Letting Schedule for Dallas District (FY 2016)
Dallas District (FY 2016) |
Collin | Dallas | Denton | Ellis | Kaufman | Navarro | Rockwall | ||||||
Collin County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0047-04-024 | SH 5 | Actual | MAR 2016 | $3,442,214 | 1 | MILL, BASE REPAIR, OVERLAY |
0047-06-133 | US 75 | Actual | NOV 2015 | $37,466,722 | 3 | WIDEN D - C FROM PGBT TO NB US 75 & SB US 75 TO PGBT; EXT DART |
0047-06-157 | US 75 | Actual | SEP 2015 | $1,527,421 | 1 | FULL DEPTH CONCRETE REPAIR |
0047-14-069 | US 75 | Actual | DEC 2015 | $79,417,673 | 1 | RECONSTRUCT AND WIDEN 4 LANE TO 6 LANES AND 2 LANE FRONTAGE |
0091-05-073 | SH 289 | Actual | AUG 2016 | $474,268 | 10 | LANDSCAPE TREATMENT OF RIGHT OF WAY AND MEDIANS |
0281-01-032 | SH 78 | Actual | SEP 2015 | $2,633,294 | 1 | BASE REPAIR, MILL AND OVERLAY |
0549-03-025 | SH 121 | Actual | JAN 2016 | $14,843,627 | 8 | CONSTRUCTION OF SH 160 GRADE SEPARATION |
0816-04-054 | FM 455 | Actual | OCT 2015 | $3,866,002 | 1 | SHOULDER WIDENING, BASE REPAIR, OVERLAY AND GUARDRAIL |
0816-05-023 | FM 2862 | Actual | JUL 2016 | $22,144 | 10 | INSTALL RAILROAD CROSSING SURFACE |
0918-24-203 | VA | Actual | AUG 2016 | $249,968 | 3 | ON STREET BICYCLE FACILITIES;SIGNAGE;MARKINGS |
0918-24-237 | VA | Actual | AUG 2016 | $1,379,874 | 3 | UPDATE HUNT COUNTY TRANS PLAN TO IDENTIFY IMPROVEMENTS TO |
1013-01-026 | FM 546 | Actual | MAY 2016 | $17,391,617 | 3 | REALIGN HIGHWAY - CONSTRUCT FOUR LANE DIVIDED FACILITY |
2351-01-020 | FM 2478 | Actual | OCT 2015 | $7,473,978 | 3 | WIDEN FOUR LANE DIVIDED URBAN ROADWAY TO SIX LANES |
Dallas County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0009-11-233 | IH 30 | Actual | JUL 2016 | $2,254,488 | 8 | CONSTRUCT PREFAB PEDESTRIAN BRIDGE |
0047-07-226 | US 75 | Actual | DEC 2015 | $3,097,136 | 1 | PAINT RETAINING WALLS, BRIDGES, COLUMNS AND RAILS |
0047-07-229 | US 75 | Actual | AUG 2016 | $834,794 | 10 | LANDSCAPE MEDIAN AREAS AND BRIDGE AREAS (IN CITY OF DALLAS) |
0092-02-122 | SH 310 | Actual | JUN 2016 | $1,320,321 | 1 | IMPROVE GUARDRAIL TO DESIGN STANDARDS |
0092-14-080 | IH 345 | Actual | SEP 2015 | $30,450,159 | 1 | REHABILITATE JULIUS SCHEPPS OVERHEAD BRIDGE; REPAIR AND |
0094-03-118 | SS 482 | Actual | APR 2016 | $1,154,671 | 8 | CONCRETE FULL DEPTH REPAIR AND MBGR ON FRONTAGE ROADS |
0095-02-102 | US 80 | Actual | JUL 2016 | $10,441,948 | 7 | RAMP MODIFICATIONS & ADDITION OF AUXILIARY LANE ON FRONTAGE |
0095-02-119 | US 80 | Actual | MAR 2016 | $3,008,042 | 1 | DEPRESS ROADWAY |
0197-02-122 | US 175 | Actual | FEB 2016 | 103,886,640 | ROW | EXTEND US 175; RECON SM WRIGHT / SH 310 INC; 2 LN DC W OF INC; |
0261-02-076 | US 67 | Actual | APR 2016 | $1,080,056 | 1 | INSTALL SAFETY LIGHTING |
0442-02-157 | IH 35E | Actual | SEP 2015 | $3,240,395 | 1 | FULL DEPTH REPAIR CONCRETE PAVEMENT ON MAINLANES & FRONTAGE |
0442-02-158 | IH 35E | Actual | JUN 2016 | $1,285,286 | 8 | IMPROVE TRAFFIC SIGNALS |
0581-01-141 | SL 12 | Actual | APR 2016 | $1,625,002 | 3 | IMPROVE TRAFFIC SIGNALS |
0918-00-187 | VA | Actual | MAY 2016 | $1,276,600 | 1 | NON - SITE SPECIFIC SIGNAL CONTRACT ON NEW LOCATIONS |
0918-00-208 | VA | Actual | AUG 2016 | $301,000 | 3 | CONDUCT STATED PREFERENCE SURVEY TO ASSESS POTENTIAL |
0918-00-214 | VA | Actual | AUG 2016 | $2,109,648 | 3 | REGIONAL TRIP REDUCTION PROGRAM, VANPOOL PGM, BIKE / PEDESTRIAN |
0918-00-215 | VA | Actual | JUN 2016 | $4,064,000 | 7 | PROVIDE ASSISTANCE TO STRANDED MOTORISTS OR NON INJURY |
0918-00-217 | VA | Actual | AUG 2016 | $4,151,000 | 3 | REGIONAL TRIP REDUCTION PROGRAM, VANPOOL PGM, BIKE / PEDESTRIAN |
0918-00-231 | VA | Actual | FEB 2016 | $1,500,000 | 3 | FREEWAY INCIDENT MANAGEMENT PROGRAM; FY 2015 FUNDING; |
0918-00-233 | VA | Actual | JUN 2016 | $949,021 | 3 | REGIONAL CONGESTION MANAGEMENT PLANNING & DATA COLLECTION - |
0918-00-237 | VA | Actual | JAN 2016 | $625,000 | 5 | NCTCOG - - 511 TRAVELER INFORMATION SYSTEM; DEVELOP 511 SYSTEM |
0918-00-239 | VA | Actual | MAR 2016 | $1,547,000 | 3 | TRAVEL SURVEY AND DATA COLLECTION EFFORT FOR PROJECTS IN MPO |
0918-00-256 | VA | Actual | AUG 2016 | $501,000 | 3 | ALTERNATIVE FUEL VEHICLE DEPLOYMENT INITIATIVES; INCL.INCENT |
0918-00-257 | VA | Actual | AUG 2016 | $501,000 | 3 | IDLE - FREE SCHOOL ZONES; EDUCATION STRATEGIES AND |
0918-00-260 | VA | Actual | AUG 2016 | $1,501,000 | 3 | DART - - 511 TRAVELER INFORMATION SYSTEM; DEVELOP 511 SYSTEM |
0918-00-262 | VA | Actual | FEB 2016 | $1,050,000 | 3 | AIR QUALITY MARKETING AND EDUCATION PROGRAM |
0918-45-791 | CS | Actual | NOV 2015 | $1,305,085 | 6 | REHAB BRIDGE AND APPROACHES |
0918-45-853 | CS | Actual | NOV 2015 | $6,335,394 | ROW | RECONSTRUCT CITY STREET AND SIGNAL IMPROVEMENTS AT |
0918-47-016 | VA | Actual | MAY 2016 | $521,561 | 3 | SIGNAL RETIMING AND LOOP DETECTOR REPLACEMENT |
0918-47-119 | VA | Actual | SEP 2015 | $60,000,000 | 3 | OPERATIONAL IMPROVEMENTS; EXTEND STATION PLATFORMS TO |
0918-47-120 | CS | Actual | MAY 2016 | $1,300,501 | 3 | IMPROVE TRAFFIC SIGNALS |
0918-47-151 | CS | Actual | FEB 2016 | $96,977 | 8 | IMPROVE TRAFFIC SIGNALS |
0918-47-166 | CS | Actual | FEB 2016 | $246,890 | 8 | INSTALL RAILROAD WARNING SIGNALS AND GATES |
0918-47-167 | CS | Actual | FEB 2016 | $378,000 | 8 | INSTALL RAILROAD WARNING SIGNALS AND GATES |
0918-47-169 | CS | Actual | JUL 2016 | $107,199 | 10 | REPAIR ROADWAY |
0918-47-170 | CS | Actual | JUL 2016 | $12,552 | 10 | REPAIR ROADWAY |
0918-47-171 | CS | Actual | JUL 2016 | $496,369 | 10 | REPAIR ROADWAY |
0918-47-172 | CS | Actual | AUG 2016 | $221,477 | 10 | REPAIR ROADWAY |
0918-47-173 | CS | Actual | JUL 2016 | $221,477 | 10 | REPAIR ROADWAY |
0918-47-174 | CS | Actual | JUL 2016 | $32,497 | 10 | REPAIR ROADWAY |
1047-03-070 | FM 1382 | Actual | JUL 2016 | $6,048,901 | 5 | INSTALL TRAFFIC SIGNAL |
1068-04-122 | IH 30 | Actual | DEC 2015 | $25,185,923 | ROW | CONSTRUCT THREE LANE FRONTAGE ROADS |
1068-04-148 | IH 30 | Actual | FEB 2016 | $7,991,673 | 7 | CONSTRUCT 0 TO 2 / 3 LANE EASTBOUND FRONTAGE ROAD AND RAMP |
2374-02-149 | IH 635 | Actual | AUG 2016 | $821,756 | 10 | LANDSCAPE TREATMENT FOR RIGHT OF WAY AND MEDIANS |
2374-04-077 | IH 20 | Actual | MAY 2016 | $1,241,391 | 1 | INTERSECTION IMPROVEMENTS ON EB FRT RD AT WHEATLAND RD; ADD |
Denton County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0081-13-041 | IH 35W | Actual | SEP 2015 | $15,427,422 | 1 | CONSTRUCT 2 LANE SOUTHBOUND FRONTAGE ROADS WITH RAMP |
0135-10-055 | US 377 | Actual | JAN 2016 | $5,166,238 | 1 | FULL DEPTH CONCRETE REPAIR AND PAVEMENT MARKING |
0353-02-075 | SH 114 | Actual | JUN 2016 | $693,594 | 1 | FLEXIBLE PAVEMENT REPAIR, MILL, OVERLAY AND PAVEMENT |
0718-01-064 | FM 156 | Actual | NOV 2015 | $32,541,856 | 3 | WIDEN 2 LANE RURAL TO 4 LANE DIVIDED URBAN CROSS SECTION |
0816-02-076 | FM 455 | Actual | JUL 2016 | $4,986,229 | 1 | CONSTRUCT PAVED SHOULDERS (1 - 4FT) |
0918-46-272 | CS | Actual | JUL 2016 | $6,719,415 | 3 | BICYCLE AND PEDESTRIAN FACILITY - 10 WIDE CONCRETE PATH AND |
0918-46-288 | VA | Actual | AUG 2016 | $1,056,379 | 3 | VANPOOL SUBSIDY INITIATIVE FOR COMMUTERS TRAVELING LONG DIST |
0918-46-293 | CS | Actual | AUG 2016 | $55,663 | 10 | REPLACE CULVERT, REPAIR ROADWAY AND RESURFACE |
0918-46-294 | CS | Actual | JUL 2016 | $186,337 | 10 | REPAIR ROADWAY |
0918-46-295 | CS | Actual | JUL 2016 | $172,508 | 10 | REPAIR ROADWAY |
0918-46-296 | CS | Actual | JUL 2016 | $116,990 | 10 | REPAIR ROADWAY |
0918-46-297 | CS | Actual | JUL 2016 | $383,175 | 10 | REPAIR ROADWAY |
Ellis County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0048-03-092 | US 77 | Actual | SEP 2015 | $10,510,815 | 1 | SEAL COAT, PAVEMENT MARKINGS |
0048-08-049 | IH 35E | Actual | SEP 2015 | $35,775,603 | 1 | WIDEN 4 LANE RURAL TO 6 LANES |
0092-03-049 | IH 45 | Actual | MAY 2016 | $1,185,768 | 5 | INSTALLATION OF WIRELESS ITS |
0092-03-051 | IH 45 | Actual | AUG 2016 | $494,158 | 10 | REPAIR OF SLOPE FAILURE ON FRONTAGE ROAD |
0172-04-045 | US 287 | Actual | AUG 2016 | $1,138,651 | 10 | REPAIR OF SLOPE FAILURE |
0568-01-050 | SH 34 | Actual | JUN 2016 | $994,419 | 8 | INSTALLATION OF RAILROAD WARNING SIGNALS AND GATES |
0568-01-051 | SH 34 | Actual | JUL 2016 | $77,504 | 10 | INSTALL RAILROAD CROSSING SURFACE |
0596-02-037 | FM 66 | Actual | NOV 2015 | $2,694,786 | 6 | REPLACE BRIDGE AND APPROACHES |
0815-08-031 | FM 875 | Actual | APR 2016 | $8,799,581 | 1 | WIDEN, SAFETY TREAT FIXED OBJECTS AND CENTERLINE TEXTURING |
0918-22-141 | CR | Actual | DEC 2015 | $1,038,508 | 6 | REPLACE BRIDGE AND APPROACHES |
0918-22-154 | CS | Actual | JAN 2016 | $238,887 | 8 | INSTALL GRADE CROSSING WARNING DEVICES |
1050-01-017 | FM 85 | Actual | OCT 2015 | $12,874,396 | 1 | ADD SHOULDERS AND REHABILITATE ROADWAY |
Kaufman County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0095-03-087 | US 80 | Actual | JUN 2016 | $5,049,368 | 1 | RELOCATION OF EB US 80 ENTRANCE & EXIT RAMPS BETWEEN FM 460 |
0173-10-001 | SH 34 | Actual | NOV 2015 | $699,319 | 3 | INSTALL CONTINUOUS ILLUMINATION ON EXISTING HIGHWAY |
0197-03-071 | US 175 | Actual | MAY 2016 | $1,913,970 | 1 | SPOT BASE REPAIR, MILL AND OVERLAY ON FRONTAGE ROADS |
0495-01-070 | IH 20 | Actual | MAR 2016 | $2,582,662 | 6 | INSTALL CABLE BARRIER SYSTEM IN MEDIAN |
1217-03-019 | FM 1388 | Actual | DEC 2015 | $22,041,072 | 1 | PROVIDE ADDITIONAL PAVEMENT SURFACE AND OVERLAY |
1397-01-030 | FM 1836 | Actual | NOV 2015 | $6,141,936 | 1 | REHABILITATION OF EXISTING ROADWAY |
1397-01-031 | FM 1836 | Actual | JAN 2016 | $5,943,147 | 1 | RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS |
1494-03-001 | FM 3486 | Actual | APR 2016 | $4,849,821 | 4 | RECONSTRUCT 2 LANE CR TO 2 LANE FM HIGHWAY |
3146-01-006 | FM 148 | Actual | OCT 2015 | $3,178,556 | 1 | REHABILITATE EXISTING ROADWAY AND ADD SHOULDERS |
Navarro County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0121-04-026 | SH 22 | Actual | APR 2016 | $6,426,066 | 1 | HIGH FRICTION SURFACE TREATMENT, TEXTURE SHOULDERS AND CENTER |
0162-11-001 | SH 31 | Actual | NOV 2015 | 105,980,140 | 1 | CONSTRUCT NEW LOCATION RELIEF ROUTE; ULTIMATE FOUR LANE |
1289-01-029 | FM 1126 | Actual | APR 2016 | $6,714,488 | 6 | REPLACE BRIDGE AND APPROACHES. |
Rockwall County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0009-04-061 | SH 66 | Actual | MAR 2016 | $15,872,365 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0009-12-072 | IH 30 | Actual | FEB 2016 | $32,882,301 | 3 | RECONSTRUCT INTERCHANGE AT FM 3549 INCLUDING FRONTAGE ROADS |
0009-12-214 | IH 30 | Actual | APR 2016 | $3,485,857 | 3 | REVERSE IH 30 RAMPS EAST OF SH 205 |
1014-02-041 | FM 548 | Actual | OCT 2015 | $13,784,401 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH AND OVERLAY |
1016-03-013 | FM 1138 | Actual | MAY 2016 | $1,956,520 | 1 | RESTORE EXISTING PAVEMENT AND ADD SHOULDERS |
|