Letting Schedule for Houston District (FY 2015)

Last Update: Wednesday, September 24, 2014
Houston District (FY 2015)
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller

Brazoria County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0178-02-087 SH 35 Approved DEC 2014 $566,328 8 IMPROVE TRAFFIC SIGNALS AT INTERSECTION
0178-03-152 SH 35 Tentative MAR 2015 $1,750,000 1 ADD AUXILIARY LANE
0188-03-022 SH 36 Tentative MAR 2015 $11,950,000 3 GS OVER NEW SH 35, OVERLAY AND RESTRIPE PAVEMENT FROM 2 TO 4
0192-02-049 SH 6 Tentative JUN 2015 $109,000 3 LANDSCAPE DEVELOPMENT
0192-02-050 SH 6 Tentative MAR 2015 $1,250,000 1 CONSTRUCT ACCESS MANAGEMENT IMPROVEMENTS (MEDIAN,
0598-02-106 SH 288 Tentative AUG 2015 $7,300,000 3 CONSTRUCT SOUTHBOUND ON - RAMP, NORTHBOUND OFF - RAMP AND REPAIR
0912-31-266 VA Tentative AUG 2015 $270,000 10 LANDSCAPE DEVELOPMENT
0912-31-272 CS Tentative JUN 2015 $4,420,196 3 CONSTRUCT 4 - LANE UNDIVIDED ROAD
0912-31-273 CR Tentative MAY 2015 $6,450,617 3 WIDEN FROM 2 TO 4 - LANES DIVIDED WITH CURB AND GUTTER
0912-31-281 VA Approved OCT 2014 $510,710 1 SPALL REPAIR (NON - SITE SPECIFIC)
0912-31-289 CS Approved JAN 2015 $27,244,344 3 WIDENING TO 4 LANES DIVIDED WITH RAISED MEDIAN
0912-31-294 CR Tentative FEB 2015 $13,682,738 3 WIDEN FROM 2 TO 4 - LANE DIVIDED RURAL SECTION WITH 10 - FOOT
1003-01-091 FM 523 Approved JAN 2015 $6,250,000 1 ONE COURSE SURFACE TREATMENT, RICH BOTTOM LAYER AND 1.5" ACP
1524-01-078 SH 332 Tentative MAR 2015 $1,705,000 1 PAVEMENT REPAIR, MILLING, BASE REPAIR, 1.5" ACP OVERLAY AND
1684-01-021 FM 1128 Tentative APR 2015 $1,945,000 1 PAVEMENT REPAIR, BASE REPAIR AND 1.5" ACP OVERLAY
2523-02-067 FM 2004 Approved DEC 2014 $316,741 1 BRIDGE JOINT REPAIR

Fort Bend County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0027-06-051 US 90A Tentative JUN 2015 $16,600,000 1 ADD 10 - FOOT SHOULDERS, OVERLAY AND REPLACE BRIDGE CULVERTS
0027-06-056 US 90A Approved DEC 2014 $4,168,619 1 WB ONE - WAY PAIR, CRISS - CROSS, INTERSECTIONS AND 1.5" OVERLAY
0027-07-041 US 90A Tentative MAR 2015 $2,113,000 1 BASE REPAIR, 1.5" ACP O / L AND PAVEMENT MARKINGS
0111-03-031 FM 521 Tentative FEB 2015 $31,364,182 3 WIDEN TO 4 - LANE DIVIDED SECTION
0111-03-058 FM 521 Tentative APR 2015 $1,115,000 1 BASE REPAIR, 1.5" ACP O / L, JOINT CLEANING AND PAVEMENT
0543-02-055 FM 359 Tentative MAY 2015 $31,000,000 1 RAILROAD GRADE SEPARATION (ELEVATED T)
0543-02-063 FM 359 Tentative FEB 2015 $17,703,035 3 CONSTRUCT TWO 2 - LANE FRONTAGE ROADS
0543-02-065 FM 359 Tentative FEB 2015 $18,536,859 3 WIDEN TO 4 LANES ARTERIAL, NON TOLL
0543-02-070 FM 359 Tentative MAR 2015 $3,000,000 3 ENVIRONMENTAL REVIEW & PROCESSING FOR THE CONSTRUCTION OF A
0838-03-023 FM 361 Tentative MAY 2015 $1,135,000 6 REPLACE BRIDGE AND APPROACHES (NBI#12080083803014)
0912-34-143 CS Tentative MAR 2015 $1,680,000 3 CONSTRUCT 4 LANES CONCRETE DIVIDED, STORM SEWERS, ESPLANADE,
0912-34-144 CS Approved DEC 2014 $19,756,502 3 WIDEN FROM 2 TO 4 LANES RURAL ROAD
0912-34-162 VA Tentative JUL 2015 $2,938,101 3 CONSTRUCT SIDEWALKS AND TRAILS FOR IMPROVEMENT IN SUGAR LAND
0912-34-176 CR Tentative JUN 2015 $2,504,000 6 REPLACE BRIDGE AND APPROACHES (NBI# 12080AA0970002)
0912-34-182 CS Tentative MAR 2015 $4,910,641 3 CONSTRUCT 2 LANE CONCRETE ROADWAYS TO EXISTING INTERCHANGE
0912-34-187 VA Tentative JUN 2015 $1,200,000 3 INSTALLATION OF DYNAMIC MESSAGE SIGNS
1258-03-042 FM 1093 Tentative FEB 2015 $39,542,463 3 CONSTRUCT 4 TOLL LANES WITH TWO 2 - LANE FRONTAGE ROADS
1258-03-043 FM 1093 Tentative FEB 2015 $43,733,444 3 4 TOLL LNS FROM W OF SPRING GREEN TO W OF KATY - GASTON & TWO
2105-01-020 FM 2234 Tentative FEB 2015 $28,216,184 1 RECONSTRUCT AND WIDEN FROM 2 LANES TO 4 - LANE DIVIDED RURAL
3510-04-053 SH 99 Tentative APR 2015 $600,000 1 ADD MEDIAN LANES AND REBUILD TRAFFIC SIGNALS

Galveston County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0051-03-103 SH 3 Tentative MAY 2015 $207,000 1 FLEXIBLE BASE REPAIR, 1.5" PLANING AND 1.5" ACP O / L
0051-03-106 SH 3 Tentative JUN 2015 $953,349 8 IMPROVE TRAFFIC SIGNALS AT INTERSECTION
0192-04-104 SH 6 Tentative JUL 2015 $3,365,500 1 BASE REPAIR, SEAL COAT AND 1.5" PFC ACP O / L
0367-02-075 SH 87 Tentative MAY 2015 $1,000,000 3 REALIGN ROAD (ESTIMATE, WORK AND LPAFA PENDING)
0389-06-103 SH 146 Approved OCT 2014 $500,812 8 IMPROVE TRAFFIC SIGNAL
0500-01-143 IH 45 Tentative APR 2015 $634,319 8 IMPROVE TRAFFIC SIGNALS AT INTERSECTION
0500-04-126 IH 45 Tentative MAR 2015 $3,235,000 1 AR - BINDER SEAL COAT, 1" CAM & 1.5" ACP O / L
0500-04-127 IH 45 Tentative APR 2015 $2,282,000 1 TRACK FREE TACK COAT - HOT APPLIED, 1" CAM AND 1" THIN OVERLAY
0500-04-129 IH 45 Tentative APR 2015 $3,332,000 1 AR - BINDER SEAL COAT, 1" CAM & 1.5" ACP O / L
0500-04-134 IH 45 Tentative AUG 2015 $1,000,000 10 LANDSCAPE DEVELOPMENT
0686-01-046 FM 1765 Approved NOV 2014 $554,132 8 INSTALL INTERSECTION FLASHING BEACON AND ADD LEFT TURN LANE
0912-73-182 CS Tentative FEB 2015 $2,163,200 3 MILLING OF 4 INCHES AND 2 INCHES OF ASPHALT OVERLAY
0912-73-201 VA Actual SEP 2014 $34,155 10 DISPOSAL OF DEBRIS AS A RESULT OF HURRICANE IKE
1002-02-021 FM 517 Tentative JUL 2015 $2,100,000 1 CONVERT OPEN DITCH SECTION TO A CLOSED SECTION W / STORM
3312-02-014 FM 270 Tentative JUL 2015 $5,000,000 3 REALIGN ROADWAY

Harris County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0028-02-091 US 90 Tentative JUL 2015 $1,000,000 10 LANDSCAPE DEVELOPMENT
0050-06-086 US 290 Tentative JUL 2015 $31,000,000 2M WIDEN TO 8 MAIN LANES WITH AUXILIARY LANES AND TWO 2 - LANE
0050-09-089 US 290 Tentative AUG 2015 $41,500,000 3 CONSTRUCT 3 - LANE REVERSIBLE MANAGED LANE CONNECTOR AND
0051-02-088 SH 3 Approved JAN 2015 $830,735 1 DRAINAGE IMPROVEMENTS
0110-05-119 IH 45 Tentative MAR 2015 $2,000,000 3 RECONFIGURE TO CREATE 2 MANAGED LANES
0177-11-150 US 59 Tentative APR 2015 $2,600,000 1 SEAL BRIDGE DECK CRACKING
0271-06-121 IH 10 Tentative MAY 2015 $2,609,408 3 INTERSECTION ENHANCEMENTS AT 6 LOCATIONS (PED RAMPS,
0271-07-305 IH 10 Tentative MAY 2015 $3,000,000 1 INTERSECTION IMPROVEMENTS AND RESTRIPING FOR OPERATIONAL
0271-14-229 IH 610 Tentative AUG 2015 $24,000,000 3 CONSTRUCT 2 DIRECT CONNECTORS WITH ENTRANCE AND EXIT RAMPS
0271-14-232 IH 610 Tentative JUL 2015 $1,012,482 10 LANDSCAPE DEVELOPMENT
0271-15-086 IH 610 Approved OCT 2014 $4,246,381 1 ASPHALT OVERLAY OF FRTG RDS AND CONNECTORS, ASPHALT SHOULDER
0271-15-087 IH 610 Tentative FEB 2015 $500,000 1 PAVEMENT MARKINGS
0389-05-123 SH 146 Tentative JUN 2015 $1,677,000 10 LANDSCAPE DEVELOPMENT
0389-13-057 SH 146 Actual SEP 2014 $224,351 1 1" MILLING, 1" ACP OVERLAY OF SHOULDERS / GORE AREAS AND
0500-03-572 IH 45 Actual SEP 2014 $28,468,889 ROW CONSTRUCT ENTRANCE AND EXIT RAMPS, REMOVE AND REPLACE
0500-03-575 IH 45 Tentative FEB 2015 $1,182,231 1 INSTALL HIGH MAST LIGHTING
0502-01-209 SH 225 Tentative MAR 2015 $524,864 8 IMPROVE TRAFFIC SIGNAL
0502-01-211 SH 225 Tentative JUN 2015 $630,000 1 PAVEMENT MARKINGS
0508-01-338 IH 10 Tentative FEB 2015 $960,000 1 REPLACE FOUR ACP RAMPS AND FRTG RDS WITH FAST TRACK
0508-01-349 IH 10 Approved DEC 2014 $600,000 1 CONSTRUCT UTURN
0508-07-286 SS 330 Tentative FEB 2015 $1,900,000 3 LEFT TURN LANE IMPROVEMENTS AT VARIOUS LOCATIONS ON THE
0912-00-440 VA Approved NOV 2014 $902,749 1 UPGRADE / RECONSTRUCT TRAFFIC SIGNALS
0912-00-460 VA Tentative JUN 2015 $2,500,000 5 COMMUTE SOLUTIONS PROGRAM IMPLEMENTATION (COMMUTER AND
0912-00-472 VA Tentative FEB 2015 $500,000 1 REHAB 10 DMS BOARDS
0912-00-474 VA Tentative MAR 2015 $1,952,500 5 CLEAN AIR ACTION PROGRAM DEVELOPMENT, IMPLEMENTATION AND
0912-00-487 VA Tentative FEB 2015 $6,250,000 3 REGIONAL FREEWAY INCIDENT MANAGEMENT (YEAR 2)
0912-00-488 VA Tentative FEB 2015 $1,650,000 3 UPGRADE CONTROLLER COMMUNICATIONS HARDWARE, INSTALL WIRELESS
0912-00-499 VA Tentative JUN 2015 $1,380,000 5 COMMUTE SOLUTIONS STAFF AND OUTREACH (C.S. FUNDING INCLUDING
0912-00-501 VA Tentative JUL 2015 $1,600,000 5 METRO STAR VANPOOL PROGRAM (FY 2015)
0912-00-503 VA Tentative AUG 2015 $3,750,000 7 METRO STAR VANPOOL PROGRAM (FY 2015)
0912-00-506 VA Tentative AUG 2015 $6,000,000 5 DEVELOPING TRANSIT MARKET FLEET EXPANSION PROGRAM (YEAR 2)
0912-00-509 VA Actual SEP 2014 $3,708,936 1 REPAIR BRIDGE APPROACH SLABS
0912-70-082 CS Approved OCT 2014 $16,500,000 3 RECONSTRUCT AND WIDEN TO 4 - LANES DIVIDED WITH INTERSECTION
0912-70-086 CR Tentative FEB 2015 $412,074 8 IMPROVE TRAFFIC SIGNAL AT INTERSECTION
0912-70-094 VA Approved NOV 2014 $1,923,191 1 REPLACE BRIDGE DECK, REP BRIDGE CONC STRUCTURES, INSTALL
0912-70-100 VA Tentative FEB 2015 $1,500,000 10 CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS IN HARRIS COUNTY
0912-70-103 CR Tentative JUL 2015 $4,430,724 3 CONSTRUCT PEDESTRIAN AND BIKE BRIDGE OVER BRAYS BAYOU AND
0912-70-104 CR Tentative JUN 2015 $3,353,918 3 CONSTRUCT UNIVERSITY CONNECTION BIKE / PED PATH
0912-70-105 CR Tentative JUN 2015 $1,785,619 3 INSTALL LED BRIDGE LIGHTING ON US 59 ARCH BRIDGES AND
0912-71-003 CS Approved JAN 2015 $9,616,146 3 ROADWAY RECONSTRUCTION
0912-71-627 VA Tentative FEB 2015 $2,866,943 3 CITY OF HOUSTON RCTSS PROGRAM
0912-71-836 CS Tentative FEB 2015 $16,000,000 3 WIDEN TO 4 LANE DIVIDED
0912-72-072 CS Approved JAN 2015 $10,200,000 3 RECONSTRUCT & WIDEN TO 6 LANES INCLUDING 10 FT SHARED - USE
0912-72-132 VA Tentative FEB 2015 $2,536,832 3 CITY OF PASADENA SIGNAL PROGRAM
0912-72-285 CS Tentative FEB 2015 $449,839 6 REPLACE BRIDGE AND APPROACHES (NBI# 12102S44185001)
0912-72-289 CS Approved JAN 2015 $1,100,000 3 CONSTRUCTING A PEDESTRIAN BRIDGE AT BRINGHURST STREET IN
0912-72-299 VA Tentative JUL 2015 $1,130,600 3 MISSOURI KANSAS TEXAS TRAIL SPUR CONNECTOR
0912-72-301 VA Tentative JUL 2015 $1,658,000 9 CONSTRUCT OLD KATY BIKEWAY (SHARE USE PATH)
0912-72-302 VA Tentative MAY 2015 $2,374,451 1 CONSTRUCT 10' SHARED USE PATH
0912-72-310 VA Tentative JUN 2015 $1,500,000 3 INSTALL FIBER CABLE AND COMMUNICATIONS EQUIPMENT (CENTER TO
0912-72-311 CS Tentative MAY 2015 $5,000,000 3 CONSTRUCT 4 - LANE GRADE SEPARATION OVER HOLMES RD AND UPRR
0912-72-314 VA Tentative APR 2015 $3,978,230 3 CONSTRUCT MULTI - USE PATH
0912-72-315 VA Tentative APR 2015 $759,288 3 CONSTRUCT MULTI - USE PATH
0912-72-319 VA Tentative JUN 2015 $747,178 3 CONSTRUCT MULTI - USE PATH CONNECTORS / MISSING SEGMENTS
0912-72-322 CS Tentative MAY 2015 $13,500,000 3 DESIGN AND RECONSTRUCT ROADWAY WITH TRANSITWAY (YEAR 2)
0912-72-327 VA Tentative MAY 2015 $971,500 3 DESIGN AND CONSTRUCT MULTIMODAL TRANSIT CENTER / PARK & RIDE
0912-72-331 VA Tentative APR 2015 $5,663,625 3 DESIGN AND CONST NEW SIDEWALKS TO ENHANCE PEDESTRIAN SAFETY,
1062-05-009 FM 1942 Tentative FEB 2015 $1,350,000 1 WIDEN ROADWAY FROM 2 TO 4 LANES TO MATCH HARRIS COUNTY
1258-04-060 FM 1093 Actual SEP 2014 $493,967 8 IMPROVE TRAFFIC SIGNAL
1812-01-021 FM 1942 Approved JAN 2015 $1,000,000 1 CONSTRUCT LEFT TURN LANE
2941-02-050 FM 2920 Tentative MAR 2015 $2,730,000 1 BASE REPAIR, MILL, SEAL COAT INTERLAYER, 2.0" ACP OVERLAY &
3256-01-089 SL 8 Tentative MAY 2015 150,258,781 3 WIDEN FROM 4 TO 8 MAIN LANES IN SECTIONS
3256-01-102 SL 8 Tentative FEB 2015 $571,830 8 IMPROVE TRAFFIC SIGNAL
3256-01-106 BW 8 Tentative JUL 2015 $1,000,000 10 LANDSCAPE DEVELOPMENT
3312-01-008 FM 270 Tentative MAY 2015 $1,805,410 1 BICYCLE / PEDESTRIAN IMPROVEMENTS
3510-05-036 SH 99 Approved DEC 2014 $2,473,320 3 CONSTRUCT SB FRONTAGE ROAD AND U - TURNS

Montgomery County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0110-03-053 SH 75 Actual SEP 2014 $1,747,731 1 BASE REPAIR AND 1.5" ACP O / L
0110-04-195 IH 45 Tentative AUG 2015 $1,600,000 10 LANDSCAPE DEVELOPMENT
0338-02-041 SH 105 Actual SEP 2014 $2,574,452 1 BASE REPAIR AND 1.5" ACP O / L
0912-37-221 CR Actual SEP 2014 $1,378,509 6 REPLACE BRIDGE AND APPROACHES (NBI# 12170AA0150001)
1259-01-036 FM 1097 Tentative MAR 2015 $3,200,000 1 WIDEN FOR CLTL AND 2" OVERLAY
1259-01-039 FM 1097 Approved JAN 2015 $4,044,874 1 BASE REPAIR AND 1.5" ACP O / L
3050-02-024 FM 2978 Tentative JUN 2015 $12,483,000 1 WIDEN FROM 2 TO 4 LANES
3158-01-037 FM 3083 Tentative MAR 2015 $3,300,000 1 BASE REPAIR AND 1.5" ACP O / L

Waller County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0271-09-022 US 90 Tentative JUN 2015 $1,900,000 3 CONSTRUCT NEW INTERSECTION, BRIDGE WIDENING, SIGNALS AND A
3047-02-010 FM 529 Tentative APR 2015 $800,000 1 BASE REPAIR, SEAL COAT AND PAVEMENT MARKINGS


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract