Detail Letting Schedule for Howard County (FY 2017)

Last Update: Monday, October 16, 2017
Howard County (FY 2017)

CCSJ: 0005-05-110

District:ABILENELet Date:Mar 2017
Highway:IH 20Let Status:Actual
Project ID:NH 2017(833)CSJ:0005-05-110
Description:SPOT BASE REPAIR, 1-COURSE SURFACE TREATMENT, 2 SMA-DHandling
Code:
 
Limits From:MARTIN COUNTY LINEFund Cat:1
Limits To:NEAR US 87_(EB LANES ONLY)ESTIMATE:$6,407,011
Length:9.5Actual$5,321,335
 
Proposal Request
List Showing Order
Bid Tabulations
Addenda
Bid List
Award Status
Back...
Totals for 0005-05-110
Length:9.5
Estimate:$6,407,011
Actual:$5,321,335

CCSJ: 0005-05-112

District:ABILENELet Date:Jul 2017
Highway:IH 20Let Status:Actual
Project ID:BR 1702(476)CSJ:0005-05-112
Description:INSTALL CRASHWALLSHandling
Code:
 
Limits From:IH 20 AND MOORE FIELD ROADFund Cat:6
Limits To:IH 20 AND MORE FIELD ROADESTIMATE:$6,122,331
Length:1.0Actual$7,767,028
 
List Showing Order
Proposal Request
Bid List
Bid Tabulations
Award Status
Back...
Totals for 0005-05-112
Length:1
Estimate:$6,122,331
Actual:$7,767,028

CCSJ: 0005-06-117

District:ABILENELet Date:Aug 2017
Highway:IH 20Let Status:Actual
Project ID:BR 1702(598)CSJ:0005-06-117
Description:BRIDGE REHABHandling
Code:
 
Limits From:IH 20 WEST BOUND AT UNION PAC RRFund Cat:6
Limits To:IH 20 WEST BOUND AT UNION PAC RRESTIMATE:$444,644
Length:0.1Actual$536,432
 
District:ABILENELet Date:Aug 2017
Highway:IH 20Let Status:Actual
Project ID:BR 1702(598)CSJ:0005-06-118
Description:BRIDGE REHABHandling
Code:
 
Limits From:IH 20 EAST BOUND AT UNION PAC RRFund Cat:6
Limits To:IH 20 EAST BOUND AT UNION PAC RRESTIMATE:$246,724
Length:0.1Actual$324,581
 
District:ABILENELet Date:Aug 2017
Highway:US 87Let Status:Actual
Project ID:BR 1702(598)CSJ:0069-01-058
Description:BRIDGE REHABHandling
Code:
 
Limits From:US 87 AT FM 700Fund Cat:6
Limits To:US 87 AT FM 700ESTIMATE:$446,125
Length:0.0Actual$455,906
 
Proposal Request
List Showing Order
Bid List
Addenda
Bid Tabulations
Award Status
Back...
Totals for 0005-06-117
Length:0.2
Estimate:$1,137,493
Actual:$1,316,919

CCSJ: 0005-06-119

District:ABILENELet Date:Aug 2017
Highway:IH 20Let Status:Actual
Project ID:STP 1702(599)HESCSJ:0005-06-119
Description:INSTALL MEDIAN BARRIERHandling
Code:
 
Limits From:N SCURRY STFund Cat:8
Limits To:MOSS LAKE RDESTIMATE:$1,440,754
Length:6.9Actual$986,495
 
District:ABILENELet Date:Aug 2017
Highway:IH 20Let Status:Actual
Project ID:STP 1702(600)HESCSJ:0007-02-053
Description:INSTALL MEDIAN BARRIERHandling
Code:
 
Limits From:LOCUST STFund Cat:8
Limits To:EASTLAND COUNTY LINEESTIMATE:$957,846
Length:4.8Actual$678,174
 
List Showing Order
Bid List
Proposal Request
Addenda
Bid Tabulations
Award Status
Back...
Totals for 0005-06-119
Length:11.7
Estimate:$2,398,600
Actual:$1,664,669

CCSJ: 0908-12-022

District:ABILENELet Date:Sep 2016
Highway:VALet Status:Actual
Project ID:DMO 1102(493)CSJ:0908-12-022
Description:CONSTRUCT NEW RELIEF ROUTEHandling
Code:
 
Limits From:IH 20Fund Cat:11
Limits To:FM 700ESTIMATE:$68,227,779
Length:8.2Actual$67,744,816
 
Back...
Totals for 0908-12-022
Length:8.2
Estimate:$68,227,779
Actual:$67,744,816

Handling CodeDefinition
XXProject not processed through statewide letting
TRTransfer of funds
LCProject let through local entity
LCProject not charged against district apportionment



Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract