Letting Schedule for Houston District (FY 2015)

Last Update: Wednesday, April 15, 2015
Houston District (FY 2015)
Brazoria | Fort Bend | Galveston | Harris | Montgomery

Brazoria County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0178-02-087 SH 35 Actual DEC 2014 $470,432 8 IMPROVE TRAFFIC SIGNALS AT INTERSECTION
0178-03-152 SH 35 Actual MAR 2015 $2,129,905 1 ADD AUXILIARY LANE
0598-02-106 SH 288 Actual MAR 2015 $9,196,617 3 CONSTRUCT SOUTHBOUND ON - RAMP, NORTHBOUND OFF - RAMP AND REPAIR
0912-31-281 VA Actual OCT 2014 $497,361 1 SPALL REPAIR (NON - SITE SPECIFIC)
0912-31-282 CR Approved JUN 2015 $1,049,427 6 REPLACE BRIDGE AND APPROACHES NBI# 12020AA0887002
0912-31-294 CR Actual FEB 2015 $12,154,201 3 WIDEN FROM 2 TO 4 - LANE DIVIDED RURAL SECTION WITH 10 - FOOT
1003-01-091 FM 523 Actual APR 2015 $7,475,839 1 ONE COURSE SURFACE TREATMENT, RICH BOTTOM LAYER AND 1.5 IN
1524-01-078 SH 332 Actual APR 2015 $3,739,397 1 PAVEMENT REPAIR, MILLING, BASE REPAIR, 1.5 IN ACP OVERLAY
2523-02-067 FM 2004 Actual DEC 2014 $262,611 1 BRIDGE JOINT REPAIR

Fort Bend County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0027-06-056 US 90A Actual DEC 2014 $4,585,131 1 WB ONE - WAY PAIR, CRISS - CROSS, INTERSECTIONS AND 1.5" OVERLAY
0027-07-041 US 90A Actual FEB 2015 $2,209,344 1 BASE REPAIR, 1.5" ACP O / L AND PAVEMENT MARKINGS
0027-08-173 US 90A Approved JUL 2015 $8,300,001 1 WIDEN FROM 4 TO 6 LANES WITH ASPHALT
0111-03-058 FM 521 Actual MAR 2015 $1,220,326 1 BASE REPAIR, 1.5IN ASPHALTIC CONCRETE PAVEMENT OVERLAY
0543-02-055 FM 359 Approved MAY 2015 $24,596,610 1 RAILROAD GRADE SEPARATION ELEVATED T
0838-03-023 FM 361 Approved MAY 2015 $1,102,787 6 REPLACE BRIDGE AND APPROACHES NBI#12080083803014
0912-34-144 CS Actual DEC 2014 $20,864,455 3 WIDEN FROM 2 TO 4 LANES RURAL ROAD
0912-34-176 CR Approved JUN 2015 $2,590,611 6 REPLACE BRIDGE AND APPROACHES NBI# 12080AA0970002
0912-34-182 CS Approved JUL 2015 $7,012,343 3 CONSTRUCT 2 LANE CONCRETE ROADWAYS TO EXISTING INTERCHANGE
1258-03-042 FM 1093 Approved JUL 2015 $39,542,463 3 CONSTRUCT 4 TOLL LANES WITH TWO 2 - LANE FRONTAGE ROADS
1258-03-043 FM 1093 Approved JUL 2015 $43,733,444 3 4 TOLL LNS FROM W OF SPRING GREEN TO W OF KATY - GASTON & TWO
2105-01-020 FM 2234 Approved MAY 2015 $31,405,041 3 RECONSTRUCT AND WIDEN FROM 2 LANES TO 4 - LANE DIVIDED RURAL

Galveston County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0051-03-106 SH 3 Approved JUN 2015 $671,475 8 IMPROVE TRAFFIC SIGNALS AT INTERSECTION
0192-04-104 SH 6 Approved JUL 2015 $3,365,500 1 BASE REPAIR, SEAL COAT AND 1.5 IN PFC ACP O / L
0389-06-103 SH 146 Actual OCT 2014 $369,996 8 IMPROVE TRAFFIC SIGNAL
0500-01-143 IH 45 Actual MAR 2015 $259,722 8 IMPROVE TRAFFIC SIGNALS AT INTERSECTION
0500-04-126 IH 45 Actual APR 2015 $4,689,019 1 TRACKLESS TACK, 1 IN TOM - F & 1 IN ACP OVERLAY
0500-04-127 IH 45 Actual APR 2015 $4,583,511 1 TRACK FREE TACK COAT - HOT APPLIED, 1 IN CAM AND 1 IN THIN
0500-04-129 IH 45 Actual APR 2015 $4,920,505 1 TRACK FREE TACK COAT, 1 IN CAM AND 1 IN THIN OVERLAY MIX
0686-01-046 FM 1765 Actual NOV 2014 $481,774 8 INSTALL INTERSECTION FLASHING BEACON AND ADD LEFT TURN LANE
0912-73-182 CS Approved JUL 2015 $2,163,200 3 SCARIFY OR MILL 2 INCH OF EXISTING PAVEMENT AND PLACE 2 INCH
0912-73-201 VA Actual SEP 2014 $34,155 10 DISPOSAL OF DEBRIS AS A RESULT OF HURRICANE IKE
0912-73-203 VA Approved JUL 2015 $370,000 10 RENOVATION OF GALVESTON - BOLIVAR FERRY MAINTENANCE BUILDING
0978-01-034 FM 646 Approved JUL 2015 $12,773,213 1 WIDEN FROM 2 LANES TO 4 - LANE DIVIDED
1002-02-021 FM 517 Approved JUL 2015 $2,094,161 1 CONVERT OPEN DITCH SECTION TO A CLOSED SECTION W / STORM

Harris County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0028-02-091 US 90 Approved JUL 2015 $1,470,476 1 LANDSCAPE DEVELOPMENT
0050-06-079 US 290 Approved MAY 2015 $31,971,727 1 WIDEN TO 6 MAIN LANES WITH AUXILIARY LANES AND MILL ACP AND
0050-06-086 US 290 Approved MAY 2015 $32,945,262 2M WIDEN TO 8 MAIN LANES WITH AUXILIARY LANES AND TWO 2 - LANE
0051-02-088 SH 3 Actual JAN 2015 $1,056,577 1 DRAINAGE IMPROVEMENTS
0110-05-119 IH 45 Actual MAR 2015 $2,603,484 1 RECONFIGURE TO CREATE 2 MANAGED LANES
0114-12-007 US 290 Approved JUN 2015 $60,120,991 1 WIDEN TO 6 MAIN LANES WITH DISCONTINUOUS TWO 2 - LANE FRONTAGE
0177-11-150 IH 69 Actual APR 2015 $1,777,777 1 SEAL BRIDGE DECK CRACKING
0271-07-305 IH 10 Approved JUL 2015 $788,270 1 RESTRIPE IN SECTIONS TO ADD LANES TO PROVIDE 10 MAIN LANES
0271-14-232 IH 610 Approved JUL 2015 $577,278 10 LANDSCAPE DEVELOPMENT
0271-15-086 IH 610 Actual OCT 2014 $4,114,147 1 ASPHALT OVERLAY OF FRTG RDS AND CONNECTORS, ASPHALT SHOULDER
0389-13-057 SH 146 Actual SEP 2014 $224,351 1 1" MILLING, 1" ACP OVERLAY OF SHOULDERS / GORE AREAS AND
0500-03-571 IH 45 Approved JUL 2015 $2,212,000 1 RECONFIGURE EXISTING ALLEN PARKWAY SOUTHBOUND ENTRANCE RAMP
0500-03-572 IH 45 Actual SEP 2014 $28,468,889 ROW CONSTRUCT ENTRANCE AND EXIT RAMPS, REMOVE AND REPLACE
0500-03-575 IH 45 Actual FEB 2015 $1,176,662 1 INSTALL HIGH MAST LIGHTING
0502-01-209 SH 225 Actual MAR 2015 $229,926 8 IMPROVE TRAFFIC SIGNAL
0502-01-211 SH 225 Actual APR 2015 $684,682 1 PAVEMENT MARKINGS
0508-01-338 IH 10 Approved MAY 2015 $4,279,548 1 REPLACE FOUR ACP RAMPS AND FRTG RDS WITH FAST TRACK
0508-01-349 IH 10 Actual DEC 2014 $669,740 1 CONSTRUCT UTURN
0508-07-286 SS 330 Actual JAN 2015 $2,251,559 3 LEFT TURN LANE IMPROVEMENTS AT VARIOUS LOCATIONS ON THE
0912-00-440 VA Actual NOV 2014 $772,663 1 UPGRADE / RECONSTRUCT TRAFFIC SIGNALS
0912-00-472 VA Actual FEB 2015 $500,000 1 REHAB 10 DMS BOARDS
0912-00-488 VA Approved JUN 2015 $1,348,463 3 UPGRADE CONTROLLER COMMUNICATIONS HARDWARE, INSTALL WIRELESS
0912-00-503 VA Tentative AUG 2015 $3,750,000 7 METRO STAR VANPOOL PROGRAM FY 2015
0912-00-509 VA Actual SEP 2014 $3,708,936 1 REPAIR BRIDGE APPROACH SLABS
0912-00-529 VA Tentative AUG 2015 $8,000,000 3 FY 15 INCIDENT MANAGEMENT PROGRAM
0912-70-094 VA Actual NOV 2014 $1,698,653 1 REPLACE BRIDGE DECK, REP BRIDGE CONC STRUCTURES, INSTALL
0912-70-100 VA Actual FEB 2015 $3,140,223 10 CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS ALONG IH 45, SH 3,
0912-70-105 CR Approved JUN 2015 $3,142,456 3 INSTALL LED BRIDGE LIGHTING ON US 59 ARCH BRIDGES AND
0912-71-003 CS Actual JAN 2015 $13,919,000 3 ROADWAY RECONSTRUCTION
0912-71-627 VA Approved JUL 2015 $2,866,943 3 CITY OF HOUSTON RCTSS PROGRAM
0912-72-046 VA Actual OCT 2014 $960,080 3 BASE REPAIR WITH CONCRETE PANEL REPLACEMENT, REPAIR & IMPROVE
0912-72-072 CS Approved JUN 2015 $10,200,000 3 RECONSTRUCT & WIDEN TO 6 LANES INCLUDING 10 FT SHARED - USE
0912-72-276 CS Actual OCT 2014 $4,011,142 3 INSTALL ADVANCED TRAFFIC CONTROL DEVICES AT HATSS
0912-72-285 CS Actual FEB 2015 $548,725 6 REPLACE BRIDGE AND APPROACHES (NBI# 12102S44185001)
0912-72-302 VA Approved MAY 2015 $2,288,254 9 CONSTRUCT 10' SHARED USE PATH
0912-72-309 VA Actual OCT 2014 $1,880,145 3 ARTERIAL TRAVEL TIME SYSTEM (EXPANDED COVERAGE, APPROX 650
0912-72-310 VA Approved JUN 2015 $1,500,000 3 INSTALL FIBER CABLE AND COMMUNICATIONS EQUIPMENT CENTER TO
1062-05-009 FM 1942 Actual FEB 2015 $3,477,178 3 WIDEN ROADWAY FROM 2 TO 4 LANES TO MATCH HARRIS COUNTY
1258-04-060 FM 1093 Actual SEP 2014 $493,967 8 IMPROVE TRAFFIC SIGNAL
1812-01-021 FM 1942 Actual JAN 2015 $948,590 1 CONSTRUCT LEFT TURN LANE
2941-02-050 FM 2920 Approved JUL 2015 $3,022,281 1 BASE REPAIR, MILL, CRACK SEAL, 1.0 INCH THIN OVERLAY MIX,
3256-01-089 SL 8 Approved MAY 2015 150,258,781 3 WIDEN FROM 4 TO 8 MAIN LANES IN SECTIONS
3256-01-102 SL 8 Actual FEB 2015 $611,049 8 IMPROVE TRAFFIC SIGNAL
3256-01-104 BW 8 Actual NOV 2014 $500,000 3 LANDSCAPE DEVELOPMENT
3256-01-106 SL 8 Approved JUL 2015 $1,066,761 10 LANDSCAPE DEVELOPMENT
3256-02-089 SL 8 Approved JUL 2015 $26,000,000 1 ADD AUXILIARY LANES AND WIDEN BRIDGES
3510-05-036 SH 99 Approved MAY 2015 $2,445,526 3 CONSTRUCT SB FRONTAGE ROAD AND U - TURNS

Montgomery County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0110-03-053 SH 75 Actual SEP 2014 $1,747,731 1 BASE REPAIR AND 1.5" ACP O / L
0110-04-193 IH 45 Approved MAY 2015 $136,530 1 ADJUST SB FEEDER ROAD CONFIGURATION TO RETAIN 3 LANES
0177-05-093 IH 69 Approved MAY 2015 $5,210,174 3 CONSTRUCT NEW 2 - LANE FRONTAGE ROAD
0338-02-041 SH 105 Actual SEP 2014 $2,574,452 1 BASE REPAIR AND 1.5" ACP O / L
0912-37-221 CR Actual SEP 2014 $1,378,509 6 REPLACE BRIDGE AND APPROACHES (NBI# 12170AA0150001)
1259-01-036 FM 1097 Approved MAY 2015 $3,806,825 1 WIDEN FOR CLTL AND 2 IN OVERLAY
1259-01-039 FM 1097 Actual JAN 2015 $4,097,442 1 BASE REPAIR AND 1.5" ACP O / L
3158-01-037 FM 3083 Actual APR 2015 $4,452,712 1 BASE REPAIR AND 1.5 IN ACP O / L


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract