Letting Schedule for November, 2015 (FY 2016)

Last Update: Tuesday, December 6, 2016
November, 2015 (FY 2016) (see Links)
SEP 2015 | OCT 2015 | NOV 2015 | DEC 2015 | JAN 2016 | FEB 2016 | MAR 2016 | APR 2016 | MAY 2016 | JUN 2016 | JUL 2016 | AUG 2016
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0122-04-037 Anderson/
Tyler
US 287 Actual $10,343,180 1 SEAL COAT & PAVEMENT MARKINGS
1721-02-012 Austin/
Yoakum
FM 1094 Actual $3,954,433 8 SAFETY TREAT FIXED OBJECTS WIDEN PAVED SHOULDER
0017-10-272 Bexar/
San Antonio
IH 35 Actual $342,679 8 INSTALL WARNING / GUIDE SIGNS - OVERHEAD ADVANCE FLASHERS &
0188-07-005 Brazoria/
Houston
SH 35 Actual $741,700 1 CONSTRUCT SIDEWALKS (NEW LOCATIONS)
0914-22-064 Caldwell/
Austin
CR Actual $1,385,690 3 GRADING, ASPHALTIC CEMENT PAVEMENT & MARKINGS FOR CR 110
0633-05-018 Camp/
Atlanta
FM 1519 Actual $1,439,953 8 INSTALL LED FLASHING CHEVRONS, TEXTURIZE SHOULDERS &
0546-08-011 Cass/
Atlanta
FM 1399 Actual $1,162,910 8 SAFETY TREAT FIXED OBJECTS
0043-01-079 Childress/
Childress
US 287 Actual $1,893,993 1 INSTALL DMS & UPGRADE TRAFFIC SIGNALS
0047-06-133 Collin/
Dallas
US 75 Actual $37,466,722 3 WIDEN D - C FROM PGBT TO NB US 75 & SB US 75 TO PGBT; EXT DART
0183-04-050 Coryell/
Waco
SH 36 Actual $8,429,991 1 SEAL COAT
0760-01-024 Cottle/
Childress
FM 1038 Actual $863,089 11 REPLACEMENT OF AN EXISTING BRIDGE FACILITY
0925-14-008 Cottle/
Childress
PW Actual $142,752 10 REPLACEMENT OF LOW WATER CROSSING
0918-45-791 Dallas/
Dallas
CS Actual $1,305,085 6 REHAB BRIDGE AND APPROACHES
0918-45-853 Dallas/
Dallas
CS Actual $6,335,394 ROW RECONSTRUCT CITY STREET AND SIGNAL IMPROVEMENTS AT
0718-01-064 Denton/
Dallas
FM 156 Actual $32,541,856 3 WIDEN 2 LANE RURAL TO 4 LANE DIVIDED URBAN CROSS SECTION
0042-08-056 Donley/
Childress
US 287 Actual $5,850,221 1 ASPHALTIC CONCRETE PAVEMENT OVERLAY
2005-02-016 Ector/
Odessa
FM 1882 Actual $10,730,666 1 SEAL COAT
0924-06-482 El Paso/
El Paso
VA Actual $2,056,250 3 SCHOOL ZONE SAFETY
0924-06-515 El Paso/
El Paso
CS Actual $198,843 3 RESLER DRIVE BUFFERED BIKE LANES
0924-06-516 El Paso/
El Paso
CS Actual $664,563 3 INDEPENDENCE DR PEDESTRIAN AND BICYCLE ENHANCEMENTS TO
0924-06-517 El Paso/
El Paso
CS Actual $703,275 3 VISCOUNT BLVD PEDESTRIAN AND BICYCLE ENHANCEMENTS TO INCLUDE
0924-06-518 El Paso/
El Paso
CS Actual $915,945 3 RIVER BEND DR PEDESTRIAN AND BICYCLE ENHANCEMENTS TO INCLUDE
2552-01-054 El Paso/
El Paso
SL 375 Actual $3,200,882 11 IMPROVE PEDESTRIAN CONNECTIVITY AT FMSP
0596-02-037 Ellis/
Dallas
FM 66 Actual $2,694,786 6 REPLACE BRIDGE AND APPROACHES
0205-06-028 Freestone/
Bryan
US 79 Actual $7,487,648 1 REHABILITATION OF EXISTING ROAD CONSISTING OF GRADING,
0051-04-063 Galveston/
Houston
SH 87 Actual $699,482 8 IMPROVE TRAFFIC SIGNALS AT INTERSECTION
0912-71-627 Harris/
Houston
VA Actual $2,119,997 3 CITY OF HOUSTON RCTSS PROGRAM
0912-72-294 Harris/
Houston
VA Actual $1,678,208 8 RECONSTRUCT CONCRETE APPROACHES, DRAINAGE IMPROVEMENTS,
1743-01-009 Harris/
Houston
FM 1876 Actual $1,214,435 1 2" PLANING, SEAL COAT, 1.5" ACP OVERLAY & PAVEMENT MARKINGS
3256-02-089 Harris/
Houston
SL 8 Actual $26,822,716 1 ADD AUXILIARY LANES AND WIDEN BRIDGES
2293-01-027 Hays/
Austin
FM 2439 Actual $274,000 1 RESURFACE ROADWAY
0039-17-180 Hidalgo/
Pharr
IH 2 Actual $46,102,657 6 INTERCHANGE IMPROVEMENTS @ MAIN STREET & BICENTENNIAL
0220-01-023 Hidalgo/
Pharr
US 281 Actual $19,425,546 3 WIDEN TO 4 LANE DIVIDED URBAN WITH OVERPASS AT SH 365
0621-01-100 Hidalgo/
Pharr
SH 336 Actual $1,846,323 1 MEDIANS WITH LANDSCAPING
2966-01-009 Hidalgo/
Pharr
SH 364 Actual $6,848,710 1 WIDEN TO 4 LANE DIVIDED URBAN
0173-06-044 Hunt/
Paris
SH 34 Actual $39,179 10 LANDSCAPE SOUTHWEST CORNER OF SH 276 / SH 34 IN QUINLAN
0087-02-050 Jim Wells/
Corpus Christi
SH 359 Actual $3,670,299 1 DISTRICT WIDE SEAL COAT 2016 PROJECT_LOW CONTROL CSJ
0107-01-036 Jones/
Abilene
SH 6 Actual $5,991,843 1 SEAL COAT
0173-10-001 Kaufman/
Dallas
SH 34 Actual $699,319 3 INSTALL CONTINUOUS ILLUMINATION ON EXISTING HIGHWAY
1397-01-030 Kaufman/
Dallas
FM 1836 Actual $6,141,936 1 REHABILITATION OF EXISTING ROADWAY
0072-06-073 Kendall/
San Antonio
IH 10 Actual $6,910,845 1 SEAL COAT AND PAVEMENT MARKINGS ON FRONTAGE ROADS
0605-01-061 Matagorda/
Yoakum
FM 457 Actual $814,911 1 ADD SHOULDERS
0922-10-029 Maverick/
Laredo
VA Actual $5,752,419 3 UPGRADE INTERNATIONAL BRIDGE II FACILITY
1718-01-033 Midland/
Odessa
FM 1788 Actual $10,991,276 1 RESTORATION
0903-28-043 Montague/
Wichita Falls
CR Actual $1,149,466 6 REPLACE BRIDGE AND APPROACHES
0162-11-001 Navarro/
Dallas
SH 31 Actual 105,980,140 1 CONSTRUCT NEW LOCATION RELIEF ROUTE; ULTIMATE FOUR LANE
0102-15-002 Nueces/
Corpus Christi
SH 44 Actual $1,821,534 1 PLANE, SEAL AND OVERLAY
0373-02-090 Nueces/
Corpus Christi
SH 44 Actual $4,937,119 1 MILL, SEAL & OVERLAY
0373-02-092 Nueces/
Corpus Christi
SH 44 Actual $1,730,818 1 NOVACHIP ROADWAY
0028-11-193 Orange/
Beaumont
IH 10 Actual $13,089,625 4 WIDEN EXISTING MAINLANES FROM 4 TO 6 LANES
0155-05-039 Refugio/
Corpus Christi
US 183 Actual $6,324,507 1 OVERLAY ROADWAY, BASE REPAIR
0034-03-018 Runnels/
San Angelo
US 83 Actual $4,499,947 1 SEAL COAT
0063-06-096 Shelby/
Lufkin
US 96 Actual $2,189,250 1 PLANE EXISTING SURFACE AND OVERLAY
0911-39-062 Shelby/
Lufkin
CS Actual $423,619 8 INSTALL NEW LIGHTS AND GATES
0011-07-047 Stephens/
Brownwood
US 180 Actual $4,046,707 1 BASE OVERLAY, TWO COURSE SURFACE TREATMENT, ADD PASSING LANE
0008-15-049 Tarrant/
Fort Worth
IH 820 Actual $3,652,534 5 INSTALL ITS FIBER, DETECTION, & DMS
0902-48-872 Tarrant/
Fort Worth
VA Actual $3,877,852 1 DFW CONNECTOR COMPREHENSIVE MAINTENANCE AGREEMENT FY16
1068-02-076 Tarrant/
Fort Worth
IH 30 Actual 233,181,888 ROW CONST DIR CONN INTCHG AT SH 360 & TRAFFIC MANAGEMENT SYSTEM
0015-13-379 Travis/
Austin
IH 35 Actual $78,833,227 ROW ADD SHOULDERS, AUXILIARY LNS, RAMP IMPROVEMENTS, PAVEMENT
0152-01-076 Travis/
Austin
US 183 Actual $937,585 1 OVERLAY
2102-01-066 Travis/
Austin
RM 2244 Actual $28,752,815 ROW CONST 4 - LN URBAN RDWY W / CONT LTL
3063-01-011 Victoria/
Yoakum
FM 1432 Actual $2,639,774 1 RESTORE ROADWAY
0186-06-065 Washington/
Bryan
SH 36 Actual $14,327,538 1 WIDEN NON - FREEWAY CONSISTING OF GRADING, STRUCTURES, BASE
0037-09-029 Webb/
Laredo
US 83 Actual $2,956,080 1 RESURFACE OF EXISTING HIGHWAY
0089-06-081 Wharton/
Yoakum
US 59 Actual $18,889,263 1 CONSTRUCT FRONTAGE ROADS


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract