Letting Schedule for January, 2016 (FY 2016)

Last Update: Tuesday, December 6, 2016
January, 2016 (FY 2016) (see Links)
SEP 2015 | OCT 2015 | NOV 2015 | DEC 2015 | JAN 2016 | FEB 2016 | MAR 2016 | APR 2016 | MAY 2016 | JUN 2016 | JUL 2016 | AUG 2016
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0200-01-082 Angelina/
Lufkin
US 69 Actual $861,311 6 SAFETY TREAT FIXED OBJECTS
0156-05-056 Archer/
Wichita Falls
US 82 Actual $4,811,526 1 2" OVERLAY - REMAINING PAVEMENT STRUCT
0527-07-007 Austin/
Yoakum
PR 38 Actual $1,368,077 6 REPLACE BRIDGE AND APPROACHES
0738-05-013 Bee/
Corpus Christi
FM 2441 Actual $4,303,828 8 WIDEN ROADWAY
0915-12-534 Bexar/
San Antonio
VA Actual $880,803 3 LOW IMPACT LANDSCAPING AROUND DOWNTOWN SAN ANTONIO FREEWAY
0915-12-560 Bexar/
San Antonio
VA Actual $20,520,000 9 BUS PURCHASE, PARK & RIDE FACILITIES, AND BUS STOP AMENITIES
0113-05-047 Blanco/
Austin
US 281 Actual $1,397,340 1 LEVEL UP, SEAL, THIN OVERLAY
0610-06-087 Bowie/
Atlanta
IH 30 Actual $88,000 6 REPAIR STEEL BEAM
0111-08-120 Brazoria/
Houston
SH 288 Actual $651,061 8 IMPROVE TRAFFIC SIGNALS AT INTERSECTION
0178-08-016 Brazoria/
Houston
BS 35-C Actual $504,498 8 FY 2016 RR SIGNAL & WARNING DEVICES (BNSF DOT# 022 645V)
0506-04-022 Burleson/
Bryan
FM 2155 Actual $1,647,283 6 REPLACE EXISTING BRIDGE CONSISTING OF GRADING, STRUCTURES,
0648-03-066 Burleson/
Bryan
FM 60 Actual $2,005,363 1 OVERLAY CONSISTING OF PLANING, HMA OVERLAY AND PAVEMENT
0006-07-076 Callahan/
Abilene
IH 20 Actual $249,107 6 REPAIR CULVERT SAFETY END TREATMENTS
0220-04-035 Cameron/
Pharr
US 281 Actual $12,496,310 1 CONSTRUCT RURAL 4 LANE
0044-02-079 Clay/
Wichita Falls
US 82 Actual $5,938,098 1 REPLACE BRIDGE AND APPROACH RAILING
0549-03-025 Collin/
Dallas
SH 121 Actual $14,843,627 8 CONSTRUCTION OF SH 160 GRADE SEPARATION
0266-03-029 Colorado/
Yoakum
SH 71 Actual $9,120,997 1 CONSTRUCT SUPER 2 LANES
0003-02-039 Culberson/
El Paso
IH 10 Actual $12,874,699 1 MILL AND INLAY
0918-00-237 Dallas/
Dallas
VA Actual $625,000 5 NCTCOG - - 511 TRAVELER INFORMATION SYSTEM; DEVELOP 511 SYSTEM
0135-10-055 Denton/
Dallas
US 377 Actual $5,166,238 1 FULL DEPTH CONCRETE REPAIR AND PAVEMENT MARKING
0300-03-066 Dimmit/
Laredo
US 277 Actual $9,546,333 1 RESURFACE OF EXISTING HIGHWAY
0925-10-036 Donley/
Childress
CR Actual $247,503 8 2015 FEDERAL RAILROAD SIGNAL PROGRAM
0086-10-049 Duval/
Laredo
SH 359 Actual $14,344,015 1 RESURFACE OF EXISTING HIGHWAY
2296-01-051 Ector/
Odessa
SH 191 Actual $4,387,312 11 HTMIX, FLBS, SEALCOAT, ILL, CLV & SGNS & PM
0924-06-154 El Paso/
El Paso
CS Actual $7,848,531 ROW OFF - SYSTEM BRIDGE REPLACEMENT
0924-06-466 El Paso/
El Paso
VA Actual $540,000 5 FORTY FT. BUS PURCHASE
0924-06-524 El Paso/
El Paso
VA Actual $1,250,000 5 PURCHASE TWO 35' BUSES AND ONE LOW FLOOR 28' BUS (TO ASSIST
0924-06-525 El Paso/
El Paso
VA Actual $2,100,000 5 WEST EL PASO TRAFFIC MITIGATION CIRCULATOR SERVICE
0918-22-154 Ellis/
Dallas
CS Actual $238,887 8 INSTALL GRADE CROSSING WARNING DEVICES
0343-04-042 Erath/
Fort Worth
SH 108 Actual $75,144 8 TEXTURIZE SHOULDERS
0026-03-043 Fayette/
Yoakum
US 90 Actual $958,370 8 SAFETY TREAT FIXED OBJECTS
0912-34-182 Fort Bend/
Houston
CS Actual $6,588,849 3 CONSTRUCT 2 LANE CONCRETE ROADWAYS TO EXISTING INTERCHANGE
0190-01-021 Franklin/
Paris
SH 37 Actual $20,387,244 1 RECONST & ADD 10' SHLDRS
0917-20-038 Freestone/
Bryan
CR Actual $490,735 6 REPLACE EXISTING BRIDGE CONSISTING OF GRADING, STRUCTURES,
1002-02-019 Galveston/
Houston
FM 517 Actual $3,082,201 1 BASE REPAIR, SEAL COAT, 1.5" ACP O / L AND PAVEMENT MARKINGS
0081-16-003 Grayson/
Paris
BU 377C Actual $178,510 10 LANDSCAPE DEVELOPMENT
0901-19-186 Grayson/
Paris
CS Actual $700,297 8 GRADE CROSSING PROTECTION
0271-07-305 Harris/
Houston
IH 10 Actual $1,166,378 1 RESTRIPE IN SECTIONS TO ADD LANES TO PROVIDE 10 MAIN LANES
1685-03-096 Harris/
Houston
FM 1960 Actual $191,208 1 PAVEMENT MARKINGS
0041-02-014 Hartley/
Amarillo
US 385 Actual $6,104,316 8 OVERLAY
0016-03-096 Hays/
Austin
IH 35 Actual $1,166,529 1 MILL & INLAY NB & SB FRONTAGE ROADS
0039-04-122 Hidalgo/
Pharr
BU 83-S Actual $525,151 8 INSTALL INTERSECTION FLASHING BEACON, SAFETY LIGHTING AT
0083-02-048 Hopkins/
Paris
SH 11 Actual $5,504,239 1 WIDEN ROADWAY
0109-04-029 Houston/
Lufkin
US 287 Actual $1,611,863 8 SAFETY TREAT FIXED OBJECTS
1725-01-012 Hunt/
Paris
FM 118 Actual $1,185,832 6 BRIDGE REPLACEMENT
0089-03-088 Jackson/
Yoakum
US 59 Actual $6,620,873 1 ACP OVERLAY
0422-03-073 Johnson/
Fort Worth
BU 67-M Actual $1,839,574 1 WEDGE MILL, SEAL, 2 INCHES HMAC OVERLAY SIGNAL WORK
1181-03-030 Johnson/
Fort Worth
FM 917 Actual $919,634 1 2" OVERLAY, PAVEMENT MARKINGS & FULL DEPTH PAVEMENT REPAIR
3348-01-019 Johnson/
Fort Worth
FM 3136 Actual $6,829,235 8 WIDEN PAVEMENT & ADD SHOULDERS
1397-01-031 Kaufman/
Dallas
FM 1836 Actual $5,943,147 1 RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS
0035-07-044 Kimble/
San Angelo
US 83 Actual $1,487,817 1 CONSTRUCT TRAFFIC SIGNALS AND IMPROVE INTERSECTION
0769-02-028 Lamar/
Paris
FM 906 Actual $5,917,664 1 REHAB
0117-04-041 Madison/
Bryan
US 190 Actual $2,150,935 1 OVERLAY CONSISTING OF PLANING, HMA OVERLAY AND PAVEMENT
0917-31-022 Madison/
Bryan
CR Actual $1,204,840 6 REPLACEMENT OF AN EXISTING BRIDGE FACILITY CONSISTING OF
0915-51-011 McMullen/
San Antonio
VA Actual $454,942 10 CONSTRUCT 12 NEW GRAVEL PARKING LOTS AND DRIVEWAYS
0912-37-226 Montgomery/
Houston
VA Actual $766,066 1 BASE REPAIR AND PAVEMENT LEVELING
1402-03-011 Montgomery/
Houston
FM 1375 Actual $1,297,510 1 OCST AND PAVEMENT MARKINGS
2560-01-076 Nacogdoches/
Lufkin
SL 224 Actual $789,787 1 RESURFACE WITH THIN OVERLAY MIXTURE
0883-02-068 Orange/
Beaumont
FM 105 Actual $2,668,331 1 ADD SHOULDERS
0441-07-062 Pecos/
Odessa
IH 10 Actual $23,135,092 9 CONSTRUCTION OF SAFETY REST AREA
0911-04-054 Polk/
Lufkin
VA Actual $2,009,215 10 REHABILITATE ROADS, PARKING LOTS, AND CAMPSITE PULLOUTS IN
0904-11-059 Randall/
Amarillo
CS Actual $43,673 8 2016 FED RAILROAD SIGNAL PR2016 FED
0901-27-029 Red River/
Paris
CS Actual $1,506,399 6 REPLACE BRIDGE AND APPROACHES
0169-08-022 Roberts/
Amarillo
US 60 Actual $996,579 8 CENTERLINE TEXTURING
0118-10-058 San Augustine/
Lufkin
SH 21 Actual $5,229,088 6 REPLACE BRIDGE AND APPROACHES
0008-04-046 Tarrant/
Fort Worth
SS 580 Actual $3,743,232 1 HMAC OVERLAY
0902-00-142 Tarrant/
Fort Worth
VA Actual $1,179,390 1 NON - SITE SPECIFIC INSTALLATION OF TRAFFIC SIGNALS ON - SYSTEM
0902-48-453 Tarrant/
Fort Worth
CS Actual $24,298,000 3 RECONSTRUCT FROM 4 LANES TO 4 LANE DIVIDED WITH RAISED
2079-01-043 Tarrant/
Fort Worth
FM 1220 Actual $8,350,775 1 CONSTRUCT LEFT TURN BAYS, 10'SHLDERS, EXTEND CULVERT, REPAIR
2266-02-138 Tarrant/
Fort Worth
SH 360 Actual $2,126,640 1 PAVEMENT REPAIR, MILL AND OVERLAY BRIDGES, DIAMOND GRINDING
0016-01-110 Travis/
Austin
IH 35 Actual $2,011,906 1 MILL, SEAL, & OVERLAY FRTG RDS
0523-02-046 Waller/
Houston
FM 362 Actual $1,069,740 8 INSTALL LED FLASHING CHEVRONS (CURVE)
0004-03-048 Ward/
Odessa
SS 57 Actual $1,972,471 8 TEXTURIZE SHOULDERS
0114-09-073 Washington/
Bryan
US 290 Actual $990,746 8 2016 FEDERAL RAILROAD SIGNAL PROGRAM
0043-09-124 Wichita/
Wichita Falls
US 287 Actual $2,435,988 1 MILL AND INLAY
0249-01-045 Wichita/
Wichita Falls
US 281 Actual $2,947,969 1 OVERLAY
0337-01-038 Williamson/
Austin
SH 29 Actual $2,014,970 1 UNDERSEAL & THIN OVERLAY
0337-02-041 Williamson/
Austin
SH 29 Actual $1,499,000 1 UNDERSEAL & THIN OVERLAY
0463-06-027 Winkler/
Odessa
SH 302 Actual $7,977,008 1 REHABILITATION OF EXISTING ROAD
0313-01-053 Wise/
Fort Worth
FM 51 Actual $2,188,439 8 HMAC OVERLAY - 1.8 MILE SOUTH US 81 TO SH 114


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract