0047-04-024 SH 5 Actual MAR 2016 $3,442,214 1 MILL, BASE REPAIR, OVERLAY
0047-06-133 US 75 Actual NOV 2015 $37,466,722 3 WIDEN D - C FROM PGBT TO NB US 75 & SB US 75 TO PGBT; EXT DART
0047-06-157 US 75 Actual SEP 2015 $1,527,421 1 FULL DEPTH CONCRETE REPAIR
0047-14-069 US 75 Actual DEC 2015 $79,417,673 1 RECONSTRUCT AND WIDEN 4 LANE TO 6 LANES AND 2 LANE FRONTAGE
0091-05-073 SH 289 Actual AUG 2016 $474,268 10 LANDSCAPE TREATMENT OF RIGHT OF WAY AND MEDIANS
0281-01-032 SH 78 Actual SEP 2015 $2,633,294 1 BASE REPAIR, MILL AND OVERLAY
0549-03-025 SH 121 Actual JAN 2016 $14,843,627 8 CONSTRUCTION OF SH 160 GRADE SEPARATION
0816-04-054 FM 455 Actual OCT 2015 $3,866,002 1 SHOULDER WIDENING, BASE REPAIR, OVERLAY AND GUARDRAIL
0816-05-023 FM 2862 Actual JUL 2016 $22,144 10 INSTALL RAILROAD CROSSING SURFACE
0918-24-203 VA Actual AUG 2016 $249,968 3 ON STREET BICYCLE FACILITIES;SIGNAGE;MARKINGS
0918-24-237 VA Actual AUG 2016 $1,379,874 3 UPDATE HUNT COUNTY TRANS PLAN TO IDENTIFY IMPROVEMENTS TO
1013-01-026 FM 546 Actual MAY 2016 $17,391,617 3 REALIGN HIGHWAY - CONSTRUCT FOUR LANE DIVIDED FACILITY
2351-01-020 FM 2478 Actual OCT 2015 $7,473,978 3 WIDEN FOUR LANE DIVIDED URBAN ROADWAY TO SIX LANES

Dallas County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0009-11-233 IH 30 Actual JUL 2016 $2,254,488 8 CONSTRUCT PREFAB PEDESTRIAN BRIDGE
0047-07-226 US 75 Actual DEC 2015 $3,097,136 1 PAINT RETAINING WALLS, BRIDGES, COLUMNS AND RAILS
0047-07-229 US 75 Actual AUG 2016 $834,794 10 LANDSCAPE MEDIAN AREAS AND BRIDGE AREAS (IN CITY OF DALLAS)
0092-02-122 SH 310 Actual JUN 2016 $1,320,321 1 IMPROVE GUARDRAIL TO DESIGN STANDARDS
0092-14-080 IH 345 Actual SEP 2015 $30,450,159 1 REHABILITATE JULIUS SCHEPPS OVERHEAD BRIDGE; REPAIR AND
0094-03-118 SS 482 Actual APR 2016 $1,154,671 8 CONCRETE FULL DEPTH REPAIR AND MBGR ON FRONTAGE ROADS
0095-02-102 US 80 Actual JUL 2016 $10,441,948 7 RAMP MODIFICATIONS & ADDITION OF AUXILIARY LANE ON FRONTAGE
0095-02-119 US 80 Actual MAR 2016 $3,008,042 1 DEPRESS ROADWAY
0197-02-122 US 175 Actual FEB 2016 103,886,640 ROW EXTEND US 175; RECON SM WRIGHT / SH 310 INC; 2 LN DC W OF INC;
0261-02-076 US 67 Actual APR 2016 $1,080,056 1 INSTALL SAFETY LIGHTING
0442-02-157 IH 35E Actual SEP 2015 $3,240,395 1 FULL DEPTH REPAIR CONCRETE PAVEMENT ON MAINLANES & FRONTAGE
0442-02-158 IH 35E Actual JUN 2016 $1,285,286 8 IMPROVE TRAFFIC SIGNALS
0581-01-141 SL 12 Actual APR 2016 $1,625,002 3 IMPROVE TRAFFIC SIGNALS
0918-00-187 VA Actual MAY 2016 $1,276,600 1 NON - SITE SPECIFIC SIGNAL CONTRACT ON NEW LOCATIONS
0918-00-208 VA Actual AUG 2016 $301,000 3 CONDUCT STATED PREFERENCE SURVEY TO ASSESS POTENTIAL
0918-00-214 VA Actual AUG 2016 $2,109,648 3 REGIONAL TRIP REDUCTION PROGRAM, VANPOOL PGM, BIKE / PEDESTRIAN
0918-00-215 VA Actual JUN 2016 $4,064,000 7 PROVIDE ASSISTANCE TO STRANDED MOTORISTS OR NON INJURY
0918-00-217 VA Actual AUG 2016 $4,151,000 3 REGIONAL TRIP REDUCTION PROGRAM, VANPOOL PGM, BIKE / PEDESTRIAN
0918-00-231 VA Actual FEB 2016 $1,500,000 3 FREEWAY INCIDENT MANAGEMENT PROGRAM; FY 2015 FUNDING;
0918-00-233 VA Actual JUN 2016 $949,021 3 REGIONAL CONGESTION MANAGEMENT PLANNING & DATA COLLECTION -
0918-00-237 VA Actual JAN 2016 $625,000 5 NCTCOG - - 511 TRAVELER INFORMATION SYSTEM; DEVELOP 511 SYSTEM
0918-00-239 VA Actual MAR 2016 $1,547,000 3 TRAVEL SURVEY AND DATA COLLECTION EFFORT FOR PROJECTS IN MPO
0918-00-256 VA Actual AUG 2016 $501,000 3 ALTERNATIVE FUEL VEHICLE DEPLOYMENT INITIATIVES; INCL.INCENT
0918-00-257 VA Actual AUG 2016 $501,000 3 IDLE - FREE SCHOOL ZONES; EDUCATION STRATEGIES AND
0918-00-260 VA Actual AUG 2016 $1,501,000 3 DART - - 511 TRAVELER INFORMATION SYSTEM; DEVELOP 511 SYSTEM
0918-00-262 VA Actual FEB 2016 $1,050,000 3 AIR QUALITY MARKETING AND EDUCATION PROGRAM
0918-45-791 CS Actual NOV 2015 $1,305,085 6 REHAB BRIDGE AND APPROACHES
0918-45-853 CS Actual NOV 2015 $6,335,394 ROW RECONSTRUCT CITY STREET AND SIGNAL IMPROVEMENTS AT
0918-47-016 VA Actual MAY 2016 $521,561 3 SIGNAL RETIMING AND LOOP DETECTOR REPLACEMENT
0918-47-119 VA Actual SEP 2015 $60,000,000 3 OPERATIONAL IMPROVEMENTS; EXTEND STATION PLATFORMS TO
0918-47-120 CS Actual MAY 2016 $1,300,501 3 IMPROVE TRAFFIC SIGNALS
0918-47-151 CS Actual FEB 2016 $96,977 8 IMPROVE TRAFFIC SIGNALS
0918-47-166 CS Actual FEB 2016 $246,890 8 INSTALL RAILROAD WARNING SIGNALS AND GATES
0918-47-167 CS Actual FEB 2016 $378,000 8 INSTALL RAILROAD WARNING SIGNALS AND GATES
0918-47-169 CS Actual JUL 2016 $107,199 10 REPAIR ROADWAY
0918-47-170 CS Actual JUL 2016 $12,552 10 REPAIR ROADWAY
0918-47-171 CS Actual JUL 2016 $496,369 10 REPAIR ROADWAY
0918-47-172 CS Actual AUG 2016 $221,477 10 REPAIR ROADWAY
0918-47-173 CS Actual JUL 2016 $221,477 10 REPAIR ROADWAY
0918-47-174 CS Actual JUL 2016 $32,497 10 REPAIR ROADWAY
1047-03-070 FM 1382 Actual JUL 2016 $6,048,901 5 INSTALL TRAFFIC SIGNAL
1068-04-122 IH 30 Actual DEC 2015 $25,185,923 ROW CONSTRUCT THREE LANE FRONTAGE ROADS
1068-04-148 IH 30 Actual FEB 2016 $7,991,673 7 CONSTRUCT 0 TO 2 / 3 LANE EASTBOUND FRONTAGE ROAD AND RAMP
2374-02-149 IH 635 Actual AUG 2016 $821,756 10 LANDSCAPE TREATMENT FOR RIGHT OF WAY AND MEDIANS
2374-04-077 IH 20 Actual MAY 2016 $1,241,391 1 INTERSECTION IMPROVEMENTS ON EB FRT RD AT WHEATLAND RD; ADD

Denton County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0081-13-041 IH 35W Actual SEP 2015 $15,427,422 1 CONSTRUCT 2 LANE SOUTHBOUND FRONTAGE ROADS WITH RAMP
0135-10-055 US 377 Actual JAN 2016 $5,166,238 1 FULL DEPTH CONCRETE REPAIR AND PAVEMENT MARKING
0353-02-075 SH 114 Actual JUN 2016 $693,594 1 FLEXIBLE PAVEMENT REPAIR, MILL, OVERLAY AND PAVEMENT
0718-01-064 FM 156 Actual NOV 2015 $32,541,856 3 WIDEN 2 LANE RURAL TO 4 LANE DIVIDED URBAN CROSS SECTION
0816-02-076 FM 455 Actual JUL 2016 $4,986,229 1 CONSTRUCT PAVED SHOULDERS (1 - 4FT)
0918-46-272 CS Actual JUL 2016 $6,719,415 3 BICYCLE AND PEDESTRIAN FACILITY - 10 WIDE CONCRETE PATH AND
0918-46-288 VA Actual AUG 2016 $1,056,379 3 VANPOOL SUBSIDY INITIATIVE FOR COMMUTERS TRAVELING LONG DIST
0918-46-293 CS Actual AUG 2016 $55,663 10 REPLACE CULVERT, REPAIR ROADWAY AND RESURFACE
0918-46-294 CS Actual JUL 2016 $186,337 10 REPAIR ROADWAY
0918-46-295 CS Actual JUL 2016 $172,508 10 REPAIR ROADWAY
0918-46-296 CS Actual JUL 2016 $116,990 10 REPAIR ROADWAY
0918-46-297 CS Actual JUL 2016 $383,175 10 REPAIR ROADWAY

Ellis County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0048-03-092 US 77 Actual SEP 2015 $10,510,815 1 SEAL COAT, PAVEMENT MARKINGS
0048-08-049 IH 35E Actual SEP 2015 $35,775,603 1 WIDEN 4 LANE RURAL TO 6 LANES
0092-03-049 IH 45 Actual MAY 2016 $1,185,768 5 INSTALLATION OF WIRELESS ITS
0092-03-051 IH 45 Actual AUG 2016 $494,158 10 REPAIR OF SLOPE FAILURE ON FRONTAGE ROAD
0172-04-045 US 287 Actual AUG 2016 $1,138,651 10 REPAIR OF SLOPE FAILURE
0568-01-050 SH 34 Actual JUN 2016 $994,419 8 INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES
0568-01-051 SH 34 Actual JUL 2016 $77,504 10 INSTALL RAILROAD CROSSING SURFACE
0596-02-037 FM 66 Actual NOV 2015 $2,694,786 6 REPLACE BRIDGE AND APPROACHES
0815-08-031 FM 875 Actual APR 2016 $8,799,581 1 WIDEN, SAFETY TREAT FIXED OBJECTS AND CENTERLINE TEXTURING
0918-22-141 CR Actual DEC 2015 $1,038,508 6 REPLACE BRIDGE AND APPROACHES
0918-22-154 CS Actual JAN 2016 $238,887 8 INSTALL GRADE CROSSING WARNING DEVICES
1050-01-017 FM 85 Actual OCT 2015 $12,874,396 1 ADD SHOULDERS AND REHABILITATE ROADWAY

Kaufman County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0095-03-087 US 80 Actual JUN 2016 $5,049,368 1 RELOCATION OF EB US 80 ENTRANCE & EXIT RAMPS BETWEEN FM 460
0173-10-001 SH 34 Actual NOV 2015 $699,319 3 INSTALL CONTINUOUS ILLUMINATION ON EXISTING HIGHWAY
0197-03-071 US 175 Actual MAY 2016 $1,913,970 1 SPOT BASE REPAIR, MILL AND OVERLAY ON FRONTAGE ROADS
0495-01-070 IH 20 Actual MAR 2016 $2,582,662 6 INSTALL CABLE BARRIER SYSTEM IN MEDIAN
1217-03-019 FM 1388 Actual DEC 2015 $22,041,072 1 PROVIDE ADDITIONAL PAVEMENT SURFACE AND OVERLAY
1397-01-030 FM 1836 Actual NOV 2015 $6,141,936 1 REHABILITATION OF EXISTING ROADWAY
1397-01-031 FM 1836 Actual JAN 2016 $5,943,147 1 RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS
1494-03-001 FM 3486 Actual APR 2016 $4,849,821 4 RECONSTRUCT 2 LANE CR TO 2 LANE FM HIGHWAY
3146-01-006 FM 148 Actual OCT 2015 $3,178,556 1 REHABILITATE EXISTING ROADWAY AND ADD SHOULDERS

Navarro County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0121-04-026 SH 22 Actual APR 2016 $6,426,066 1 HIGH FRICTION SURFACE TREATMENT, TEXTURE SHOULDERS AND CENTER
0162-11-001 SH 31 Actual NOV 2015 105,980,140 1 CONSTRUCT NEW LOCATION RELIEF ROUTE; ULTIMATE FOUR LANE
1289-01-029 FM 1126 Actual APR 2016 $6,714,488 6 REPLACE BRIDGE AND APPROACHES.

Rockwall County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0009-04-061 SH 66 Actual MAR 2016 $15,872,365 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0009-12-072 IH 30 Actual FEB 2016 $32,882,301 3 RECONSTRUCT INTERCHANGE AT FM 3549 INCLUDING FRONTAGE ROADS
0009-12-214 IH 30 Actual APR 2016 $3,485,857 3 REVERSE IH 30 RAMPS EAST OF SH 205
1014-02-041 FM 548 Actual OCT 2015 $13,784,401 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH AND OVERLAY
1016-03-013 FM 1138 Actual MAY 2016 $1,956,520 1 RESTORE EXISTING PAVEMENT AND ADD SHOULDERS


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract