Detail Letting Schedule for Smith County (FY 2015)

Last Update: Tuesday, September 29, 2015
Smith County (FY 2015)

CCSJ: 0203-08-015

District: Tyler Let Date: JUN 2015
Highway: FM 1253 Let Status: Actual
Project ID: STP 1502(278)HES CSJ: 0203-08-015
Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH Handling
Code:
 
Limits From: CR 462(S), 1.3 MI N OF FM 857, S Fund Cat: 8
Limits To: FM 1805 Estimate: $2,161,323
Length: 3.9 Miles Actual: $2,348,774
 
District: Tyler Let Date: JUN 2015
Highway: FM 1804 Let Status: Actual
Project ID: STP 1502(279)HES CSJ: 1791-01-009
Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH Handling
Code:
 
Limits From: WOOD C/L, S Fund Cat: 8
Limits To: US 69 N OF LINDALE Estimate: $2,575,561
Length: 5.0 Miles Actual: $2,795,781
 
District: Tyler Let Date: JUN 2015
Highway: FM 2015 Let Status: Actual
Project ID: STP 1502(280)HES CSJ: 1934-02-004
Description: PROVIDE ADDITIONAL PAVED SURFACE WIDTH Handling
Code:
 
Limits From: FM 16, S Fund Cat: 8
Limits To: 1.4 MI N OF IH20 (SAND FLAT/CR313) Estimate: $2,112,443
Length: 3.1 Miles Actual: $2,354,944
 
Back...

Totals for 0203-08-015
Length: 12.0 Miles
Estimate: $6,849,327
Actual: $7,499,499

CCSJ: 0910-00-094

District: Tyler Let Date: SEP 2014
Highway: VA Let Status: Actual
Project ID: STP 2015(160) CSJ: 0910-00-094
Description: DISTRICT WIDE THERMOPLASTIC PAVEMENT MARKINGS PROGRAM Handling
Code:
 
Limits From: VARIOUS LOCATIONS IN Fund Cat: 1
Limits To: THE TYLER DISTRICT Estimate: $412,377
Length: 1.0 Miles Actual: $296,129
 
Back...

Totals for 0910-00-094
Length: 1.0 Miles
Estimate: $412,377
Actual: $296,129

CCSJ: 0910-16-117

District: Tyler Let Date: MAR 2015
Highway: CR Let Status: Actual
Project ID: BR 2012(174) CSJ: 0910-16-117
Description: REPLACE BRIDGE AND APPROACHES Handling
Code:
 
Limits From: CR 481 AT DUCK CREEK Fund Cat: 6
Limits To: STR# AA06-54-001 Estimate: $300,494
Length: 0.1 Miles Actual: $277,678
 
District: Tyler Let Date: MAR 2015
Highway: CR Let Status: Actual
Project ID: BR 2012(181) CSJ: 0910-16-118
Description: REPLACE BRIDGE AND APPROACHES Handling
Code:
 
Limits From: CR 452 AT DUCK CRK Fund Cat: 6
Limits To: STR# AA01-19-002 Estimate: $285,413
Length: 0.1 Miles Actual: $278,162
 
Back...

Totals for 0910-16-117
Length: 0.2 Miles
Estimate: $585,907
Actual: $555,840

CCSJ: 1790-02-038

District: Tyler Let Date: APR 2015
Highway: SL 323 Let Status: Actual
Project ID: NH 2015(623) CSJ: 1790-02-038
Description: REPAIR PAVEMENT & RESURFACE ROADWAY Handling
Code:
 
Limits From: 0.6 MI E OF US 271(AMER LEG RD), S Fund Cat: 1
Limits To: .24 MI N OF FM2767(COMMERCE)IN TYLR Estimate: $3,222,037
Length: 2.2 Miles Actual: $3,363,192
 
Back...

Totals for 1790-02-038
Length: 2.2 Miles
Estimate: $3,222,037
Actual: $3,363,192


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract