Detail Letting Schedule for Anderson County (FY 2017)
Anderson County (FY 2017) |
CCSJ: 0122-04-038 |
|||
District: | TYLER | Let Date: | Jan 2017 |
Highway: | US 287 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0122-04-038 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FREESTONE C/L SE | Fund Cat: | 1 |
Limits To: | FM 2706 | ESTIMATE: | $1,023,132 |
Length: | 8.7 | Actual | $1,703,791 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0095-07-058 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM857, E | Fund Cat: | 1 |
Limits To: | 1 MI W OF FM1253 (SMITH C/L) | ESTIMATE: | $474,371 |
Length: | 6.2 | Actual | $453,701 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0095-08-019 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | 1 MI W OF FM1253 (SMITH C/L), E | Fund Cat: | 1 |
Limits To: | .5 MI W OF FM1253, (WOOD C/L) | ESTIMATE: | $97,300 |
Length: | 1.3 | Actual | $93,387 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0095-09-038 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | .5 MI W OF FM1253, (WOOD C/L), E | Fund Cat: | 1 |
Limits To: | US69 | ESTIMATE: | $444,348 |
Length: | 5.2 | Actual | $423,378 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | US 80 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0096-01-044 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | US69, E | Fund Cat: | 1 |
Limits To: | 1.25 MI E IF US69 | ESTIMATE: | $106,055 |
Length: | 1.3 | Actual | $101,701 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | US 287 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0109-01-063 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | US84 (W. SPRING ST), SE | Fund Cat: | 1 |
Limits To: | SL256 | ESTIMATE: | $138,023 |
Length: | 1.8 | Actual | $126,872 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | SH 31 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0138-01-096 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM 349, NE | Fund Cat: | 1 |
Limits To: | 1.5 MI S OF IH20 AT RABBIT CREEK | ESTIMATE: | $54,595 |
Length: | 0.8 | Actual | $64,335 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | BU 259G | Let Status: | Actual |
Project ID: | NH 2017(356) | CSJ: | 0138-01-097 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM349/SH31, SW | Fund Cat: | 1 |
Limits To: | SH42/BU259 IN KILGORE | ESTIMATE: | $140,513 |
Length: | 1.8 | Actual | $129,484 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | SH 42 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0138-01-098 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | BU259/SH42, S | Fund Cat: | 1 |
Limits To: | .2 MI N OF SS101 (RUSK C/L) | ESTIMATE: | $85,697 |
Length: | 1.0 | Actual | $78,472 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | NH 2017(356) | CSJ: | 0138-03-145 |
Description: | SEAL COAT AND PAVEMENT MARKINGS-NBL ONLY | Handling Code: | |
Limits From: | FM850, S | Fund Cat: | 1 |
Limits To: | SL571 (NBL ONLY) | ESTIMATE: | $268,328 |
Length: | 6.2 | Actual | $256,419 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 2208 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0138-15-013 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | .5 MI N OF SL 281 (HARRISON C/L),S | Fund Cat: | 1 |
Limits To: | US80 | ESTIMATE: | $187,064 |
Length: | 2.6 | Actual | $177,800 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | BS 31H | Let Status: | Actual |
Project ID: | NH 2017(356) | CSJ: | 0163-04-056 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | .2 MI E OF SL7, E | Fund Cat: | 1 |
Limits To: | AT PINKERTON ST ON BU175 | ESTIMATE: | $237,022 |
Length: | 3.1 | Actual | $217,961 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | NH 2017(356) | CSJ: | 0165-01-104 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | .8 MI OF IH20 (CR353), S | Fund Cat: | 1 |
Limits To: | .5 MI N OF FM2015 | ESTIMATE: | $638,228 |
Length: | 6.6 | Actual | $608,447 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | US 271 | Let Status: | Actual |
Project ID: | NH 2017(356) | CSJ: | 0165-02-063 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | 03 MI S OF IH20, S | Fund Cat: | 1 |
Limits To: | .8 MI S OF IH20 (CR353) | ESTIMATE: | $44,874 |
Length: | 0.6 | Actual | $41,879 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 347 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0191-05-006 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: | |
Limits From: | US 69 IN JACKSONVILLE, S | Fund Cat: | 1 |
Limits To: | US 175 (ALEXANDER ST) | ESTIMATE: | $79,707 |
Length: | 2.4 | Actual | $73,748 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 347 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0198-04-041 |
Description: | SEAL COAT & PAVEMENT MARKINGS - SECTIONS | Handling Code: | |
Limits From: | US 175 (ALEXANDER ST), S | Fund Cat: | 1 |
Limits To: | .2 MI N OF US79 (E. CHEROKEE ST.) | ESTIMATE: | $31,013 |
Length: | 0.6 | Actual | $29,058 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | US 79 | Let Status: | Actual |
Project ID: | NH 2017(356) | CSJ: | 0206-01-051 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | .5 MI NE OF SL256 (PALESTINE CL),SW | Fund Cat: | 1 |
Limits To: | SL256 | ESTIMATE: | $280,325 |
Length: | 4.3 | Actual | $257,609 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | SH 64 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0245-05-049 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | VZ C/L (NECHES RIVER) E | Fund Cat: | 1 |
Limits To: | TOLL49 | ESTIMATE: | $137,108 |
Length: | 2.7 | Actual | $131,261 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | SH 64 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0245-19-028 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM314, E | Fund Cat: | 1 |
Limits To: | SMITH C/L (NECHES RIVER) | ESTIMATE: | $450,240 |
Length: | 7.4 | Actual | $429,551 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | SH 135 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0377-01-049 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | .2 MI S. OF IH20 AT EB RAMP, S | Fund Cat: | 1 |
Limits To: | .5 MI N OF SH31 (END OF GRASS MDN) | ESTIMATE: | $280,838 |
Length: | 2.6 | Actual | $265,689 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 347 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0378-07-031 |
Description: | SEAL COAT & PAVEMENT MARKINGS-SECTIONS | Handling Code: | |
Limits From: | .2 MI N OF US79 (E. CHEROKEE ST) | Fund Cat: | 1 |
Limits To: | SL 456 IN JACKSONVILLE | ESTIMATE: | $114,530 |
Length: | 2.4 | Actual | $105,531 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | NH 2017(356) | CSJ: | 0392-03-048 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | LP281, S | Fund Cat: | 1 |
Limits To: | US80 | ESTIMATE: | $309,111 |
Length: | 2.6 | Actual | $292,182 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | US 259 | Let Status: | Actual |
Project ID: | NH 2017(356) | CSJ: | 0393-01-099 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: | |
Limits From: | US80, S | Fund Cat: | 1 |
Limits To: | IH20 N ENTRANCE RAMP | ESTIMATE: | $392,855 |
Length: | 3.7 | Actual | $373,899 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 2767 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0424-07-014 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM757, E | Fund Cat: | 1 |
Limits To: | 1 MI NW IF SH31 (GREGG C/L) | ESTIMATE: | $255,986 |
Length: | 7.6 | Actual | $244,518 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 2767 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0424-07-015 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | SL323, E | Fund Cat: | 1 |
Limits To: | FM2908 | ESTIMATE: | $256,187 |
Length: | 6.0 | Actual | $244,324 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 2767 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0424-08-004 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | 1 MI NW OF SH31 (SMITH C/L), S | Fund Cat: | 1 |
Limits To: | SH31 | ESTIMATE: | $34,880 |
Length: | 0.9 | Actual | $33,818 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 17 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0443-03-021 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: | |
Limits From: | SH 110,SW | Fund Cat: | 1 |
Limits To: | IH 20 | ESTIMATE: | $375,204 |
Length: | 10.5 | Actual | $357,958 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | SH 315 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0462-01-023 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: | |
Limits From: | US 259 IN MT ENTERPRISE, NE | Fund Cat: | 1 |
Limits To: | .8 MI N OF FM840 (PANOLA C/L) | ESTIMATE: | $463,009 |
Length: | 8.8 | Actual | $441,833 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 346 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0492-04-038 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM756, E | Fund Cat: | 1 |
Limits To: | SH110 | ESTIMATE: | $171,987 |
Length: | 2.5 | Actual | $158,277 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 346 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0492-05-028 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: | |
Limits From: | SH110, ESE | Fund Cat: | 1 |
Limits To: | 2.3 MI SE OF FM 848 | ESTIMATE: | $188,034 |
Length: | 2.6 | Actual | $172,802 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | SH 110 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0505-01-047 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | JUST S OF US80, SE | Fund Cat: | 1 |
Limits To: | FM1255 | ESTIMATE: | $184,251 |
Length: | 5.0 | Actual | $175,838 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | SH 42 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0545-04-049 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | US80, S | Fund Cat: | 1 |
Limits To: | 1MI N OF IH20 (SINCLAIR RD) | ESTIMATE: | $205,148 |
Length: | 5.0 | Actual | $195,961 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | SH 322 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0594-02-027 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM2011 (GREGG C/L), S | Fund Cat: | 1 |
Limits To: | US259 | ESTIMATE: | $699,238 |
Length: | 13.8 | Actual | $667,738 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 47 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0646-01-033 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: | |
Limits From: | 3 MI N OF FM1395 (RAINS C/L), SW | Fund Cat: | 1 |
Limits To: | FM2475 | ESTIMATE: | $179,911 |
Length: | 5.1 | Actual | $172,200 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 515 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0657-03-016 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | .9 MI W OF FM17 (RAINS C/L), E | Fund Cat: | 1 |
Limits To: | SH154 | ESTIMATE: | $187,533 |
Length: | 5.7 | Actual | $183,004 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 607 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0745-03-023 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | SH31, S | Fund Cat: | 1 |
Limits To: | FM317 | ESTIMATE: | $143,004 |
Length: | 5.2 | Actual | $136,660 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 69 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0766-03-006 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM515, S | Fund Cat: | 1 |
Limits To: | FM37 | ESTIMATE: | $209,802 |
Length: | 6.6 | Actual | $200,486 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 69 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0766-05-005 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | .8 MI S OF FM269 (HOPKINS C/L), S | Fund Cat: | 1 |
Limits To: | FM515 | ESTIMATE: | $75,845 |
Length: | 2.5 | Actual | $72,898 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 2868 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0889-03-011 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | SH155, SE | Fund Cat: | 1 |
Limits To: | FM346 | ESTIMATE: | $132,970 |
Length: | 4.1 | Actual | $127,161 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 346 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0889-04-014 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | US69, ENE | Fund Cat: | 1 |
Limits To: | FM 2868 | ESTIMATE: | $93,932 |
Length: | 3.3 | Actual | $87,002 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 321 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0892-01-020 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | .4 MI W OF FM645, NE | Fund Cat: | 1 |
Limits To: | 1.8 MI E OF US287 | ESTIMATE: | $116,443 |
Length: | 3.4 | Actual | $111,568 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 344 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0927-01-027 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM 756 AT WALNUT GROVE, E | Fund Cat: | 1 |
Limits To: | SH 110 | ESTIMATE: | $102,277 |
Length: | 3.6 | Actual | $94,790 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 344 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 0927-01-028 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | .2 MI NE OF US69, E | Fund Cat: | 1 |
Limits To: | FM756 | ESTIMATE: | $123,414 |
Length: | 4.0 | Actual | $114,111 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 850 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 1163-01-023 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | SH31, SE | Fund Cat: | 1 |
Limits To: | .4 MI E OF FM2607 | ESTIMATE: | $276,744 |
Length: | 8.6 | Actual | $264,075 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 1252 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 1389-02-012 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | .1 MI E OF SH135, E | Fund Cat: | 1 |
Limits To: | SH31 | ESTIMATE: | $135,200 |
Length: | 4.0 | Actual | $129,044 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 1795 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 1762-02-007 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | 1.5 MI S OF FM1002 (UPSHUR C/L), SW | Fund Cat: | 1 |
Limits To: | FM14 | ESTIMATE: | $154,617 |
Length: | 5.1 | Actual | $147,952 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | RM 3054 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 2302-02-008 |
Description: | SEAL COAT & PAVEMENT MARKINGS | Handling Code: | |
Limits From: | SH 198 IN LOG CABIN, NE | Fund Cat: | 1 |
Limits To: | RM 2329 | ESTIMATE: | $148,982 |
Length: | 4.2 | Actual | $142,686 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 2010 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 2840-02-005 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | .3 MI SS OF FM279 (VAN ZANDT C/L),S | Fund Cat: | 1 |
Limits To: | FM315 | ESTIMATE: | $102,013 |
Length: | 3.6 | Actual | $97,521 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 3079 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 3155-02-001 |
Description: | SEAL COAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM314, E | Fund Cat: | 1 |
Limits To: | FM315 | ESTIMATE: | $168,779 |
Length: | 5.1 | Actual | $161,106 |
District: | TYLER | Let Date: | Jan 2017 |
Highway: | FM 2972 | Let Status: | Actual |
Project ID: | STP 2017(355) | CSJ: | 3294-01-007 |
Description: | SEALCOAT AND PAVEMENT MARKINGS | Handling Code: | |
Limits From: | FM347, SE | Fund Cat: | 1 |
Limits To: | US69 | ESTIMATE: | $120,775 |
Length: | 3.7 | Actual | $115,579 |
Bid Tabulations Back... | Totals for 0122-04-038 | ||
---|---|---|---|
Length: | 216.4 | ||
Estimate: | $11,321,435 | ||
Actual: | $11,487,064 | ||
CCSJ: 0206-01-049 |
|||
District: | TYLER | Let Date: | Aug 2017 |
Highway: | US 79 | Let Status: | Actual |
Project ID: | BR 1702(753) | CSJ: | 0206-01-049 |
Description: | CLEAN/PAINT STEEL GIRDERS,REPL BR RAIL,CONCRETE DECK OVERLAY | Handling Code: | |
Limits From: | 1.5 MI EAST OF FM 2574 | Fund Cat: | 6 |
Limits To: | STR#100010020601032 OVER UPRR | ESTIMATE: | $1,382,585 |
Length: | 0.7 | Actual | $1,646,254 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0206-01-049 | ||
Length: | 0.7 | ||
Estimate: | $1,382,585 | ||
Actual: | $1,646,254 | ||
CCSJ: 0910-08-067 |
|||
District: | TYLER | Let Date: | Mar 2017 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2015(257) | CSJ: | 0910-08-067 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: | |
Limits From: | CR 2418 AT OTTER CREEK | Fund Cat: | 6 |
Limits To: | STR# AA03-55-001 | ESTIMATE: | $427,790 |
Length: | 0.1 | Actual | $404,866 |
District: | TYLER | Let Date: | Mar 2017 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 1602(009) | CSJ: | 0910-08-074 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: | |
Limits From: | CR 458 AT BEAVER CR, E OF SH 19 | Fund Cat: | 6 |
Limits To: | STR# AA0458102, N OF FM 2330 | ESTIMATE: | $376,768 |
Length: | 0.1 | Actual | $348,809 |
Proposal Request List Showing Order Bid Tabulations Bid List Award Status Back... | Totals for 0910-08-067 | ||
Length: | 0.2 | ||
Estimate: | $804,558 | ||
Actual: | $753,676 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |