Detail Letting Schedule for Titus County (FY 2015)
Titus County (FY 2015) |
CCSJ: 0010-07-051 | |||
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0010-07-051 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | MORRIS C/L | Fund Cat: | 1 |
Limits To: | FM 1402 | Estimate: | $1,035,363 |
Length: | 8.0 Miles | Actual: | $754,974 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | US 67 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0010-08-054 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 259 | Fund Cat: | 1 |
Limits To: | TITUS C/L | Estimate: | $228,182 |
Length: | 4.7 Miles | Actual: | $225,785 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | SH 8 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0060-01-016 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | ARKANSAS SL | Fund Cat: | 1 |
Limits To: | 2.9 MI S OF ARKANSAS SL | Estimate: | $123,813 |
Length: | 2.9 Miles | Actual: | $123,553 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | SH 8 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0060-02-031 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 2.9 MI S OF ARKANSAS SL | Fund Cat: | 1 |
Limits To: | IH 30 | Estimate: | $164,891 |
Length: | 3.7 Miles | Actual: | $164,309 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | SH 11 | Let Status: | Actual |
Project ID: | STP 2015(169) | CSJ: | 0083-08-050 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 271 | Fund Cat: | 1 |
Limits To: | 0.9 MI. E. OF US 271 | Estimate: | $48,779 |
Length: | 0.9 Miles | Actual: | $48,328 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0085-01-046 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | BOWIE C/L | Fund Cat: | 1 |
Limits To: | IH 30 | Estimate: | $35,670 |
Length: | 0.8 Miles | Actual: | $35,596 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0085-02-048 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 0.3 MI S OF FM 44 | Fund Cat: | 1 |
Limits To: | MORRIS C/L | Estimate: | $377,082 |
Length: | 12.5 Miles | Actual: | $373,157 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | FM 992 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0085-02-049 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 44 S | Fund Cat: | 1 |
Limits To: | US 82 | Estimate: | $68,436 |
Length: | 2.3 Miles | Actual: | $67,410 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0096-03-072 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | WOOD C/L | Fund Cat: | 1 |
Limits To: | SH 155 S | Estimate: | $111,981 |
Length: | 1.6 Miles | Actual: | $110,768 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | FM 2208 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0138-12-023 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 134 | Fund Cat: | 1 |
Limits To: | HARRISON C/L | Estimate: | $243,634 |
Length: | 8.4 Miles | Actual: | $240,213 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | STP 2015(169) | CSJ: | 0208-01-024 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 1.0 MI N OF LP 390 | Fund Cat: | 1 |
Limits To: | LP 390 | Estimate: | $64,954 |
Length: | 1.0 Miles | Actual: | $64,687 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | STP 2015(169) | CSJ: | 0208-01-025 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | LP 390 | Fund Cat: | 1 |
Limits To: | US 59 | Estimate: | $165,157 |
Length: | 2.6 Miles | Actual: | $164,262 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | SH 43 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0208-02-040 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 2682 | Fund Cat: | 1 |
Limits To: | 1.0 MI N OF LP 390 | Estimate: | $186,040 |
Length: | 6.9 Miles | Actual: | $182,900 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | IH 369 | Let Status: | Actual |
Project ID: | NH 2015(173) | CSJ: | 0218-02-040 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 82 | Fund Cat: | 1 |
Limits To: | RR OVERPASS | Estimate: | $95,367 |
Length: | 2.4 Miles | Actual: | $93,609 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | IH 369 | Let Status: | Actual |
Project ID: | NH 2015(173) | CSJ: | 0218-02-041 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 82 | Fund Cat: | 1 |
Limits To: | RR OVERPASS | Estimate: | $89,472 |
Length: | 2.5 Miles | Actual: | $88,382 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | IH 369 | Let Status: | Actual |
Project ID: | NH 2015(173) | CSJ: | 0218-02-042 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | RR OVERPASS | Fund Cat: | 1 |
Limits To: | SH 93 | Estimate: | $19,206 |
Length: | 0.4 Miles | Actual: | $18,947 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | IH 369 | Let Status: | Actual |
Project ID: | NH 2015(173) | CSJ: | 0218-02-043 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | RR OVERPASS | Fund Cat: | 1 |
Limits To: | SH 93 | Estimate: | $17,554 |
Length: | 0.5 Miles | Actual: | $17,727 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | SH 49 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0222-02-054 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 0.2 MI E OF FM 144 S | Fund Cat: | 1 |
Limits To: | 0.1 MI W OF US 259 | Estimate: | $247,477 |
Length: | 5.2 Miles | Actual: | $246,309 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | SH 77 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0278-01-056 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1841 | Fund Cat: | 1 |
Limits To: | 0.5 MI E OF FM 1635 | Estimate: | $185,962 |
Length: | 3.9 Miles | Actual: | $185,150 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0392-02-089 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 0.5 MI S OF SH 155 | Fund Cat: | 1 |
Limits To: | MEDLIN CREEK | Estimate: | $127,888 |
Length: | 1.7 Miles | Actual: | $124,387 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0392-02-090 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 154 | Fund Cat: | 1 |
Limits To: | 0.5 MI S OF FM 3245 | Estimate: | $118,699 |
Length: | 1.4 Miles | Actual: | $115,626 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | SS 572 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0394-01-064 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 149 | Fund Cat: | 1 |
Limits To: | BU 59 D | Estimate: | $81,067 |
Length: | 1.2 Miles | Actual: | $80,361 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | SH 154 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0401-04-036 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | WOOD C/L | Fund Cat: | 1 |
Limits To: | 0.2 MI W OF FM 1795 | Estimate: | $178,084 |
Length: | 6.1 Miles | Actual: | $175,644 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | SH 154 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0402-01-024 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1650 | Fund Cat: | 1 |
Limits To: | FM 726 S | Estimate: | $119,157 |
Length: | 3.5 Miles | Actual: | $118,008 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | SH 154 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0402-02-033 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 726 S | Fund Cat: | 1 |
Limits To: | 0.7 MI W OF US 259 | Estimate: | $114,767 |
Length: | 3.3 Miles | Actual: | $113,644 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | FM 999 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0428-01-016 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 10 | Fund Cat: | 1 |
Limits To: | US 59 | Estimate: | $135,172 |
Length: | 5.2 Miles | Actual: | $133,102 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | SH 315 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0462-03-042 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | RUSK C/L | Fund Cat: | 1 |
Limits To: | FM 1970 | Estimate: | $581,558 |
Length: | 9.0 Miles | Actual: | $569,796 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | SH 155 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0520-02-058 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1404 | Fund Cat: | 1 |
Limits To: | 0.5 MI N OF UPRR | Estimate: | $128,478 |
Length: | 3.1 Miles | Actual: | $123,881 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | SH 155 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0520-03-032 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 49 | Fund Cat: | 1 |
Limits To: | MARION C/L | Estimate: | $180,003 |
Length: | 3.9 Miles | Actual: | $178,745 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | SH 155 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0520-04-032 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | CASS C/L | Fund Cat: | 1 |
Limits To: | UPSHUR C/L | Estimate: | $251,534 |
Length: | 5.3 Miles | Actual: | $250,068 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | FM 31 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0640-01-048 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | 0.1 MI N OF IH 20 | Fund Cat: | 1 |
Limits To: | FM 2625 | Estimate: | $165,755 |
Length: | 4.8 Miles | Actual: | $164,225 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | FM 123 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0731-01-050 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 79 | Fund Cat: | 1 |
Limits To: | FM 31 N | Estimate: | $90,878 |
Length: | 3.0 Miles | Actual: | $89,548 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | FM 2088 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 0964-02-029 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | WOOD C/L | Fund Cat: | 1 |
Limits To: | US 271 | Estimate: | $349,199 |
Length: | 13.2 Miles | Actual: | $341,863 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | FM 729 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 1018-03-041 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 155 | Fund Cat: | 1 |
Limits To: | HURRICANE CREEK | Estimate: | $283,901 |
Length: | 11.1 Miles | Actual: | $278,619 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | FM 729 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 1018-03-042 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | HURRICANE CREEK | Fund Cat: | 1 |
Limits To: | SH 49 | Estimate: | $231,990 |
Length: | 6.2 Miles | Actual: | $230,109 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | FM 989 | Let Status: | Actual |
Project ID: | STP 2015(169) | CSJ: | 1231-01-063 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 59 | Fund Cat: | 1 |
Limits To: | FM 2516 | Estimate: | $95,606 |
Length: | 2.9 Miles | Actual: | $94,634 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | SH 300 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 1385-01-035 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 271 | Fund Cat: | 1 |
Limits To: | 3.0 MI N OF FM 726 | Estimate: | $456,569 |
Length: | 5.3 Miles | Actual: | $456,135 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | FM 726 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 1896-03-015 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 300 | Fund Cat: | 1 |
Limits To: | FM 1650 | Estimate: | $102,041 |
Length: | 4.0 Miles | Actual: | $100,231 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | FM 1997 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 1919-02-035 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 3001 | Fund Cat: | 1 |
Limits To: | LP 390 | Estimate: | $166,328 |
Length: | 6.6 Miles | Actual: | $163,455 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | FM 959 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 2341-01-013 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 149 | Fund Cat: | 1 |
Limits To: | US 79 | Estimate: | $115,854 |
Length: | 4.1 Miles | Actual: | $114,263 |
District: | Atlanta | Let Date: | SEP 2014 |
Highway: | FM 2625 | Let Status: | Actual |
Project ID: | STP 2015(168) | CSJ: | 3283-01-016 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 31 | Fund Cat: | 1 |
Limits To: | FM 9 | Estimate: | $212,455 |
Length: | 8.6 Miles | Actual: | $209,117 |
Back... |
Totals for 0010-07-051 | ||
---|---|---|---|
Length: | 184.7 Miles | ||
Estimate: | $7,796,003 | ||
Actual: | $7,431,527 | ||
CCSJ: 0610-03-079 | |||
District: | Atlanta | Let Date: | DEC 2014 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | NH 2015(407) | CSJ: | 0610-03-079 |
Description: | RESURFACE EXISTING INTERSTATE FACILITY | Handling Code: |
|
Limits From: | FRANKLIN COUNTY LINE | Fund Cat: | 1 |
Limits To: | MORRIS COUNTY LINE | Estimate: | $13,018,958 |
Length: | 20.5 Miles | Actual: | $14,575,721 |
District: | Atlanta | Let Date: | DEC 2014 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | STP 2015(457)HES | CSJ: | 0610-03-081 |
Description: | IMPROVE GUARDRAIL TO DESIGN STANDARDS | Handling Code: |
|
Limits From: | FRANKLIN C/L | Fund Cat: | 1 |
Limits To: | MORRIS C/L | Estimate: | $1,069,259 |
Length: | 20.5 Miles | Actual: | $1,376,193 |
District: | Atlanta | Let Date: | DEC 2014 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | NH 2015(407) | CSJ: | 0610-04-031 |
Description: | RESURFACE EXISTING INTERSTATE FACILITY | Handling Code: |
|
Limits From: | TITUS COUNTY LINE | Fund Cat: | 1 |
Limits To: | WEST END OF SULPHUR RIVER BRIDGE | Estimate: | $4,945,249 |
Length: | 7.3 Miles | Actual: | $5,472,858 |
District: | Atlanta | Let Date: | DEC 2014 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | STP 2015(458)HES | CSJ: | 0610-04-032 |
Description: | IMPROVE GUARDRAIL TO DESIGN STANDARDS | Handling Code: |
|
Limits From: | TITUS C/L | Fund Cat: | 1 |
Limits To: | WEST END OF SULPHUR RIVER BRIDGE | Estimate: | $1,953,370 |
Length: | 7.3 Miles | Actual: | $2,091,580 |
District: | Atlanta | Let Date: | DEC 2014 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | NH 2015(407) | CSJ: | 0610-05-049 |
Description: | REPAIR PAVEMENT & RESURFACE EXISTING INTERSTATE FACILITY | Handling Code: |
|
Limits From: | WEST END OF SULPHUR RIVER BRIDGE | Fund Cat: | 1 |
Limits To: | SH 98 | Estimate: | $8,296,765 |
Length: | 17.1 Miles | Actual: | $8,147,236 |
District: | Atlanta | Let Date: | DEC 2014 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | STP 2015(459)HES | CSJ: | 0610-05-050 |
Description: | IMPROVE GUARDRAIL TO DESIGN STANDARDS | Handling Code: |
|
Limits From: | WEST END OF SULPHUR RIVER BRIDGE | Fund Cat: | 1 |
Limits To: | FM 44 | Estimate: | $1,452,695 |
Length: | 7.7 Miles | Actual: | $1,350,199 |
District: | Atlanta | Let Date: | DEC 2014 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | STP 2015(460)HES | CSJ: | 0610-06-081 |
Description: | IMPROVE GUARDRAIL TO DESIGN STANDARDS | Handling Code: |
|
Limits From: | SS 86 | Fund Cat: | 1 |
Limits To: | 0.3 MI. W. OF SS 74 | Estimate: | $268,833 |
Length: | 5.7 Miles | Actual: | $366,152 |
District: | Atlanta | Let Date: | DEC 2014 |
Highway: | IH 30 | Let Status: | Actual |
Project ID: | STP 2015(461)HES | CSJ: | 0610-07-101 |
Description: | IMPROVE GUARDRAIL TO DESIGN STANDARDS | Handling Code: |
|
Limits From: | 0.3 MI. W. OF SS 74 | Fund Cat: | 1 |
Limits To: | ARKANSAS STATE LINE | Estimate: | $247,964 |
Length: | 11.9 Miles | Actual: | $345,389 |
Back... |
Totals for 0610-03-079 | ||
Length: | 98.0 Miles | ||
Estimate: | $31,253,093 | ||
Actual: | $33,725,328 |
|