Letting Schedule for November, 2015 (FY 2016)
November, 2015 (FY 2016) | (see Links) |
SEP 2015 | OCT 2015 | NOV 2015 | DEC 2015 | JAN 2016 | FEB 2016 | MAR 2016 | APR 2016 | MAY 2016 | JUN 2016 | JUL 2016 | AUG 2016 | ||||||
CCSJ | County/ District |
Highway | Let Status | Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0122-04-037 | Anderson/ Tyler |
US 287 | Actual | $10,343,180 | 1 | SEAL COAT & PAVEMENT MARKINGS |
1721-02-012 | Austin/ Yoakum |
FM 1094 | Actual | $3,954,433 | 8 | SAFETY TREAT FIXED OBJECTS WIDEN PAVED SHOULDER |
0017-10-272 | Bexar/ San Antonio |
IH 35 | Actual | $342,679 | 8 | INSTALL WARNING / GUIDE SIGNS - OVERHEAD ADVANCE FLASHERS & |
0188-07-005 | Brazoria/ Houston |
SH 35 | Actual | $741,700 | 1 | CONSTRUCT SIDEWALKS (NEW LOCATIONS) |
0914-22-064 | Caldwell/ Austin |
CR | Actual | $1,385,690 | 3 | GRADING, ASPHALTIC CEMENT PAVEMENT & MARKINGS FOR CR 110 |
0633-05-018 | Camp/ Atlanta |
FM 1519 | Actual | $1,439,953 | 8 | INSTALL LED FLASHING CHEVRONS, TEXTURIZE SHOULDERS & |
0546-08-011 | Cass/ Atlanta |
FM 1399 | Actual | $1,162,910 | 8 | SAFETY TREAT FIXED OBJECTS |
0043-01-079 | Childress/ Childress |
US 287 | Actual | $1,893,993 | 1 | INSTALL DMS & UPGRADE TRAFFIC SIGNALS |
0047-06-133 | Collin/ Dallas |
US 75 | Actual | $37,466,722 | 3 | WIDEN D - C FROM PGBT TO NB US 75 & SB US 75 TO PGBT; EXT DART |
0183-04-050 | Coryell/ Waco |
SH 36 | Actual | $8,429,991 | 1 | SEAL COAT |
0760-01-024 | Cottle/ Childress |
FM 1038 | Actual | $863,089 | 11 | REPLACEMENT OF AN EXISTING BRIDGE FACILITY |
0925-14-008 | Cottle/ Childress |
PW | Actual | $142,752 | 10 | REPLACEMENT OF LOW WATER CROSSING |
0918-45-791 | Dallas/ Dallas |
CS | Actual | $1,305,085 | 6 | REHAB BRIDGE AND APPROACHES |
0918-45-853 | Dallas/ Dallas |
CS | Actual | $6,335,394 | ROW | RECONSTRUCT CITY STREET AND SIGNAL IMPROVEMENTS AT |
0718-01-064 | Denton/ Dallas |
FM 156 | Actual | $32,541,856 | 3 | WIDEN 2 LANE RURAL TO 4 LANE DIVIDED URBAN CROSS SECTION |
0042-08-056 | Donley/ Childress |
US 287 | Actual | $5,850,221 | 1 | ASPHALTIC CONCRETE PAVEMENT OVERLAY |
2005-02-016 | Ector/ Odessa |
FM 1882 | Actual | $10,730,666 | 1 | SEAL COAT |
0924-06-482 | El Paso/ El Paso |
VA | Actual | $2,056,250 | 3 | SCHOOL ZONE SAFETY |
0924-06-515 | El Paso/ El Paso |
CS | Actual | $198,843 | 3 | RESLER DRIVE BUFFERED BIKE LANES |
0924-06-516 | El Paso/ El Paso |
CS | Actual | $664,563 | 3 | INDEPENDENCE DR PEDESTRIAN AND BICYCLE ENHANCEMENTS TO |
0924-06-517 | El Paso/ El Paso |
CS | Actual | $703,275 | 3 | VISCOUNT BLVD PEDESTRIAN AND BICYCLE ENHANCEMENTS TO INCLUDE |
0924-06-518 | El Paso/ El Paso |
CS | Actual | $915,945 | 3 | RIVER BEND DR PEDESTRIAN AND BICYCLE ENHANCEMENTS TO INCLUDE |
2552-01-054 | El Paso/ El Paso |
SL 375 | Actual | $3,200,882 | 11 | IMPROVE PEDESTRIAN CONNECTIVITY AT FMSP |
0596-02-037 | Ellis/ Dallas |
FM 66 | Actual | $2,694,786 | 6 | REPLACE BRIDGE AND APPROACHES |
0205-06-028 | Freestone/ Bryan |
US 79 | Actual | $7,487,648 | 1 | REHABILITATION OF EXISTING ROAD CONSISTING OF GRADING, |
0051-04-063 | Galveston/ Houston |
SH 87 | Actual | $699,482 | 8 | IMPROVE TRAFFIC SIGNALS AT INTERSECTION |
0912-71-627 | Harris/ Houston |
VA | Actual | $2,119,997 | 3 | CITY OF HOUSTON RCTSS PROGRAM |
0912-72-294 | Harris/ Houston |
VA | Actual | $1,678,208 | 8 | RECONSTRUCT CONCRETE APPROACHES, DRAINAGE IMPROVEMENTS, |
1743-01-009 | Harris/ Houston |
FM 1876 | Actual | $1,214,435 | 1 | 2" PLANING, SEAL COAT, 1.5" ACP OVERLAY & PAVEMENT MARKINGS |
3256-02-089 | Harris/ Houston |
SL 8 | Actual | $26,822,716 | 1 | ADD AUXILIARY LANES AND WIDEN BRIDGES |
2293-01-027 | Hays/ Austin |
FM 2439 | Actual | $274,000 | 1 | RESURFACE ROADWAY |
0039-17-180 | Hidalgo/ Pharr |
IH 2 | Actual | $46,102,657 | 6 | INTERCHANGE IMPROVEMENTS @ MAIN STREET & BICENTENNIAL |
0220-01-023 | Hidalgo/ Pharr |
US 281 | Actual | $19,425,546 | 3 | WIDEN TO 4 LANE DIVIDED URBAN WITH OVERPASS AT SH 365 |
0621-01-100 | Hidalgo/ Pharr |
SH 336 | Actual | $1,846,323 | 1 | MEDIANS WITH LANDSCAPING |
2966-01-009 | Hidalgo/ Pharr |
SH 364 | Actual | $6,848,710 | 1 | WIDEN TO 4 LANE DIVIDED URBAN |
0173-06-044 | Hunt/ Paris |
SH 34 | Actual | $39,179 | 10 | LANDSCAPE SOUTHWEST CORNER OF SH 276 / SH 34 IN QUINLAN |
0087-02-050 | Jim Wells/ Corpus Christi |
SH 359 | Actual | $3,670,299 | 1 | DISTRICT WIDE SEAL COAT 2016 PROJECT_LOW CONTROL CSJ |
0107-01-036 | Jones/ Abilene |
SH 6 | Actual | $5,991,843 | 1 | SEAL COAT |
0173-10-001 | Kaufman/ Dallas |
SH 34 | Actual | $699,319 | 3 | INSTALL CONTINUOUS ILLUMINATION ON EXISTING HIGHWAY |
1397-01-030 | Kaufman/ Dallas |
FM 1836 | Actual | $6,141,936 | 1 | REHABILITATION OF EXISTING ROADWAY |
0072-06-073 | Kendall/ San Antonio |
IH 10 | Actual | $6,910,845 | 1 | SEAL COAT AND PAVEMENT MARKINGS ON FRONTAGE ROADS |
0605-01-061 | Matagorda/ Yoakum |
FM 457 | Actual | $814,911 | 1 | ADD SHOULDERS |
0922-10-029 | Maverick/ Laredo |
VA | Actual | $5,752,419 | 3 | UPGRADE INTERNATIONAL BRIDGE II FACILITY |
1718-01-033 | Midland/ Odessa |
FM 1788 | Actual | $10,991,276 | 1 | RESTORATION |
0903-28-043 | Montague/ Wichita Falls |
CR | Actual | $1,149,466 | 6 | REPLACE BRIDGE AND APPROACHES |
0162-11-001 | Navarro/ Dallas |
SH 31 | Actual | 105,980,140 | 1 | CONSTRUCT NEW LOCATION RELIEF ROUTE; ULTIMATE FOUR LANE |
0102-15-002 | Nueces/ Corpus Christi |
SH 44 | Actual | $1,821,534 | 1 | PLANE, SEAL AND OVERLAY |
0373-02-090 | Nueces/ Corpus Christi |
SH 44 | Actual | $4,937,119 | 1 | MILL, SEAL & OVERLAY |
0373-02-092 | Nueces/ Corpus Christi |
SH 44 | Actual | $1,730,818 | 1 | NOVACHIP ROADWAY |
0028-11-193 | Orange/ Beaumont |
IH 10 | Actual | $13,089,625 | 4 | WIDEN EXISTING MAINLANES FROM 4 TO 6 LANES |
0155-05-039 | Refugio/ Corpus Christi |
US 183 | Actual | $6,324,507 | 1 | OVERLAY ROADWAY, BASE REPAIR |
0034-03-018 | Runnels/ San Angelo |
US 83 | Actual | $4,499,947 | 1 | SEAL COAT |
0063-06-096 | Shelby/ Lufkin |
US 96 | Actual | $2,189,250 | 1 | PLANE EXISTING SURFACE AND OVERLAY |
0911-39-062 | Shelby/ Lufkin |
CS | Actual | $423,619 | 8 | INSTALL NEW LIGHTS AND GATES |
0011-07-047 | Stephens/ Brownwood |
US 180 | Actual | $4,046,707 | 1 | BASE OVERLAY, TWO COURSE SURFACE TREATMENT, ADD PASSING LANE |
0008-15-049 | Tarrant/ Fort Worth |
IH 820 | Actual | $3,652,534 | 5 | INSTALL ITS FIBER, DETECTION, & DMS |
0902-48-872 | Tarrant/ Fort Worth |
VA | Actual | $3,877,852 | 1 | DFW CONNECTOR COMPREHENSIVE MAINTENANCE AGREEMENT FY16 |
1068-02-076 | Tarrant/ Fort Worth |
IH 30 | Actual | 233,181,888 | ROW | CONST DIR CONN INTCHG AT SH 360 & TRAFFIC MANAGEMENT SYSTEM |
0015-13-379 | Travis/ Austin |
IH 35 | Actual | $78,833,227 | ROW | ADD SHOULDERS, AUXILIARY LNS, RAMP IMPROVEMENTS, PAVEMENT |
0152-01-076 | Travis/ Austin |
US 183 | Actual | $937,585 | 1 | OVERLAY |
2102-01-066 | Travis/ Austin |
RM 2244 | Actual | $28,752,815 | ROW | CONST 4 - LN URBAN RDWY W / CONT LTL |
3063-01-011 | Victoria/ Yoakum |
FM 1432 | Actual | $2,639,774 | 1 | RESTORE ROADWAY |
0186-06-065 | Washington/ Bryan |
SH 36 | Actual | $14,327,538 | 1 | WIDEN NON - FREEWAY CONSISTING OF GRADING, STRUCTURES, BASE |
0037-09-029 | Webb/ Laredo |
US 83 | Actual | $2,956,080 | 1 | RESURFACE OF EXISTING HIGHWAY |
0089-06-081 | Wharton/ Yoakum |
US 59 | Actual | $18,889,263 | 1 | CONSTRUCT FRONTAGE ROADS |
|