Detail Letting Schedule for Randall County (FY 2015)

Last Update: Tuesday, September 29, 2015
Randall County (FY 2015)

CCSJ: 0534-01-020

District: Amarillo Let Date: APR 2015
Highway: PR 5 Let Status: Actual
Project ID: C 534-1-20 CSJ: 0534-01-020
Description: REPLACE CONCRETE WATER CROSSINGS Handling
Code:
 
Limits From: AT WATER CROSSINGS 3,4 AND 5 Fund Cat: 10
Limits To: WITHIN PALO DURO CANYON STATE PARK Estimate: $3,049,102
Length: 0.4 Miles Actual: $3,768,710
 
Back...

Totals for 0534-01-020
Length: 0.4 Miles
Estimate: $3,049,102
Actual: $3,768,710

CCSJ: 2635-02-028

District: Amarillo Let Date: APR 2015
Highway: IH 40 Let Status: Actual
Project ID: NH 1502(349) CSJ: 0275-01-168
Description: CONSTRUCT TURNAROUNDS AT SL 335 Handling
Code:
 
Limits From: AT SL335 (LAKESIDE) Fund Cat: 1
Limits To: . Estimate: $2,315,416
Length: 0.3 Miles Actual: $2,519,584
 
District: Amarillo Let Date: APR 2015
Highway: SL 335 Let Status: Actual
Project ID: STP 2013(605) CSJ: 2635-02-028
Description: PAVEMENT, STRUCTURE AND DRAINAGE Handling
Code:
 
Limits From: 0.13 MILES EAST OF GEORGIA ST. Fund Cat: 1
Limits To: 0.26 MILES WEST OF FM 1541 Estimate: $15,666,791
Length: 0.8 Miles Actual: $17,821,897
 
Back...

Totals for 2635-02-028
Length: 1.1 Miles
Estimate: $17,982,207
Actual: $20,341,481


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract