Letting Schedule for Fort Worth District (FY 2015)

Last Update: Monday, February 9, 2015
Fort Worth District (FY 2015)
Dallas | Erath | Hood | Jack | Johnson | Palo Pinto | Parker | Somervell | Tarrant | Wise

Dallas County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0094-03-065 SH 183 Actual JAN 2015 847,600,000 3 RECONSTRUCT 6 TO 6 GENERAL PURPOSE LANES, 0 TO 2 CONCURRENT

Erath County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0250-03-044 US 281 Approved MAR 2015 $1,262,751 1 FLEX BASE REPAIR AND HMAC OVERLAY
0250-03-045 US 281 Approved MAR 2015 $677,841 8 TEXURIZE SHOULDERS
0258-01-028 SH 6 Tentative AUG 2015 $5,000,000 1 WIDEN SHLDRS, EXTEND CULVERTS, MILL, SEAL COAT
0258-02-057 US 281 Tentative AUG 2015 $3,065,635 8 HIGH FRICTION SURFACE TREATMENT (CURVE) , IMPROVE HORIZONTAL
0550-03-024 FM 914 Approved MAY 2015 $3,254,971 8 ADD SHOULDERS, SAFETY END TREATMENTS, SEAL COAT AND PAVEMENT

Hood County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0080-04-095 US 377 Actual SEP 2014 $2,044,370 1 HMAC OVERLAY
0902-51-015 VA Actual OCT 2014 $882,845 3 CONTRUCT HIKE / BIKE TRAIL "MOMENTS IN TIME"TRAIL PHASE II
1601-03-014 FM 2580 Tentative AUG 2015 $1,434,781 8 WIDEN ROADWAY TO 2 - 12 FT DRIVING LANES WITH 2 FT SHOULDERS

Jack County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0249-05-028 US 281 Approved APR 2015 $857,774 8 TEXTURIZE SHOULDERS (ROLLED IN OR MILLED IN) AND CENTERLINE

Johnson County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0014-22-031 IH 35W Tentative JUN 2015 $424,456 6 REPLACE BRIDGE & APPROACH RAILING OR ADD SAFETY END
0519-01-028 SH 174 Approved MAR 2015 $2,710,075 1 HMAC OVERLAY - 2.5"
0902-50-079 CS Actual NOV 2014 $707,180 3 CONSTRUCT PARK AND RIDE FACILITY
1181-04-045 FM 917 Approved MAY 2015 $390,000 3 LANDSCAPE ENHANCEMENT
1600-02-017 FM 1807 Tentative AUG 2015 $6,670,842 8 WIDEN PAVEMENT AND ADD SHOULDERS
2118-02-019 FM 1902 Tentative AUG 2015 $4,562,917 8 WIDEN PAVEMENT AND ADD SHOULDERS
3010-02-014 FM 2738 Tentative AUG 2015 $3,673,621 8 WIDEN PAVEMENT AND ADD SHOULDERS
3348-01-019 FM 3136 Tentative AUG 2015 $4,613,946 8 WIDEN PAVEMENT & ADD SHOULDERS

Palo Pinto County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
1993-01-015 FM 2201 Tentative JUN 2015 $4,226,887 1 WIDEN TO 11' LANES AND 3' SHOULDERS
2290-01-009 FM 2353 Tentative JUN 2015 $4,681,805 1 WIDEN PAVEMENT TO 2 - 11' LANES AND ADD 4'SHOULDERS

Parker County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0008-02-072 US 180 Actual SEP 2014 $2,644,391 1 MICROSURFACING AND PAVEMENT MARKERS
0314-01-077 IH 20 Actual FEB 2015 $1,309,705 6 REPLACE BRIDGE
0314-01-081 IH 20 Actual OCT 2014 $8,460,305 1 SEAL COAT FRONTAGE ROADS
0539-05-015 FM 1885 Tentative JUN 2015 $5,746,489 1 WIDEN TO 11' LANES AND 3' SHOULDERS
0902-38-075 CS Approved MAY 2015 $5,770,900 3 INTERSEC.IMPROVE. AT LAKESHORE DR, US 180, & IH 20 FR RD;CONS.
0902-38-076 CR Actual FEB 2015 $1,379,497 6 REPLACE BRIDGE AND APPROACHES
1179-02-034 FM 920 Approved APR 2015 $1,605,918 8 CENTERLINE TEXTURING
2930-02-011 FM 3028 Tentative JUN 2015 $659,250 6 REPLACE BRIDGE AND APPROACHES

Somervell County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0259-02-049 US 67 Tentative JUN 2015 $146,711 6 REPLACE BRIDGE & APPROACH RAILING OR ADD SAFETY END

Tarrant County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0008-13-229 IH 820 Approved APR 2015 $668,370 8 CONVERT MEDIAN BARRIER
0008-15-049 IH 820 Tentative AUG 2015 $3,030,000 5 INSTALL ITS FIBER, DETECTION, & DMS
0008-16-036 IH 20 Approved MAY 2015 $4,500,000 3 ADD 3 LEFT TURN LANES TO BRIDGE OVER IH 20
0013-10-070 BU 287P Approved APR 2015 $700,001 1 INSTALLATION OF A FULL TRAFFIC ACTUATED TRAFFIC SIGNAL AND
0013-10-081 BU 287P Tentative AUG 2015 $1,597,960 8 TEXTURIZE SHOULDERS
0014-02-049 IH 35W Tentative AUG 2015 $6,281,000 3 CONSTRUCT 3 LANE BRIDGE FOR A TOTAL OF 6 LANES AT THIS
0014-15-039 US 81 Approved APR 2015 $347,766 8 INSTALL TRAFFIC SIGNAL
0080-07-092 US 377 Approved MAR 2015 $2,891,314 1 REPAIR FAILURES, OVERLAY, AND BACKFILL PAVEMENT EDGES
0094-02-128 SH 183 Approved MAY 2015 $112,000 3 LANDSCAPE ENHANCEMENT
0094-02-129 SH 183 Approved MAR 2015 $200,000 3 LANDSCAPE ENHANCEMENT
0094-02-130 SH 10 Tentative JUL 2015 $370,000 3 LANDSCAPE ENHANCEMENT
0171-05-095 SH 199 Actual SEP 2014 $1,000,000 7 CORRIDOR ANALYSIS & DEVELOP MASTER PLAN FOR CORRIDOR; ADDIT.
0363-01-139 SH 26 Tentative AUG 2015 $29,648,898 3 RECONSTRUCT 4 LANE UNDIVIDED TO 4 LANE DIVIDED W / MEDIAN;
0902-00-131 VA Actual SEP 2014 $1,587,885 1 FY15 CONCRETE PAVEMENT REPAIR VARIOUS LOCATIONS; SPOT REPAIR
0902-00-132 VA Actual SEP 2014 $930,000 1 PAVEMENT MARKINGS FOR FY 14 SEAL COATS
0902-00-137 VA Actual OCT 2014 $979,265 1 NON - SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION
0902-00-138 VA Tentative AUG 2015 $620,000 3 WRONG WAY DRIVING, TECHNOLOGY AND SHOULDERS UTILIZATION
0902-00-141 VA Tentative AUG 2015 $1,111,559 3 CONSTRUCT BICYCLE / PEDESTRIAN PATH
0902-00-152 VA Actual NOV 2014 $2,039,936 3 ON - SYSTEM FRONTAGE ROAD SIGNAL IMPROVEMENTS FOR INCIDENT
0902-00-153 VA Actual NOV 2014 $407,264 3 OFF - SYSTEM FRONTAGE ROAD SIGNAL IMPROVEMENTS FOR INCIDENT
0902-48-014 VA Tentative AUG 2015 $2,501,366 3 CONSTRUCT NEW RAIL CONNECTION; DFW INTERNATIONAL AIRPORT
0902-48-058 VA Tentative JUN 2015 $1,500,000 10 CONSTRUCT CURB RAMPS_FM1709, SH114, IH30, FM157
0902-48-453 CS Tentative AUG 2015 $13,834,820 1 RECONSTRUCT FROM 4 LANES TO 4 LANE DIVIDED WITH RAISED
0902-48-502 CS Actual NOV 2014 $13,943,405 3 REPLACE BRIDGE
0902-48-577 CS Approved MAY 2015 $13,070,000 3 WIDEN FROM 4 TO 6 LANES W / CONT CENTER LEFT TURN LANE & ADDT
0902-48-645 VA Actual NOV 2014 $238,049 3 INSTALL GATES AT HALTOM RD & DART;UPGRADE ELECTRONICS IN PRE
0902-48-659 CS Tentative JUN 2015 $1,650,000 6 REPLACE BRIDGES AND APPROACHES
0902-48-743 CS Tentative AUG 2015 $758,000 6 REPLACE BRIDGE AND APPROACHES
0902-48-829 VA Approved MAR 2015 $483,096 3 FORT WORTH URBAN VILLAGES AND COMMERCIAL CORRIDORS
0902-48-867 VA Actual OCT 2014 $285,791 3 CONSTRUCT BICYCLE PATH / PEDESTRIAN PATH
0902-48-868 VA Tentative AUG 2015 $482,270 3 INSTALL ADDITIONAL BICYCLE STATIONS
0902-48-869 VA Approved APR 2015 $2,621,757 3 CONSTRUCT BIKE / PED PATH FOR TRINITY TRAILS CLEAR FORT - EAST
0902-48-871 VA Actual JAN 2015 $3,921,554 1 DFW CONNECTOR COMPREHENSIVE MAINTENANCE AGREEMENT FY15
0902-48-884 VA Tentative AUG 2015 $6,424,845 3 CONSTRUCT NEW RAIL CONNECTION;
0902-48-885 VA Tentative AUG 2015 $14,000,000 11 CONSTRUCT NEW RAIL CONNECTION; DFW INTL AIRPORT INTERMODAL
0902-48-887 VA Tentative AUG 2015 $510,632 7 PROVIDE MPO PLAN. SUPPORT & TECH ASST FOR SURF TRAN PROJ
0902-90-001 VA Approved MAY 2015 $2,088,723 3 CONSTRUCT 2 PEDESTRIAN AND BICYCLE CONNECTIONS TO TRINITY
0902-90-008 VA Actual OCT 2014 $1,501,000 3 GENERAL MOTOR PLANT TECHNOLOGY PILOT PROJECT
0902-90-012 VA Approved APR 2015 $323,940 5 ITS EQUIPMENT UPGRADES FOR TECHNOLOGY ADVANCES
0902-90-015 VA Tentative AUG 2015 $770,000 5 DEPLOY 5 DMS ON US 287 & IH 20; INSTALL CCTV CAMERA AT FM 51
0902-90-017 CS Actual FEB 2015 $1,115,561 6 REPLACE BRIDGE AND APPROACHES
1068-01-203 IH 30 Actual FEB 2015 $4,161,251 1 MILL AND OVERLAY EASTBOUND AND WESTBOUND LANES
1068-02-144 IH 30 Approved MAY 2015 $310,000 3 INSTALLATION OF CITY OF ARLINGTON GATEWAY MONUMENT AND
2266-02-140 SH 360 Tentative JUL 2015 $2,654,197 1 MILL, BASE REPAIR, HMAC OVERLAY FRONTAGE ROADS
2374-06-005 IH 635 Actual OCT 2014 $1,773,525 1 MILL, BASE REPAIR, HMAC OVERLAY SH 121 CONNECTIONS
2374-06-006 IH 635 Tentative JUL 2015 $390,000 3 LANDSCAPE ENHANCEMENT

Wise County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0013-06-042 US 81 Actual JAN 2015 $3,343,656 8 2" HMAC OVERLAY SB LANES, 2 CST SHOULDERS, SPOT SHLDR REPAIR
0352-01-060 SH 114 Approved MAR 2015 $3,316,998 1 2" OVERLAY
0902-20-098 CR Tentative JUN 2015 $464,000 6 REPLACE BRIDGE AND APPROACHES
0902-20-109 VA Actual JAN 2015 $5,019,768 1 CONSTRUCT DECEL / ACCEL LANES; INTERSECTION IMPROVEMENTS
1310-03-025 FM 2264 Actual SEP 2014 $3,983,918 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH, PROPOSED 2 - 12'LANES
1606-02-019 FM 2123 Approved MAY 2015 $3,665,412 1 WIDEN SHOULDER; 32' TOTAL WIDTH


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract