Detail Letting Schedule for Hidalgo County (FY 2015)

Last Update: Tuesday, September 29, 2015
Hidalgo County (FY 2015)

CCSJ: 0039-02-040

District: Pharr Let Date: JUL 2015
Highway: US 83 Let Status: Actual
Project ID: NH 1502(464) CSJ: 0039-02-040
Description: CONSTRUCT NEW 4 LANE DIVIDED RURAL HIGHWAY FACILITY Handling
Code:
 
Limits From: 0.85 MI E OF FM 886 (EL FARO RD) Fund Cat: 1
Limits To: 232' W OF FM 1427 Estimate: $55,969,036
Length: 6.7 Miles Actual: $57,163,619
 
District: Pharr Let Date: JUL 2015
Highway: US 83 Let Status: Actual
Project ID: NH 1502(464) CSJ: 0039-17-131
Description: CONSTRUCT NEW 4 LANE DIVIDED RURAL HIGHWAY FACILITY Handling
Code:
 
Limits From: 232' W OF FM 1427 Fund Cat: 1
Limits To: 0.28 MI WEST OF SHOWERS RD Estimate: $30,272,839
Length: 1.6 Miles Actual: $30,058,579
 
Back...

Totals for 0039-02-040
Length: 8.3 Miles
Estimate: $86,241,875
Actual: $87,222,198

CCSJ: 0039-03-097

District: Pharr Let Date: NOV 2014
Highway: BU 83-S Let Status: Actual
Project ID: NH 2015(292) CSJ: 0039-03-097
Description: SEAL COAT Handling
Code:
 
Limits From: WHALEN RD. Fund Cat: 1
Limits To: US 281 Estimate: $248,297
Length: 1.4 Miles Actual: $179,388
 
District: Pharr Let Date: NOV 2014
Highway: BU 83-S Let Status: Actual
Project ID: NH 2015(292) CSJ: 0039-04-114
Description: SEAL COAT Handling
Code:
 
Limits From: FM 907 Fund Cat: 1
Limits To: FM 1423 Estimate: $173,902
Length: 2.5 Miles Actual: $144,149
 
District: Pharr Let Date: NOV 2014
Highway: BU 83-S Let Status: Actual
Project ID: NH 2015(292) CSJ: 0039-04-116
Description: SEAL COAT Handling
Code:
 
Limits From: FM 2557 Fund Cat: 1
Limits To: US 281 Estimate: $164,942
Length: 2.4 Miles Actual: $139,285
 
District: Pharr Let Date: NOV 2014
Highway: BU 83-S Let Status: Actual
Project ID: NH 2015(292) CSJ: 0039-04-117
Description: SEAL COAT Handling
Code:
 
Limits From: FM 2557 Fund Cat: 1
Limits To: FM 907 Estimate: $102,770
Length: 1.5 Miles Actual: $85,465
 
District: Pharr Let Date: NOV 2014
Highway: BU 83-S Let Status: Actual
Project ID: NH 2015(292) CSJ: 0039-04-119
Description: SEAL COAT Handling
Code:
 
Limits From: FM 493 Fund Cat: 1
Limits To: FM 88 Estimate: $233,793
Length: 2.3 Miles Actual: $195,580
 
District: Pharr Let Date: NOV 2014
Highway: BU 83-S Let Status: Actual
Project ID: NH 2015(292) CSJ: 0039-04-120
Description: SEAL COAT Handling
Code:
 
Limits From: FM 88 Fund Cat: 1
Limits To: FM 1015 Estimate: $148,467
Length: 2.1 Miles Actual: $125,950
 
District: Pharr Let Date: NOV 2014
Highway: BU 83-S Let Status: Actual
Project ID: NH 2015(292) CSJ: 0039-06-042
Description: SEAL COAT Handling
Code:
 
Limits From: FM 800 Fund Cat: 1
Limits To: PALM COURT Estimate: $221,321
Length: 3.4 Miles Actual: $184,056
 
Back...

Totals for 0039-03-097
Length: 15.6 Miles
Estimate: $1,293,492
Actual: $1,053,873

CCSJ: 0039-03-102

District: Pharr Let Date: APR 2015
Highway: US 83 Let Status: Actual
Project ID: STP 2015(901)HES CSJ: 0038-07-065
Description: INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ EAGLE RD. Fund Cat: 8
Limits To: . Estimate: $23,738
Length: 0.1 Miles Actual: $22,089
 
District: Pharr Let Date: APR 2015
Highway: US 83 Let Status: Actual
Project ID: STP 2015(902)HES CSJ: 0038-07-066
Description: INSTALL INTERSECTION FLASHING BEACON, SEFETY LIGHTING AT Handling
Code:
 
Limits From: @ GARCENO RD. Fund Cat: 8
Limits To: . Estimate: $25,513
Length: 0.1 Miles Actual: $23,835
 
District: Pharr Let Date: APR 2015
Highway: US 83 Let Status: Actual
Project ID: STP 2015(903)HES CSJ: 0039-01-086
Description: INSTALL INTERSECTION FLSHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ FRANCISCO CHAPA RD. Fund Cat: 8
Limits To: . Estimate: $25,624
Length: 0.1 Miles Actual: $23,985
 
District: Pharr Let Date: APR 2015
Highway: BU 83-S Let Status: Actual
Project ID: STP 2015(904)HES CSJ: 0039-03-102
Description: INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ 26TH ST. Fund Cat: 8
Limits To: . Estimate: $107,471
Length: 0.1 Miles Actual: $49,954
 
District: Pharr Let Date: APR 2015
Highway: BU 83-S Let Status: Actual
Project ID: STP 2015(905)HES CSJ: 0039-04-121
Description: INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ 7TH ST. Fund Cat: 8
Limits To: . Estimate: $22,733
Length: 0.1 Miles Actual: $20,559
 
District: Pharr Let Date: APR 2015
Highway: IH 2 Let Status: Actual
Project ID: STP 2015(906)HES CSJ: 0039-17-181
Description: INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ GLASSCOCK RD. Fund Cat: 8
Limits To: . Estimate: $21,745
Length: 0.1 Miles Actual: $19,657
 
District: Pharr Let Date: APR 2015
Highway: IH 2 Let Status: Actual
Project ID: STP 2015(907)HES CSJ: 0039-17-182
Description: INSTALL INTERSECETION FLACHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ BENTSEN RD. Fund Cat: 8
Limits To: . Estimate: $22,729
Length: 0.1 Miles Actual: $20,969
 
District: Pharr Let Date: APR 2015
Highway: PR 100 Let Status: Actual
Project ID: STP 2015(908)HES CSJ: 0331-04-066
Description: INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ ESPERANZA ST. Fund Cat: 8
Limits To: . Estimate: $23,077
Length: 0.1 Miles Actual: $21,068
 
District: Pharr Let Date: APR 2015
Highway: SH 285 Let Status: Actual
Project ID: STP 2015(909)HES CSJ: 0482-02-032
Description: MODERNIZE INTERSECTION FLASHING BEACON Handling
Code:
 
Limits From: @ FM 1329 Fund Cat: 8
Limits To: . Estimate: $28,490
Length: 0.1 Miles Actual: $27,611
 
District: Pharr Let Date: APR 2015
Highway: FM 511 Let Status: Actual
Project ID: STP 2015(910)HES CSJ: 0684-02-025
Description: MODERNIZE INTERSECTION FLASHING BEACON Handling
Code:
 
Limits From: @ CALIFORNIA ROAD Fund Cat: 8
Limits To: . Estimate: $23,659
Length: 0.1 Miles Actual: $22,122
 
District: Pharr Let Date: APR 2015
Highway: FM 491 Let Status: Actual
Project ID: STP 2015(911)HES CSJ: 0861-01-062
Description: INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ MILE 12 N ROAD Fund Cat: 8
Limits To: . Estimate: $22,650
Length: 0.1 Miles Actual: $20,477
 
District: Pharr Let Date: APR 2015
Highway: FM 492 Let Status: Actual
Project ID: STP 2015(912)HES CSJ: 0862-01-054
Description: INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ 6 MILE ROAD Fund Cat: 8
Limits To: . Estimate: $25,434
Length: 0.1 Miles Actual: $23,662
 
District: Pharr Let Date: APR 2015
Highway: FM 510 Let Status: Actual
Project ID: STP 2015(913)HES CSJ: 1057-03-042
Description: INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ GREEN VALLEY DRIVE Fund Cat: 8
Limits To: . Estimate: $25,392
Length: 0.1 Miles Actual: $25,615
 
District: Pharr Let Date: APR 2015
Highway: FM 755 Let Status: Actual
Project ID: STP 2015(914)HES CSJ: 1103-04-037
Description: INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ LA CARLA LANE Fund Cat: 8
Limits To: . Estimate: $24,599
Length: 0.1 Miles Actual: $23,116
 
District: Pharr Let Date: APR 2015
Highway: FM 803 Let Status: Actual
Project ID: STP 2015(915)HES CSJ: 1138-01-036
Description: INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ EBONY RD. Fund Cat: 8
Limits To: . Estimate: $25,915
Length: 0.1 Miles Actual: $26,161
 
District: Pharr Let Date: APR 2015
Highway: FM 1015 Let Status: Actual
Project ID: STP 2015(916)HES CSJ: 1228-03-040
Description: INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ MILE 13 1/2 N RD. Fund Cat: 8
Limits To: . Estimate: $22,680
Length: 0.1 Miles Actual: $20,506
 
District: Pharr Let Date: APR 2015
Highway: FM 1423 Let Status: Actual
Project ID: STP 2015(917)HES CSJ: 1427-01-028
Description: SAFETY LIGHTING Handling
Code:
 
Limits From: 250 FT N OF CURVE RD Fund Cat: 8
Limits To: 650 FT N OF ANDERSON RD. (MILE 15) Estimate: $78,914
Length: 0.6 Miles Actual: $74,142
 
District: Pharr Let Date: APR 2015
Highway: FM 1423 Let Status: Actual
Project ID: STP 2015(918)HES CSJ: 1427-01-029
Description: SAFETY LIGHTING Handling
Code:
 
Limits From: IH-2 Fund Cat: 8
Limits To: 550 FT N OF ELM ST. Estimate: $71,072
Length: 0.5 Miles Actual: $66,499
 
District: Pharr Let Date: APR 2015
Highway: FM 490 Let Status: Actual
Project ID: STP 2015(919)HES CSJ: 1430-01-024
Description: MODERNIZE INTERSECTION FLASHING BEACON Handling
Code:
 
Limits From: @ FM 1425 Fund Cat: 8
Limits To: . Estimate: $28,323
Length: 0.1 Miles Actual: $26,300
 
District: Pharr Let Date: APR 2015
Highway: FM 490 Let Status: Actual
Project ID: STP 2015(920)HES CSJ: 1490-01-014
Description: SAFETY LIGHTING Handling
Code:
 
Limits From: 700 FT W OF FM 2844 Fund Cat: 8
Limits To: 1200 FT E OF FM 2844 Estimate: $91,514
Length: 0.4 Miles Actual: $84,619
 
District: Pharr Let Date: APR 2015
Highway: FM 907 Let Status: Actual
Project ID: STP 2015(921)HES CSJ: 1586-01-070
Description: SAFETY LIGHTING Handling
Code:
 
Limits From: CURRY RD Fund Cat: 8
Limits To: 250 FT S OF CURVE RD Estimate: $72,843
Length: 0.4 Miles Actual: $69,051
 
District: Pharr Let Date: APR 2015
Highway: FM 907 Let Status: Actual
Project ID: STP 2015(922)HES CSJ: 1586-01-071
Description: INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ IOWA RD. Fund Cat: 8
Limits To: . Estimate: $22,690
Length: 0.1 Miles Actual: $20,515
 
District: Pharr Let Date: APR 2015
Highway: FM 1847 Let Status: Actual
Project ID: STP 2015(923)HES CSJ: 1801-01-049
Description: INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ EVENTS CENTER Fund Cat: 8
Limits To: . Estimate: $24,086
Length: 0.1 Miles Actual: $22,278
 
District: Pharr Let Date: APR 2015
Highway: FM 1926 Let Status: Actual
Project ID: STP 2015(924)HES CSJ: 1804-01-066
Description: INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ OXFORD AVENUE Fund Cat: 8
Limits To: . Estimate: $21,094
Length: 0.1 Miles Actual: $18,861
 
District: Pharr Let Date: APR 2015
Highway: FM 1926 Let Status: Actual
Project ID: STP 2015(925)HES CSJ: 1804-01-067
Description: INSTALL INTERSECTION FLASHING BEACON, SAEFTY LIGHTING AT Handling
Code:
 
Limits From: @ HERON AVE. Fund Cat: 8
Limits To: . Estimate: $22,384
Length: 0.1 Miles Actual: $20,250
 
District: Pharr Let Date: APR 2015
Highway: FM 2061 Let Status: Actual
Project ID: STP 2015(926)HES CSJ: 1939-02-035
Description: INSTALL TRAFFIC SIGNAL, SAFETY LIGHTING AT INTERSECTION Handling
Code:
 
Limits From: @ JUAN BALLI RD. Fund Cat: 8
Limits To: . Estimate: $111,354
Length: 0.1 Miles Actual: $102,112
 
District: Pharr Let Date: APR 2015
Highway: FM 2098 Let Status: Actual
Project ID: STP 2015(927)HES CSJ: 1942-01-013
Description: INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ CHELE RD Fund Cat: 8
Limits To: . Estimate: $23,404
Length: 0.1 Miles Actual: $21,748
 
District: Pharr Let Date: APR 2015
Highway: FM 2220 Let Status: Actual
Project ID: STP 2015(928)HES CSJ: 2094-01-057
Description: INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ COVINA AVE. Fund Cat: 8
Limits To: . Estimate: $23,552
Length: 0.1 Miles Actual: $21,836
 
District: Pharr Let Date: APR 2015
Highway: FM 2520 Let Status: Actual
Project ID: STP 2015(929)HES CSJ: 2356-01-023
Description: INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT Handling
Code:
 
Limits From: @ TURNER ST. Fund Cat: 8
Limits To: . Estimate: $23,421
Length: 0.1 Miles Actual: $21,583
 
Back...

Totals for 0039-03-102
Length: 4.4 Miles
Estimate: $1,086,100
Actual: $961,180

CCSJ: 0039-04-115

District: Pharr Let Date: MAR 2015
Highway: US 83 Let Status: Actual
Project ID: NH 2015(748) CSJ: 0038-04-030
Description: OVERLAY Handling
Code:
 
Limits From: CURB & GUTTER Fund Cat: 1
Limits To: VALENO BRIDGE Estimate: $1,149,752
Length: 2.5 Miles Actual: $1,030,618
 
District: Pharr Let Date: MAR 2015
Highway: US 83 Let Status: Actual
Project ID: NH 2015(748) CSJ: 0039-01-083
Description: OVERLAY Handling
Code:
 
Limits From: EAST "Y" SPLIT Fund Cat: 1
Limits To: LOS OLMOS Estimate: $857,262
Length: 2.0 Miles Actual: $818,472
 
District: Pharr Let Date: MAR 2015
Highway: BU 83-S Let Status: Actual
Project ID: STP 2015(749) CSJ: 0039-04-115
Description: OVERLAY Handling
Code:
 
Limits From: FM 1423 Fund Cat: 1
Limits To: FM 493 Estimate: $1,549,855
Length: 2.6 Miles Actual: $1,100,966
 
District: Pharr Let Date: MAR 2015
Highway: US 281 Let Status: Actual
Project ID: STP 2015(749) CSJ: 0255-09-092
Description: FY 2015 OVERLAY PROGRAM Handling
Code:
 
Limits From: WEST OF 10TH ST Fund Cat: 1
Limits To: SP 115 Estimate: $247,500
Length: 0.6 Miles Actual: $222,189
 
District: Pharr Let Date: MAR 2015
Highway: SH 336 Let Status: Actual
Project ID: STP 2015(749) CSJ: 0621-01-101
Description: OVERLAY Handling
Code:
 
Limits From: TRENTON RD. Fund Cat: 1
Limits To: SH 495 Estimate: $1,413,994
Length: 3.5 Miles Actual: $1,253,501
 
District: Pharr Let Date: MAR 2015
Highway: SH 336 Let Status: Actual
Project ID: STP 2015(749) CSJ: 0621-01-102
Description: OVERLAY Handling
Code:
 
Limits From: SH 495 Fund Cat: 1
Limits To: US 83 Estimate: $558,663
Length: 0.1 Miles Actual: $502,582
 
Back...

Totals for 0039-04-115
Length: 11.3 Miles
Estimate: $5,777,026
Actual: $4,928,328

CCSJ: 0039-04-123

District: Pharr Let Date: JUL 2015
Highway: BU 83-S Let Status: Actual
Project ID: BR 1502(465) CSJ: 0039-04-123
Description: CONCRETE OVERLAY & REPLACE RAIL Handling
Code:
 
Limits From: @NBI 21-109-0039-04-026 Fund Cat: 6
Limits To: BUS 83 @ NORTH FLOODWAY IN MERCEDES Estimate: $2,930,594
Length: 0.3 Miles Actual: $2,750,348
 
Back...

Totals for 0039-04-123
Length: 0.3 Miles
Estimate: $2,930,594
Actual: $2,750,348

CCSJ: 0220-01-025

District: Pharr Let Date: NOV 2014
Highway: US 281 Let Status: Actual
Project ID: NH 2015(293) CSJ: 0220-01-025
Description: REHAB AND WIDEN EXISTING ROADWAY Handling
Code:
 
Limits From: FM 88 Fund Cat: 1
Limits To: FM 1015 Estimate: $4,967,236
Length: 2.1 Miles Actual: $4,739,753
 
Back...

Totals for 0220-01-025
Length: 2.1 Miles
Estimate: $4,967,236
Actual: $4,739,753

CCSJ: 0342-01-087

District: Pharr Let Date: JAN 2015
Highway: SH 107 Let Status: Actual
Project ID: STP 2014(254) CSJ: 0342-01-087
Description: OVERLAY Handling
Code:
 
Limits From: BUS 281 Fund Cat: 1
Limits To: US 281 Estimate: $646,192
Length: 0.9 Miles Actual: $531,026
 
District: Pharr Let Date: JAN 2015
Highway: SH 107 Let Status: Actual
Project ID: STP 2014(254) CSJ: 0528-01-107
Description: OVERLAY Handling
Code:
 
Limits From: RAIL ROAD TRACKS Fund Cat: 1
Limits To: US 281 SQUARE Estimate: $151,290
Length: 0.3 Miles Actual: $135,280
 
District: Pharr Let Date: JAN 2015
Highway: FM 2220 Let Status: Actual
Project ID: STP 2014(254) CSJ: 2094-01-053
Description: OVERLAY Handling
Code:
 
Limits From: US 83 Fund Cat: 1
Limits To: BUS 83 Estimate: $592,489
Length: 0.9 Miles Actual: $403,673
 
District: Pharr Let Date: JAN 2015
Highway: FM 2220 Let Status: Actual
Project ID: STP 2014(254) CSJ: 2094-01-054
Description: OVERLAY Handling
Code:
 
Limits From: BUS 83 Fund Cat: 1
Limits To: FM 1924 Estimate: $2,186,821
Length: 2.9 Miles Actual: $1,397,798
 
Back...

Totals for 0342-01-087
Length: 5.0 Miles
Estimate: $3,576,792
Actual: $2,467,777

CCSJ: 0921-02-316

District: Pharr Let Date: DEC 2014
Highway: CS Let Status: Actual
Project ID: STP 2014(146)TE CSJ: 0921-02-316
Description: CONSTRUCT CITY OF EDINBURG JACKSON RD HIKE & BIKE TRAIL Handling
Code:
 
Limits From: CHAPIN RD. Fund Cat: 3
Limits To: CANTON RD. Estimate: $2,233,961
Length: 2.8 Miles Actual: $2,059,445
 
Back...

Totals for 0921-02-316
Length: 2.8 Miles
Estimate: $2,233,961
Actual: $2,059,445

CCSJ: 0921-02-319

District: Pharr Let Date: APR 2015
Highway: VA Let Status: Actual
Project ID: STP 2015(930) CSJ: 0921-02-319
Description: CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS ALONG FM 491, Handling
Code:
 
Limits From: VARIOUS LOCATIONS IN HIDALGO COUNTY Fund Cat: 10
Limits To: . Estimate: $1,521,024
Length: 0.0 Miles Actual: $1,475,632
 
Back...

Totals for 0921-02-319
Length: 0.0 Miles
Estimate: $1,521,024
Actual: $1,475,632

CCSJ: 1803-02-028

District: Pharr Let Date: JUL 2015
Highway: FM 1925 Let Status: Actual
Project ID: C 1803-2-28 CSJ: 1803-02-028
Description: WIDEN TO 4 LANE DIVIDED URBAN Handling
Code:
 
Limits From: 0.13 MI. EAST OF KENYON RD Fund Cat: 2M
Limits To: 0.21 MI. EAST OF FM 907 Estimate: $3,779,456
Length: 1.1 Miles Actual: $2,891,653
 
Back...

Totals for 1803-02-028
Length: 1.1 Miles
Estimate: $3,779,456
Actual: $2,891,653


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract