Letting Schedule for Houston District (FY 2015)

Last Update: Monday, January 26, 2015
Houston District (FY 2015)
Brazoria | Fort Bend | Galveston | Harris | Montgomery

Brazoria County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0178-02-087 SH 35 Actual DEC 2014 $470,432 8 IMPROVE TRAFFIC SIGNALS AT INTERSECTION
0178-03-152 SH 35 Approved MAR 2015 $1,977,834 1 ADD AUXILIARY LANE
0192-02-050 SH 6 Tentative JUN 2015 $1,250,000 1 CONSTRUCT ACCESS MANAGEMENT IMPROVEMENTS (MEDIAN,
0598-02-106 SH 288 Approved MAR 2015 $9,071,616 3 CONSTRUCT SOUTHBOUND ON - RAMP, NORTHBOUND OFF - RAMP AND REPAIR
0912-31-266 VA Tentative AUG 2015 $270,000 10 LANDSCAPE DEVELOPMENT
0912-31-281 VA Actual OCT 2014 $497,361 1 SPALL REPAIR (NON - SITE SPECIFIC)
0912-31-282 CR Tentative JUL 2015 $1,116,000 6 REPLACE BRIDGE AND APPROACHES (NBI# 12020AA0887002)
0912-31-289 CS Approved FEB 2015 $27,244,344 3 WIDENING TO 4 LANES DIVIDED WITH RAISED MEDIAN
0912-31-294 CR Approved FEB 2015 $11,479,505 3 WIDEN FROM 2 TO 4 - LANE DIVIDED RURAL SECTION WITH 10 - FOOT
1003-01-091 FM 523 Approved APR 2015 $7,754,757 1 ONE COURSE SURFACE TREATMENT, RICH BOTTOM LAYER AND 1.5" ACP
1524-01-078 SH 332 Approved APR 2015 $3,650,000 1 PAVEMENT REPAIR, MILLING, BASE REPAIR, 1.5" ACP OVERLAY AND
2523-02-067 FM 2004 Actual DEC 2014 $262,611 1 BRIDGE JOINT REPAIR

Fort Bend County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0027-06-056 US 90A Actual DEC 2014 $4,585,131 1 WB ONE - WAY PAIR, CRISS - CROSS, INTERSECTIONS AND 1.5" OVERLAY
0027-07-041 US 90A Approved FEB 2015 $2,630,015 1 BASE REPAIR, 1.5" ACP O / L AND PAVEMENT MARKINGS
0027-08-173 US 90A Approved MAY 2015 $8,300,001 1 WIDEN FROM 4 TO 6 LANES WITH ASPHALT
0089-09-058 US 59 Tentative AUG 2015 $39,000,000 1 WIDEN TO 6 MAIN LANES, GRADE SEPARATIONS, 2 - LANE FRONTAGE
0111-03-031 FM 521 Tentative AUG 2015 $31,364,182 3 WIDEN TO 4 - LANE DIVIDED SECTION
0111-03-058 FM 521 Approved MAR 2015 $1,587,512 1 BASE REPAIR, 1.5 ASPHALTIC CONCRETE PAVEMENT OVERLAY WITH
0543-02-055 FM 359 Approved MAY 2015 $25,191,846 1 RAILROAD GRADE SEPARATION (ELEVATED T)
0838-03-023 FM 361 Approved MAY 2015 $1,019,712 6 REPLACE BRIDGE AND APPROACHES (NBI#12080083803014)
0912-34-144 CS Actual DEC 2014 $20,864,455 3 WIDEN FROM 2 TO 4 LANES RURAL ROAD
0912-34-162 VA Tentative JUL 2015 $2,938,101 3 CONSTRUCT SIDEWALKS AND TRAILS FOR IMPROVEMENT IN SUGAR LAND
0912-34-176 CR Tentative JUN 2015 $2,504,000 6 REPLACE BRIDGE AND APPROACHES (NBI# 12080AA0970002)
0912-34-182 CS Approved MAY 2015 $4,910,641 3 CONSTRUCT 2 LANE CONCRETE ROADWAYS TO EXISTING INTERCHANGE
1258-03-042 FM 1093 Tentative JUL 2015 $39,542,463 3 CONSTRUCT 4 TOLL LANES WITH TWO 2 - LANE FRONTAGE ROADS
1258-03-043 FM 1093 Tentative JUL 2015 $43,733,444 3 4 TOLL LNS FROM W OF SPRING GREEN TO W OF KATY - GASTON & TWO
2105-01-020 FM 2234 Approved MAY 2015 $28,216,184 1 RECONSTRUCT AND WIDEN FROM 2 LANES TO 4 - LANE DIVIDED RURAL

Galveston County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0051-03-106 SH 3 Tentative JUN 2015 $953,349 8 IMPROVE TRAFFIC SIGNALS AT INTERSECTION
0192-04-104 SH 6 Tentative JUL 2015 $3,365,500 1 BASE REPAIR, SEAL COAT AND 1.5" PFC ACP O / L
0367-02-081 SH 124 Tentative AUG 2015 $2,500,000 6 CLEAN / PAINT WEATHERING STEEL
0389-06-103 SH 146 Actual OCT 2014 $369,996 8 IMPROVE TRAFFIC SIGNAL
0500-01-143 IH 45 Approved MAR 2015 $282,778 8 IMPROVE TRAFFIC SIGNALS AT INTERSECTION
0500-04-126 IH 45 Approved APR 2015 $4,175,000 1 TRACKLESS TACK, 1" TOM - F & 1" ACP OVERLAY (TOM - C)
0500-04-127 IH 45 Approved APR 2015 $3,552,000 1 TRACK FREE TACK COAT - HOT APPLIED, 1" CAM AND 1" THIN OVERLAY
0500-04-129 IH 45 Approved APR 2015 $4,256,600 1 TRACK FREE TACK COAT, 1" CAM AND 1" THIN OVERLAY MIX
0500-04-134 IH 45 Tentative AUG 2015 $1,000,000 10 LANDSCAPE DEVELOPMENT
0686-01-046 FM 1765 Actual NOV 2014 $481,774 8 INSTALL INTERSECTION FLASHING BEACON AND ADD LEFT TURN LANE
0912-73-182 CS Approved MAY 2015 $2,163,200 3 MILLING OF 4 INCHES AND 2 INCHES OF ASPHALT OVERLAY
0912-73-201 VA Actual SEP 2014 $34,155 10 DISPOSAL OF DEBRIS AS A RESULT OF HURRICANE IKE
0978-01-034 FM 646 Tentative JUN 2015 $12,700,500 1 WIDEN FROM 2 LANES TO 4 - LANE DIVIDED
1002-02-021 FM 517 Tentative JUL 2015 $2,100,000 1 CONVERT OPEN DITCH SECTION TO A CLOSED SECTION W / STORM
3312-02-014 FM 270 Tentative JUL 2015 $5,000,000 3 REALIGN ROADWAY

Harris County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0028-02-091 US 90 Tentative JUL 2015 $1,000,000 10 LANDSCAPE DEVELOPMENT
0050-06-079 US 290 Approved MAY 2015 $42,779,000 1 WIDEN TO 6 MAIN LANES WITH AUXILIARY LANES AND MILL ACP AND
0050-06-086 US 290 Tentative JUL 2015 $34,356,000 2M WIDEN TO 8 MAIN LANES WITH AUXILIARY LANES AND TWO 2 - LANE
0051-02-088 SH 3 Actual JAN 2015 $1,056,577 1 DRAINAGE IMPROVEMENTS
0110-05-119 IH 45 Approved MAR 2015 $2,435,566 1 RECONFIGURE TO CREATE 2 MANAGED LANES
0110-06-136 IH 45 Approved MAY 2015 $296,000 8 IMPROVE TRAFFIC SIGNAL
0114-12-007 US 290 Tentative JUN 2015 $55,293,000 1 WIDEN TO 6 MAIN LANES WITH DISCONTINUOUS TWO 2 - LANE FRONTAGE
0177-11-150 US 59 Approved APR 2015 $2,837,300 1 SEAL BRIDGE DECK CRACKING
0271-06-121 IH 10 Tentative AUG 2015 $2,609,408 3 INTERSECTION ENHANCEMENTS AT 6 LOCATIONS (PED RAMPS,
0271-07-305 IH 10 Tentative JUN 2015 $3,000,000 1 INTERSECTION IMPROVEMENTS AND RESTRIPING FOR OPERATIONAL
0271-14-232 IH 610 Tentative JUL 2015 $1,012,482 10 LANDSCAPE DEVELOPMENT
0271-15-086 IH 610 Actual OCT 2014 $4,114,147 1 ASPHALT OVERLAY OF FRTG RDS AND CONNECTORS, ASPHALT SHOULDER
0271-15-087 IH 610 Approved FEB 2015 $470,676 1 PAVEMENT MARKINGS
0389-05-123 SH 146 Tentative AUG 2015 $1,677,000 10 LANDSCAPE DEVELOPMENT
0389-13-057 SH 146 Actual SEP 2014 $224,351 1 1" MILLING, 1" ACP OVERLAY OF SHOULDERS / GORE AREAS AND
0500-03-571 IH 45 Tentative JUN 2015 $2,212,000 1 RECONFIGURE EXISTING ALLEN PARKWAY SOUTHBOUND ENTRANCE RAMP
0500-03-572 IH 45 Actual SEP 2014 $28,468,889 ROW CONSTRUCT ENTRANCE AND EXIT RAMPS, REMOVE AND REPLACE
0500-03-575 IH 45 Approved FEB 2015 $1,181,031 1 INSTALL HIGH MAST LIGHTING
0500-03-592 IH 45 Tentative JUN 2015 $475,362 6 REPLACE BRIDGE AND APPROACH RAILING
0502-01-209 SH 225 Approved MAR 2015 $301,962 8 IMPROVE TRAFFIC SIGNAL
0502-01-211 SH 225 Approved APR 2015 $630,000 1 PAVEMENT MARKINGS
0508-01-338 IH 10 Approved MAY 2015 $2,903,375 1 REPLACE FOUR ACP RAMPS AND FRTG RDS WITH FAST TRACK
0508-01-349 IH 10 Actual DEC 2014 $669,740 1 CONSTRUCT UTURN
0508-07-286 SS 330 Actual JAN 2015 $2,251,559 3 LEFT TURN LANE IMPROVEMENTS AT VARIOUS LOCATIONS ON THE
0912-00-440 VA Actual NOV 2014 $772,663 1 UPGRADE / RECONSTRUCT TRAFFIC SIGNALS
0912-00-460 VA Tentative JUN 2015 $2,500,000 5 COMMUTE SOLUTIONS PROGRAM IMPLEMENTATION (COMMUTER AND
0912-00-488 VA Approved FEB 2015 $1,519,414 3 UPGRADE CONTROLLER COMMUNICATIONS HARDWARE, INSTALL WIRELESS
0912-00-499 VA Tentative JUN 2015 $1,380,000 5 COMMUTE SOLUTIONS STAFF AND OUTREACH (C.S. FUNDING INCLUDING
0912-00-501 VA Tentative JUL 2015 $1,600,000 5 METRO STAR VANPOOL PROGRAM (FY 2015)
0912-00-503 VA Tentative AUG 2015 $3,750,000 7 METRO STAR VANPOOL PROGRAM (FY 2015)
0912-00-506 VA Tentative AUG 2015 $6,000,000 5 DEVELOPING TRANSIT MARKET FLEET EXPANSION PROGRAM (YEAR 2)
0912-00-509 VA Actual SEP 2014 $3,708,936 1 REPAIR BRIDGE APPROACH SLABS
0912-70-082 CS Approved FEB 2015 $16,500,000 3 RECONSTRUCT AND WIDEN TO 4 - LANES DIVIDED WITH INTERSECTION
0912-70-094 VA Actual NOV 2014 $1,698,653 1 REPLACE BRIDGE DECK, REP BRIDGE CONC STRUCTURES, INSTALL
0912-70-100 VA Approved FEB 2015 $2,593,354 10 CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS ALONG IH 45, SH 3,
0912-70-103 CR Tentative JUL 2015 $4,430,724 3 CONSTRUCT PEDESTRIAN AND BIKE BRIDGE OVER BRAYS BAYOU AND
0912-70-105 CR Tentative JUN 2015 $1,785,619 3 INSTALL LED BRIDGE LIGHTING ON US 59 ARCH BRIDGES AND
0912-71-003 CS Actual JAN 2015 $13,919,000 3 ROADWAY RECONSTRUCTION
0912-71-627 VA Approved FEB 2015 $2,866,943 3 CITY OF HOUSTON RCTSS PROGRAM
0912-72-046 VA Actual OCT 2014 $960,080 3 BASE REPAIR WITH CONCRETE PANEL REPLACEMENT, REPAIR & IMPROVE
0912-72-072 CS Tentative JUN 2015 $10,200,000 3 RECONSTRUCT & WIDEN TO 6 LANES INCLUDING 10 FT SHARED - USE
0912-72-132 VA Tentative AUG 2015 $2,536,832 3 CITY OF PASADENA SIGNAL PROGRAM
0912-72-276 CS Actual OCT 2014 $4,011,142 3 INSTALL ADVANCED TRAFFIC CONTROL DEVICES AT HATSS
0912-72-285 CS Approved FEB 2015 $432,753 6 REPLACE BRIDGE AND APPROACHES (NBI# 12102S44185001)
0912-72-289 CS Approved FEB 2015 $1,827,969 3 CONSTRUCTING A PEDESTRIAN BRIDGE AT BRINGHURST STREET IN
0912-72-299 VA Tentative JUL 2015 $1,130,600 3 MISSOURI KANSAS TEXAS TRAIL SPUR CONNECTOR
0912-72-302 VA Approved MAY 2015 $2,374,451 1 CONSTRUCT 10' SHARED USE PATH
0912-72-309 VA Actual OCT 2014 $1,880,145 3 ARTERIAL TRAVEL TIME SYSTEM (EXPANDED COVERAGE, APPROX 650
0912-72-310 VA Tentative JUN 2015 $1,500,000 7 INSTALL FIBER CABLE AND COMMUNICATIONS EQUIPMENT (CENTER TO
0912-72-319 VA Tentative JUN 2015 $747,178 3 CONSTRUCT MULTI - USE PATH CONNECTORS / MISSING SEGMENTS
0912-72-331 VA Tentative JUL 2015 $5,663,625 3 DESIGN AND CONST NEW SIDEWALKS TO ENHANCE PEDESTRIAN SAFETY,
1062-05-009 FM 1942 Approved FEB 2015 $2,822,641 3 WIDEN ROADWAY FROM 2 TO 4 LANES TO MATCH HARRIS COUNTY
1258-04-060 FM 1093 Actual SEP 2014 $493,967 8 IMPROVE TRAFFIC SIGNAL
1812-01-020 FM 1942 Tentative AUG 2015 $150,000 1 INSTALL RIPRAP & REPAIR SHOULDER
1812-01-021 FM 1942 Actual JAN 2015 $948,590 1 CONSTRUCT LEFT TURN LANE
2941-02-050 FM 2920 Tentative JUL 2015 $3,062,718 1 BASE REPAIR, MILL, SEAL COAT INTERLAYER, 2.0" ACP OVERLAY &
3256-01-089 SL 8 Approved MAY 2015 150,258,781 3 WIDEN FROM 4 TO 8 MAIN LANES IN SECTIONS
3256-01-102 SL 8 Approved FEB 2015 $875,103 8 IMPROVE TRAFFIC SIGNAL
3256-01-104 BW 8 Actual NOV 2014 $500,000 3 LANDSCAPE DEVELOPMENT
3256-01-106 SL 8 Tentative JUL 2015 $1,000,000 10 LANDSCAPE DEVELOPMENT
3256-02-089 SL 8 Tentative JUL 2015 $26,000,000 1 ADD AUXILIARY LANES AND WIDEN BRIDGES
3312-01-008 FM 270 Approved MAY 2015 $4,608,488 1 BICYCLE / PEDESTRIAN IMPROVEMENTS
3510-05-036 SH 99 Approved MAY 2015 $2,473,320 3 CONSTRUCT SB FRONTAGE ROAD AND U - TURNS

Montgomery County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0110-03-053 SH 75 Actual SEP 2014 $1,747,731 1 BASE REPAIR AND 1.5" ACP O / L
0110-04-193 IH 45 Approved MAY 2015 $300,000 1 ADJUST SB FEEDER ROAD CONFIGURATION TO RETAIN 3 LANES
0110-04-195 IH 45 Tentative AUG 2015 $1,600,000 10 LANDSCAPE DEVELOPMENT
0177-05-093 IH 69 Approved MAY 2015 $3,920,000 1 CONSTRUCT NEW 2 - LANE FRONTAGE ROAD
0338-02-041 SH 105 Actual SEP 2014 $2,574,452 1 BASE REPAIR AND 1.5" ACP O / L
0720-02-087 FM 149 Tentative AUG 2015 $8,500,000 8 BASE REPAIR, OCST, 1.5" OVERLAY AND ADD SHOULDER
0912-37-221 CR Actual SEP 2014 $1,378,509 6 REPLACE BRIDGE AND APPROACHES (NBI# 12170AA0150001)
1259-01-036 FM 1097 Approved MAY 2015 $3,200,000 1 WIDEN FOR CLTL AND 2" OVERLAY
1259-01-039 FM 1097 Actual JAN 2015 $4,097,442 1 BASE REPAIR AND 1.5" ACP O / L
3050-02-024 FM 2978 Tentative JUN 2015 $12,483,000 1 WIDEN FROM 2 TO 4 LANES
3158-01-037 FM 3083 Approved APR 2015 $3,964,000 1 BASE REPAIR AND 1.5" ACP O / L


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract