESG | CSJ: | 0889-04-013 |
Description: | INSTALL MILLED CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | FM 2493 IN FLINT, E | Fund Cat: | 8 |
Limits To: | W OF US 69 | Estimate: | $9,473 |
Length: | 1.8 Miles | Actual: | $8,992 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 346 | Let Status: | Actual |
Project ID: | STP 2015(127)HESG | CSJ: | 0889-04-076 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | W OF US 69, E | Fund Cat: | 8 |
Limits To: | FM 756 | Estimate: | $14,854 |
Length: | 3.3 Miles | Actual: | $14,468 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 323 | Let Status: | Actual |
Project ID: | STP 2015(091)HESG | CSJ: | 0891-02-019 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | US 84 IN PALESTINE, SE | Fund Cat: | 8 |
Limits To: | N OF SH 294 | Estimate: | $291,420 |
Length: | 15.9 Miles | Actual: | $218,933 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 751 | Let Status: | Actual |
Project ID: | STP 2015(128)HESG | CSJ: | 1089-01-021 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | HUNT C/L, S | Fund Cat: | 8 |
Limits To: | FM 47 IN WILLS POINT | Estimate: | $62,714 |
Length: | 9.5 Miles | Actual: | $38,008 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 782 | Let Status: | Actual |
Project ID: | STP 2015(124)HESG | CSJ: | 1116-01-022 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | US 259 IN HENDERSON, NE | Fund Cat: | 8 |
Limits To: | N OF FM 1716 | Estimate: | $62,605 |
Length: | 9.2 Miles | Actual: | $38,596 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 1255 | Let Status: | Actual |
Project ID: | STP 2015(138)HESG | CSJ: | 1322-02-015 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | FM 17 IN CANTON, NE | Fund Cat: | 8 |
Limits To: | SW OF SH 110 AT JONES | Estimate: | $83,314 |
Length: | 12.0 Miles | Actual: | $51,920 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 1504 | Let Status: | Actual |
Project ID: | STP 2015(099)HESG | CSJ: | 1323-01-009 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | US 80 IN EDGEWOOD, S | Fund Cat: | 8 |
Limits To: | N OF SH 64 IN MYRTLE SPRINGS | Estimate: | $45,200 |
Length: | 7.3 Miles | Actual: | $27,986 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 346 | Let Status: | Actual |
Project ID: | STP 2015(137)HESG | CSJ: | 1764-01-016 |
Description: | INSTALL MILLED CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | SMITH C/L, NE | Fund Cat: | 8 |
Limits To: | FM 2493 IN FLINT | Estimate: | $29,694 |
Length: | 7.1 Miles | Actual: | $28,762 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 346 | Let Status: | Actual |
Project ID: | STP 2015(111)HESG | CSJ: | 1764-02-007 |
Description: | INSTALL MILLED CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | FM 855, N | Fund Cat: | 8 |
Limits To: | SMITH C/L | Estimate: | $18,203 |
Length: | 4.1 Miles | Actual: | $17,652 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 2206 | Let Status: | Actual |
Project ID: | STP 2015(132)HESG | CSJ: | 2073-01-011 |
Description: | TEXTURIZE SHOULDERS BY ROLLING OR MILLING IN AND | Handling Code: |
|
Limits From: | SH 42,E | Fund Cat: | 8 |
Limits To: | W OF SL 281 IN LONGVIEW | Estimate: | $52,597 |
Length: | 3.7 Miles | Actual: | $33,073 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 2275 | Let Status: | Actual |
Project ID: | STP 2015(093)HESG | CSJ: | 2158-01-018 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | US 271 IN GLADEWATER, E | Fund Cat: | 8 |
Limits To: | W OF SH 300 IN LONGVIEW | Estimate: | $48,734 |
Length: | 8.2 Miles | Actual: | $30,385 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 2661 | Let Status: | Actual |
Project ID: | STP 2015(108)HESG | CSJ: | 2654-01-021 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | SH 64, S | Fund Cat: | 8 |
Limits To: | N OF SH 155 | Estimate: | $87,531 |
Length: | 13.0 Miles | Actual: | $54,424 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 2709 | Let Status: | Actual |
Project ID: | STP 2015(133)HESG | CSJ: | 2743-01-009 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | FM 316 IN EUSTACE, E | Fund Cat: | 8 |
Limits To: | W OF SH 19 | Estimate: | $63,103 |
Length: | 9.4 Miles | Actual: | $38,810 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 2869 | Let Status: | Actual |
Project ID: | STP 2015(130)HESG | CSJ: | 2918-01-011 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | FM 49, S | Fund Cat: | 8 |
Limits To: | N OF US 80 | Estimate: | $81,403 |
Length: | 11.3 Miles | Actual: | $50,753 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | RM 2909 | Let Status: | Actual |
Project ID: | STP 2015(109)HESG | CSJ: | 2957-01-009 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | SH 19 IN CANTON, SE | Fund Cat: | 8 |
Limits To: | N OF FM 858 | Estimate: | $63,938 |
Length: | 9.0 Miles | Actual: | $39,801 |
District: | Tyler | Let Date: | SEP 2014 |
Highway: | FM 2869 | Let Status: | Actual |
Project ID: | STP 2015(140)HESG | CSJ: | 2958-01-012 |
Description: | INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS | Handling Code: |
|
Limits From: | FM 852 S OF WINNSBORO, S | Fund Cat: | 8 |
Limits To: | N OF FM 2088 | Estimate: | $61,138 |
Length: | 8.3 Miles | Actual: | $38,615 |
Back... |
Totals for 0891-02-019 | ||
Length: | 389.7 Miles | ||
Estimate: | $2,677,203 | ||
Actual: | $1,884,148 | ||
CCSJ: 0910-08-040 | |||
District: | Tyler | Let Date: | MAR 2015 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2000(274) | CSJ: | 0910-08-040 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | CR 471 AT BOX CREEK | Fund Cat: | 6 |
Limits To: | STR # AA04-71-101 | Estimate: | $395,346 |
Length: | 0.1 Miles | Actual: | $368,233 |
District: | Tyler | Let Date: | MAR 2015 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2015(258) | CSJ: | 0910-08-065 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | CR 4801 AT INDIAN CREEK | Fund Cat: | 6 |
Limits To: | STR# AA05-75-001 | Estimate: | $313,047 |
Length: | 0.1 Miles | Actual: | $228,105 |
District: | Tyler | Let Date: | MAR 2015 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2015(259) | CSJ: | 0910-08-066 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | CR 1231 AT STILLS CREEK | Fund Cat: | 6 |
Limits To: | STR# AA01-22-001 | Estimate: | $299,450 |
Length: | 0.1 Miles | Actual: | $221,074 |
Back... |
Totals for 0910-08-040 | ||
Length: | 0.3 Miles | ||
Estimate: | $1,007,843 | ||
Actual: | $817,412 | ||
CCSJ: 0910-08-062 | |||
District: | Tyler | Let Date: | JAN 2015 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 1302(075) | CSJ: | 0910-08-062 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | CR 453 AT BEAVER CREEK | Fund Cat: | 6 |
Limits To: | STR# AA0349-001 | Estimate: | $267,162 |
Length: | 0.1 Miles | Actual: | $256,313 |
Back... |
Totals for 0910-08-062 | ||
Length: | 0.1 Miles | ||
Estimate: | $267,162 | ||
Actual: | $256,313 |
|