Detail Letting Schedule for Hidalgo County (FY 2016)
Hidalgo County (FY 2016) |
CCSJ: 0039-04-122 | |||
District: | Pharr | Let Date: | JAN 2016 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | STP 2016(486)HES | CSJ: | 0039-04-122 |
Description: | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT | Handling Code: |
|
Limits From: | @ JENNIFER ST. | Fund Cat: | 8 |
Limits To: | . | Estimate: | $46,024 |
Length: | 0.2 Miles | Actual: | $38,076 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | STP 2016(487)HES | CSJ: | 0039-06-044 |
Description: | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT | Handling Code: |
|
Limits From: | @ DILWORTH RD. | Fund Cat: | 8 |
Limits To: | ;. | Estimate: | $22,547 |
Length: | 0.2 Miles | Actual: | $21,934 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2016(489)HES | CSJ: | 0220-03-032 |
Description: | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT | Handling Code: |
|
Limits From: | @ IGLESIA DRIVE | Fund Cat: | 8 |
Limits To: | . | Estimate: | $21,731 |
Length: | 0.2 Miles | Actual: | $20,623 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | IH 69C | Let Status: | Actual |
Project ID: | STP 2016(490)HES | CSJ: | 0255-08-104 |
Description: | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT | Handling Code: |
|
Limits From: | @ ELDORA RD. | Fund Cat: | 8 |
Limits To: | . | Estimate: | $38,323 |
Length: | 0.2 Miles | Actual: | $24,280 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | BU 281W | Let Status: | Actual |
Project ID: | STP 2016(491)HES | CSJ: | 0255-11-020 |
Description: | INSTALL INTERSECTION FLASHING BEACON , SAFETY LIGHTING AT | Handling Code: |
|
Limits From: | @ ALBERTA RD. | Fund Cat: | 8 |
Limits To: | . | Estimate: | $22,457 |
Length: | 0.2 Miles | Actual: | $21,494 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | FM 508 | Let Status: | Actual |
Project ID: | STP 2016(492)HES | CSJ: | 0342-04-031 |
Description: | INSTALL SAFETY LIGHTING | Handling Code: |
|
Limits From: | 0.3 MI W OF FM 1420 | Fund Cat: | 8 |
Limits To: | 0.3 MI E OF FM 1420 | Estimate: | $71,175 |
Length: | 0.6 Miles | Actual: | $62,638 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | FM 511 | Let Status: | Actual |
Project ID: | STP 2016(493)HES | CSJ: | 0684-02-026 |
Description: | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT | Handling Code: |
|
Limits From: | @ MARRS AVENUE | Fund Cat: | 8 |
Limits To: | . | Estimate: | $22,311 |
Length: | 0.2 Miles | Actual: | $23,045 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | FM 732 | Let Status: | Actual |
Project ID: | STP 2016(495)HES | CSJ: | 1057-02-028 |
Description: | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT | Handling Code: |
|
Limits From: | @ LONG LANE | Fund Cat: | 8 |
Limits To: | . | Estimate: | $21,744 |
Length: | 0.2 Miles | Actual: | $20,626 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | FM 732 | Let Status: | Actual |
Project ID: | STP 2016(496)HES | CSJ: | 1057-02-029 |
Description: | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT | Handling Code: |
|
Limits From: | @ CALLE PALOMA | Fund Cat: | 8 |
Limits To: | . | Estimate: | $21,839 |
Length: | 0.2 Miles | Actual: | $20,751 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | FM 800 | Let Status: | Actual |
Project ID: | STP 2016(497)HES | CSJ: | 1136-01-019 |
Description: | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT | Handling Code: |
|
Limits From: | @ KISKADEE CT. | Fund Cat: | 8 |
Limits To: | , | Estimate: | $21,839 |
Length: | 0.1 Miles | Actual: | $20,751 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | FM 1425 | Let Status: | Actual |
Project ID: | STP 2016(498)HES | CSJ: | 1428-01-026 |
Description: | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT | Handling Code: |
|
Limits From: | @ MILE 9 NORTH RD. | Fund Cat: | 8 |
Limits To: | . | Estimate: | $22,833 |
Length: | 0.2 Miles | Actual: | $22,807 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | FM 907 | Let Status: | Actual |
Project ID: | STP 2016(499)HES | CSJ: | 1586-01-073 |
Description: | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT | Handling Code: |
|
Limits From: | @ MILE 17 1/2 NORTH RD. | Fund Cat: | 8 |
Limits To: | . | Estimate: | $24,889 |
Length: | 0.2 Miles | Actual: | $25,254 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | FM 1925 | Let Status: | Actual |
Project ID: | STP 2016(500)HES | CSJ: | 1803-01-093 |
Description: | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT | Handling Code: |
|
Limits From: | @ TROSPER RD. | Fund Cat: | 8 |
Limits To: | . | Estimate: | $22,885 |
Length: | 0.2 Miles | Actual: | $23,061 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | FM 2062 | Let Status: | Actual |
Project ID: | STP 2016(501)HES | CSJ: | 1941-01-011 |
Description: | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT | Handling Code: |
|
Limits From: | @ ROYAL PALM DR. | Fund Cat: | 8 |
Limits To: | . | Estimate: | $22,772 |
Length: | 0.2 Miles | Actual: | $22,601 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | FM 2220 | Let Status: | Actual |
Project ID: | STP 2016(502)HES | CSJ: | 2094-01-060 |
Description: | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT | Handling Code: |
|
Limits From: | @ ROGERS RD. | Fund Cat: | 8 |
Limits To: | . | Estimate: | $21,734 |
Length: | 0.2 Miles | Actual: | $20,570 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | FM 2220 | Let Status: | Actual |
Project ID: | STP 2016(503)HES | CSJ: | 2094-01-061 |
Description: | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT | Handling Code: |
|
Limits From: | @ AUGUSTA AVE. | Fund Cat: | 8 |
Limits To: | . | Estimate: | $24,503 |
Length: | 0.2 Miles | Actual: | $25,039 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | FM 2128 | Let Status: | Actual |
Project ID: | STP 2016(504)HES | CSJ: | 2450-01-023 |
Description: | INSTALL SAFETY LIGHTING | Handling Code: |
|
Limits From: | 0.3 MI W OF SH 107 | Fund Cat: | 8 |
Limits To: | SH 107 | Estimate: | $60,891 |
Length: | 0.3 Miles | Actual: | $56,970 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | FM 2556 | Let Status: | Actual |
Project ID: | STP 2016(607)HES | CSJ: | 2529-01-021 |
Description: | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING_AT | Handling Code: |
|
Limits From: | @ CLARK RD. | Fund Cat: | 8 |
Limits To: | . | Estimate: | $22,758 |
Length: | 0.2 Miles | Actual: | $22,579 |
District: | Pharr | Let Date: | JAN 2016 |
Highway: | FM 2994 | Let Status: | Actual |
Project ID: | STP 2016(505)HES | CSJ: | 3044-01-012 |
Description: | INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT | Handling Code: |
|
Limits From: | @ HAND RD. | Fund Cat: | 8 |
Limits To: | . | Estimate: | $32,581 |
Length: | 0.2 Miles | Actual: | $32,052 |
Back... |
Totals for 0039-04-122 | ||
---|---|---|---|
Length: | 4.2 Miles | ||
Estimate: | $565,836 | ||
Actual: | $525,151 | ||
CCSJ: 0039-17-180 | |||
District: | Pharr | Let Date: | NOV 2015 |
Highway: | IH 2 | Let Status: | Actual |
Project ID: | NH 2016(326) | CSJ: | 0039-17-180 |
Description: | INTERCHANGE IMPROVEMENTS @ MAIN STREET & BICENTENNIAL | Handling Code: |
|
Limits From: | 0.209 MI W OF SP 115 | Fund Cat: | 1 |
Limits To: | 0.203 MI E OF SH 336 | Estimate: | $33,682,074 |
Length: | 1.2 Miles | Actual: | $43,588,077 |
District: | Pharr | Let Date: | NOV 2015 |
Highway: | IH 2 | Let Status: | Actual |
Project ID: | BR 2016(044) | CSJ: | 0039-17-186 |
Description: | REPLACE BRIDGE | Handling Code: |
|
Limits From: | IH 2 | Fund Cat: | 6 |
Limits To: | @ BICENTENNIAL RAMP,STR#0039-17-278 | Estimate: | $2,738,586 |
Length: | 0.1 Miles | Actual: | $2,514,580 |
Back... |
Totals for 0039-17-180 | ||
Length: | 1.3 Miles | ||
Estimate: | $36,420,660 | ||
Actual: | $46,102,657 | ||
CCSJ: 0039-18-114 | |||
District: | Pharr | Let Date: | OCT 2015 |
Highway: | IH 2 | Let Status: | Actual |
Project ID: | NH 2016(124) | CSJ: | 0039-18-114 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | FM 88 | Fund Cat: | 1 |
Limits To: | FM 1015 | Estimate: | $1,154,203 |
Length: | 2.1 Miles | Actual: | $1,055,223 |
District: | Pharr | Let Date: | OCT 2015 |
Highway: | IH 2 | Let Status: | Actual |
Project ID: | NH 2016(124) | CSJ: | 0039-18-115 |
Description: | OVERLAY_ (FRONTAGE LANES) | Handling Code: |
|
Limits From: | FM 1423 | Fund Cat: | 1 |
Limits To: | FM 88 | Estimate: | $2,177,237 |
Length: | 6.0 Miles | Actual: | $2,057,607 |
District: | Pharr | Let Date: | OCT 2015 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | NH 2016(123) | CSJ: | 0255-09-096 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | 0.25 MI S OF BUS 83 | Fund Cat: | 1 |
Limits To: | RIDGE RD | Estimate: | $491,454 |
Length: | 0.7 Miles | Actual: | $464,551 |
District: | Pharr | Let Date: | OCT 2015 |
Highway: | FM 494 | Let Status: | Actual |
Project ID: | STP 2016(125) | CSJ: | 0864-01-066 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | 0.25 MI S OF IH-2 | Fund Cat: | 1 |
Limits To: | RAIL ROAD TRACKS SOUTH OF FM 1016 | Estimate: | $938,789 |
Length: | 2.8 Miles | Actual: | $898,194 |
District: | Pharr | Let Date: | OCT 2015 |
Highway: | FM 494 | Let Status: | Actual |
Project ID: | STP 2016(125) | CSJ: | 0864-01-067 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | SH 495 | Fund Cat: | 1 |
Limits To: | VICTORIA ST | Estimate: | $629,312 |
Length: | 1.7 Miles | Actual: | $593,967 |
District: | Pharr | Let Date: | OCT 2015 |
Highway: | FM 3461 | Let Status: | Actual |
Project ID: | STP 2016(125) | CSJ: | 1802-02-013 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | IH-69C | Fund Cat: | 1 |
Limits To: | 0.1 MI WEST OF I RD. | Estimate: | $318,089 |
Length: | 0.9 Miles | Actual: | $293,387 |
Back... |
Totals for 0039-18-114 | ||
Length: | 14.2 Miles | ||
Estimate: | $5,709,084 | ||
Actual: | $5,362,929 | ||
CCSJ: 0039-18-118 | |||
District: | Pharr | Let Date: | DEC 2015 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | STP 2016(427) | CSJ: | 0039-03-103 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | WEST SIDE SPLIT AT HOLLAND AVE. | Fund Cat: | 1 |
Limits To: | EAST SIDE SPLIT AT MAYBERRY ST. | Estimate: | $111,233 |
Length: | 1.2 Miles | Actual: | $86,604 |
District: | Pharr | Let Date: | DEC 2015 |
Highway: | IH 2 | Let Status: | Actual |
Project ID: | NH 2016(426) | CSJ: | 0039-18-118 |
Description: | SEAL COAT_ (FRONTAGE ROADS) | Handling Code: |
|
Limits From: | FM 1015 | Fund Cat: | 1 |
Limits To: | HIDALGO/CAMERON COUNTY LINE | Estimate: | $811,552 |
Length: | 6.2 Miles | Actual: | $642,045 |
District: | Pharr | Let Date: | DEC 2015 |
Highway: | IH 2 | Let Status: | Actual |
Project ID: | NH 2016(426) | CSJ: | 0039-19-060 |
Description: | SEAL COAT_ (FRONTAGE ROADS) | Handling Code: |
|
Limits From: | HIDALGO/CAMERON COUNTY LINE | Fund Cat: | 1 |
Limits To: | CHESTER PARK RD | Estimate: | $856,456 |
Length: | 8.4 Miles | Actual: | $632,973 |
District: | Pharr | Let Date: | DEC 2015 |
Highway: | SH 495 | Let Status: | Actual |
Project ID: | STP 2016(427) | CSJ: | 0865-01-106 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 364 | Fund Cat: | 1 |
Limits To: | SH 107 | Estimate: | $225,199 |
Length: | 2.5 Miles | Actual: | $176,110 |
District: | Pharr | Let Date: | DEC 2015 |
Highway: | SH 364 | Let Status: | Actual |
Project ID: | STP 2016(427) | CSJ: | 0865-01-107 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 495 | Fund Cat: | 1 |
Limits To: | US 83 | Estimate: | $22,688 |
Length: | 0.2 Miles | Actual: | $17,798 |
District: | Pharr | Let Date: | DEC 2015 |
Highway: | FM 507 | Let Status: | Actual |
Project ID: | STP 2016(427) | CSJ: | 0873-01-026 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | LOOP 499 | Fund Cat: | 1 |
Limits To: | BUS 77 | Estimate: | $157,935 |
Length: | 1.7 Miles | Actual: | $118,123 |
District: | Pharr | Let Date: | DEC 2015 |
Highway: | FM 510 | Let Status: | Actual |
Project ID: | STP 2016(427) | CSJ: | 1057-03-040 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 2480 | Fund Cat: | 1 |
Limits To: | FM 803 | Estimate: | $298,335 |
Length: | 7.4 Miles | Actual: | $222,886 |
District: | Pharr | Let Date: | DEC 2015 |
Highway: | FM 510 | Let Status: | Actual |
Project ID: | STP 2016(427) | CSJ: | 1057-03-041 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 3462 | Fund Cat: | 1 |
Limits To: | FM 803 | Estimate: | $173,457 |
Length: | 4.6 Miles | Actual: | $139,945 |
District: | Pharr | Let Date: | DEC 2015 |
Highway: | FM 676 | Let Status: | Actual |
Project ID: | STP 2016(427) | CSJ: | 1064-01-035 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 492 | Fund Cat: | 1 |
Limits To: | SH 107 | Estimate: | $167,060 |
Length: | 3.9 Miles | Actual: | $128,376 |
District: | Pharr | Let Date: | DEC 2015 |
Highway: | FM 1017 | Let Status: | Actual |
Project ID: | STP 2016(427) | CSJ: | 1227-02-013 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | JIM HOGG/STARR COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 2686 | Estimate: | $275,235 |
Length: | 6.5 Miles | Actual: | $205,729 |
Back... |
Totals for 0039-18-118 | ||
Length: | 42.6 Miles | ||
Estimate: | $3,099,150 | ||
Actual: | $2,370,589 | ||
CCSJ: 0220-01-023 | |||
District: | Pharr | Let Date: | NOV 2015 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | CBI 1502(587) | CSJ: | 0220-01-023 |
Description: | WIDEN TO 4 LANE DIVIDED URBAN WITH OVERPASS AT SH 365 | Handling Code: |
LC |
Limits From: | 0.45 MI E OF SPUR 600 | Fund Cat: | 3 |
Limits To: | FM 2557 (STEWART RD) | Estimate: | $17,668,412 |
Length: | 1.8 Miles | Actual: | $17,541,942 |
District: | Pharr | Let Date: | NOV 2015 |
Highway: | CS | Let Status: | Actual |
Project ID: | CC 921-2-337 | CSJ: | 0921-02-337 |
Description: | CONSTRUCT CONNECTOR ROADWAY TO US 281 | Handling Code: |
LC |
Limits From: | US 281 (MILITARY RD.) | Fund Cat: | 3 |
Limits To: | SP 29 @ BSIF | Estimate: | $1,590,534 |
Length: | 0.7 Miles | Actual: | $1,883,604 |
Back... |
Totals for 0220-01-023 | ||
Length: | 2.5 Miles | ||
Estimate: | $19,258,946 | ||
Actual: | $19,425,546 | ||
CCSJ: 0255-06-065 | |||
District: | Pharr | Let Date: | OCT 2015 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | NH 1502(262) | CSJ: | 0255-06-065 |
Description: | SMA OVERLAY NB & SB LANES | Handling Code: |
|
Limits From: | 0.315 MI N OF SH 186 | Fund Cat: | 1 |
Limits To: | BROOKS/HIDALGO C.L. | Estimate: | $18,776,484 |
Length: | 15.5 Miles | Actual: | $16,635,028 |
District: | Pharr | Let Date: | OCT 2015 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | NH 1502(262) | CSJ: | 0255-07-132 |
Description: | SMA OVERLAY NORTH BOUND & SOUTH BOUND LANES | Handling Code: |
|
Limits From: | SH 186 | Fund Cat: | 1 |
Limits To: | .315 MI N OF SH 186 | Estimate: | $276,764 |
Length: | 0.3 Miles | Actual: | $261,170 |
Back... |
Totals for 0255-06-065 | ||
Length: | 15.8 Miles | ||
Estimate: | $19,053,248 | ||
Actual: | $16,896,198 | ||
CCSJ: 0342-02-049 | |||
District: | Pharr | Let Date: | SEP 2015 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 2016(059) | CSJ: | 0342-02-049 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: |
|
Limits From: | FLOODWAY | Fund Cat: | 1 |
Limits To: | FM 1015 | Estimate: | $2,689,592 |
Length: | 2.6 Miles | Actual: | $2,525,668 |
Back... |
Totals for 0342-02-049 | ||
Length: | 2.6 Miles | ||
Estimate: | $2,689,592 | ||
Actual: | $2,525,668 | ||
CCSJ: 0528-01-100 | |||
District: | Pharr | Let Date: | MAR 2016 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 2016(429) | CSJ: | 0528-01-100 |
Description: | REHABILITATE EXISTING ROADWAY | Handling Code: |
|
Limits From: | FM 2993 | Fund Cat: | 1 |
Limits To: | 0.303 MI WEST OF GLASSCOCK RD. | Estimate: | $2,274,241 |
Length: | 1.7 Miles | Actual: | $2,081,791 |
Back... |
Totals for 0528-01-100 | ||
Length: | 1.7 Miles | ||
Estimate: | $2,274,241 | ||
Actual: | $2,081,791 | ||
CCSJ: 0621-01-100 | |||
District: | Pharr | Let Date: | NOV 2015 |
Highway: | SH 336 | Let Status: | Actual |
Project ID: | STP 2016(276)MM | CSJ: | 0621-01-100 |
Description: | MEDIANS WITH LANDSCAPING | Handling Code: |
|
Limits From: | TRENTON RD. | Fund Cat: | 3 |
Limits To: | SH 107 | Estimate: | $983,866 |
Length: | 2.8 Miles | Actual: | $842,320 |
District: | Pharr | Let Date: | NOV 2015 |
Highway: | SH 336 | Let Status: | Actual |
Project ID: | STP 2016(277) | CSJ: | 0621-01-105 |
Description: | OVERLAY | Handling Code: |
|
Limits From: | TRENTON RD. | Fund Cat: | 1 |
Limits To: | SH 107 | Estimate: | $957,973 |
Length: | 2.8 Miles | Actual: | $1,004,003 |
Back... |
Totals for 0621-01-100 | ||
Length: | 5.6 Miles | ||
Estimate: | $1,941,839 | ||
Actual: | $1,846,323 | ||
CCSJ: 0921-02-252 | |||
District: | Pharr | Let Date: | JUL 2016 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2010(761) | CSJ: | 0921-02-252 |
Description: | REPLACE BRIDGE & RECONST APPROACHES | Handling Code: |
|
Limits From: | STR #AA06-53-001 @ S FLOODWAY CHANL | Fund Cat: | 6 |
Limits To: | .40 MI E OF FM 907 | Estimate: | $629,674 |
Length: | 0.1 Miles | Actual: | $635,348 |
District: | Pharr | Let Date: | JUL 2016 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2012(630) | CSJ: | 0921-22-003 |
Description: | REPLACE BRIDGE & RECONST APPROACHES | Handling Code: |
|
Limits From: | CR 113 | Fund Cat: | 6 |
Limits To: | OVER LOS OLMOS CREEK | Estimate: | $354,965 |
Length: | 0.1 Miles | Actual: | $332,099 |
Back... |
Totals for 0921-02-252 | ||
Length: | 0.2 Miles | ||
Estimate: | $984,639 | ||
Actual: | $967,447 | ||
CCSJ: 0921-02-301 | |||
District: | Pharr | Let Date: | FEB 2016 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1502(510)MM | CSJ: | 0921-02-301 |
Description: | WIDEN TO 4 LANE DIVIDED - CURB & GUTTER SECTION | Handling Code: |
LC |
Limits From: | ON INSPIRATION RD., FROM IH 2/US 83 | Fund Cat: | 3 |
Limits To: | 0.15 MILES NORTH OF FM 1924 | Estimate: | $11,171,611 |
Length: | 3.0 Miles | Actual: | $6,998,410 |
Back... |
Totals for 0921-02-301 | ||
Length: | 3.0 Miles | ||
Estimate: | $11,171,611 | ||
Actual: | $6,998,410 | ||
CCSJ: 0921-02-324 | |||
District: | Pharr | Let Date: | AUG 2016 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2014(093)TE | CSJ: | 0921-02-324 |
Description: | CITY OF PHARR BICYCLE ACCESSIBILITY IMPROVEMENTS | Handling Code: |
|
Limits From: | WITHIN THE CITY OF PHARR, OWASSA RD | Fund Cat: | 3 |
Limits To: | MILITARY HIGHWAY | Estimate: | $478,762 |
Length: | 22.0 Miles | Actual: | $487,777 |
Back... |
Totals for 0921-02-324 | ||
Length: | 22.0 Miles | ||
Estimate: | $478,762 | ||
Actual: | $487,777 | ||
CCSJ: 0921-02-325 | |||
District: | Pharr | Let Date: | AUG 2016 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2014(102)TE | CSJ: | 0921-02-325 |
Description: | CONSTRUCT BENSTSEN ROAD HIKE & BIKE TRAIL | Handling Code: |
LC |
Limits From: | ON BENTSEN RD., FROM SH 495 | Fund Cat: | 3 |
Limits To: | NOLANA LOOP | Estimate: | $1,020,265 |
Length: | 1.6 Miles | Actual: | $1,273,162 |
Back... |
Totals for 0921-02-325 | ||
Length: | 1.6 Miles | ||
Estimate: | $1,020,265 | ||
Actual: | $1,273,162 | ||
CCSJ: 0921-02-339 | |||
District: | Pharr | Let Date: | OCT 2015 |
Highway: | VA | Let Status: | Actual |
Project ID: | BR 2016(126) | CSJ: | 0921-02-339 |
Description: | UPGRADE BRIDGE AND APPROACH RAILING | Handling Code: |
|
Limits From: | DISTRICT WIDE | Fund Cat: | 1 |
Limits To: | VARIOUS LOCATIONS | Estimate: | $1,702,502 |
Length: | 0.1 Miles | Actual: | $1,398,543 |
Back... |
Totals for 0921-02-339 | ||
Length: | 0.1 Miles | ||
Estimate: | $1,702,502 | ||
Actual: | $1,398,543 | ||
CCSJ: 0921-02-347 | |||
District: | Pharr | Let Date: | AUG 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 921-2-347 | CSJ: | 0921-02-347 |
Description: | REHABILITATION OF EXISTING CONTINUOUS HIGHWAY ILLUMINATION | Handling Code: |
|
Limits From: | COUNTYWIDE | Fund Cat: | 2M |
Limits To: | VARIOUS LOCATIONS ON IH-2 & IH-69C | Estimate: | $2,459,028 |
Length: | 0.1 Miles | Actual: | $2,161,095 |
District: | Pharr | Let Date: | AUG 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 921-6-300 | CSJ: | 0921-06-300 |
Description: | REHABILITATION OF EXISTING CONTINOUS HIGHWAY ILLUMINATION | Handling Code: |
|
Limits From: | COUNTYWIDE | Fund Cat: | 2M |
Limits To: | VARIOUS LOCATIONS ON IH-2 & IH-69E | Estimate: | $649,836 |
Length: | 10.2 Miles | Actual: | $569,144 |
District: | Pharr | Let Date: | AUG 2016 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 921-6-301 | CSJ: | 0921-06-301 |
Description: | REHABILITATION OF EXISTING CONTINUOUS HIGHWAY ILLUMINATION | Handling Code: |
|
Limits From: | COUNTYWIDE | Fund Cat: | 2M |
Limits To: | VARIOUS LOCATIONS ON IH-69E | Estimate: | $611,841 |
Length: | 1.0 Miles | Actual: | $444,310 |
Back... |
Totals for 0921-02-347 | ||
Length: | 11.3 Miles | ||
Estimate: | $3,720,705 | ||
Actual: | $3,174,549 | ||
CCSJ: 1803-01-037 | |||
District: | Pharr | Let Date: | OCT 2015 |
Highway: | FM 1925 | Let Status: | Actual |
Project ID: | STP 2016(127) | CSJ: | 1803-01-037 |
Description: | REHABILITATE ROADWAY | Handling Code: |
|
Limits From: | FM 681 | Fund Cat: | 1 |
Limits To: | FM 2220 | Estimate: | $9,422,827 |
Length: | 5.5 Miles | Actual: | $8,117,383 |
Back... |
Totals for 1803-01-037 | ||
Length: | 5.5 Miles | ||
Estimate: | $9,422,827 | ||
Actual: | $8,117,383 | ||
CCSJ: 1939-01-057 | |||
District: | Pharr | Let Date: | JUL 2016 |
Highway: | FM 2061 | Let Status: | Actual |
Project ID: | CRX 1939-1-57 | CSJ: | 1939-01-057 |
Description: | UPGRADED RAILROAD CROSSING PLANKING | Handling Code: |
XX |
Limits From: | FM 2061 (MCCOLL RD.), DOT #488 821V | Fund Cat: | 10 |
Limits To: | IN MCALLEN | Estimate: | $145,800 |
Length: | 0.1 Miles | Actual: | $145,800 |
Back... |
Totals for 1939-01-057 | ||
Length: | 0.1 Miles | ||
Estimate: | $145,800 | ||
Actual: | $145,800 | ||
CCSJ: 2966-01-009 | |||
District: | Pharr | Let Date: | NOV 2015 |
Highway: | SH 364 | Let Status: | Actual |
Project ID: | C 2966-1-9 | CSJ: | 2966-01-009 |
Description: | WIDEN TO 4 LANE DIVIDED URBAN | Handling Code: |
|
Limits From: | SH 495 N | Fund Cat: | 1 |
Limits To: | FM 1924 | Estimate: | $7,479,003 |
Length: | 2.0 Miles | Actual: | $6,848,710 |
Back... |
Totals for 2966-01-009 | ||
Length: | 2.0 Miles | ||
Estimate: | $7,479,003 | ||
Actual: | $6,848,710 |
|